DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
PENSACOLA REGULATORY OFFICE
41 NORTH JEFFERSON STREET, SUITE 301
PENSACOLA, FLORIDA 32502
REPLY TO
ATTENTION OF March 10, 2014
Regulatory Division
North Permits Branch
Pensacola Permits Section
SAJ-2013-02668 (SP-SWA)
Okaloosa County Board of County Commissioners
1804 Lewis Turner Boulevard, Suite 100
Ft. Walton Beach, Florida 32547
Gentlemen:
The U.S. Army Corps of Engineers (Corps) has completed the review and evaluation
of your Department of the Army permit application, number SAJ-2013-02668. Our
regulations require that you have an opportunity to review the terms and conditions prior
to final signature by the Department of the Army. Enclosed is an unsigned Department
of the Army permit instrument (permit).
Please read carefully the Special Conditions beginning on page 3 of the permit.
These were developed to apply specifically to your project. Water Quality Certification
is also required prior to issuance of a permit. The Corps has received a copy of the
State of Florida certification for your project. In accordance with General Condition 5 of
the permit, any special conditions of the Water Quality Certification have been attached
to the Department of the Army permit.
Instructions for Objecting to Permit Terms and Conditions: This letter contains
an initial proffered permit for your proposed project. If you object to certain terms and
conditions contained within the permit, you may request that the permit be modified.
Enclosed you will find a Notification of Administrative Appeal Options and Process fact
sheet and Request for Appeal (RFA) form. If you choose to object to certain terms and
conditions of the permit, you must follow the directions provided in Section 1, Part A and
submit the completed RFA form to the letterhead address.
In order for an RFA to be accepted by the Corps, the Corps must determine that it is
complete, that it meets the criteria under 33 CFR Part 331.5, and that it has been
received by the District office within 60 days of the date of the RFA. Should you decide
to submit an RFA form, it must be received at the letterhead address by May 9, 2014.
Instructions for Accepting Terms and Conditions and Finalizing Your Permit: It
is not necessary to submit an RFA form to the District office, if you do not object to the
decision in this letter. In this case, the permit must be signed by the applicant in the
space provided on the signature page of the permit. In the case of corporations,
-2-
acceptance must be by an officer of that corporation authorized to sign on behalf of the
corporation. The party responsible for assuring the work is done in accordance with the
permit terms and conditions must sign the permit. Please type or print the name and
title of the person signing below the signature and the date signed.
SIGN (PAGE 9) AND RETURN THE ENTIRE PERMIT, INCLUDING ALL
ATTACHMENTS, TO THE LETTERHEAD ADDRESS
The permit will be signed by the District Engineer or his representative. The Corps
will add the permit expiration date to the permit and return the permit to you. It is
important to note that the permit is not valid until the District Engineer or his
representative signs it.
Please note U.S. Coast Guard regulations may require you as permittee to provide
information for a Notice to the maritime community regarding your project. You should
contact the Coast Guard Sector Mobile Waterways Management Branch (spw), 1500
15th Street, Mobile, AL 36615 or by phone at 251-441-5684 to determine if a Notice is
necessary. Also any safety lights, signs and signals prescribed by the U.S. Coast
Guard through their regulations or otherwise, must be installed and maintained at your
expense as permittee on authorized facilities in navigable waters of the United States.
To receive a U.S. Coast Guard Private Aids to Navigation marking determination, you
are advised to contact the Eighth Coast Guard District (dpw), 500 Poydras St. Suite
1230, New Orleans, LA 70130, 504-671-2328 or via email to: D8oanPATON@uscg.mil
prior to installation/construction of any fixed structures. For general information related
to Private Aids to Navigation please visit the Eighth CG District web site at:
http://www.uscg.mil/d8/waterways/PATON.Home.asp.
Thank you for your cooperation with our permit program. The Corps’ Jacksonville
District Regulatory Division is committed to improving service to our customers. We
strive to perform our duty in a friendly and timely manner while working to preserve our
environment. We invite you to complete our automated Customer Service Survey at
http://corpsmapu.usace.army.mil/cm_apex/f?p=regulatory_survey. Please be aware
this Internet address is case sensitive; and, you will need to enter it exactly as it
appears above. Your input is appreciated – favorable or otherwise.
