Okaloosa County BOCC — August 2, 2016 — Change Order No. 1
Change Order No. 1 in the August 2, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-generated OCR reading text.
Preserved among the August 2, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1346). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used ; the meeting date was corrected using the agenda/minutes heading and matching source filename.
Original publication
Change Order No. 1
Date
August 2, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
3
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)
Source identity and meeting date checked. OCR text has not received independent human proofreading; consult the scan for names, numbers and uncertain characters.
HOW FAR THIS HAS BEEN CHECKED
File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Machine OCR from page images of the unchanged preserved PDF with source page boundaries retained. Not independently human proofread; consult the original scan for uncertain characters.
Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.
Change Order No. 1 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
CHANGE ORDER FORM
Date: 06/24/2016 Contract No: C15-2310-AP Change Order No.:_01
Owner: __ OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS
Contractor: Lord & Son Construction, Inc.
Description of this summary change: Increase the amount of time needed to complete the project.
ISA requested changes to incorporate elements from the current Planning Guidelines and Design
Standards (PGDS) Version (V5.0) that was approved by TSA post-award of this construction contract.
In addition, TSA requested alterations to temporary bag screening location and configuration that
varied from the issued construction drawings. This iterative process required multiple levels of TSA
input/approvals. These items interrupted the development of shop drawings and the manufacturing
of the temporary and permanent systems as well as slowed construction work progress. Costs
associated with these changes are covered by existing Allowances within the Contract.
CHANGE TO CONTRACT PRICE
DESCRIPTION AMOUNT
Original Contract Price: $ 3,670,500.00
Net change by previously authorized Change Orders: $0.00
Present Contract Price: $ 3,670,500.00
This Change Order will (add/deduct): $0.00
New Contract Price: $ 3,670,500.00
CHANGE TO CONTRACT TIME
DESCRIPTION DATE or NUMBER OF DAYS
Original Contract Date: October 1, 2015
Original Substantial Completion Date: June 26, 2016
Net change by previously authorized Change Orders: None
This Change Order will (add/deduct): 77 days
Unchanged
New Contract Date:
New Substantial Completion Date: September 11, 2016
APPROVALS (SEE ATTACHED SHEET(S) FOR ADDITIONAL CHANGE ORDER APPROVAL SIGNATURES)
DATE: _ 7- /3/l
o pae_ 7/15/e
/ e ’/Lwedo%,\du) DATE: 7/2'///9
OWNER: DATE:
Grades W Laindes, 3¢, Oncrmarn
This Change Order is an amendment to the Contract / Agreement between Contractor and the
Owner, and all other contract provisions shall remain in full force and effect unless specifically
amended in writing, sighed by both parties.
REQUESTED BY:
PROJECT ENGINEER:
CONTRACTOR:
RECAPITULATION
Job: Airport Baggage Handling System ESTIMATE NO.: 1
Location: VPS Airport SHEET NO.:| 1.00
For: CBRA Area Layout Changes
Engineer: Michael Baker International DATE:|4/4/2016 (Revised 6/9/1
Prepared by: Lord & Son Construction, Inc. CHECKED BY:| RC
RFP # CP-04 CBRA PGDS 5.0 Revisions
DESCRIPTION QUANTITY ~UNIT SUB-CONTRACTS UNIT TOTALESTIMATED UNIT TOTAL ESTIMATED
B PRICE MATERIAL COST PRICE LABOR COST
#
1|tectum panels and furing 1940 sf 13,192
2|Electrical Revisions @ Baggage Inspection Tables 1 Is 800
3|Electrical Revisions @ Computer Network Rack 1 Is 1,680
4|Delete Epoxy Floor 1 Is -19,800
5{Add Dur A Flex Paint Floor 1 Is 16,500
6|walkway mats (630 sf) 1 Is 8,663
7|Exhaust Duct @ CMU wall (2 locations) 1 Is 3,500
Credit Reduced Data Cabling to Network Rack - (Wash
8|with Data to AOC) i Is 0
9|Data Revisions @ BHS Inspection Tables 1 Is -400
10|Credit BSDS (4 deleted) 1 Is -1,250
11|Credit BSDS Data Drops (4 deleted) 1 Is -800
12|Credit Floor Finishes @ Plumbing Line 1 Is -1,338
Additional Sawcut/Concrete Work @ Plumbing Line (70
13[If) (Deleted - can use existing drains) 1 Is 0
14|Added Bollards (31 ea) 1 Is 8,250
15|Delete Jersey Barriers (200 If) 1 Is -5,880
16 |Install Roller Bed Equipment @ Lobby 1 Is 5,528
Revised Power to Lobby vs "As Bid" (Add 480V
17 |Power/Deduct Data) 1 Is 3,860
18|Relocate Power for Temp MCP to Normal Power Panel 1 Is 750
19|Lobby Door Remove/Replace for EDS Machines 1 Is 6,999
20|CBRA HVAC Unit 1 Is 26,176
21|CBRA HVAC Unit Electrical 1 Is 4,323
CBRA HVAC Unit Controls & BAC NET - Owner Decided
22|to use built in controls/Tstat ($11,550) 1 Is 0
Drain Line Work Deletion - Use Existing Drains (sawcut,
concretework, sheetrock, ceiling tile work, plumbing &
23|balance of associated floor finishes) 1 Is -8,041
Replace Existing Conveyor TC02-04 - Damaged beyond
24 |repair due to missalignment of belt 1 Is 9,711
72,423 0 0
| Tax: 6% 0
Labor Burden: 40% 0
Total Subcontracts: 72,423
Total Materials: 0
Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.
Citation & reuse
Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — August 2, 2016 — Change Order No. 1.” August 2, 2016. Change Order No. 1. Crypt of Echoes evidence ID LED-2026-e04a7d420db64eebb7fdc7206f0178e3. http://127.0.0.1:58097/evidence/LED-2026-e04a7d420db64eebb7fdc7206f0178e3. Accessed [date].
Catalogue citation: Okaloosa County Board of County Commissioners, Change Order No. 1, meeting materials for August 2, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=11981&MeetingID=1346
Preserved county public-record source. Third-party attachments may retain their original rights.