About this source
Action Item Printout from the Okaloosa County BOCC meeting of September 16, 2014 (IQM2 meeting #1234). Original portal label: Action Item Printout. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Action Item Printout
- Date
- September 16, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Action Item Printout (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 342.2 KB
Download ↓Machine-extracted text — 162-Action Item Printout.pdf
Text extracted on 2026-10-31 from 162-Action Item Printout.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 2.5 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: September 16, 2014
TO: Honorable Chairman and Members of the Board
FROM: Zan Fedorak
SUBJECT: Seeking Award of Bid for Packaged Motor Control Center and Control
Panel (WS 56-14)
DEPARTMENT: Purchasing
BCC DISTRICT: All
STATEMENT OF ISSUE: [PUR] Seeking Award of Bid for East County Re-pump Station-
Packaged Motor Control Center and Control Panel. (WS 56-14)
BACKGROUND & ANALYSIS: In April of 2012, Okaloosa County Water & Sewer (OCWS)
entered into an interlocal agreement with the City of Niceville and City of Valparaiso to transfer
its ownership and treatment capacity at the Niceville Regional Wastewater Treatment Facility.
As part of this agreement, OCWS transferred its cost sharing responsibility of the Niceville
Regional Wastewater Treatment facility, upon relocation of all of its flows from the East
County/Bluewater Bay Service Area to the Arbennie Pritchett Water Reclamation Facility
(APWRF). As part of this relocation, OCWS will construct a new sanitary sewer force main and
re-pump station to convey its flows to the APWRF. This project is funded by a bank loan
obtained in 2012. Procurement of items for the project has begun.
Bids were opened on June 25, 2014 for the East County Re-pump Station Packaged Motor
Control Center and Control Panel and two (2) bids were received. Automated Control Services
(ACS) was the lowest responsive/responsible base bid at $179,533. ACS also included a write-in
additive cost of $31,295 to utilize Rockwell Controls. Rockwell Controls are currently being
utilized at other major pumping stations in the Water & Sewer system. This Rockwell Control
will provide a more systematic product and operational familiarity in the system. It was the
opinion of Water & Sewer staff and their consultant on this project, Constantine Engineering, to
award this bid to ACS, the lowest and most responsive/responsible base bid with the additive
cost for a combined lump sum total of $210,828 with a maximum deliver time of 150 days.
OPTIONS: Approval/Deny the awarding the bid to ACS for the Packaged Motor Control Center
and Control Panel with the write-in additive of Rockwell Controls for a lump sum total of
$210,828.
RECOMMENDATION: Staff recommends awarding the bid to ACS for the Packaged Motor
Control Center and Control Panel with the write-in additive of Rockwell Controls for a lump
sum total of $210,828.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Related sources
This action item printout is part of the Okaloosa County BOCC meeting of September 16, 2014.