Drawings. Temporary movement or
relocation of the Contractor facilities will be made only upon approval by the Owner.
2. Prior to any construction, the Contractor will mark the areas that are not required to accomplish
all work to be performed under this contract. Isolated areas within the general work area that are
to be saved and/or protected will also be marked or fenced. Markers must be clearly visible
during all construction times and operations. The Contractor will convey to his personnel the
purpose of marking and/or protection of all necessary objects.
C. Disposal of Wastes
Solid wastes (excluding clearing debris) shall be placed in containers that are emptied on a regular
schedule. All handling and disposal shall be conducted to prevent contamination. The Contractor shall
transport all solid waste off the properties within the project limits and dispose of it in compliance with
federal, state, and local requirements for solid waste disposal. Discarded materials other than those that
can be handled in the solid waste category will be handled as directed by the Owner.
D. Dispensing of Fuel
The Contractor shall take all responsible precautions to prevent fuel spills or contamination of the
ground with fuel. Fuel dispensers shall have a 4-foot square, 16-gauge metal pan with borders banded
up and welded at corners right below the bibb. Edges of the pans shall be 8-inch minimum in depth to
ascertain that no contamination of the ground takes place. Pans shall be cleaned by an approved
method immediately after every dispensing of fuel and wastes disposed of offsite in an approved area.
Should any fuel spills occur, the Contractor shall immediately notify the Owner, Engineer, property
owner, and any other required parties and immediately remove the contaminated ground and dispose of
it offsite at an approved facility.
E. Disposal of Chemical Wastes
Chemical waste shall be stored in corrosion resistant containers, removed from the work area and
disposed of in accordance with Federal, State, and local regulations.
Page 14 of 37
F. Disposal of Discarded Materials
Discarded materials other than those that can be included in the solid waste category shall be handled
as directed by the Owner or Engineer.
4.9 PROTECTION OF WATER RESOURCES
A. General
The Contractor shall keep construction activities under surveillance, management, and control to avoid
pollution of surface and ground waters. The Contractor shall conduct his operations in a manner to
minimize run-off and erosion, and shall conform to all water quality standards as prescribed by Chapter
63-302 of the Florida Administrative Code. Special management techniques as set out below shall be
implemented to control water pollution by the listed construction activities that are included in this
contract.
B. Marine and Estuarine Resources
The Contractor shall avoid impacts to any protected species and marine resources such as existing
artificial and natural reefs, seagrasses, and marsh habitat within Choctawhatchee Bay, the Gulf of
Mexico and connected waterbodies. Construction shall be limited to daylight hours only. Care shall be
taken to avoid impacts to reefs, oysters, seagrasses, marsh, and any other resources or habitat in
shallow marine or estuarine waters. All personnel should be advised there are civil and criminal
penalties for damaging natural resources.
C. Navigation
The Contractor’s equipment shall remain within navigable water depths to avoid equipment groundings
or impacts to submerged aquatic resources. The Contractor shall maintain current navigational charts of
all work and transport areas at all times aboard the deployment and support vessels. The Contractor
shall not obstruct navigation channels during material loading, transport or deployment operations. All
vessels shall operate at minimum speeds necessary to maintain steerage while operating in shallow
waters or channels where the draft of the vessel provides less than 3 feet clearance from the bottom.
The Contractor shall immediately stop work and notify the Owner, Engineer, and Florida Fish & Wildlife
Conservation Commission of any collision with or injury to submerged natural resources (e.g., reefs,
seagrasses, etc.) or protected species (e.g., manatees, turtles, etc.).
D. Washing and Curing Water
Wastewaters directly derived from construction activities shall not be allowed to enter open surface
waters or waters of the State. Any wastewater generated shall be collected or controlled through
retention ponds or other environmental controls where suspended materials can settle out or the water
evaporation can separate pollutants from the water.
E. Oil Spill Prevention
1. The Contractor shall prevent oil, fuel, or other hazardous substances from entering the ground,
drainage system, or local bodies of water. Containment, diversionary structures, or equipment
shall be implemented by the Contractor to prevent discharged oil from reaching a watercourse.
Should a spill occur, the Contractor shall take immediate action to contain and clean up any spill
of oily substances, petroleum products, or hazardous substances and immediately report such
Page 15 of 37
spills to the Owner and Engineer. The Contractor shall supply oil spill containment materials such
as oil booms and absorbent materials at each site and offshore conveyance where the potential
for an oil spill may exist.
