TASK ORDER APPROVAL FORM
C14-2117-TDD
11
CONTRACT #:
TASK ORDER #:
TASK ORDER AMOUNT: 39/9,856.00
OFFERED BY CONSULTANT:
TAYLOR ENGINEERING, INC.
07-0 9-14P03:28 RCVD
FIRM'S NAME
JONATHAN ARMBRUSTER, P.E.
REP ESENTATIVE S PRINTED —{, / J
Nikos Hey —
NATURE
ICE PRESIDENT, WATERFRONT ENGINEERING
fy |Srawy
TITLE
RECOMMENDED FOR APPROVAL
(Department Director)
LEA wider
SIGNATURE
TDD DiZ
TITLE
é, sof) L/
DATE
ws hon
COUNTY ADMINISTRATOR (if applicable)
Ut lie
DATE
DATE
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
e $25,000 or less approved by Purchasing
Director
e Between $25,001 and $50,000 approved by
Purchasing Director and County
Administrator
e In excess of $50,000 approved by the Board.
Yuu tole
PURGHJSING DIRECTOR aw) BaVOrel
Zio fig
DATE
CHAIRMAN (if applicable)
DATE
TOURIST DEVELOPMENT DEPARTMENT
ATTORNEY APPROVAL FORM
CONTRACTOR NAME: TAYLOR ENGINEERING
CONTRACT #: C14-2117-TDD
TASK/PURCHASE ORDER #: 11
TASK/PURCHASE ORDER AMOUNT: NOT TO EXCEED $79,856.00
I have reviewed the above-referenced task/purchase order and find it to be in
compliance with the terms of the contract, Tourist Development Department
Operations & Procedures Manual, the Okaloosa County Purchasing Manual and
applicable local, state and federal laws, rules and regulations.
(Initial applicable authorization)
LH This approval authorizes the goods/work described in the attached Task or
Purchase Order to be performed or acquired.
This approval authorizes the goods/work described in the attached invoice(s)
to be processed for payment.
APPROVED AS TO FORM AND LEGALITY:
-— 7 _
TDD ANWORNEY
LYNN M. HOSHIHARA
JUNE 30, 2014
EXHIBIT A
Scope of Work
For
OKALOOSA COUNTY BAYWALK PROJECT
PHASE II PRELIMINARY DESIGN AND
ENVIRONMENTAL PERMITTING
INTRODUCTION
Taylor Engineering presents this scope of work and cost estimate to Okaloosa County (“County”) for
background data collection, natural resources investigations, conceptual planning, preliminary design, and
permit application assistance to support the second phase of the County’s living shoreline project
(previously Project Greenshores). Phase II includes the landside components of the proposed project
along the Veteran’s Park (previous Island Golf Center) property. The previous Phase I portion includes alt
waterside improvements ~ offshore breakwaters/oyster reefs, saltwater marsh restoration, public access
pier, existing dock expansion (Marler Park Boat Ramp), and water access features (e.g., kayak launch).
Taylor Engineering and Okaloosa County staff met with the Florida Department of Environmental
Protection (FDEP) staff on April 18, 2014 to discuss the proposed project and permitting requirements for
the second phase. This scope of work addresses the background data collection, natural resources
investigations, and permitting requirements as discussed with regulatory staff. Taylor Engineering will
apply the information collected to develop the landside conceptual design and support preliminary design
and permitting of the second (landside) phase.
ASSUMPTIONS
We have developed this scope of work with the following assumptions:
¢ The conceptual landside improvements will include elevated boardwalks and gazebo structures, at-
grade nature trails, and educational components. The proposed improvements will not require
stormwater or utility design.
* Wetlands delineation and habitat characterization work will only include the proposed Veteran’s
Park property and only minor portions of the leased property necessary for regulatory review.
+ Based on our conversations with County and regulatory staff, Taylor Engineering will prepare and
submit one permit application package for the entire project (both the waterside and landside
project components).
+ Given the waterside features currently included in Phase I of the project and the connectivity of the
landside and waterside areas, we assume FDEP will provide permit review and processing.
+ Okaloosa County will be responsible for all regulatory fees.
+ The proposed project does not include any requests for waivers or variances from County Land
Development Regulations and other Regulations or Ordinances.
* The conceptual permit application will not include any stormwater components.
¢ The proposed services do not include location of underground utilities or networks.
+ The proposed services do not include any work associated with offsite drainage studies, traffic
studies or any work associated with modifications to existing offsite roadways, geotechnical or
subsurface investigations.
ITEMS SUPPLIED BY COUNTY
Taylor Engineering assumes the County will provide the following additional documents:
A-1
+ Site development plans and lease agreements for the lease-holder properties in digital (pdf)
format, if available. These properties include the Gulf Coast Marine Life Center, Emerald Coast
Wildlife Refuge and Wild Willy’s Adventure Zone as well as any improvements to the Emerald
Coast Convention Center and Marler Park.
