August 4, 2015

Okaloosa County BOCC — August 4, 2015 — Engineers Cost Estimate

Engineers Cost Estimate in the August 4, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-generated OCR reading text.

FILED WITH

About this source

Preserved among the August 4, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1275). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used July 7, 2015; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Engineers Cost Estimate
Date
August 4, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
1
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source identity and meeting date checked. OCR text has not received independent human proofreading; consult the scan for names, numbers and uncertain characters.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Engineers Cost Estimate — extracted reading text

Machine OCR from page images of the unchanged preserved PDF with source page boundaries retained. Not independently human proofread; consult the original scan for uncertain characters.

Text · 587 bytes · 1

Download ↓

Engineers Cost Estimate — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 124.6 KB · 1

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Engineers Cost Estimate — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Engineer's Estimated Value of Constructed Improvements for Stillwell Blvd Turn Lane Prepared: 6/30/2015 CEFCO Crestview Based on Plans Dated: 11/24/2014 DESCRIPTION UNIT QTY REMAINING UNIT PRICE AMOUNT 2.0" Layer of Asphalt SY 419 $15.00 $6,285.00 6" Graded Aggregate Base Sy 419 $22.00 $9,218.00 12" Compacted Subbase Sy 419 $4.00 $1,676.00 12" Flat Curb LF 45 $17.00 $765.00 Signage & Striping EA 1 $1,000.00 $1,000.00 Swale Stabilization (Sod) Sy 100 $2.50 $250.00 ESTIMATED COST TO COMPLETE TOTAL = I $19,194.00 | 20% ESTIMATED COST TO COMPLETE TOTAL = | $3,838.80 ] Page 1 of 1

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — August 4, 2015 — Engineers Cost Estimate.” August 4, 2015. Engineers Cost Estimate. Crypt of Echoes evidence ID LED-2026-cb788f51cb7e481493443aafa19035b1. http://127.0.0.1:58097/evidence/LED-2026-cb788f51cb7e481493443aafa19035b1. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Engineers Cost Estimate, meeting materials for August 4, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=8992&MeetingID=1275

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