March 17, 2015

Okaloosa County BOCC — March 17, 2015 — Utility Work By Highway Contractor Agreement With The Flordia — agenda request

Utility Work By Highway Contractor Agreement With The Flordia — agenda request in the March 17, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the March 17, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1251). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used Feb 18, 2014; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
March 17, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Utility Work By Highway Contractor Agreement With The Flordia — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 4.0 KB · 2

Download ↓

Utility Work By Highway Contractor Agreement With The Flordia — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 288.4 KB · 2

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Utility Work By Highway Contractor Agreement With The Flordia — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: March 17, 2015 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Utility Work By Highway Contractor Agreement With The Flordia Department of Transportation DEPARTMENT: Water and Sewer BCC DISTRICT: All STATEMENT OF ISSUE: Staff requests the Board of County Commissioners (BCC) to approve and authorize the Chairman to execute two Utility Work by Contractor Agreements. The agreements are attached for your consideration, along with the County Contract Review Coordination Sheets. BACKGROUND: FDOT has three separate projects under construction on Highway 123. Okaloosa County Water and Sewer (OCWS) has a 30 inch water main running along the entire length of Highway 123. This is a critical transmission water main that brings water from our Mid County area to our Garniers and West County service areas. The water main is the main source of water for our West County service area and the only source of fire protection for the Okaloosa Regional Airport. The water main must remain in service at all times for those reasons. Two of the three FDOT projects have planned storm pipes crossing our water main at various locations. Some of the planned crossings are deep under our water main. Trenching the storm pipe crossings at the planned depths would pose a significant risk to our water main. Excavating a trench across the water main alignment would require the live water main to remain suspended over a large open pit during the storm pipe installation. This creates a dangerous situation where the live water main is likely to move at the joints (deflection). If the joints move to much, it could result in a catastrophic failure of the water main. If a failure occurs with a full pipe flow, as much as 2 million gallons of water could be discharged. That's enough water to completely devastate the surrounding area which would possibly include the existing road. Injury and loss of life are possible during an event of this scale. Fire protection for the Okaloosa Regional Airport would be compromised. OCWS coordinated with FDOT to find an alternate method for their contractor to safely cross the water main. OCWS proposed that FDOT's contractor use jack and bores for the deep storm pipe crossings. The use of jack and bores would allow a steel casing to be pushed under the water main, eliminating the need to excavate near the water main. This would dramatically reduce the risk associated with the deep storm pipe crossings. A safer alternative was not found and FDOT agreed that this was the safest method. The jack and bores will cost more to install than the planned installation by trenching. FDOT has not budgeted for the protection of our water main using jack and bores. FDOT asked if OCWS would participate in the cost. OCWS agrees that the purpose of the jack and bores would be for the protection of our water main and the additional cost was due to our request for a safer method to be used for the deep storm pipe crossings. One Utility Work by Contractor Agreement is for one 36 inch diameter jack and bore on FDOT project number 411102-4-56-01 on Highway 123. The project location is at the northern end of Highway 123 near the new flyover construction. The cost for this jack and bore is $63,597.74. The second Utility Work by Contractor Agreement is for two 36 inch diameter jack and bores on FDOT project number 411102-03-56-01, located between Toms Creek and Turkey Creek on Highway 123. The cost for these two jack and bores is $54,573.00. The total cost for both agreements is $118,170.74. Funds are available for this agreement in our approved FY2015 Capital Improvement Plan (CIP). OPTIONS: Approve or deny. RECOMMENDATIONS: OCWS staff recommends BCC approval and authorization for the Chairman to execute the two Utility Work by Contractor Agreements with FDOT.

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — March 17, 2015 — Utility Work By Highway Contractor Agreement With The Flordia — agenda request.” March 17, 2015. Action Item Printout. Crypt of Echoes evidence ID LED-2026-82265c9efb2e47a280d3ee75120c4278. http://127.0.0.1:58097/evidence/LED-2026-82265c9efb2e47a280d3ee75120c4278. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Utility Work By Highway Contractor Agreement With The Flordia — agenda request, meeting materials for March 17, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=13116&MeetingID=1251

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