¢ Digital master plan drawings of the Veteran’s Park property in AutoCAD format showing all
leased property boundaries, existing uses, and proposed conservation/protected areas,
improvements, etc.
* Copies of existing County easements across neighboring properties between the proposed project
site and the Gulf Islands National Seashore (GINS).
« Any available additional studies, investigations, or preliminary designs completed for the County
property.
The following tasks comprise this scope of work.
TASK 1 — Background Data Investigations
This task includes efforts to obtain and review the available site background information that may be
required by FDEP. Based on our findings, we will determine which data to analyze and present as part of
future permit applications. Taylor Engineering will research specific regulatory and site condition
characterizations including natural resource assessments, endangered species occurrence data, historical
aerial photographs, and other available information pertinent to the project.
Following background data investigations and prior to obtaining topographic or natural resource surveys
(Tasks 2 and 3), Taylor Engineering, in collaboration with the Genesis Group (Genesis), will conduct a
field review of the site for the purpose of observing environmental conditions and to further ascertain
opportunities and/or constraints that may influence design considerations. The field observation will
include a detailed review of the existing shoreline, wetland, and upland conditions within the proposed
property and the interface with the future Veteran’s Park and other natural amenities. The review will also
consider design opportunities for optimized connectivity to the Convention Center, Marler Park and
potential access to the proposed Gulf Coast Marine Life Center, the Emerald Coast Wildlife Refuge and
Wild Willy’s Adventure Zone, where appropriate, to support a natural park operational program and/or
expand visitor experience. Taylor Engineering and Genesis staff will field identify specific areas of
interest to be refined/included within the proposed topographic and natural resource surveys.
Cost Task 1: $4,740.00
TASK 2 — Topographic Survey
FDEP will require an updated topographic survey of the project area for permit application review. Our
survey subcontractor will collect upland topography and general site features of the Phase II project area
(above the mean high water line). The survey will include the following:
Topographic survey of the approximately 17 acre upland area (excluding ponds)
Location of significant vegetation areas, trees, and treelines within the project area
Location of pond shorelines and water elevation at time of survey
Property boundary lines
Wetland delineation markers (as located by Taylor Engineering under Task 3)
Location of existing structures (roadway, parking areas, drainage, utilities, fences) within and
immediately adjacent to (within 50 ft) of the proposed project area
eon soe
A-2
Our subcontractor will provide signed and sealed drawings in digital and hard copy format including
these features. The drawings will be geo-referenced to the state plane coordinate system NAD 1983 and
vertical datum NAVD 1988.
Cost Task 2: $5,690.00
TASK 3 — Natural Resources Investigations
Future preliminary design and environmental permitting phases of the project will require an inventory of
existing natural resource conditions within the project area. As such, Taylor Engineering will perform a
natural resources survey to characterize and map existing vegetation and habitat conditions covering all
terrestrial, wetland, and aquatic communities within the proposed project area. We will describe plant
communities and develop vegetative species lists for each recorded community type. We will evaluate the
site with regard to the occurrence of nuisance/invasive species and provide an assessment of wildlife
utilization including state- and federally- listed species.
We will also field delineate the limits of jurisdictional wetlands within the project area pursuant to the
current methodologies of the USACE and state of Florida. We will stake/flag the jurisdictional wetland
boundary and record the position using a differentially-corrected global positioning system (DGPS) with
sub-meter accuracy. We will coordinate and attend a joint site visit with the FDEP and USACE to verify
the wetlands delineation. Following the verification meeting, we will incorporate any necessary
adjustments to the wetland line and provide the coordinates to the surveyor to facilitate formal mapping.
We assume wetland delineation and habitat characterization work will only include the project area and
immediately adjacent properties (within approx. 50 ft of the project area).
We will prepare a natural resources survey report to document the survey findings. The report will detail
onsite habitats and vegetative communities, wildlife utilization including state- and federally-listed
species, jurisdictional wetland boundaries, and nuisance and exotic species. The critical information
collected in this task will provide the environmental baseline for development of the conceptual site
design and will also provide the necessary information to develop the environmental permit application
for state and federal agency review.
Cost Task 3: $7,766.00
TASK 4 — Program Formulation / Workshop
Based on the information collected during Tasks 1 - 3, Genesis, in association with Taylor Engineering,
will conduct a programming workshop with representatives from the Tourist Development Department,
Parks Advisory Committee, the Okaloosa Island Lease Holder’s Association, and other relevant project
partners to overview the site data and further identify design components that will contribute positively to
a nature-based park design and operational program. Following the completion of Tasks 1 —3 and prior to
the workshop, Taylor Engineering and Genesis staff will conduct a field review of the site for the purpose
of observing environmental findings and to further ascertain opportunities and/or constraints that may
influence design considerations. The site visit will include a detailed overview of the existing shoreline
and landside conditions associated with the Okaloosa Baywalk Project and the interface with the future
Veteran’s Park and natural park amenities.
