Replacement Projects performed, as expected, with the highest levels of professionalism, safety consciousness and fiscal awareness. The Choctawhatchee High School Project was initially a seven-phase project that was scheduled to take 193 calendar days and require up to twenty portables to house displaced students during Phase 4 of the project. Through extensive pre-planning on your part and by performing future phase work out of sequence, the total number of calendar days was reduced by 56 days - thus eliminating the need to relocate students to portables. This saved the District approximately $300,000 and, more importantly, provided a more secure and safe learning environment for the students and teachers. The success of this project was further enhanced when you and your team were able to replace the existing 200 ton chiller with a new 400 ton chiller. This swap provided redundancy and sequencing capability that did not exist prior to the start of the project. When you relocated the existing 200 ton chiller to Bluewater Elementary over the 19 days of Winter Break, it did not delay the progress of your work or interrupt the school operations at either location. Finally, and as a testament to your dedication and support of us and our client, you were able to increase your scope of work and handle the installation of two (2) large Air Handling Units during the last two (2) weeks of the summer construction period, Your commitment to get the job done and the quality of work provided is to be commended. Phase 1 of the Longwood HVAC Replacement Project was accomplished in 43 calendar days over this past summer. It involved the complete replacement of the mechanical systems that served approximately 36,000 SF (almost two thirds of the school) and included a new cooling tower, new 6” chilled water piping and new individual classroom units. The planning, punctuality and quality of finished work exemplifies the conscientious approach exhibited by the entire Lord & Son team. We are confident that Phase 2 of this project will be just as successful. Mr. Leven Lord August 12, 2010 Page 2 It is important to note that the Project Manager for Lord & Son on both projects was Mr. Ryan Chavers. Ryan always represents your firm with the greatest level of professionalism and we feel that he epitomizes the core values that define Lord & Son. Over the last fifteen years, Lord & Son Construction, Inc. has worked with us to complete fifty-nine projects on the OCSD Construction Program to include a new school in Crestview, numerous additions and renovations and emergency projects. The end result of all of these projects has been exceptional quality. They have all been professionally contracted from inception to completion - regardless of the size of the project. Please pass along our appreciation of your outstanding performance on all of these projects to your entire staff. We appreciate your continued drive for excellence and your adherence to safety on all the projects. We look forward to many more years of building better schools together. Sincerely, JACOBS/TITA Ws GE Zn Fate Mr. Jogf{ Lindner Mr. Thomas Mitchell Program Manager Construction Manager STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR SIMILAR PROJECT EXPERIENCE New Sherwin Williams Store in Destin, FL SHERWIN N Wittiams, Lord & Son performed General Contracting services (Prime Contractor) for this new 5,000 SF retail space. This pre-engineered metal building was completed with EIFS exterior finishes and interior finishes with sheetrock walls and acoustical ceilings. The project was finalized with a parking lot and landscaping on the lot. When Lord & Son was awarded this contract in late October 2013, it had to be completed in four months to meet the deadline of March 1, 2014. In addition to the project already being fast-tracked, there was a two week delay in receiving the metal building followed by another two weeks of bad weather. Through careful coordination and discussions with subcontractors, not only was the project completed on time, it was completed three days ahead of schedule. Project Team: Project Manager: Pat Griffith Project Superintendent: Jack Harris Construction Cost: At Award: $653,827.00 Final Cost: $693,903.00 Reason for the cost growth: Owner requested modifications. Page 58 STATEMENT OF QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR Construction Dates: 10/27/2013 Construction Start: October 27, 2013 Substantial Completion: February 26, 2014 Final Completion: March 27, 2014 Note: The Owner moved into the building on February 26, and Lord & Son stayed to help with finishes. The Owner obtained the Certificate of Occupancy on March 27. Owner: John Paul Somers ECOLEED Homes, LLC 36164 Emerald Coast Parkway, Suite 8 Destin, FL 32541 850-654-7777 (P) jp@somerscompany.com Architect: DAG Architects 1223 Airport Road : Destin, FL 32541 rasosasaVAMI GUST Sherwin-Willioms' newest store is ol 36248 Emerald Coast Parkway in Destin | 850-837-8152 (P) General Manager Geoff Matthew, above, says this porlicular store is unique | 850-654-4276 (F) compared to the company’s typical paint center { NOW OPEN Sherwin-Williams paints Destin with 2nd location Pe anes “This store was designed for the sthsnthedeslg cam do-it-yourself market, as well as the Sherwin-Williams has contractor. We are excited about the er Otinatimtbeena location because of the accessibility; Coast Parkway The store ‘ontractors hoary i Da ee eae contractors can get w hat they need Somers, of Somers znd and get back to the site, and stay Company, . ae. . Although the paint pr oductive. retailer detailed some specifications such as Geoff Matthew, store manager square footage for the store, Somers added his first project Somers has that short of time,” Matthew. own flair in customization conducted representing, said. features such ax flooring. himself. The new location and windows. “This is what Ido. was chosen with both “We did things in the all the time for clients,” retail customers and store that have not heen Somers said, “But in this professionals in mind. done anywhere in the case, the client opted out. “This store was designed company,” Somers said. and I wanted to fulfill the for the do-it-yourself “We used scored and commitment to Sherwin. market, as well as the stained concrete floors Williams, so | finished the contract Matthew said. ‘as opposed to tiled, and “We are excited about the we incorporated transom " location because of the i windows to keep it well it in discussion with Somers accessibility; contractors for employees. You won't for about two years.as they can get what they need and sought out a location in get back tothe sile,and stay Destin, but once building productive.” began, the store was As for Somers, be i finished in just under five couldn't be happier with the que store, a ted on the east outcome of the project -ompany in the .the new store “Sherwin-Williams is 2 design aspect,"he said. joins the already operating fantastic company. known “Going forward, we might store on Stahlman Avenue. _ in the industry as a national start doing other stores, “With John Paul credit rated tenant,” he i especially with the Somers on board, Lord said. “Their building here & Son contractors and shows positive signs of I As the land-owner, AVCON Enginecring, recession recovery, which t building per and real they're pr ly the only is the fi als of the t estate broker. this was the contractors to gel it done in marketplace in Destin.” Page 59

Download this text file with its original spacing ↓