Okaloosa County BOCC — July 30, 2015 — I. e. Colleen Marine contract — reading text
Part 14 of 19. These parts divide the reading text for browsing; they are not the source document's page numbers.
I. e. Colleen Marine contract — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
damage resulting from the Contractor’s operations at no cost to the
Owner or Engineer.
4.14 PRESERVATION AND RESTORATION OF LANDSCAPE AND MARINE RESOURCE DAMAGES
The Contractor will restore all upland landscape features and marine resources (seagrass, reefs, etc.)
damaged or destroyed during construction operations within and outside the limits of the approved work
areas. The Contractor shall repair any damage resulting from the Contractor’s operations at no cost to
the Owner or Engineer.
Page 17 of 37
PART 5 - QUALITY ASSURANCE AND QUALITY CONTROL
5.1 GENERAL
The Contractor shall be solely responsible for assuring the quality of all work conducted by the
Contractor or its subcontractors in association with the contract for this project. The Contractor will
establish and maintain an effective quality control system in compliance with the Contract Documents
and General Conditions. The quality control system will consist of plans, procedures, and organization
necessary to produce an end product which complies with the contract requirements. The system will
cover all construction operations, both onsite and offsite, and will be keyed to the proposed construction
sequence. The Contractor shall designate a Quality Assurance (QA) Officer for this contract to assume
responsibility for compliance with all requirements of this contract including permit conditions,
easements, statutes, laws and applicable regulations. The QA officer will be held responsible for the
quality of work on the job and is subject to removal by the Owner or Engineer for non-compliance with
quality requirements specified in the Contract and Specifications. The QA Officer in this context will
mean the individual with the responsibility for the overall management of the project including quality
and production.
5.2 QUALITY CONTROL PLAN
The Contractor shall prepare a Quality Control Plan specifying quality control procedures for all critical
components of the work. Within ten (10) calendar days of the Notice of Award, the Contractor will submit
the Contractor Quality Control (CQC) Plan for review and acceptance by the Owner and Engineer. The
Owner and Engineer will consider an interim plan for the first ten (10) days of operation. However, the
Contractor will furnish, not later than twenty (20) calendar days after receipt of the Notice to Proceed, an
acceptable final CQC Plan with which he proposes to implement the requirements of the applicable
articles of the General Conditions.
The Contractor shall provide the Owner access to all QC procedures, data, and reports at any time at
the request of the Owner. All costs related to activities associated with QA/QC shall be borne by the
Contractor. The Contractor shall revise the CQC Plan at the discretion of the Owner and Engineer.
Owner and Engineer approval of the CQC Plan shall be a required prerequisite to the start of
construction.
The CQC Plan shall include but not be limited to the following:
A. Letter of Appointment designating a QA Officer(s), describing responsibilities, providing qualifications
and delineating the line of authority and organizational reporting requirements of the QA Officer.
B. Personnel Training: Personnel responsible for initial training and dissemination of updated information
throughout the term of the contract shall be specified as well as a comprehensive list of training issues
covered. Training shall include review of all applicable Technical Specifications; permit conditions;
licenses, easements, statutes, laws, and other regulations; environmental resource protection; methods
of detecting and avoiding pollution; and statutory and contractual pollution standards. QA/QC and
supervisory personnel shall be thoroughly trained in the proper use of pollution monitoring devices and
abatement equipment and shall be thoroughly knowledgeable of applicable Federal, State, and local
laws, regulations, permits, easements and other applicable requirements.
C. Quality Control Methods: Methods shall include those requirements specified for environmental
protection, equipment, verification of the barge position, and any other methods the Contractor proposes
Page 18 of 37
to assure the quality of their work. These methods shall also be used for any and all work that will be
performed by subcontractor(s).
D. Reporting: Reporting requirements shall be specified in the CQC Plan. The Contractor is required to
prepare and submit to the Owner and Engineer the Daily CQC Report. The daily reports shall include all
work activity, weather and sea conditions, personnel, on-site materials and equipment list, and/or barge
surveys for all barge loads from the first day of mobilization through the last day of work, including site
restoration. Reports in electronic format shall be provided to the Owner or Engineer daily and signed
hardcopies of the daily reports shall be submitted weekly. Each report shall describe each day’s work
and include a narrative describing the length and nature of any delays in work. The Contractor shall
include in the CQC Plan a sample daily report for Engineer review and approval. The daily report shall
include, at a minimum:
1. Project name
2. Contractor’s name and contact information
3. Date of report
4. Weather conditions
5. Work performed
6. On-site materials and equipment
7. Quantity of materials loaded, transported, deployed, etc. (including barge displacement
measurements and calculations)
8. Problems/delays/issues
9. Environmental compliance/Species sightings/Environmental issues (indicating whether all
operations remain within compliance, species, sightings, etc.)
