Replacement Projects performed, as expected, with the
highest levels of professionalism, safety consciousness and fiscal awareness.
The Choctawhatchee High School Project was initially a seven-phase project that was scheduled to
take 193 calendar days and require up to twenty portables to house displaced students during Phase 4
of the project. Through extensive pre-planning on your part and by performing future phase work
out of sequence, the total number of calendar days was reduced by 56 days - thus eliminating the
need to relocate students to portables. This saved the District approximately $300,000 and, more
importantly, provided a more secure and safe learning environment for the students and teachers.
The success of this project was further enhanced when you and your team were able to replace the
existing 200 ton chiller with a new 400 ton chiller. This swap provided redundancy and sequencing
capability that did not exist prior to the start of the project. When you relocated the existing 200 ton
chiller to Bluewater Elementary over the 19 days of Winter Break, it did not delay the progress of
your work or interrupt the school operations at either location. Finally, and as a testament to your
dedication and support of us and our client, you were able to increase your scope of work and handle
the installation of two (2) large Air Handling Units during the last two (2) weeks of the summer
construction period, Your commitment to get the job done and the quality of work provided is to be
commended.
Phase 1 of the Longwood HVAC Replacement Project was accomplished in 43 calendar days over
this past summer. It involved the complete replacement of the mechanical systems that served
approximately 36,000 SF (almost two thirds of the school) and included a new cooling tower, new 6”
chilled water piping and new individual classroom units. The planning, punctuality and quality of
finished work exemplifies the conscientious approach exhibited by the entire Lord & Son team. We
are confident that Phase 2 of this project will be just as successful.
Mr. Leven Lord
August 12, 2010
Page 2
It is important to note that the Project Manager for Lord & Son on both projects was Mr. Ryan
Chavers. Ryan always represents your firm with the greatest level of professionalism and we feel
that he epitomizes the core values that define Lord & Son.
Over the last fifteen years, Lord & Son Construction, Inc. has worked with us to complete fifty-nine
projects on the OCSD Construction Program to include a new school in Crestview, numerous
additions and renovations and emergency projects. The end result of all of these projects has been
exceptional quality. They have all been professionally contracted from inception to completion -
regardless of the size of the project. Please pass along our appreciation of your outstanding
performance on all of these projects to your entire staff. We appreciate your continued drive for
excellence and your adherence to safety on all the projects. We look forward to many more years of
building better schools together.
Sincerely,
JACOBS/TITA
Ws GE Zn Fate
Mr. Jogf{ Lindner Mr. Thomas Mitchell
Program Manager Construction Manager
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
SIMILAR PROJECT EXPERIENCE
New Sherwin Williams Store in Destin, FL
SHERWIN
N
Wittiams,
Lord & Son performed General Contracting services (Prime Contractor) for this new 5,000 SF retail space. This
pre-engineered metal building was completed with EIFS exterior finishes and interior finishes with sheetrock
walls and acoustical ceilings. The project was finalized with a parking lot and landscaping on the lot.
When Lord & Son was awarded this contract in late October 2013, it had to be completed in four months to
meet the deadline of March 1, 2014. In addition to the project already being fast-tracked, there was a two
week delay in receiving the metal building followed by another two weeks of bad weather. Through careful
coordination and discussions with subcontractors, not only was the project completed on time, it was
completed three days ahead of schedule.
Project Team:
Project Manager: Pat Griffith
Project Superintendent: Jack Harris
Construction Cost:
At Award: $653,827.00
Final Cost: $693,903.00
Reason for the cost growth: Owner requested modifications.
Page 58
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Construction Dates: 10/27/2013
Construction Start: October 27, 2013
Substantial Completion: February 26, 2014
Final Completion: March 27, 2014
Note: The Owner moved into the building on February 26, and Lord & Son stayed to help with
finishes. The Owner obtained the Certificate of Occupancy on March 27.
Owner:
John Paul Somers
ECOLEED Homes, LLC
36164 Emerald Coast Parkway, Suite 8
Destin, FL 32541
850-654-7777 (P)
jp@somerscompany.com
Architect:
DAG Architects
1223 Airport Road :
Destin, FL 32541 rasosasaVAMI GUST
Sherwin-Willioms' newest store is ol 36248 Emerald Coast Parkway in Destin |
850-837-8152 (P) General Manager Geoff Matthew, above, says this porlicular store is unique |
850-654-4276 (F) compared to the company’s typical paint center {
NOW OPEN
Sherwin-Williams paints Destin with 2nd location
Pe anes “This store was designed for the
sthsnthedeslg cam do-it-yourself market, as well as the
Sherwin-Williams has contractor. We are excited about the
er Otinatimtbeena location because of the accessibility;
Coast Parkway The store ‘ontractors hoary i Da
ee eae contractors can get w hat they need
Somers, of Somers znd and get back to the site, and stay
Company, . ae. .
Although the paint pr oductive.
retailer detailed some
specifications such as Geoff Matthew, store manager
square footage for the
store, Somers added his first project Somers has that short of time,” Matthew.
own flair in customization conducted representing, said.
features such ax flooring. himself. The new location
and windows. “This is what Ido. was chosen with both
“We did things in the all the time for clients,” retail customers and
store that have not heen Somers said, “But in this professionals in mind.
done anywhere in the case, the client opted out. “This store was designed
company,” Somers said. and I wanted to fulfill the for the do-it-yourself
“We used scored and commitment to Sherwin. market, as well as the
stained concrete floors Williams, so | finished the contract Matthew said.
‘as opposed to tiled, and “We are excited about the
we incorporated transom " location because of the i
windows to keep it well it in discussion with Somers accessibility; contractors
for employees. You won't for about two years.as they can get what they need and
sought out a location in get back tothe sile,and stay
Destin, but once building productive.”
began, the store was As for Somers, be i
finished in just under five couldn't be happier with the
que store, a ted on the east outcome of the project
-ompany in the .the new store “Sherwin-Williams is 2
design aspect,"he said. joins the already operating fantastic company. known
“Going forward, we might store on Stahlman Avenue. _ in the industry as a national
start doing other stores, “With John Paul credit rated tenant,” he
i especially with the Somers on board, Lord said. “Their building here
& Son contractors and shows positive signs of I
As the land-owner, AVCON Enginecring, recession recovery, which t
building per and real they're pr ly the only is the fi als of the t
estate broker. this was the contractors to gel it done in marketplace in Destin.”
Page 59