READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 30, 2015 — I. e. Colleen Marine contract — reading text
Part 19 of 19. These parts divide the reading text for browsing; they are not the source document's page numbers.
I. e. Colleen Marine contract — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Ton (2,000 pounds)
10.3 PAYMENT PROCEDURES
A. Monthly Progress Payment
Monthly progress payments shall be based on the weight of artificial reef material placed in accordance
with the Contract Documents and verified by the Contractor and Owner. The Contractor will be eligible
for initial progress payment after the first load of material (minimum 400 tons) has been placed within the
proposed reef site(s) and accepted by the Owner and Engineer. The Contractor shall submit to the
Owner and Engineer for review, not more often than monthly, an Application for Progress Payment filled
out and signed by the Contractor. The Application shall describe the Work completed and be
accompanied by verified quantity measurements, the placement verification report, and additional
supporting documentation as is required by the Contract Documents and also as may reasonably be
required by the Owner and Engineer. The Post-deployment Verification Report shall verify that all
material transported offshore was accurately placed within the designated artificial reef construction
site(s) at the specified deployment depth (relief of the reef) and final depth (clearance above the reef).
The Contractor will be required to submit a certified placement report indicating the exact latitude and
longitude coordinates of the artificial reef construction site(s), accurate within 5 meters horizontal, and
the reef height and water depth, verified utilizing a fathometer or depth sounder accurate to within 1 foot.
The placement report shall also include information on the condition of the material at the time of
deployment and shall include a statement verifying all material transported offshore was deployed within
the proposed artificial reef site(s). The Contractor shall also include representative photographs of the
material on the offshore conveyance prior to deployment and, if available, pictures and/or video of the
material on the bottom. The Contractor shall attach to the report an as-built drawing that contains the
approximate deployment configurations and the height of the material after placement. The report and
drawings shall be limited to a few pages per deployment.
B. Options and Modification CLINS
When additional work is added by modification, existing CLINs funding amounts must be updated, or
new CLINs for modification will be created. If contract has option CLINs not yet awarded, option CLINs
will appear as zero dollar CLINs until option is awarded by modification. No payment may be requested
for Options or Modification CLINs until contract modification has been funded and signed.
C. Final Payment
Upon written notice from Contractor that the Work is complete, the Owner and Engineer will observe the
Work within five (5) days of the receipt of the written notice from the Contractor and, if required, will
notify the Contractor in writing of all particulars in which the final inspection reveals that the Work is
incomplete or defective. The Contractor shall immediately take such measures as are necessary to
remedy such deficiencies.
After the Contractor has completed all such corrections to the satisfaction of the Owner and Engineer
and provided any required quality control reports, post-construction verification reports, data requested
Page 35 of 37
by the Engineer, guarantees, bonds, certificates of inspection, as-built or record documents, and all
other documents as required by the Contract Documents or Owner, and after the Engineer has indicated
that the Work is acceptable to the Owner, the Contractor may make application for final payment. The
final Application for Payment shall be accompanied by all documentation called for in the Contract
Documents and other data and schedules as the Owner may reasonably require, together with complete
and legally effective releases or waivers (satisfactory to Owner) of all Liens arising out of, or filed in
connection with, the Work.
Following receipt of the final Application for Payment as described above, the Engineer will review the
submitted information and, if acceptable, submit to the Owner a recommendation for payment within
seven days after receipt of the final Application for Payment. If the Engineer is not satisfied that the work
is completed, the Engineer will return the application to the Contractor, indicating in writing the reasons
for refusing to recommend final payment, in which case the Contractor shall make the necessary
corrections and resubmit the application.
-- End of Section --
Page 36 of 37
THIS PAGE INTENTIONALLY LEFT BLANK
Page 37 of 37