If you have any questions concerning this application, you may contact Steve
Andrews Jr. in writing at the letterhead address, by electronic mail at
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Okaloosa County BOCC File Number: SAJ-2013-02668 Date: 10 March 2014
Attached is: See Section below
X INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A
PROFFERED PERMIT (Standard Permit or Letter of permission) B
PERMIT DENIAL C
APPROVED JURISDICTIONAL DETERMINATION D
PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional
information may be found at http://www.usace.army.mil/CECW/Pages/reg_materials.aspx or Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on
the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the
permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to
address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined
that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered
permit for your reconsideration, as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on
the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this
notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer
within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be
received by the division engineer within 60 days of the date of this notice.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to
an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where
your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for
the record of the appeal conference or meeting, and any supplemental information that the review officer has determined
is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses
to the record. However, you may provide additional information to clarify the location of information that is already in the
administrative record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the If you only have questions regarding the appeal process
appeal process you may contact: you may also contact:
for process:
Project Manager as noted in letter Stuart Santos 904-232-2018
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any
government consultants, to conduct investigations of the project site during the course of the appeal process. You will
be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations.
Date: Telephone number:
_______________________________
Signature of appellant or agent.
DEPARTMENT OF THE ARMY PERMIT
Permittee: Okaloosa County Board of County Commissioners
1804 Lewis Turner Boulevard, Suite 100
Ft. Walton Beach, Florida 32547
Permit No: SAJ-2013-02668 (SP-SWA)
Issuing Office: U.S. Army Engineer District, Jacksonville
NOTE: The term "you" and its derivatives, as used in this permit, means the permittee
or any future transferee. The term "this office" refers to the appropriate district or
division office of the Corps of Engineers having jurisdiction over the permitted activity or
the appropriate official of that office acting under the authority of the commanding
officer.
You are authorized to perform work in accordance with the terms and conditions
specified below.
Project Description: The applicant proposes to establish an artificial reef area, which
would be referred to as the “Fish Haven #14”. It would consist of a ¼ by ¼ mile
deployment area, totaling 40 acres, which would provide enhanced habitat and
recreational fishing and diving opportunities upon implementation of the project.
Additionally, there would be a deployment buffer of 50 feet on each side. Material to be
deployed would consist of clean concrete or rock and prefabricated structures that are a
mixture of clean concrete and heavy gauge steel. The material to be deployed would
have a maximum profile height of no more than 30 feet and would result in a minimum
authorized depth of -38 feet at mean lower low water MLLW. The applicant would
implement a monitoring plan. The work described above is to be completed in
accordance with the three (3) pages of drawings affixed at the end of this permit
instrument.
Project Location: The project site is located in the Gulf of Mexico, 5.66 nautical miles
southwest of Destin pass, 2.71 nautical miles north of the East-West Safety Fairway
and 2.59 nautical miles south of Okaloosa Island off of Okaloosa County, Florida.
Latitude & Longitude:
NE Site Corner: Latitude: 30.354166° North
Longitude: 86.612483° West
NW Site Corner: Latitude: 30.354166° North
Longitude: 86.616666° West
SE Site Corner: Latitude: 30.350533° North
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 2 of 11
Longitude: 86.612483° West
SW Site Corner: Latitude: 30.350533° North
Longitude: 86.616666° West
Permit Conditions
General Conditions:
1. The time limit for completing the work authorized ends on March 10, 2024. If
you find that you need more time to complete the authorized activity, submit your
request for a time extension to this office for consideration at least one month before the
above date is reached.
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good faith
transfer to a third party in compliance with General Condition 4 below. Should you wish
to cease to maintain the authorized activity or should you desire to abandon it without a
good faith transfer, you must obtain a modification of this permit from this office, which
may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this
office of what you have found. We will initiate the Federal and State coordination
required to determine if the remains warrant a recovery effort or if the site is eligible for
listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature
and the mailing address of the new owner in the space provided and forward a copy of
the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you
must comply with the conditions specified in the certification as special conditions to this
permit. For your convenience, a copy of the certification is attached if it contains such
conditions.
6. You must allow representatives from this office to inspect the authorized activity at
any time deemed necessary to ensure that it is being or has been accomplished in
accordance with the terms and conditions of your permit.
