pump on a pedestal (has to be built)
Run a new T-stat in a central location
Construct new duct top of unit with 3-4 directional louver vents paint and seal w/mastic
Run flex duck to new workshop area
Install 2 disconnects one on outside and one inside
Electrical whips MUST BR PROVIDED
AINA MnP W Dh =
Materials andlabor $7,245.00
Mechanicals/Must Haves
1 Build pedestal for heat pump inside M&L $150
2 Fix and secure existing insulation on ceiling
3 2 Electric scissor lifts FOR 2 WEEKS @ $774.68 each x 2 = $3,098.72 (MUST HAVE for steel and roof
and painting) 2 lifts for 2 weeks
Materials and Labor $3,248.72
Steel beam work
Support existing steel beam gurters on both sides
Cut out angled supports
Install 2 Monolift angled I beams front and back of hangar higher to the maximum height of roofline
Cut out existing I beam in center
Install a new I beam closer to roofline, bolt weld ALL together
REPAIR a few rusted out clips, bolts and shims in hangar
All steel work permitted by a licensed structural engineer w stamped drawings
COA Mm BW Ne
Materials and labor $11,524.73
Total for ALL projects material and labor $62,000.73
**** ALL Planes and vehicles MUST BE removed from the hangar, contractor will be
responsible for removing, and covering the contents in stages****
Total Balance $62,000.00
Transferred deposits Paid $45,000.00
Balance Forward $17,000.00
Could NOT do beam work so Deduct $11,524.73
Balance Forward $5,475.00
ADD ONS
New Irrigation pump/tank valve rusted out $389.00
Labor $175.00
Structural engineer to look over bldg w/letter $775.00
Draftsman to draw set of plans per bld inspector $1,625.00
Blg permit for expansion on hanger (old work) $685.00
Small door motor burnt up (rewound motor) $372.00
Door switch burnt up install new switch $368.72
Labor to install switch and motor $300.00
Bldg inspector wanted AC 10 ft in air
Make new plenum materials and labor $300.00
Move air compressor per bldg inspector
Move electrical for compressor and install
Longer whip for AC materials and labor $350.00
Sheet rock under stair case with 5/8 fire rated
Sheetrock with tape smooth finish
Materials and labor $525.00
Total ADD Ons $5864.72
Total DUE $11,339.72
A 50% Deposit will be required at signing of this contract; balance will be paid when finished
Job will take approx 6 weeks depending on weather
All prep, clean up and removal of all debris will be done by contractor.
Job will be done in a timely and professional manner.
By signing this INVOICE, it becomes a LEGAL and BINDING Contract!!
Nicky Capobianco 8-29-12
Contractor Date Customer Date
Dave Miner
From: Roy Clennan [roy@quantico.vi]
Sent: Thursday, October 02, 2014 3:14 PM
To: Dave Miner
Subject: Re: invoice
would cancel the checks made out to this contractor work? He was a general contractor, and he took care of
all the subcontractors.
Roy Clennan
---— Reply message -----
From: "Dave Miner" <dminer@co.okaloosa.fl.us>
To: "Roy Clennan" <roy@quantico.vi>
Subject: invoice
Date: Thu, Oct 2, 2014 1:01 PM
Mr. Clennan:
| reviewed the attached paperwork and unfortunately | will not be able to use it. The attached is a proposal and nota
final invoice marked paid. if there are separate final invoices,(different contractors) | will need a copy of all. | will need
them for the total amount that you paid for the renovations.
Did you have a set of drawings or plans prior to the renovation? If so | will need them also.
David Miner
Airports Administration
From: Roy Clennan [mailto:roy@quantico.vi]
Sent: Wednesday, October 01, 2014 2:12 PM
To: Dave Miner
Subject: FW: invoice
Please note that the hangar WAS NOT permitted or up to cocle when | purchased it. We actually ended up paying more
than billed, since this contractor did not complete ALL the work. We replaced the door motor also.