To support the workshop, Taylor Engineering and Genesis will present findings from the site analysis to
convey any physical / environmental influences that may be unique to the planning and decision-making
process. Taylor and Genesis will present in PowerPoint format a collection of traditional nature-based
park features and experiences to initiate collaborative discussion among the team members. Previously
A-3
developed site plans will also be on hand to illustrate prior park planning efforts. The workshop will focus
on identifying specific design issues including, but not limited to the following:
Determine appropriate and desirable recreation activities and amenities
Identify areas for conservation, site restoration and habitat creation
Establish the goals for visual character and spatial definition
Determine support facilities and utility requirements
Determine hours of operation
Identify site security needs
Define theme and architectural character
Cost Task 4: $20,780.00
TASK 5 — Conceptual Design
Based on the results of Tasks 1 - 3 and in consideration of programmatic elements established in the
program formulation above, Genesis in consultation with Taylor Engineering will prepare a conceptual
design overlay for the project area. The proposed plan will illustrate both the Okaloosa Baywalk and
Veteran’s Park natural park improvements. The plan will incorporate proposed site features including
hardscape components such as boardwalks, site lighting, docks and bridges; structures such as gazebos
and pavilions; and environmental components such as nature trails and education features. Per the
County’s request, the plan will not propose restroom facilities. The conceptual design will also identify
areas for conservation, site restoration, and habitat creation / enhancement. The plan view layouts will
endeavor to incorporate the County’s project goals and consider protected/environmentally-sensitive
areas, protection from coastal conditions, and connectivity to proposed future upland and offshore
development features.
To support plan formulation, photographic images of similar project amenities will be presented to
illustrate the potential character of the proposed park design. The conceptual design plan will include
color enhanced graphics suitable for public presentation. Genesis and Taylor Engineering will present the
plan and supporting graphics (o the project team mentioned in the previous section to overview the
proposed concepts and receive comments and recommendations from these groups.
Following receipt of County staff and public comments, Genesis and Taylor Engineering will revise the
conceptual design to incorporate all feasible design requests, further develop the preferred concept, and
prepare the preliminary design. We have budgeted sufficient time to allow one refinement of the preferred
project concept. The refinement may include minor modifications to the water access and upland
structures, and minor adjustments to improve interaction with the upland project components. We will
present the preliminary design to the Okaloosa Board of County Commissioners for review prior to
performing the preliminary engineering design and permitting tasks below.
Cost Task 5: $12,990.00
TASK 6 — Preliminary Engineering Design and Permit Drawings
Taylor Engineering will perform preliminary engineering design and develop permit drawings for the
structural components of the conceptual plan (Task 5). As previously mentioned, we anticipate the plan’s
hardscape components to include pile-supported boardwalks, gazebos and a bridge, and at-grade nature
trails. Taylor Engineering will also perform preliminary environmental design for the proposed
enbancement/restoration areas. Based on regulatory guidance, we will design the structures and
A4
restoration areas to avoid and minimize environmental impact as much as practicable and optimize the
probability of success for the restoration and enhancement areas.
Taylor Engineering will provide permit drawings depicting:
* Location map and general plan-view overlays of the entire project area
« Preliminary structural design sections for the pile-supported structures
* Environmental restoration/enhancement area plan-view layouts, design sections, planting/
stabilization details, and acreages
+ Existing environmental resources (identified during previous investigations) and proposed
environmental protection measures (turbidity and erosion control measures, etc.)
Taylor Engineering will complete permit drawings for the project in a two-step process. To provide the
opportunity for County review and comment, we will submit permit drawings at preliminary and final
design stages. The preliminary permit drawing submittal will provide two sets of 8.5 in. x 11 in. paper
plots and corresponding digital format drawing files in AutoCAD 2013 and pdf formats. Taylor
Engineering will provide the preliminary permit drawing submittal for County and project team review
and comment. Following receipt of comments, we will incorporate any necessary changes to produce
final permit drawings.
The final permit drawings submittal will include three sets of signed and sealed 8.5 in. x 11 in. paper plots
and corresponding digital format drawing files in AutoCAD and PDF formats. Taylor Engineering will
submit additional copies, as necessary, of the permit drawings with the permit application (Task 7).