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 3 of 11
Special Conditions:
1. Reporting Addresses: The Permittee shall reference this permit number, SAJ-
2013-02668 (SP-SWA), on all correspondence. Unless specifically notified to the
contrary, the Permittee shall use the following addresses for transmitting
correspondence to the referenced agencies:
(a) U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section
41 North Jefferson Street, Suite 301
Pensacola, Florida 32502
The Permittee shall reference this permit number,
SAJ-2010-03163 (SP-SWA), on all submittals.
Or email at: CESAJ-ComplyDocs@usace.army.mil
(b) National Oceanic and Atmospheric Administration
(NOAA), Marine Chart Division, Office of
Coast Survey, N/CS26, Sta. 7317
1315 East-West Highway
Silver Springs, MD, 20910-3282
Or email at: ocs.ndb@noaa.gov.
(c) Commander, U.S. Coast Guard (USCG)
8th Coast Guard District
Hale Boggs Federal Building
500 Poydras Street
New Orleans, LA 70130
(d) Florida Fish and Wildlife Conservation Commission
(FWC), Artificial Reef Program,
620 S. Meridian Street, Box 4B2
Tallahassee, FL 32399.
Or email at: artificialreefdeployments@MyFWC.com
2. Initial Agency Notification: The Permittee shall provide to the Corps, NOAA and
USCG written notification of the planned deployment start date at least two weeks prior
to the initial deployment on the authorized artificial reef site.
3. Protection of Existing Resources: The Permittee shall not deploy artificial reef
materials until an assessment of the bottom conditions have been accomplished by
diver, submersible video camera, fathometer, depth/bottom sounder (e.g. “fish finder”),
or side-scan sonar. The inspection of the deployment area may occur at the time of
deployment, but no more than one year prior to deployment. The Permittee shall
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 4 of 11
maintain a deployment buffer of at least 200 feet from any submerged beds of sea
grasses, coral reefs, live bottom, areas supporting growth of sponges, sea fans, soft
corals, and other sessile macroinvertebrates generally associated with rock outcrops,
oyster reefs, scallop beds, clam beds, or areas where there are unique or unusual
concentrations of bottom-dwelling marine organisms. If, during the inspection, evidence
is observed of cultural/archaeological resources, such as sunken vessels, ballast,
historic refuse piles, or careenage areas the Corps will be notified by the Permittee and
the above referenced deployment buffer will be implemented. The Permittee shall
maintain a record of the information gained during the inspection such that it can be
provided upon request to the Corps.
4. Pre-Deployment Notification: No less than 14 days prior to deployment of material
on an artificial reef, the Permittee shall transmit by electronic mail (“email”) a complete
and signed “Florida Artificial Reef Materials Cargo Manifest and Pre-Deployment
Notification” form, attached to this permit, to the Corps and FWC to allow inspection of
the proposed reef materials as deemed necessary by the agencies. Inspection is
allowable at the staging area. By signing the Pre-Deployment Notification the Permittee
certifies that all materials are free from asphalt, petroleum, other hydrocarbons and toxic
residues. The Permittee shall not deploy material if notified by the Corps or FWC that
the material is questionable. The material needs to be evaluated before it is released
for deployment. Any material that is deemed unacceptable for reef material will be
disposed in an approved upland disposal site.
Deployment of the material shall not occur until after the end of the 14-day inspection
period. The Permittee shall ensure both a copy of the Corps permit and the signed
“Florida Artificial Reef Materials Cargo Manifest and Pre-Deployment Notification Form”
are maintained aboard the deployment vessel at all times during loading, transit, and
deployment.
5. Post-Deployment Placement Report/As-Built Drawing: No less than 30 days
after deployment at the reef site, the Permittee shall transmit by email to the Corps,
FWC, and NOAA a complete and signed “Florida Artificial Reef Materials Placement
Report and Post-Deployment Notification” form attached to this permit. Please note, the
Corps requires the latitude and longitude to be accurate within 5 meters horizontal
distance on the post-deployment report. Attach to the report, an as-built drawing that
contains the approximate deployment configurations and the height of the material after
placement. Depth shall be verified utilizing fathometer, depth sounder, or similar device
accurate to within 1 meter. Also, include information on the condition of the material at
the time of deployment. The report and drawing shall be limited to a few pages per
deployment. Representative photographs and/or video, if available, are encouraged to
be submitted.
