About this source
Preserved among the December 1, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1302). The date shown is the verified meeting context, not an independently established creation date for every attachment. Meeting date checked against the agenda/minutes heading and matching source filename.
- Original publication
- 8) Addendum 2
- Date
- December 1, 2015
- Publisher
- Okaloosa County Board of County Commissioners
- Where to find it
- 6
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
Source date and document identity checked for this intake. Machine text has not received independent human proofreading.
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Each reading-text file shows its recorded review status below.
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
8) Addendum 2 — extracted reading text
Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.
Text · 16.1 KB · 6
Download ↓8) Addendum 2 — preserved PDF
Unchanged downloaded original; SHA-256 checked against the capture inventory.
PDF · 233.8 KB · 6
Download ↓
Reading text preview
Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.
8) Addendum 2 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
DATE: April 26, 2015
RFP #: WS 01-15
ADDENDUM NO. 2
TO THE RFQ DOCUMENTS:
Request for Proposals
Arbennie Pritchett WRF Expansion Design-Build Project
Okaloosa County Water and Sewer System
Okaloosa County, Florida
To All Document Holders:
The following modifications, additions, and or deletions are hereby made a part of the Request
for Proposals for the Arbennie Pritchett Water Reclamation Facility Expansion Design-Build
Project, RFP # WS 01-15 as fully and completely as if the same were fully set forth therein:
Procurement Documents – Volume II DCP
Section 3.7.8.1 General
a. Page 3-81, Table Section UV Disinfection, Column heading labeled: DESCRIPTION,
REPLACE “Electromagnetic Flow Meter” WITH “In Channel UltraSonic Flow Meter”.
b. Page 3-81, Table Section UV Disinfection, Column heading labeled:
MANUFACTURER, REPLACE “Foxboro, Rosemount, ABB/Fischer &Porter” WITH
“Accusonic Technologies Model 7510+C8HOMOAC per Submittal No. M-13315-001
of Original Arbennie Pritchett WRF DB Project, or Approved Equal”.
c. Page 3-81, Table Section UV Disinfection, Column heading labeled:
MANUFACTURER, REPLACE the Blank cell of this table WITH “Ozonia North
America UV Aquaray 40 HO VLS System per Submittal No. M-11261-001 of Original
Arbennie Pritchett WRF DB Project, or Approved Equal”.
Section 2.2.1.2 Oxygen Delivery System
a. Page 2-5, Second Main Bullet, DELETE this bullet that begins with “Aeration
equipment shall be …”
Section 1.2.1 Wastewater Treatment Plant Influent Characterization
a. Page 1-2, Table 1-1. The Influent alkalinity is confirmed to be 125 mg/L.
Section 2.2.1.2 Oxygen Delivery System
ADDENDUM NO. 2
Project No. 100557 Revised: 4/26/2015
1
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
a. Page 2-4, Slow –Speed Mechanical Surface Aerators, DELETE the Rows entitled 2,
3, 4, under the Column Heading labeled: DESIGN POINT.
b. Page 2-4, Slow –Speed Mechanical Surface Aerators, Column Heading labeled:
DESIGN POINT, REPLACE “Max.” WITH “Design”.
c. Page 2-4, Slow –Speed Mechanical Surface Aerators, Column Heading labeled:
EVALUATED FACTOR, REPLACE “0.05.” WITH “1.0”.
d. Page 2-4, Slow –Speed Mechanical Surface Aerators, CHANGE “Column Heading
labeled: PLANT AIR FLOW (SCFM)” WITH “Column Heading labeled: PLANT
OXYGEN DEMAND (pounds per day)”.
e. Page 2-4, Slow –Speed Mechanical Surface Aerators, in the Row labeled “A” under
Column Heading labeled: DESIGN POINT, REPLACE “Guaranteed Total Factored
Power Draw (kW) = (1+2+3+4)” WITH “Guaranteed Total Factored Power Draw
(kW)”.
f. Page 2-4, Slow –Speed Mechanical Surface Aerators, in the Row labeled “C” under
Column Heading labeled: DESIGN POINT, REPLACE “$0.10” WITH “$0.08”.
Section 2.2.2.1 Secondary Clarifier Basin
a. Page 2-9, DELETE in its entirety, the first Paragraph that begins with “One clarifier
shall be…” and REPLACE it with ”One clarifier shall be provided equal in size as the
two existing clarifiers. The circular secondary clarifier shall be provided and
constructed of cast-in-place or pre-stressed concrete and a perimeter V-notch weir
and launder shall be provided equal in size and design as the two existing clarifiers.
The new clarifier shall have the capacity to convey a peak hourly flow of no less than
18.75 mgd, based on the assumption that one of three clarifier units is out of service
(two operational) during the p