Cost Task 6; $17,600.00
TASK 7 — Permit Application Revision
Given the County’s desire to incorporate the Phase II work with the on-going Phase I (waterside) portion,
the combined project will require an Environmental Resources Permit (ERP) issued by the FDEP or
Northwest Florida Water Management District (NWFWMD) and a U.S. Department of the Army Dredge
and Fill Permit from the U.S. Army Corps of Engineers (USACE). The FDEP will determine whether
FDEP or the NWFWMD will ultimately provide final permit review. Given the water-dependent features
and lack of stormwater management components, we assume FDEP will provide permit review and
processing. In either case:
e After completion of strategy discussions with the County, Taylor Engineering’s project manager
and key project staff will meet with lead state and federal regulatory agencies in a joint pre-
application meeting to present the project concept and receive permit application content
recommendations from the agencies. These meetings will focus on permit application details and
identify any potential hurdles in completing a successful permit application. We encourage the
participation of the County in these meetings.
¢ We will provide the County a short summary of the meetings and immediately notify County if
the meetings indicate any challenges that may significantly impact project success. Assuming
positive meeting outcomes, we will move forward with the remaining project tasks, including
permit application development.
Taylor Engineering will develop a joint ERP application that includes the information necessary for state
and federal agencies to perform their technical and regulatory review and public processes. In addition to
the permit drawings developed in Task 6, the application will include detailed narratives describing the
project design, purpose, and need; project best management practices (BMPs); avoidance and
A-5
minimization measures; natural resource impact and mitigation analysis using the state of Florida’s
Uniform Mitigation Assessment Methodology (UMAM); construction methodology and schedule; site
maintenance and adaptive management, and post-construction monitoring.
With County review and approval, we will deliver an application package to the lead state regulatory
agency. The lead agency will distribute application packages to all other appropriate agencies,
Cost Task 7: $7,760.00
TASK 8 — Opinion of Probable Construction Cost
Using the permit drawings as a base, Taylor Engineering will prepare a preliminary opinion of probable
construction cost for the Phase II (landside) project components described in this scope of work. This
opinion of cost will comprise a list of major items with associated quantities and unit costs. We will apply
internal and external data to develop a cost opinion for each major project element. This opinion of
probable construction cost will provide the County with an initial budget estimate to construct the upland
portion of the project.
Cost Task 8: $2,530.00
SCHEDULE
Because Taylor Engineering has no control over agency review processes and periods, the schedule for
project permitting is uncertain. Upon receiving authorization, Taylor Engineering will immediately
commence Task 1 ~ 3. Following completion of Task 1 — 3 and within 6 weeks of authorization, we will
commence Tasks 4 and 5. Tasks 4 and 5 shall be completed within 8 weeks of commencement, subject to
coordination and availability of the project team and County to conduct the required workshop and public
meeting. Following completion of Tasks 4 and 5, we will commence Tasks 6 and 7 concurrently. We
expect to complete Tasks 6 and 7 and submit the permit application package to the County for review
within 8 weeks. Following County review and approval of the permit application package, we will submit
the application to the regulatory agencies for review. Please note the USACE does not have set timelines
for permit application review; however, Taylor Engineering will closely coordinate with USACE and
other commenting agencies and respond to agency requests to expedite the regulatory review process. We
anticipate the permit application processing and negotiations will take approximately 6 to 12 months to
complete. Task 8 will be completed within 2 weeks of receiving a notice of intent to issue the regulatory
authorizations.
END SCOPE OF SERVICES
We will perform these services for a lump sum fixed price of $79,856.00. Exhibit B provides an estimated
breakdown of this cost. Should the project require additional work beyond the efforts noted in Exhibit A
or if any of the assumptions stated throughout the Scope of Work prove incorrect, Taylor Engineering
will provide a proposal for additional services.
A-6
EXHIBIT B
Contract Price
For
OKALOOSA COUNTY BAYWALK PROJECT
PHASE TH PRELIMINARY DESIGN AND
ENVIRONMENTAL PERMITTING ASSISTANCE
TAYLOR shall perform the services described in Exhibit A for a fixed, lump sum fee of
$79,856.00 (see table of estimated cost per task below). Should the project require additional work
beyond the efforts noted in Exhibit A, Taylor Engineering will provide a proposal for additional services.
Costs by Task
TASK 1 — Background Data Investigations $4,740.00
TASK 2 — Topographic Survey $5,690.00
TASK 3 - Natural Resources Investigations $7,766.00
TASK 4— Program Formulation / Workshop $20,780.00
TASK 5 — Conceptual Design $12,990.00
TASK 6 — Preliminary Design and Permit Drawings $17,600.00
TASK 7 — Permit Application Revision $7,760.00
TASK 8 — Opinion of Probable Construction Cost $2,530.00
TOTAL _ $79,856.00
TAYLOR shall invoice its labor based on the approved rate schedule and shall invoice its
reimbursable expenses in accordance with County policy.
B-1
This Scope of Work Submitted by:
- ps
Signature
Ken Craig — Vice President Coastal Engineering
Print Name
July 7, 2014
Date
C-1
EXHIBIT C