READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 6, 2014 — reading text
Part 19 of 49. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Unit contemplated (i.e., construction or street lighting)
2. Application for Unit
Public Works will provide the “Guidelines and Procedures” booklet to use in
requesting establishment of a Unit. The necessary information and completed forms
are returned to Public Works as the formal application for a Unit, along with a
$100.00 application fee.
An informative letter can be mailed by U.S Postal first-class mail, if deemed
necessary, to all of the property owners in the proposed area to be improved or a
meeting may be scheduled to advise the property owners of the submitted
application for an MSBU.
3. Petition Submission
The Board of County Commissioners has determined that a petition serves as an
indicator of the amount of community interest for a proposed project. The petition
process is not a requirement of Florida Law. The petition will be provided to the Unit
Liaison.
4. Petition Acceptance
The Board of County Commissioners shall consider petitions signed by at least 66%
(51% for Street Lighting Units) of the current property owners (number of owners)
representing at least 66% (51% for Street Lighting Units) of the properties (number
of lots) within the Unit boundaries.
If the petition meets the above requirements and is accepted by the Board of County
Commissioners, a public hearing shall be authorized for the consideration of an
ordinance to establish the Unit.
Please note that once the petition is accepted and a public hearing is authorized, the
petition is not binding as to a final determination by the Board of County
Commissioners to proceed with the project.
5. First Public Hearing
When the proposed ordinance and all documents are in order and a public hearing
date is scheduled, legal notices will be published in the newspaper. In addition,
notification will be mailed by U.S Postal first-class mail to all property owners listed
on the tax roll within the proposed Unit.
8
Packet Pg. 230
At the public hearing, the Board of County Commissioners may consider comments,
objections, and information relevant to the creation of the Unit. The County
Commissioners may enact or deny the ordinance. If the ordinance is enacted, it will
be officially recorded the Okaloosa County Clerk’s Office, reflecting the preliminary
assessment amount for each property.
6. Implementation
The final engineering plans are prepared by County staff, contingent upon approval
of the Board of County Commissioners.
Upon completion of the final engineering plans, if the total project cost is 20% or
more over the preliminary cost estimates, an additional petition process will be
conducted and an additional public hearing will be held by the Board of County
Commissioners to determine if the affected citizens desire the project to continue.
Notices for this public meeting will be published in the newspaper; notification will
also be mailed by U.S Postal first-class mail to all property owners listed on the tax
roll within the proposed Unit.
7. Final Public Hearing
After construction is complete, all costs relating to the project are compiled by Public
Works. The Board of County Commissioners is requested to authorize a Final
Public Hearing to adopt the Final Assessment Resolution or enact an Amended
Ordinance. All property owners listed on the roll within the Unit will be notified of the
Public Hearing and the results. The assessment will be imposed and collected
immediately after the Board authorization and the final adjusted assessments will be
recorded with the Okaloosa County Clerk’s Office.
Notification and action concerning subsequent annual increases or decreases in the
yearly assessments will be governed by:
- Requirements of Florida Statutes;
- County policy; and
- On-going coordination mechanisms between the District and County identified in
the Detailed Procedures
DISSOLUTION PROCEDURES FOR MSBUs
Upon written request, the County will provide guidelines for dissolving an existing Unit.
The steps to take in requesting dissolution of a Unit are:
9
Packet Pg. 231
• Submission of an application to dissolve the Unit and $100 application fee.
• Submission of a petition which includes a statement regarding funding to
pay for any outstanding financial obligations and distribution of credits of
the Unit.
• The petition, to be considered, must be signed by at least 66% (51% for
Street Lighting Units) of the current property owners (number of owners)
representing at least 66% (51% for Street Lighting Units) of the assessed
properties (measured consistent with the method of assessment) within
the Unit boundaries.
• Notice and Public Hearing by the Board of County Commissioners to
establish final assessments
EXCEPTIONS TO THE GUIDELINES
The Board of County Commissioners may address exceptions to any of the guidelines
on a case-by-case basis.
QUESTIONS?
Contact the Okaloosa County Public Works 850-689-5772
NOTE: Detailed Procedures for each type of Unit should be consulted for more specific
information concerning requirements and procedures.