10. Instructions given/received
11. Deviations from the Drawings and/or Specifications
12. Certification statement by the Contractor with the Contractor’s signature verifying the reported
information
E. QA Inspections: All compliance inspections conducted by the Contractor, Owner or the Engineer shall
be individually recorded on the daily CQC Report. The inspector shall also record the recommended
corrective action to be taken and shall conduct a follow-up inspection within 24 hours to ensure
compliance with the corrective action.
F. QA/QC Deficiencies: The Contractor is responsible for implementing any corrective actions
recommended by the Quality Assurance Officer, Owner or Engineer. Reported deficiencies shall require
follow-up inspection within 24 hours by the Contractor and/or the Owner. Recurring deficiencies in an
item or items may indicate inadequacies in the CQC Plan, and the Contractor may be required to revise
the CQC Plan as directed by the Owner/Engineer and advise appropriate personnel of any modifications
required.
5.3 FAILURE TO SUBMIT ACCEPTABLE CQC PLAN
If the Contractor fails to submit an acceptable CQC Plan within twenty (20) days calendar days of the
Notice of Award, construction WILL NOT start unless an acceptable interim plan is submitted. If an
Page 19 of 37
acceptable final plan is not submitted within a reasonable time, as determined by the Owner or
Engineer, the Contractor may be ordered to stop work until such time as an acceptable plan has been
submitted. Any such stop work order will not be considered a suspension of work for an unreasonable
period of time under the Contract and the General Conditions, and the Contractor will not be entitled to
pay adjustments as a result of the stop work order. Failure to comply with the above requirements within
the time prescribed will be considered a condition endangering the performance of the contract and may
be considered ground for termination of the contract in accordance with the Contract and General
Conditions.
5.4 COORDINATION MEETING
After award of the contract, but before physical work starts and before the acceptance by the Owner and
Engineer of the CQC Plan, the Contractor will meet with the Owner and Engineer to discuss the
Contractor’s quality control system and general construction operations. Meeting topics shall include
review of the daily CQC Report and administration of the system for both onsite and offsite work. There
may also be occasions when subsequent conferences will be called by either party to reconfirm mutual
understandings and/or address deficiencies in the CQC system or procedures which may require
corrective action by the Contractor.
5.5 NOTIFICATION OF NONCOMPLIANCE
The Owner or Engineer will notify the Contractor of any detected noncompliance with the foregoing
requirements. The Contractor will take immediate corrective action after receipt of such notice. Such
notices may be delivered to the Contractor at the work site or sent electronically and will be deemed
sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Owner
or Engineer may issue an order stopping all or part of the work until satisfactory corrective action has
been taken. No part of the time lost due to such stop orders will be made the subject of claim for
extension of time or for excess costs or damages by the Contractor.
Page 20 of 37
PART 6 - SAFETY AND CONFLICTS
6.1 GENERAL
A. The contractor shall at all times protect the safety of the general public and all personnel within and
immediately adjacent to all active construction areas, including material stockpile, loading, staging, and
access areas and haul routes. The contractor shall notify the Owner and Engineer immediately of any
concerns or issues relating to potential safety conflicts between work activities and the general public
and immediately following any accidents.
6.2 SAFETY PLAN
A. The Contractor shall specify all safety and inspection procedures and designate personnel responsible
for supervising accident prevention activities and ensuring compliance with safety measures. The
Contractor shall provide a Safety Plan which shall include but not be limited to the following:
1. Letter of Appointment: Designating a Safety Officer(s), describing responsibilities, providing
qualifications and delineating the line of authority and organizational reporting requirements of the
Safety Officer.
2. OSHA Standards: The Contractor shall review the latest U.S. Army Corps of Engineers Manual,
General Safety Requirements EM 385-1-1, and the latest Occupational Safety and Hazard
Agency (OSHA) standards, become fully knowledgeable of the personal protective equipment
that must be provided workers, be familiar with the safety standards applicable to the prevention
of accidents during the construction of this project, and comply with all applicable provisions.
3. Medical Emergencies Plan: The criteria for designating a medical emergency and the procedures
to be followed shall be specified by the Contractor. These procedures shall include local
information relative to