The entire place was insulated, painted and a workshop was installed. The floor was redone. Air and heat was
installed. The roof was worked on by three different people, most recently Belmac roofing. Everything is up to code
and the hangar is beautiful. We DID get permits. | apologize that you were not notified. | falsely assumed you were
part of the permit process. | can dig up cancelled checks if you need them.
Roy Clennan
From: Nicky Capobianco [mailto:nickycaps142@yahoo.com]
Sent: Sunday, November 25, 2012 8:32 PM
To: Roy Clennan; Roy Clennan
Subject: invoice
Mr C here is the final invoice on what was and HAD TO BE DONE per the building inspector ALL
because when the hangar was expanded nothing was pulled far as permits.... there is ALOT of things
that went OVER budget because of the circumstances out of my control but its all done and it looks
great, please call me in the morning so myself and mark can do a walk thru with you just tell me
whatime you would like to meet, skip told mark today that he should have the switch to the small door
all fixed and working tomorrow! i have a file fullof alldoccuments you need for the hangar as far as
permits and drawings, for you file or if we deceide to do work in the future. thank you good nite
Nicky
Nicky Capobianco
Rock Solid Productions Inc.
56 Talon Court
Santa Rosa Beach, Florida 32459
(850)259-8924 Cell
(850)278-6293 Fax
www.nickycrsp.com
Dave Miner
Nicky Capobianco [nickycaps142@yahoo.com]
From:
Sent: Saturday, October 04, 2014 7:43 AM
To: Roy Clennan
Ce: Dave Miner
Subject: Re: FW: invoice
Yes I will look in my files to make sure J still have those but every year or two years I take them off and file them away if you would
forward me the copy of the proposal all J'‘m going to do is change it from the proposal to invoice on the top of it everything else is
listed what was done and what was paid so if you could forward me that copy of what you signed for the proposal I can retype it and
send it back of money that you paid with the canceled checks and stuff like that
Sent from Yahoo Mail on Android
at. Oct 4, 2074 at 5:44 AM
L 4-ET LAP. JA, it
euoleclh PW: invoice
Nicky,
The airport authority needs a paid receipt. I can provide cancelled checks, but can you accommodate the receipt portion?
From: Dave Miner [mailto:dminer@co.okaloosa.fl.us]
Sent: Thursday, October 02, 2014 1:02 PM
To: Roy Clennan
Subject: RE: invoice
Mr. Clennan:
I reviewed the attached paperwork and unfortunately I will not be able to use it. The attached is a proposal and not a final
invoice marked paid. If there are separate final invoices,(different contractors) I will need a copy of all. I will need them
for the total amount that you paid for the renovations.
Did you have a set of drawings or plans prior to the renovation? If so I will need them also.
David Miner
Airports Administration
From: Roy Clennan [mailto:roy@quantico.vi]
Sent: Wednesday, October 01, 2014 2:12 PM
To: Dave Miner
Subject: FW: invoice
Please note that the hangar WAS NOT permitted or up to code when T purchased tt. We actually ended up paying more
than billed, since this contractor did not complete ALL the work. We replaced the door motor also.
The entire place was insulated, painted and a workshop was installed. The floor was redone. Air and heat was installed.
The roof was worked on by three different people, most recently Belmac rooting. Everything is up to code and the hangar
is beautiful. We DID get permits. | apologize that you were not notified. I falsely assumed you were part of the permit
process. I can dig up cancelled checks if you need them.
Roy Clennan
From: Nicky Capobianco [mailto:nickycapsl42@yahoo.com]
Sent: Sunday, November 25, 2012 8:32 PM
To: Roy Clennan; Roy Clennan
Subject: invoice
Mr C here is the final invoice on what was and HAD TO BE DONE per the building inspector ALL because
when the hangar was expanded nothing was pulled far as permits... there is ALOT of things that went OVER
budget because of the circumstances out of my control but its all done and it looks great, please call me in the
morning so myself and mark can do a walk thru with you just tell me whatime you would like to meet, skip told
mark today that he should have the switch to the small door all fixed and working tomorrow! i have a file
fullof alldoccuments you need for the hangar as far as permits and drawings, for you file or if we deceide to do
work in the future. thank you good nite Nicky
Nicky Capobianco
Rock Solid Productions Inc.
