other permits and authorizations obtained by the Contractor. The regulations,
requirements, and conditions of all Federal, State, and local environmental permits and authorizations,
obtained by Owner or Contractor, are considered a part of the contract and shall be complied with by the
Contractor and subcontractors. The Contractor shall be responsible for ensuring that all Contractor
personnel and subcontractors are all familiar with these and any other applicable permits, including
referenced documents, their potential impact on the proposed work, and the measures needed to
maintain compliance with these permits and authorizations. The Contractor will be responsible for all
fines and fees associated with not obtaining the proper permits or authorizations, not following the
permit conditions, and improper documentation or reporting required by regulatory authorities.
4.3 QUALITY CONTROL
The Contractor shall establish and maintain quality control for environmental protection for all items set
forth herein. The Contractor shall record on Daily Quality Control reports any problems in complying with
laws, regulations, ordinances, and project permits and any corrective action taken (See Section 5 for
daily reporting requirements).
4.4 ENDANGERED SPECIES PROTECTION
The Contractor shall not impact any protected marine species. Construction operations shall be limited
to daylight hours only. The Contractor will instruct all personnel associated with the project of the
potential presence of protected species (e.g. sea turtles, manatees, gulf sturgeon) in the waters adjacent
to the project area, the need to avoid collisions with these protected species, and specific regulatory
measures to protect these species. The Contractor and all personnel shall follow all species protection
measures required by regulatory authorizations (e.g., Sea Turtle and Smalltooth Sawfish Construction
Conditions, Standard Manatee Conditions for In-Water Work, and Vessel Strike Avoidance Measures
and Reporting for Mariners). All construction personnel will be advised that there are civil and criminal
penalties for harming, harassing, or killing marine species that are protected under the Endangered
Species Act of 1973. The Contractor will be held responsible for any protected, threatened or
endangered species harmed, harassed, or killed as a result of construction activities.
Any collisions with a sea turtle, manatee or gulf sturgeon, or sighting of any injured or incapacitated
animal will be reported immediately to the Owner, Engineer and all other organizations/individuals as
Page 11 of 37
required by regulatory authorizations. The Contractor will be required to abide by and implement all
safeguards, reporting criteria, special operating conditions, lighting requirements, and other measures
required by State and Federal permits to protect endangered species potentially occurring within and
adjacent to the project limits during the entire period of construction.
The Contractor shall maintain an Environmental Log detailing all incidents, including sightings, collisions
with, injuries, or killing of sea turtles or other marine species occurring during the contract period. The
log shall be recorded on a standardized form developed by the Contractor and approved by the Owner
and Engineer; the form is to be entitled “Environmental and Endangered Species Reporting Log.”
Copies of the log and all supporting data in its original form shall be forwarded directly to the Owner and
Engineer within 10 days of recording. Following project completion, the Contractor shall submit an
Environmental Final Summary Report summarizing the above incidents and sightings to the Owner and
Engineer.
4.5 ENVIRONMENTAL PROTECTION PLAN
Within ten (10) calendar days after Notice to Proceed, the Contractor will submit in writing an
Environmental Protection Plan. The Owner’s Representative may, at its discretion, consider an interim
plan for the first 10 days of operations. However, the Contractor must furnish an acceptable final plan no
later than 20 calendar days after receipt of Notice to Proceed. Acceptance of the Contractor’s plan will
not relieve the Contractor of its responsibility for adequate and continuing control of pollutants and other
environmental protection measures. Acceptance of the plan is conditional and predicated on satisfactory
performance during construction. The Owner and Engineer reserve the right to require the Contractor to
make changes to the Environmental Protection Plan or operations if they determine that environmental
protection requirements are not being met. No physical work at the site will begin prior to acceptance of
the Contractor’s Environmental Protection Plan or an interim plan covering the work to be performed.
The Environmental Protection Plan must include but not be limited to the following:
A. A list of federal, state, and local laws, regulations, and permits concerning environmental protection,
pollution control, and abatement that are applicable to the Contractor’s proposed operations and the
requirements imposed by those laws, regulations, and permits.
B. Methods for protection of features and resources to be preserved within authorized work areas. The
Contractor will prepare a listing of methods to protect resources needing protection, such as trees,
shrubs, grasses and ground cover; landscape features; air and water quality; fish and wildlife; soil; and
historical, archeological, and cultural resources.