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 5 of 11
6. Ownership/Maintenance/Liability: By signing this permit, the Permittee certifies
and acknowledges ownership of all artificial reef materials deployed on the reef, accepts
responsibility for maintenance of the artificial reef, and possesses the ability to assume
liability for all damages that may arise with respect to the artificial reef.
7. Assurance of Navigation and Maintenance: The Permittee understands and
agrees that, if future operations by the United States require the removal, relocation, or
other alteration, of the structures or work herein authorized, or if in the opinion of the
Secretary of the Army or his authorized representative, said structure or work shall
cause unreasonable obstruction to the free navigation of the navigable waters, the
Permittee will be required, upon due notice from the Corps of Engineers, to remove,
relocate, or alter the structural work or obstructions caused thereby, without expense to
the United States. No claim shall be made against the United States on account of any
such removal or alteration.
8. Sea Turtle, Smalltooth Sawfish and Sturgeon Conditions: The Permittee shall
comply with the attached National Marine Fisheries Service’s “Sea Turtle and
Smalltooth Sawfish Construction Conditions”, which also applies to sturgeon.
9. Manatee Conditions: The Permittee shall comply with the attached “Standard
Manatee Conditions for In-Water Work – 2011.”
10. Protected Species Guidance: The Permittee shall comply with the attached
“Vessel Strike Avoidance Measures and Injured or Dead Protected Species Reporting”
guidance for marine turtles and marine mammals.
11. Self-Certification: Within 60 days of completion of the authorized work or at the
expiration of the construction authorization of this permit, whichever occurs first, the
Permittee shall complete the attached “Self-Certification Statement of Compliance” form
and submit to the Corps. In the event that the completed work deviates, in any manner,
from the authorized work, the Permittee shall describe, on the Self-Certification Form,
the deviations between the work authorized by the permit and the work as constructed.
Please note that the description of any deviations on the Self-Certification Form does
not constitute approval of any deviations by the Corps.
12. Cultural Resources/Historic Properties:
a. No structure or work shall adversely affect impact or disturb properties listed in the
National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP.
b. If during the ground disturbing activities and construction work within the permit
area, there are archaeological/cultural materials encountered which were not the
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 6 of 11
subject of a previous cultural resources assessment survey (and which shall include,
but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics,
stone tools or metal implements, dugout canoes, evidence of structures or any other
physical remains that could be associated with Native American cultures or early
colonial or American settlement), the Permittee shall immediately stop all work in the
vicinity and notify the Corps. The Corps shall then notify the Florida State Historic
Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s)
(THPO(s)) to assess the significance of the discovery and devise appropriate actions.
c. A cultural resources assessment may be required of the permit area, if deemed
necessary by the SHPO, THPO(s), or Corps, in accordance with 36 CFR 800 or 33 CFR
325, Appendix C (5). Based, on the circumstances of the discovery, equity to all parties,
and considerations of the public interest, the Corps may modify, suspend or revoke the
permit in accordance with 33 CFR Part 325.7. Such activity shall not resume on non-
federal lands without written authorization from the SHPO and the Corps.
d. In the unlikely event that unmarked human remains are identified on non-federal
lands, they will be treated in accordance with Section 872.05 Florida Statutes. All work
in the vicinity shall immediately cease and the Permittee shall immediately notify the
medical examiner, Corps, and State Archeologist. The Corps shall then notify the
appropriate SHPO and THPO(s). Based, on the circumstances of the discovery, equity
to all parties, and considerations of the public interest, the Corps may modify, suspend
or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not
resume without written authorization from the State Archeologist, SHPO and the Corps.
e. In the unlikely event that human remains are encountered on federal or tribal
lands, or in situations where Archaeological Resources Protection Act of 1979, or Native
American Graves Protection Repatriation Act of 1990 applies, all work in the vicinity
shall immediately cease and the Permittee immediately notify the Corps. The Corps
shall then notify the appropriate THPO(s) and SHPO. Based, on the circumstances of
the discovery, equity to all parties, and considerations of the public interest, the Corps
may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. After
such notification, project activities on federal lands shall not resume without written
authorization from the Corps, and/or appropriate THPO(s), SHPO, and federal
manager. After such notification, project activities on tribal lands shall not resume
without written authorization from the appropriate THPO(s) and the Corps.