56 Talon Court
Santa Rosa Beach, Florida 32459
(850)259-8924 Cell
(850)278-6293 Fax
www.nickycrsp.com
Dave Miner
From:
Sent:
To:
Attachments:
Attached please find the signed invoice.
Roy Clennan
Roy Clennan [roy@quantico.vi]
Monday, October 06, 2014 11:12 AM
Dave Miner
Scan 001.pdf
Thank you for your help.
Nicky Capobianco
56 Talon Court
Santa Rosa Beach, FL 32459
850-259-8924
nickycaps142@yahoo.com
www.nickycrsp.com
850- 25 9- a 4 LICENSED AND INSURED
TILE TRAVERTINE STONE GRANITE
— REMODELING & MAINTENANCE
INVOICE
November 25, 2012
Roy and Diane Clennan
3023 Club Dr
Sandestin Fl 32550
719-331-7642
rjc@freedomfs.com
Re: Various projects hangar Destin airport
Mr. Clennan,
Thank you so much for allowing me, Rock Solid Productions, Inc to submit this proposal to you.
Below you will find a detailed list of proposed work. If you have any questions, please feel free to contact
me at the number listed above. We look forward to working with you.
ROOF
1 Serious roof leaks and missing and rusted out panels tape over seams where new skylights are
2 Repair ALL skylights , build a frame around each one and rubber tape each seam, screw down tight
3 Replace rusted thru roof panels (2)
4 Replace existing fascia on front of hanger approx 20’
5 Screw down entire roof line where screws are rusted thru 90x50
6 Roll out 2 coates of rubberized sealer over entire roof
7 STOP THE LEAKS
Materials and labor $5,471.31
Pressure wash
Pressure wash entire hanger ceiling, walls, and floor and face and concrete in front of hanger
2 Approx 20,000 sq ft
3 Clean all the beams and gurters make ready for paint
—
Materials and labor $2,875.00
Insulation
Install approx 7000 sq ft of 2 5/8 WMP-VRR insulation with tabs walls and doors ONLY
2 rolls of WMP-VRR patch tape 200’ rolls
5000 3 % stick pins with washers
8 gallons of Tuff Bond adhesive
BPwrno ne
Materials and labor $5,924.56
Enclosed workshop/upstairs office
Frame up work shop in between all existing columns downstairs
Install a 36” RH in swing door w/glass and deadbolt
Install 2 -36” swing out barn doors on wheels with handles and locking latch
2x4x3 ft walls with sheetrock on outside to match existing rock above
Insulate walls, Wayne’s coating bead board on inside walls even Existing walls
1x4 sq stock pine for trimming out windows doors and baseboard
Instal] 3-4 2x5 glass panes on top of wall to see out to hanger (NO TEMPERED)
Cut out and replace rotten sheetrock in upstairs shower
Tape and texture upstairs bathroom and outside of workshop bellow where all sheetrock is
Rip up old carpet on stairs and in office
Install new hardwood floating floor in office and on stairs
Install new 16x16 tile in upstairs bathroom, lay grout and seal
Cutout pump outside by entry door
Re plumb pump and make sure it has a hose bib
Fix a few holes in walls coming thru the metal skin on hangar
Grease chains, and rollers on lifts for hangar doors
oP ON AAR wD
ell eee eel oe
“SD DBW YE
Materials and Labor w/carpet $8,516.59
Paint
Wire wheel and sand down rust spots on overhead and side walls steel gerters
Prime and 2 coats of white enamel on ALL steel beams ceiling and walls and doors
Caulk and putty all nail holes and prime ALL
Paint entire office, bathroom, and work shop area inside and out
Wh —
Materials and labor $6,600.00
Paint/Epoxy Floor
Hangar floor 90x50=4,500 sq ft x $1.00 (usually $1.85 ft)
Prep clean floor
Prime with floor conditioner then
Paint 2 coat processes with floor epoxy with fleck or shark bite
Paint new yellow stripes inside and outside hanger like existing
On BW Ne