READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — December 1, 2015 — 8) Addendum 2 — reading text
Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
8) Addendum 2 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
DATE: April 26, 2015
RFP #: WS 01-15
ADDENDUM NO. 2
TO THE RFQ DOCUMENTS:
Request for Proposals
Arbennie Pritchett WRF Expansion Design-Build Project
Okaloosa County Water and Sewer System
Okaloosa County, Florida
To All Document Holders:
The following modifications, additions, and or deletions are hereby made a part of the Request
for Proposals for the Arbennie Pritchett Water Reclamation Facility Expansion Design-Build
Project, RFP # WS 01-15 as fully and completely as if the same were fully set forth therein:
Procurement Documents – Volume II DCP
Section 3.7.8.1 General
a. Page 3-81, Table Section UV Disinfection, Column heading labeled: DESCRIPTION,
REPLACE “Electromagnetic Flow Meter” WITH “In Channel UltraSonic Flow Meter”.
b. Page 3-81, Table Section UV Disinfection, Column heading labeled:
MANUFACTURER, REPLACE “Foxboro, Rosemount, ABB/Fischer &Porter” WITH
“Accusonic Technologies Model 7510+C8HOMOAC per Submittal No. M-13315-001
of Original Arbennie Pritchett WRF DB Project, or Approved Equal”.
c. Page 3-81, Table Section UV Disinfection, Column heading labeled:
MANUFACTURER, REPLACE the Blank cell of this table WITH “Ozonia North
America UV Aquaray 40 HO VLS System per Submittal No. M-11261-001 of Original
Arbennie Pritchett WRF DB Project, or Approved Equal”.
Section 2.2.1.2 Oxygen Delivery System
a. Page 2-5, Second Main Bullet, DELETE this bullet that begins with “Aeration
equipment shall be …”
Section 1.2.1 Wastewater Treatment Plant Influent Characterization
a. Page 1-2, Table 1-1. The Influent alkalinity is confirmed to be 125 mg/L.
Section 2.2.1.2 Oxygen Delivery System
ADDENDUM NO. 2
Project No. 100557 Revised: 4/26/2015
1
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
a. Page 2-4, Slow –Speed Mechanical Surface Aerators, DELETE the Rows entitled 2,
3, 4, under the Column Heading labeled: DESIGN POINT.
b. Page 2-4, Slow –Speed Mechanical Surface Aerators, Column Heading labeled:
DESIGN POINT, REPLACE “Max.” WITH “Design”.
c. Page 2-4, Slow –Speed Mechanical Surface Aerators, Column Heading labeled:
EVALUATED FACTOR, REPLACE “0.05.” WITH “1.0”.
d. Page 2-4, Slow –Speed Mechanical Surface Aerators, CHANGE “Column Heading
labeled: PLANT AIR FLOW (SCFM)” WITH “Column Heading labeled: PLANT
OXYGEN DEMAND (pounds per day)”.
e. Page 2-4, Slow –Speed Mechanical Surface Aerators, in the Row labeled “A” under
Column Heading labeled: DESIGN POINT, REPLACE “Guaranteed Total Factored
Power Draw (kW) = (1+2+3+4)” WITH “Guaranteed Total Factored Power Draw
(kW)”.
f. Page 2-4, Slow –Speed Mechanical Surface Aerators, in the Row labeled “C” under
Column Heading labeled: DESIGN POINT, REPLACE “$0.10” WITH “$0.08”.
Section 2.2.2.1 Secondary Clarifier Basin
a. Page 2-9, DELETE in its entirety, the first Paragraph that begins with “One clarifier
shall be…” and REPLACE it with ”One clarifier shall be provided equal in size as the
two existing clarifiers. The circular secondary clarifier shall be provided and
constructed of cast-in-place or pre-stressed concrete and a perimeter V-notch weir
and launder shall be provided equal in size and design as the two existing clarifiers.
The new clarifier shall have the capacity to convey a peak hourly flow of no less than
18.75 mgd, based on the assumption that one of three clarifier units is out of service
(two operational) during the peak hourly flow of 37.5 mgd”.
Questions and Answers
1. Q: On page 1-7 of the RFP, table 1 list documents to be provided, we are still missing
items listed below.
a. 2011 Capacity Analysis Report APWRF
b. Transmittance Data
c. Site Survey Data
d. APWRF Operating Data
A: The document(s) have been uploaded to the “W-Drive.”
2. Q: What is the official budget for this project? Is it anticipated that all budgeted monies
will be utilized for the base project and alternatives if determined to fall within the
budget?
A: $12 Million Dollars.
ADDENDUM NO. 2
Project No. 100557 Revised: 4/26/2015
2
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
3. Q: Please confirm that the D-B Team is not required to guarantee the hydraulics or
process for the existing plant components, and is only required to affirm the hydraulics
and process for the new components.
A: The D-B Team will be required to guarantee all new equipment and all treatment
processes affected by the expansion.
4. Q: Please provide typical chemical usages for the polymer and sodium hypochlorite, as
well as the existing feed rates. This will assist in determining additional storage
requirements for chemicals.
A: OCWS uses approx. 4,400 gals/month of polymer and 1375 gals/month of bleach,
annual average.