Further Information:
1. Congressional Authorities: You have been authorized to undertake the activity
described above pursuant to:
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 7 of 11
(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(X) Section 404 of the Clean Water Act (33 U.S.C. 1344).
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33
U.S.C. 1413).
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local
authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed
Federal projects.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not
assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted
or unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or
revocation of this permit.
4. Reliance on Applicant's Data: The determination of this office that issuance of this
permit is not contrary to the public interest was made in reliance on the information you
provided.
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 8 of 11
5. Reevaluation of Permit Decision: This office may reevaluate its decision on this
permit at any time the circumstances warrant. Circumstances that could require a
reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to
have been false, incomplete, or inaccurate (see 4 above).
c. Significant new information surfaces which this office did not consider in
reaching the original public interest decision.
Such a reevaluation may result in a determination that it is appropriate to use the
suspension, modification, and revocation procedures contained in 33 CFR 325.7 or
enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The
referenced enforcement procedures provide for the issuance of an administrative order
requiring you comply with the terms and conditions of your permit and for the initiation of
legal action where appropriate. You will be required to pay for any corrective measures
ordered by this office, and if you fail to comply with such directive, this office may in
certain situations (such as those specified in 33 CFR 209.170) accomplish the
corrective measures by contract or otherwise and bill you for the cost.
6. Extensions: General Condition 1 establishes a time limit for the completion of the
activity authorized by this permit. Unless there are circumstances requiring either a
prompt completion of the authorized activity or a reevaluation of the public interest
decision, the Corps will normally give favorable consideration to a request for an
extension of this time limit.
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 9 of 11
Your signature below, as permittee, indicates that you accept and agree to comply with
the terms and conditions of this permit.
_______________________________________ ____________________
(PERMITTEE) (DATE)
_______________________________________
(PERMITTEE NAME-PRINTED)
This permit becomes effective when the Federal official, designated to act for the
Secretary of the Army, has signed below.
_______________________________________ ____________________
(DISTRICT ENGINEER) (DATE)
Alan M. Dodd,
Colonel, U.S. Army
District Commander
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 10 of 11
When the structures or work authorized by this permit are still in existence at the time
the property is transferred, the terms and conditions of this permit will continue to be
binding on the new owner(s) of the property. To validate the transfer of this permit and
the associated liabilities associated with compliance with its terms and conditions, have
the transferee sign and date below.
_______________________________________ ____________________
(TRANSFEREE-SIGNATURE) (DATE)
_______________________________________
(NAME-PRINTED)
_______________________________________
(ADDRESS)
______________________________________________________
(CITY, STATE, AND ZIP CODE)
PERMIT NUMBER: SAJ-2013-02668 (SP-SWA)
PERMITTEE: Okaloosa County Board of County Commissioners
PAGE 11 of 11
Attachments to Department of the Army
Permit Number SAJ-2013-02668
1. PERMIT DRAWINGS: Three (3) pages, dated 25 February 2014.
2. WATER QUALITY CERTIFICATION: Specific Conditions of the water quality
permit/certification in accordance with General Condition number 5 on page 3 of this DA
permit. Eight (8) pages.
3. SEA TURTLE, SAWFISH AND STURGEON CONDITIONS: One (1) page.
4. MANATEE CONDITIONS: One (1) page.
5. VESSEL STRIKE AVOIDANCE MEASURES: Two (2) pages.
6. FLORIDA ARTIFICIAL REEF MATERIALS CARGO MANIFEST AND PRE-
DEPLOYMENT NOTIFICATION FORM:
7. FLORIDA ARTIFICIAL REEF MATERIALS PLACEMENT REPORT AND POST-
DEPLOYMENT NOTIFICATION FORM:
8. SELF-CERTIFICATION FORM: One (1) page.
UNITED STATES DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
NATIONAL MARINE FISHERIES SERVICE
Southeast Regional Office
263 13th Avenue South
St. Petersburg, FL 33701
SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS
The permittee shall comply with the following protected species construction conditions:
a. The permittee shall instruct all personnel associated with the project of the potential presence of
these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All
construction personnel are responsible for observing water-related activities for the presence of
these species.
b. The permittee shall advise all construction personnel that there are civil and criminal penalties for
harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the
Endangered Species Act of 1973.
