READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — November 1, 2016 — EXHIBIT B Compensation — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
EXHIBIT B Compensation — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
EXHIBIT B – COMPENSATION AND HOURLY PER DIEM RATE SCHEDULE AND STANDARD RATES FOR DIRECT EXPENSES FOR THE PROPOSED RECLAIMED WATER
TRANSMISSION MAINS PROJECT
Exhibit B – Compensation and Hourly Per Diem Rate Schedule and
Standard Rates for Direct Expenses for the Proposed Reclaimed
Water Transmission Mains Project
The purpose of this document is to describe Polyengineering, Inc.’s compensation and hourly per
diem rate schedule of charges.
Compensation
As compensation for providing the services described in Exhibit A—Scope of Basic Services for the
Proposed Reclaimed Water Transmission Mains Project, COUNTY shall pay CONSULTANT in
accordance with the Agreement based on either a percent complete for identified Lump Sum (LS)
task or rate based for Time and Material (T&M) task. T&M task will be billed based on the hourly
per-diem rate schedule per employee grade, as defined in Table 1, for the actual time worked on the
Project. CONSULTANT’s standard Direct Expense rates will be identified and will be reimbursed
as defined in Table 2.
The Hourly Per Diem Rates are 1/8th of the tabulated per diem rate for a normal 8-hour workday.
Table 1. Hourly Per Diem Rate Schedule
Classification Billing Rate
Sr. Principal E/A; Program Manager $179.00
Principal E/A II; Sr. Project Manager $143.00
Principal E/A I; PLS; Project Manager $122.00
Professional E/A IV $143.00
Professional E/A III $122.00
Professional E/A II $112.00
Professional E/A I $97.00
Sr. E/A Tech; Sr. Designer $92.00
Project E/A; E/A Intern $87.00
E/A Tech; Designer $77.00
CADD Tech III $61.00
CADD Tech II $54.00
CADD Tech I $36.00
GIS Tech $92.00
Sr. Environmental Scientist $102.00
Environmental Scientist; Lab Mgr. $82.00
Lab Chemist $66.00
Lab Technician $51.00
Survey 3-Man $163.00
Survey 2-Man $128.00
Survey 1-Man $77.00
Sr. Resident Project Rep.; Sr. Field Tech $92.00
Resident Project Rep. II; Sr. Field Tech II $77.00
Resident Project Rep. I; Field Tech I $61.00
Admin/Clerical II $56
Admin/Clerical I $46
1-2
EXHIBIT B – COMPENSATION AND HOURLY PER DIEM RATE SCHEDULE AND STANDARD RATES FOR DIRECT EXPENSES FOR THE PROPOSED RECLAIMED WATER
TRANSMISSION MAINS PROJECT
Table 2. Standard Rates for Direct Expenses
Expense Category Rate ($)
Mileage Cost
Special Shipping Cost
CADD Computer Time Included in Per Diem
Lodging & Travel Cost
Additional Laboratory Tests & Analysis Cost + 5%
Extra Printing, Presentation Boards, Binding, & Reproduction Cost + 5%
Sub-Consultant Services Cost + 5%
Table 2 applies only to Work Task 5. The other Work Tasks are Lump Sum and will not have Direct
Expenses.
The Total Budget for this AGREEMENT is $241,000. The estimated individual Work Tasks
specified in Exhibit A-Scope of Services, for this AGREEMENT are presented in Table 3, below:
Table 3. Breakdown of Budget
Work Task Cost Compensation
Work Task Description Amounts Method
1. Design Phase Services $175,000 Lump Sum
2. Environmental Baseline Survey Services $16,000 Lump Sum
3. Permitting and Interagency Coordination Services $25,000 Lump Sum
4. Construction Phase Services $25,000 Time & Material
Total Overall Budget $241,000
CONSULTANT will keep COUNTY informed of progress so that the Total Overall Budget Ceiling
and/or work effort can be adjusted if found necessary. CONSULTANT is not obligated to incur
costs beyond the indicated approved Total Overall Budget, as may be adjusted, nor is COUNTY
obligated to pay CONSULTANT beyond these limits. The Scope and Total Overall Budget for this
AGREEMENT can be increased with an Authorized Amendment to this AGREEMENT executed by
both parties. When any amount has been increased, CONSULTANT’s excess costs expended prior to
such increase will be allowable to the same extent as if such been incurred after the approved
increase.
******** END *******
2-2