C. Procedures to be implemented to provide the required environmental protection and to comply with the
applicable laws and regulations. The Contractor will provide written assurance that immediate corrective
action will be taken to correct pollution of the environment due to accident, natural causes, or failure to
follow the procedure set out in accordance with the environmental protection plan.
D. A permit or license for (if required) and the location of the solid waste disposal area.
E. Environmental monitoring plans for the job site, including land, water, air, and noise monitoring.
F. Methods for protection of both terrestrial and marine Threatened and Endangered Species.
G. Methods for protection of Marine and Estuarine Resources including seagrasses, salt marsh and
essential fish habitat such as existing artificial reefs.
Page 12 of 37
H. Spill prevention. The Contractor must specify all potentially hazardous substances to be used on the job
site and intended actions to prevent accidental or intentional introduction of such materials into the air,
ground, water, wetlands, or drainage areas. The plan must specify the Contractor’s provisions to be
taken to meet Federal, State, and local laws and regulations regarding labeling, storage, removal,
transport, and disposal of potentially hazardous substances.
I. Spill contingency plan for hazardous, toxic, or petroleum material
J. Work area plan showing the proposed activity in each portion of the area and identifying the areas of
limited use or non-use. Plan should include measures for marking the limits of use areas.
K. A statement identifying the Contractor’s personnel who will be responsible for implementation of the
Environmental Protection Plan. The Contractor’s personnel responsible will report directly to the
Contractor’s top management and will have the authority to act for the Contractor in all environmental
protection matters.
L. A Certification Letter signed by Contractor; clearly identifying and acknowledging receipt, review, and
understanding of all environmental permits applicable to the project and the conditions in the permits.
The Certification Letter shall also acknowledge that the Contractor, including all of the Contractor’s
personnel and subcontractors, is responsible for environmental protection. The Certification Letter must
be attached to the Environmental Protection Plan.
4.6 NOTIFICATION
The Owner or Engineer will notify the Contractor in writing of any observed noncompliance with the
aforementioned federal, state, or local laws, regulations, and permits and other elements of the
Contractor’s Environmental Protection Plan. The Contractor will, after receipt of such notice, inform the
Owner and Engineer of proposed corrective action and take such action as may be approved. If the
Contractor fails to comply promptly, the Owner or Engineer may issue an order stopping all or part of the
work until satisfactory corrective action has been taken. No time extensions will be granted for any such
suspension, and any additional costs incurred by the Contractor shall be paid by the Contractor at no
additional cost to the Owner.
The Contractor will immediately notify the Owner and Engineer, in writing, of the occurrence of any
environmental incidents or violations of the permit requirements or environmental protection laws.
4.7 REEF MATERIAL PROTECTION
The Owner, Engineer, and FWC have reviewed the proposed reef material for regulatory authorization
compliance and confirmed the material is suitable for artificial reef deployment. Appendix A and B
provides a draft inventory of the approved reef materials. The Contractor shall be responsible for
ensuring the reef material remains suitable for deployment throughout the handling, loading and
transport process. The Contractor shall ensure the materials remain free of soils, oils and greases,
debris, litter, putrescible substances, and other pollutants as required by regulatory authorizations.
Should the materials become contaminated during the handling, loading, and transport process, the
Contractor shall be responsible for cleaning the material to the satisfaction of the Owner or disposing of
and replacing any contaminated units.
Page 13 of 37
4.8 PROTECTION OF ENVIRONMENTAL RESOURCES
A. General
It is intended that the land and water resources within the project boundaries and outside the limits of
permanent work performed under this Contract be preserved in the present condition or be restored,
after completion of construction, to a condition that will appear to be natural and not detract from the
appearance of the project. As much as possible, the Contractor will confine his construction activities to
areas defined by the plans and specifications. Where vegetation must be impacted for purposes of
accessing the stockpiled artificial reef material, the Contractor shall minimize the limits of impact to the
greatest extent practical; mark areas for review and approval by the Owner, Engineer and property
owner; and impact only those areas specifically approved for necessary work. Driving of vehicles and
stockpiling or placement of equipment or materials outside the limit of approved work areas is
specifically prohibited.
B. Work Area Limits
1. The Contractor’s field offices, staging and stockpile areas, and temporary facilities will be placed
in areas approved by the Owner or described on the