c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot
become entangled, be properly secured, and be regularly monitored to avoid protected species
entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from
designated critical habitat without prior agreement from the National Marine Fisheries Service’s
Protected Resources Division, St. Petersburg, Florida.
d. All vessels associated with the construction project shall operate at “no wake/idle” speeds at all
times while in the construction area and while in water depths where the draft of the vessel
provides less than a four-foot clearance from the bottom. All vessels will preferentially follow
deep-water routes (e.g., marked channels) whenever possible.
e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily
construction/dredging operation or vessel movement, all appropriate precautions shall be
implemented to ensure its protection. These precautions shall include cessation of operation of
any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any
mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is
seen within a 50-ft radius of the equipment. Activities may not resume until the protected species
has departed the project area of its own volition.
f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported
immediately to the National Marine Fisheries Service’s Protected Resources Division (727-824-
5312) and the local authorized sea turtle stranding/rescue organization.
g. Any special construction conditions, required of your specific project, outside these general
conditions, if applicable, will be addressed in the primary consultation.
Revised: March 23, 2006
O:\forms\Sea Turtle and Smalltooth Sawfish Construction Conditions.doc
STANDARD MANATEE CONDITIONS FOR IN-WATER WORK
2011
The permittee shall comply with the following conditions intended to protect manatees from
direct project effects:
a. All personnel associated with the project shall be instructed about the presence of
manatees and manatee speed zones, and the need to avoid collisions with and injury to
manatees. The permittee shall advise all construction personnel that there are civil and
criminal penalties for harming, harassing, or killing manatees which are protected under the
Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee
Sanctuary Act.
b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake”
at all times while in the immediate area and while in water where the draft of the vessel
provides less than a four-foot clearance from the bottom. All vessels will follow routes of
deep water whenever possible.
c. Siltation or turbidity barriers shall be made of material in which manatees cannot become
entangled, shall be properly secured, and shall be regularly monitored to avoid manatee
entanglement or entrapment. Barriers must not impede manatee movement.
d. All on-site project personnel are responsible for observing water-related activities for the
presence of manatee(s). All in-water operations, including vessels, must be shutdown if a
manatee(s) comes within 50 feet of the operation. Activities will not resume until the
manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30
minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation.
Animals must not be herded away or harassed into leaving.
e. Any collision with or injury to a manatee shall be reported immediately to the Florida Fish
and Wildlife Conservation Commission (FWC) Hotline at 1-888-404-3922. Collision and/or
injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-
731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida, and to FWC
at ImperiledSpecies@myFWC.com
Vessel Strike Avoidance Measures
and Reporting for Mariners
NOAA Fisheries Service, Southeast Region
Background
The National Marine Fisheries Service (NMFS) has determined that collisions with vessels can
injure or kill protected species (e.g., endangered and threatened species, and marine mammals).
The following standard measures should be implemented to reduce the risk associated with
vessel strikes or disturbance of these protected species to discountable levels. NMFS should be
contacted to identify any additional conservation and recovery issues of concern, and to assist in
the development of measures that may be necessary.
Protected Species Identification Training
Vessel crews should use an Atlantic and Gulf of Mexico reference guide that helps identify
protected species that might be encountered in U.S. waters of the Atlantic Ocean, including the
Caribbean Sea, and Gulf of Mexico. Additional training should be provided regarding
information and resources available regarding federal laws and regulations for protected species,
ship strike information, critical habitat, migratory routes and seasonal abundance, and recent
sightings of protected species.
Vessel Strike Avoidance
In order to avoid causing injury or death to marine mammals and sea turtles the following
measures should be taken when consistent with safe navigation:
1. Vessel operators and crews should maintain a vigilant watch for marine mammals and
sea turtles to avoid striking sighted protected species.
2. When whales are sighted, maintain a distance of 100 yards or greater between the whale
and the vessel.
3. When sea turtles or small cetaceans are sighted, attempt to maintain a distance of 50
yards or greater between the animal and the vessel whenever possible.
4. When small cetaceans are sighted while a vessel is underway (e.g., bow-riding), attempt
to remain parallel to the animal’s course. Avoid excessive speed or abrupt changes in
direction until the cetacean has left the area.