10
Packet Pg. 232
DETAILED PROCEDURES, CONSTRUCTION UNITS
11
Packet Pg. 233
CONSTRUCTION UNITS
DETAILED PROCEDURES
Initial Request for MSBU Procedures
Upon request of the procedures to establish an MSBU, Public Works will forward a copy
of the “Guidelines and Procedures” booklet to the requestor. The request should be
made to:
Okaloosa County Public Works
1759 South Ferdon Blvd.
Crestview, Florida 32536
(850)689-5772
The request must identify:
• the area affected (e.g., community, subdivision or street)
• the type of improvement involved (e.g., paving or drainage)
• the type of Unit contemplated (i.e., construction or street lighting)
Application for Unit
In order to proceed with establishing a Unit, interested homeowners must submit the
following as the official request for consideration:
1. Scope of Services for the proposed improvement or construction.
• Thoroughness in describing the desired scope of services is important as it
is the key to the development of more accurate preliminary cost estimates.
2. A map depicting the proposed Unit boundary.
• Boundaries must be continuous and not split parcels or lots. Enclaves are
not allowed if the reason is to remove a lot or lots because the property
owner is not in favor of the establishment of the Unit.
• The Unit to be assessed does not necessarily include an entire
subdivision if the entire subdivision does not materially benefit from the
proposed action.
• Units may be established in unplatted residential areas where the
proposed action benefits the property in a definable geographic area.
12
Packet Pg. 234
• Units must contain a minimum of two distinct taxable (or platted) pieces of
property.
3. Contact person and proposed liaison names, addresses and phone numbers.
4. $100.00 application fee made payable to the Board of County Commissioners,
Okaloosa County.
Application Review/Preliminary Engineering Report
Upon receipt of the application for a MSBU, a letter may be mailed by U.S Postal first-
class mail to each property owner advising of the application’s submittal and the
imminent petition process. The Unit Commissioner may request an informative meeting
with the property owners to discuss the MSBU process. Upon request by the Unit
Liaison and with sufficient notice, Public Works is available to attend any community
meetings concerning the establishment of the Unit. Notification to property owners of
any County-sponsored meeting will be coordinated through Public Works. Public Works
would appreciate the opportunity to review any correspondence relating to the
establishment of the Unit prior to circulation.
Public Works will review the items submitted as part of the application to confirm that
the information is complete. The application will then be forwarded to appropriate
departments for review of the scope of work and plat information.
Preliminary engineering is required for sidewalk and roadway/drainage construction or
replacement.
• All engineering and construction will be provided by County staff, contingent
upon approval by the Board of County Commissioners, up to the financial
limits as set forth by Florida State law. Projects exceeding the statutory limits
or staffing capabilities of the County will be competitively bid out for design
and/or construction.
• All material costs will be funded by the MSBU.
County staff will present any requests for County participation in capital projects to the
Board of County Commissioners for consideration.
Petition Submission
The Board of County Commissioners has determined that a petition serves as an
indicator of the amount of community interest for a proposed project.
13
Packet Pg. 235
The petition shall reflect the cost for preliminary engineering and the cost estimates for
final engineering and construction, provided by the preliminary engineering report. The
petition shall also reflect the appropriate reserves, contingencies, administrative fees
and interest expense during the construction period. The petition shall be prepared with
assistance from the Public Works Division and the Unit Liaison.
County staff will identify a date for petition return of 30-60 calendar days based upon
target time frame for public hearing and upon length of time cost estimates will be valid.
Petition Acceptance
The petition, to be considered, must be signed by at least 66% of the current property
owners (number of owners) representing at least 66% of the assessed properties
(number of lots) within the proposed Unit boundaries.
• A property owner is the individual or group of individuals that own a parcel of
land.
• Okaloosa County Property Appraiser and Tax Collector data shall be used to
determine eligible signatures of owners. All of the non-related current owners
of a parcel or the designated trustee must sign the petition for the ownership
and parcel to count towards the 66% requirements.
• Once submitted, names may not be withdrawn from the petition.
Upon return, County staff will review the petition for sufficiency.
No petition will be accepted without the signatures of all property owners who
would be required to dedicate right-of-ways or easements to the County.
If the petition is accepted, Public Works will request that the Board of County
Commissioners authorize a public hearing for consideration of the ordinance to
establish the Unit. Please note that once the petition is accepted and a public