5. Q: Please confirm the opening sizes in the manual screen installed in the upstream UV
channel to prevent algae from fouling the bulbs.
A: one-inch (1”)
6. Q: Please confirm that the design influent TKN number to be utilized for design is 35
mg/l, not 50 mg/l as found in the DCP.
A: Confirmed.
7. Q: Please explain the modifications to the UV channels that were done during
construction of Phase I, particularly as it relates to the top of wall elevations in the
effluent channel.
A: See attached CDM Bulletin No. B-119.0 for description of work performed.
8. Q: Please provide a copy of the Preliminary Design Report (Engineer's Report) that was
submitted to the FDEP for Phase I of the plant.
A: The document(s) have been uploaded to the “W-Drive.”
9. Q: Please provide a copy of the geotechnical report from the original construction in
2007.
A: The document(s) have been uploaded to the “W-Drive.”
Q: Please provide 12 months DMR's for the facility to assist in confirming the biological
process design.
A: The document(s) have been uploaded to the “W-Drive.”
10. Q:What is the total annual electrical energy spent for the WRF and the Unit Rate
$/KwH?
A: The document(s) have been uploaded to the “W-Drive.”
11. Q: What is the annual electrical energy consumption (kWh) for the WRF?
A: The document(s) have been uploaded to the “W-Drive.”
12. Q: How are the aerobic digestion blowers operated (annual run hours for all three
blower)?
ADDENDUM NO. 2
Project No. 100557 Revised: 4/26/2015
3
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
A: Blowers operate on an 8 hr rotation. Each blower runs 2920 hrs/year.
13. Q: How are the oxidation ditch blowers operated (annual run hours for both blowers)?
A: Both blowers run continuously, one for each side.
14. Q: How are the oxidation ditch mixers operated (annual run hours for all six motors)?
A: I’m speculating you mean the surface aerators (SA). SA’s are operated according to
need. During winter months, we may power down to one per ditch. At current we are
running two SA’s in each ox. ditch. There has not been a time when we needed all three
SA’s operating in a single ditch.
15. Q: We noticed a plastic tarp over the WAS pumps during the site visit. Assuming these
units are out of service, please explain the situation and how this might impact our
design considerations.
A: These tarps were part of our freeze protection with heat lamps underneath. They have
since been removed due to season. No units are out of service.
16. Q: The original WRF design-build project required a design TKN of 35 mg/L. The current
DCP for the expansion requires a design TKN of 50 mg/L. Please confirm the correct TKN
requirement.
A: Confirmed, 35 mg/L.
17. Q: The current DCP has no ammonia limit for the expansion project. On the original WRF
project the plant was required to meet an effluent ammonia limit of 2 mg/L. Please confirm
the ammonia limit.
A: Confirmed, 2 mg/L.
18. Q: Manufacturers listed in Table 2-1 of the DCP are inconsistent with later sections,
specifically for mixers (2.2.14) and pumps (3.5.6.1). Please confirm this information.
A: Please see updated DCP that has been uploaded to the “W-Drive”.
19. Q: Table 3-13 of the DCP requires buried non-potable water pipe to be galvanized steel.
Schedule 80 PVC was used on the original project. Please confirm pipe selection.
A: If pipe is buried, schedule 80 PVC will be acceptable. If pipe is above ground,
galvanized steel will be required.
20. Q: Appendix S-3, Structural Material Specifications of the DCP referenced in Section 3.4.9.1
and 3.4.23 of the DCP has not been provided. Please provide.
A: This document has been uploaded to the “W-Drive”.
21. Q: Please note that we believe that there are some inconsistencies with the minimum
instrumentation in Section 3.7.8.1 and earlier sections of the DCP (i.e. level in scum wetwell,
magmeter for UV). Please confirm.
A: Refer to response noted in the above Procurement Documents – Volume II DCP section
of this Addendum pertaining to modifications/deletions/clarifications made to this section.
ADDENDUM NO. 2
Project No. 100557 Revised: 4/26/2015
4
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
22. Section 1.2.5.3.1 of the DCP states that “WAS from OCWS’s satellite WRFs is discharged
into the two existing aerobic digesters.” Please provide information on how much WAS is
coming from the satellite WRFs (flow and percent solids).
A: Please see 2013-2015 WAS volume and %TS table uploaded to the “W Drive”.
23. Q: Section 2.2.1.2 of the DCP requires a minimum dissolved oxygen concentration of 2.0
mg/L at all times in the oxidation ditch. This requirement was removed from DCP on the
original WRF project. Please consider removing it from this project.
A: Refer to response noted in the above Procurement Documents – Volume II DCP section
of this Addendum pertaining to modifications/deletions/clarifications made to this section
24. Q: Table 1-2: Please confirm influent alkalinity is 125 mg/L.
A: Refer to response noted in the above Procurement Documents – Volume II DCP section
of this Addendum pertaining to modifications/deletions/clarifications made to this section
25. Q: Section 2.2.1.1, Bullet 4 - i. 1.5 lb O2/lb BOD5 would be used for an extended aeration
system at SRTs well beyond 8 days. There is published literature relating SRT to this ratio.
Could these be used instead?
A: This information is currently being reviewed
