March 3, 2015

Okaloosa County BOCC — March 3, 2015 — EAST COUNTY PREVIOUS BOARD ACTION

EAST COUNTY PREVIOUS BOARD ACTION in the March 3, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-generated OCR reading text.

FILED WITH

About this source

Preserved among the March 3, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1250). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used January 20, 2015; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
EAST COUNTY PREVIOUS BOARD ACTION
Date
March 3, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
3
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source identity and meeting date checked. OCR text has not received independent human proofreading; consult the scan for names, numbers and uncertain characters.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

EAST COUNTY PREVIOUS BOARD ACTION — extracted reading text

Machine OCR from page images of the unchanged preserved PDF with source page boundaries retained. Not independently human proofread; consult the original scan for uncertain characters.

Text · 5.2 KB · 3

Download ↓

EAST COUNTY PREVIOUS BOARD ACTION — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 1004.6 KB · 3

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

EAST COUNTY PREVIOUS BOARD ACTION — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Request to solicit quotes in lieu of formal bids for the purchase of pipe and associated fitti... Page 1 of 3 Okaloosa County Florida P Action Item ipw”* 1335 VIII.2.a Request to solicit quotes in lieu of formal bids for the purchase of pipe and associated fittings for the East County/Eglin Master Sewer Plan. District: All. Information Department: Water and Sewer Sponsors: Category: Approval Attachments Printout East County Master Sewer Plan_Pagel East County Master Sewer Plan_Page2 Body STATEMENT OF ISSUE: OCWS staff requests BCC approval to authorize the Purchasing Department to solicit quotes by phase in lieu of formal bids for the purchase of pipe and associated materials for the East County/Eglin Master Sewer Plan, at the appropriate time during the procurement process of each phase. BACKGROUND: OCWS has several construction projects scheduled in the East County/Eglin area in the immediate future and the next few years. For the purposes of construction scheduling and material procurement, we have put together a 10-phase plan that encompasses all these projects. All projects are either currently in OCWS' 5-year CIP or are funded by Eglin AFB. The phases/projects are depicted on the attached aerial photos and listed as follows: - Phases 1-4 - Rocky Bayou 16" Force Main - Phase 5 - Eglin Main Base Wastewater (Main Base Lift Station, Plew Lift Station, approximately 3.6 miles of 24" force main, approximately 3.8 miles of 16" force main, and conduit/fiber) - Phase 6 - Replace 10" Force Main at Canal with 16" Force Main - Phase 7 - Replace Meigs-Seminole Lift Station - Phase 8 - Hwy 20 12" Force Main (approximately 1 mile, from Lancaster Drive to Range Road) - Phase 9 - College Blvd Re-Pump Station - Phase 10 - NVOC Force Main (approximately 6.7 miles; 16" preliminary diameter) The above-mentioned projects will achieve 4 primary goals and objectives of the department: I Complete the Eglin Main project by the contract date, which is very aggressive (12/31/2013). http://okaloosacountyfl.igm2.com/Citizens/Detail _LegiFile.aspx?ID=1335&highlightTerm... 2/19/2015 Request to solicit quotes in lieu of formal bids for the purchase of pipe and associated fitti... Page 2 of 3 2. Complete Eglin Main project ASAP, because this project will be revenue producing. 3. Abandon the Post Office Lift Station, Rocky Bayou Lift Station, and the aging 14" force main. 4. Divert all East County flow from NVOC WWTP to the Arbennie Pritchett WRF in order to save significantly on O&M expenses. Construction of Phases 1-4 (Rocky Bayou Force Main) are already substantially complete, and the BCC has already approved quotes in lieu of bids for the piping/appurtenances for the material procurement. The other phases are in surveying, design, or permitting. OCWS and Purchasing staffs have met to discuss procurement strategy for the remaining phases. On the complex items, such as lift stations, we feel that the formal bid process is absolutely necessary. On more straightforward items like pipe and miscellaneous appurtenances, we feel the most economical approach would be to solicit quotes in lieu of bids. Historically, the same vendors will provide pricing whether it is quotes or a formal bid process. Because quotes are a competitive process, OCWS and Purchasing believe the prices will come in under the budgeted amounts. In addition, obtaining quotes instead of bids allows for a quicker, more streamlined process. In many of these projects, time is of the essence, because of the above-mentioned goals and objectives. Therefore, OCWS and Purchasing staff request to solicit quotes in lieu of bids for any piping and miscellaneous appurtenances (valves, manholes, conduit, etc.) for Phases 5-10. We are asking that quotes be solicited at the appropriate time for each project in the next 2-3 years. In addition, for any in-house construction projects over $300,000, we will set up Public Meetings per Florida Statutes to request BCC approval for self pe

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — March 3, 2015 — EAST COUNTY PREVIOUS BOARD ACTION.” March 3, 2015. EAST COUNTY PREVIOUS BOARD ACTION. Crypt of Echoes evidence ID LED-2026-370ad840d0b540439cf81ea1ff89d144. http://127.0.0.1:58097/evidence/LED-2026-370ad840d0b540439cf81ea1ff89d144. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, EAST COUNTY PREVIOUS BOARD ACTION, meeting materials for March 3, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=7646&MeetingID=1250

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