5. Reduce vessel speed to 10 knots or less when mother/calf pairs, groups, or large
assemblages of cetaceans are observed near an underway vessel, when safety permits. A
single cetacean at the surface may indicate the presence of submerged animals in the
vicinity; therefore, prudent precautionary measures should always be exercised. The
vessel should attempt to route around the animals, maintaining a minimum distance of
100 yards whenever possible.
NMFS Southeast Region Vessel Strike Avoidance Measures and Reporting for Mariners; revised February 2008.
6. Whales may surface in unpredictable locations or approach slowly moving vessels.
When an animal is sighted in the vessel’s path or in close proximity to a moving vessel
and when safety permits, reduce speed and shift the engine to neutral. Do not engage the
engines until the animals are clear of the area.
Additional Requirements for the North Atlantic Right Whale
1. If a sighted whale is believed to be a North Atlantic right whale, federal regulation
requires a minimum distance of 500 yards be maintained from the animal (50 CFR
224.103 (c)).
2. Vessels entering North Atlantic right whale critical habitat are required to report into the
Mandatory Ship Reporting System.
3. Mariners should check with various communication media for general information
regarding avoiding ship strikes and specific information regarding North Atlantic right
whale sighting locations. These include NOAA weather radio, U.S. Coast Guard
NAVTEX broadcasts, and Notices to Mariners. Commercial mariners calling on United
States ports should view the most recent version of the NOAA/USCG produced training
CD entitled “A Prudent Mariner’s Guide to Right Whale Protection” (contact the NMFS
Southeast Region, Protected Resources Division for more information regarding the CD).
4. Injured, dead, or entangled right whales should be immediately reported to the U.S. Coast
Guard via VHF Channel 16.
Injured or Dead Protected Species Reporting
Vessel crews should report sightings of any injured or dead protected species immediately,
regardless of whether the injury or death is caused by your vessel.
Report marine mammals to the Southeast U.S. Stranding Hotline: 877-433-8299
Report sea turtles to the NMFS Southeast Regional Office: 727-824-5312
If the injury or death of a marine mammal was caused by a collision with your vessel,
responsible parties should remain available to assist the respective salvage and stranding network
as needed. NMFS’ Southeast Regional Office should be immediately notified of the strike by
email (takereport.nmfsser@noaa.gov) using the attached vessel strike reporting form.
For additional information, please contact the Protected Resources Division at:
NOAA Fisheries Service
Southeast Regional Office
th
263 13 Avenue South
St. Petersburg, FL 33701
Tel: (727) 824-5312
Visit us on the web at http://sero.nmfs.noaa.gov
NMFS Southeast Region Vessel Strike Avoidance Measures and Reporting for Mariners; revised February 2008.
FLORIDA ARTIFICIAL REEF MATERIALS
CARGO MANIFEST AND PRE-DEPLOYMENT NOTIFICATION
(Issued pursuant to Ch. 379.249(6)(b), Florida Statutes)
I, ______________________________________________ ______________________ ________________
Name of individual managing reef deployment (print) Signature Date
whose address is __________________________________________________________, (____) _____ - _____
Street City State Zip Code Phone
declare that I am staging and transporting the following artificial reef construction materials allowable pursuant to
the U.S. Army Corps of Engineers Artificial Reef Permit referenced below and agree to comply with all permit
conditions in the permit listed below and attached to this manifest. I understand this artificial reef site is open to public
access and this authorization does not provide any rights or exclusive private use over those rights or uses to the
general public.
The address of the land based reef materials staging area is: ______________________________________
Transporting Vessel Registration Number: _____________________________________________________
Vessel Owner: _____________________________ Vessel Operator: ______________________________
The following items are to be deployed as reef material (attach additional sheets when more than four locations):
MATERIAL TAG Descriptions of material
ID NUMBER(S), GPS Coordinates
if applicable (number of pieces, type, dimension, weight) degrees, minutes, decimal minutes
(DD°MM.mmm’)
Lat:_____°___.__ __ __’
Lon:____°___.__ __ __’
Lat:_____°___.__ __ __’
Lon:____°___.__ __ __’
Lat:_____°___.__ __ __’
Lon:____°___.__ __ __’
Lat:_____°___.__ __ __’
Lon:____°___.__ __ __’
A copy of the below referenced permit(s) and all associated conditions is attached to this manifest
and shall be carried on board the vessel during loading, storing, or transporting artificial reef material.
