January 20, 2015

Okaloosa County BOCC — January 20, 2015 — Camp Rudder Wastewater - Eglin Easement — agenda request

Camp Rudder Wastewater - Eglin Easement — agenda request in the January 20, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the January 20, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1247). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used December 2, 2014; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
January 20, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Camp Rudder Wastewater - Eglin Easement — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 2.5 KB · 2

Download ↓

Camp Rudder Wastewater - Eglin Easement — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 278.9 KB · 2

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Camp Rudder Wastewater - Eglin Easement — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: January 20, 2015 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Camp Rudder Wastewater - Eglin Easement DEPARTMENT: Water and Sewer BCC DISTRICT: 3 STATEMENT OF ISSUE: Staff requests the Board of County Commissioners execute a utility easement between Okaloosa County Water & Sewer (OCWS) and Eglin Air Force Base for the Camp Rudder Wastewater Project. BACKGROUND: In September 2011, Okaloosa County went under contract (FA2823-11-C- 0030; County Contract No. C11-1906-WS) with the U.S. Air Force for the construction of the Duke Field wastewater infrastructure. The contract was modified in August 2012 to add the following: Capacity Expansion Charges for Duke Field, construction costs for Main Base wastewater infrastructure, Capacity Expansion Charges for Main Base, construction costs for Camp Rudder wastewater infrastructure, and Capacity Expansion Charges for Camp Rudder. The total contract is now $16,699,568; of that, $8,026,192 is reimbursement of design and construction costs, and $8,673,376 is for Capacity Expansion Charges. For Duke Field and Main Base, construction is completed and wastewater is flowing to the County's Arbennie Pritchett Water Reclamation Facility (APWRF). For Camp Rudder, the infrastructure project will consist of the construction of a new duplex pump station, approximately 45,000 LF of 8" force main (including 10" bores where necessary), and fiber optic communication conduit. OCWS will be self-performing the construction of the project using staff and equipment. Approval by the BCC to self-perform the project was granted at the Public Meeting on 9/18/2012. Because the project is located on Eglin AFB property, a utility easement is required from Eglin Air Force for the County to own, operate, and maintain the above-mentioned infrastructure. The easement is at no cost to Okaloosa County. The easement documents are attached, along with an aerial photo depicting the location of the easement. County Contract Review has been completed on the attached Grant of Easement, and the coordination sheet is attached. OPTIONS: Approve or deny. RECOMMENDATIONS: Staff recommends BCC approval for the Chairman to execute the Air Force’s “Grant of Easement” for the Camp Rudder Wastewater Project. RECOMMENDED BY: APPROVED BY: John Hofstad, County Administrator

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — January 20, 2015 — Camp Rudder Wastewater - Eglin Easement — agenda request.” January 20, 2015. Action Item Printout. Crypt of Echoes evidence ID LED-2026-a24a821d32544c11989b50765236ca33. http://127.0.0.1:58097/evidence/LED-2026-a24a821d32544c11989b50765236ca33. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Camp Rudder Wastewater - Eglin Easement — agenda request, meeting materials for January 20, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=12305&MeetingID=1247

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