2. Section 13 of the River and Harbor Act of 1899 prohibits any pumping or discharging of bilge
water containing oil or any other pollutants into navigable waters or into areas which would permit
the flow of oil or other pollutants into such waters. Violation of this prohibition is subject to
penalties provided under the referenced Act.
3. Liabilities: The Contractor shall be liable for the damage caused by oil or fuel spills when it can be
shown that materials were discharged as a result of willful negligence or willful misconduct. The
penalty for failure to report the discharge of oil shall be in accordance with state and federal laws.
F. Turbidity
The Contractor shall use whatever special equipment or methodology necessary to load the reef
materials on the offshore conveyance and place the materials at the proposed artificial reef site(s)
in a manner to avoid picking up quantities of sand or soil that might cause turbidity violations. The
Contractor shall ensure that all employees involved in loading and placing material in the water
understand the causes of turbidity and need to avoid water quality violations.
Contractor shall conduct his disposal operations in accordance with FDEP permits requiring that
all artificial reef construction shall commence in a manner to minimize turbidity and shall conform
to all water quality standards as prescribed by Chapter 62-302, Florida Administrative Code and
as required by approved permits. If the Contractor violates any condition of any Permit or work is
stopped by any public entity, any additional costs incurred by the Contractor, including any fines,
shall be paid by the Contractor at no additional cost to the Owner.
4.10 PROTECTION OF AIR RESOURCES
A. General
The Contractor shall continuously monitor and manage all construction activities to comply with the
following requirements for environmental pollution prevention.
B. Noise
The Contractor shall make all possible efforts to minimize noise pollution. The Contractor will keep
construction activities under surveillance and control to minimize damage to the environment by noise
and to comply with all federal, state, and local noise ordinances. All equipment shall be equipped with
satisfactory mufflers or other noise abatement devices. The use of horns, bells or the use of whistle
signals shall be held to a minimum necessary in order to ensure as safe and as quiet an operation as
possible.
C. Air Pollution
The Contractor will keep construction activities under surveillance, management, and control to minimize
pollution of air resources. All activities, equipment, processes and work operated or performed by the
Contractor in accomplishing the specified construction shall be in strict accordance with the applicable
Page 16 of 37
air pollution standards of the State of Florida (Florida Statue, Chapter 403 and others) and all Federal
emission and performance laws and standards.
4.11 TRAINING OF CONTRACTOR PERSONNEL IN POLLUTION CONTROL
The Contractor will train his personnel in all phases of environmental protection. The training will include
methods of detecting and avoiding pollution, familiarization with pollution standards, both statutory and
contractual, and installation and care of facilities to ensure adequate and continuous environmental
pollution control. Quality Control and supervisory personnel will be thoroughly trained in the proper use
of monitoring devices and abatement equipment, and will be thoroughly knowledgeable of Federal,
State, and local laws, regulations, and permits as listed in the Environmental Protection Plan submitted
by the Contractor. Quality Control personnel will be identified in the Quality Control Plan submitted in
accordance with Section 5.
4.12 PRESERVATION AND RECOVERY OF HISTORIC, ARCHEOLOGICAL, AND CULTURAL
RESOURCES
If, during construction activities, the Contractor observes items that may have historic or archeological
value, such observations shall be reported immediately to the Owner and Engineer so that the
appropriate authorities may be notified and a determination made as to their significance and what, if
any, special disposition of the finds should be made. The Contractor shall cease all activities that may
result in the destruction of these resources and shall prevent his employees from trespassing on,
removing, or otherwise damaging such resources.
4.13 POST-CONSTRUCTION CLEANUP
The Contractor will be responsible for cleaning and restoring all construction areas (material stockpile,
staging, and access areas) to pre-construction conditions to the satisfaction of the Owner and Engineer
prior to demobilization. Post-Construction Cleanup shall include removal of all Contractors’ equipment
and the removal and disposal of all waste generated during the construction process. The Contractor will
not abandon any equipment or materials at any of the work areas, haul routes, etc. unless approved
otherwise in writing by the Owner, Engineer and Property Owner. The Contractor shall be responsible for
repairing any environmental damage to any of the work, stockpile, staging, loading, and access areas.
The Contractor shall repair any