April 1, 2014

Okaloosa County BOCC — April 1, 2014 — East County Master Sewer Plan_Page1

Okaloosa County Board of County Commissioners east county master sewer plan_page1 for the April 1, 2014 meeting. Official document preserved from the county IQM2 public portal, with a searchable OCR text layer.

FILED WITH

About this source

East County Master Sewer Plan_Page1 from the Okaloosa County BOCC meeting of April 1, 2014 (IQM2 meeting #1196). Original portal label: East County Master Sewer Plan_Page1. Preserved as a historical public record; part of the meeting linked as a related source.

Original publication
East County Master Sewer Plan_Page1
Date
April 1, 2014
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Machine produced / unreviewed — machine-extracted, not yet human-corrected
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

East County Master Sewer Plan_Page1 (PDF)

Original PDF as published on the Okaloosa County IQM2 meeting portal.

PDF · 2.0 MB

Download ↓

Machine-extracted text — 121-East County Master Sewer Plan_Page1.pdf

Text extracted on 2026-10-31 from 121-East County Master Sewer Plan_Page1.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.

Text · 7.7 KB

Download ↓

Full text

Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.

Phase 1: Rocky Bayou 16" Force Main (FM) Phase 7: Replace Meigs-Seminole Lift Station Phase 2: Rocky Bayou 16" FM Phase 8: Hwy 20 12" FM Phase 3: Rocky Bayou 16" FM Phase 9: New College Blvd Lift Station LLY Phase 4: Rocky Bayou 16" FM Phase 10: NVOC 16" FM KE Phase 5: Eglin Main 20" FM & 2 Lift Stations Phase 10a: NVOC 16" FM Alternate Phase 6: Replace 10" FM at Canal with 16" FM WOLVERINE JACKSO N E Y EG LA R LL JC CO ER ROG S STIC VAL A ANDREW 5 Y8 HW ND BO Arbennie Pritcehtt WRF R TW O BE NR GE Proposed Eglin Main Lift Station LEWIS TURNER East County Master Sewer Plan - Page 1 . MAP PROJECTION: Lambert Conformal Conic Projection Stateplane : Flo ida Nor th (0903) NAD 1983(90), NAVD 1988. Existing Phase 3 Phase 6 Phase 9 StreetCenterlines PUBLIC RECORD: This map was created by Okaloosa County GIS and is in the public domain pur uant Phase 1 Phase 4 Phase 7 Phase 10 to Chapter 119 , Florida Statutes. DISCLAIMER: Phase 2 Phase 5 Phase 10a 1 inch = 2,500 feet Okaloosa County h reby expressly disclaims Phase 8 any liability for errors or omissions in these maps, indexes or legends.

Related sources

Citation & reuse

“Okaloosa County BOCC — April 1, 2014 — East County Master Sewer Plan_Page1.” April 1, 2014. East County Master Sewer Plan_Page1. Crypt of Echoes evidence ID LED-2026-e5067325296e4dfa9654d542d175f080. https://cryptofechoes.com/evidence/LED-2026-e5067325296e4dfa9654d542d175f080. Accessed [date].

Public record of Okaloosa County, Florida.

Technical archive record ↓