READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — May 6, 2014 — reading text

Part 13 of 49. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

entity to properly operate and maintain the system in perpetuity, and documentation of the entity's financial responsibility for long-term maintenance. If the proposed operation and maintenance entity is not a property owner's association, provide proof of the existence of an entity, or the future acceptance of the system by an entity that will operate and maintain the system. If a property owner's association is the proposed operation and maintenance entity, provide copies of the articles of incorporation for the association and copies of the declaration, restrictive covenants, deed restrictions, or other operational documents that assign responsibility for the operation and maintenance of the system. Provide information ensuring the continued Form #62-346.900(1) – Joint Application for ERP/SSL Authorization/Federal D&F Permit in Northwest Florida, Section D, Page 5 of 11 Packet Pg. 195 adequate access to the system for maintenance purposes. Before transfer of the system to the operating entity will be approved, the permittee must document that the transferee will be bound by all terms and conditions of the permit. B. Copies of all proposed conservation easements, storm water management system easements, property owner's association documents, and plats for the property containing the proposed system. VII. Water Use If the stormwater management system will be used for water supply, including landscape irrigation, provide the reuse plans as set forth in sSection 12 of Applicant’s Handbook Volume II. Be advised that if you are proposing any consumptive uses of water, you may need applicable permits under Chapter 40A-2, F.A.C. (March 27, 2006), from the NWFWMD. If required, the following information will need to be provided to the NWFWMD: A. If a Consumptive Use or Water Use permit has been issued for the project, provide the permit number. B. If no Consumptive Use or Water Use permit has been issued for the project, indicate if such a permit will be required and when the application for a permit will be submitted. C. Indicate how any existing wells located within the project site will be utilized or abandoned and the number proposed. D. Provide stormwater reuse plans if appropriate. Form #62-346.900(1) – Joint Application for ERP/SSL Authorization/Federal D&F Permit in Northwest Florida, Section D, Page 6 of 11 Packet Pg. 196 TABLE 1 Project Impact Summary WL & SW WL & SW WL & SW SIZE WL & SW PERMANENT TEMPORARY MITIGATION ID ID TYPE (ac.) ON SITE ACRES NOT IMPACTS TO WL IMPACTS TO WL IMPACTED & SW & SW IMPACT SIZE IMPACT IMPACT SIZE IMPACT (acres) CODE (acres) CODE Boggy Submerged, .008 0 .008 F Bayou intertidal WL = Wetland; SW = Surface water; ID = Identification number, letter, etc. Wetland Type: Use an established wetland classification system and, in the comments section below, indicate which classification system is being used. Impact Code (Type): D = dredge; F = fill; H = change hydrology; S = shading; C = clearing; O = other. Indicate the final impact if more than one impact type is proposed in a given area. For example, show F only for an area that will first be demucked and then backfilled. Note: Multiple entries per cell are not allowed, except in the "Mitigation ID" column. Any given acreage of wetland should be listed in one row only, such that the total of all rows equals the project total for a given category (column). For example, if Wetland No. 1 includes multiple wetland types and multiple impact codes are proposed in each type, then each proposed impact in each wetland type should be shown on a separate row, while the size of each wetland type found in Wetland No. 1 should be listed in only one row. Comments: Form #62-346.900(1) – Joint Application for ERP/SSL Authorization/Federal D&F Permit in Northwest Florida Section D, Page 7 of 11; Table 1, Page 1 of 1 Packet Pg. 197 TABLE 2 ON-SITE MITIGATION SUMMARY MITIGATION ID CREATION RESTORATION ENHANCEMENT WETLAND UPLAND OTHER PRESERVE PRESERVE AREA TARGET AREA TARGET AREA TARGET AREA TARGET AREA TARGET AREA TARGET TYPE TYPE TYPE TYPE TYPE TYPE PROJECT TOTALS: CODES (multiple entries per cell not allowed): Target Type or Type = target or existing habitat type from an established wetland classification system or land use classification for non-wetland mitigation COMMENTS: Form #62-346.900(1) – Joint Application for ERP/SSL Authorization/Federal D&F Permit in Northwest Florida Section D, Page 8 of 11; Table 2, Page 1 of 1 Packet Pg. 198 TABLE 3 OFF-SITE MITIGATION SUMMARY MITIGATION ID CREATION RESTORATION ENHANCEMENT WETLAND UPLAND OTHER PRESERVE PRESERVE AREA TARGET AREA TARGET AREA TARGET AREA TARGET AREA TARGET AREA TARGET TYPE TYPE TYPE TYPE TYPE TYPE PROJECT TOTALS: CODES (multiple entries per cell not allowed): Target Type=target or existing habitat type from an established wetland classification system or land use classification for non-wetland mitigation Form #62-346.900(1) – Joint Application for ERP/SSL Authorization/Federal D&F Permit in Northwest Florida Section D, Page 9 of 11; Table 3, Page 1 of 1 Packet Pg. 199 TABLE 4 DOCKING FACILITY SUMMARY Type of Structure* Type of Number of Length Width (feet) Height Total square Number of Work** Identical Docks (feet) (feet) feet over slips water TOTALS: Existing Proposed *Dock, Pier, Finger Pier, or other structure (please specify what Number of Slips type) **New, Replaced, Existing (unaltered), Removed, or Square Feet over the Altered/Modified water Use of Structure: Will the docking facility provide: Live-aboard Slips? If yes, Number: Fueling Facilities: If yes, Number: Sewage Pump-out Facilities? If yes, Number: Other Supplies or Services Required for Boating (excluding refreshments, bait and tackle) Yes No Type of Materials for Decking and Pilings (i.e., CCA, pressure treated wood, plastic, or concrete) Pilings Decking Proposed Dock-Plank Spacing (if applicable) Proposed Size (length and draft), Type, and Number of Boats Expected to Use or Proposed to be Mooring at the facility) Form #62-346.900(1) – Joint Application for ERP/SSL Authorization/Federal D&F Permit in Northwest Florida -- Section D, Page 10 of 11; Table 4, Page 1 of 1 Packet Pg. 200 Table 5: SHORELINE STABILIZATION IF YOU ARE CONSTRUCTING A SHORELINE STABILIZATION PROJECT, PLEASE PROVIDE THE FOLLOWING: Type of Length (in Length (in Length (in Length (in Slope: Width of the Stabilization feet) of New feet) of feet) of feet) of H: Toe (in feet) Being Done Replaced Repaired Removed V: Vertical Seawall Seawall plus Rip- Rap Rip-Rap Rip-Rap plus Vegetation Other Type of Stabilization Being Done: Size of the Rip Rap: Type of Rip Rap: COMMENTS: Form #62-346.900(1) – Joint Application for ERP/SSL Authorization/Federal D&F Permit in Northwest Florida--Section D, Page 11 of 11; Table 5, Page 1 of 1 Packet Pg. 201 SECTION F Application for Authorization to Use State-owned Submerged Lands Part 1: State-owned submerged lands title information (see Page 5 of 5 of this section for an explanation). Please read and answer the applicable questions listed below: A. I have a state-owned submerged lands title determination from the Division of State Lands which indicates that the proposed project is NOT ON state-owned submerged lands (Please attach a copy of the title determination to the application).Yes No  If you answered “Yes” to Question A and you have attached

Download this text file with its original spacing ↓