-- OFFICIAL USE ONLY --
(TO BE COMPLETED BY PERMIT HOLDER, OR AUTHORIZED ARTIFICIAL REEF INSPECTOR)
Permit Holder: ______________________________________________________________________________
Name of U.S. Department of the Army, Corps of Engineers (ACOE) Permit Holder
ACOE permit number ________________________, permitted site name _______________________________
issued on _________________________________ and has an expiration date of ________________________.
Local tracking number (if applicable): __________________________________________________________
_________________________________________________________
(Name of FWC authorized Artificial Reef Inspector, printed)
_________________________________________________________ ________________
(Signature) (Date)
Revised 4/23/07
EXPLANATION SHEET
FOR THE ARTIFICIAL
REEF MATERIALS CARGO MANIFEST FORM
The attached artificial reef cargo manifest has been developed in compliance with subsection
379.249(6)(b), Florida Statutes, which states that:
“It is unlawful for any person to: store, possess or transport on or across state waters any materials
reasonably suited for artificial reef construction and stored in such a manner providing ready access for use
and placement as an artificial reef, unless a valid cargo manifest issued by the commission or a
commission-certified inspector is onboard the transporting vessel. The manifest will serve as authorization
to use a valid permitted site or land-based staging area, which will validate that the type of artificial reef
construction material being transported is permissible for use at the permitted site, and will describe and
quantify the artificial reef material being transported. The manifest will also include the latitude and
longitude coordinates of the proposed deployment location, the valid permit number, and the copy off the
permit conditions for the permitted site. The manifest must be available for inspection by any authorized law
enforcement officer or commission employee.”
This requirement for a cargo manifest became part of the statutory revision of the artificial reef
program statute Section 379.249 Florida Statutes (F.S.), modified during the 2000 State of Florida
Legislature. The statutory language allows a “commission certified inspector” to complete and approve the
artificial reef materials cargo manifest. Therefore, we are providing the attached cargo manifest form to all
local coastal government artificial reef coordinators and eligible non-profit corporations who may physically
construct artificial reefs with the approval of the permit holders.
INSTRUCTIONS
A separate cargo manifest form is to be completed for each load to be transported offshore
(i.e., one manifest per voyage). The manifest is to list all, and only, the reef materials onboard.
The top of the form is to be filled out by the reef builder with his/her contact information and
the information about the proposed reef materials to be deployed written into the boxes. If several
materials are identical but have different tag numbers, please write “SAME” in the box for the other
materials. Also put “SAME” under additional coordinates if all materials are going to the same
deployment site.
The shaded portion of the form at the bottom is to be filled out by the materials inspector.
The cargo manifest must be completed by an entity representing the holder of the applicable
artificial reef permit to assure that all materials meet the requirements of the permit.
Completion of the artificial reef materials cargo manifest is required for all construction activities.
The requirement to complete this document is not intended to be an undue burden on entities
wishing to legally construct artificial reefs within permitted sites, but is a tool to assist law enforcement
personnel in preventing the illegal construction of artificial reefs without the knowledge of the permit holder
or in areas outside of legally permitted sites. It is intended to allow law enforcement staff to determine
whether or not a load of materials is legal under the permit conditions. Without a properly completed Cargo
Manifest Form on board, reef builders will be returned to port pursuant to Chapter 379.249 (6) (b). It is not
necessary to send a copy of the Cargo Manifest Form to the FWC artificial reef section in Tallahassee.
Documentation of the reef building activity should be maintained by the entity issuing the manifest in the
event of any FWC inquiries.
Reminder: the placement of all public artificial reefs in state or adjacent federal waters requires the
submittal of a Materials Placement Report to the FWC artificial reef program within 30 days of public reef
deployment in accordance with s. 379.249 F.S.
FLORIDA ARTIFICIAL REEF MATERIALS
PLACEMENT REPORT AND POST-DEPLOYMENT NOTIFICATION
To Be Completed For Each Deployment Location or Date of Deployment
County or
Municipality:_____________________________________ Date of Placement:_________________________
Grant No. FWC - ________________________________ U.S. Army Corps
(if applicable) Permit No.: _______________________________
Total project cost: $___________ (Funding Source(s) and Amount(s): FWC $____________ Local $ __________ Other $________)
Name of Permitted Location Name
Reef Site: ________________________________ for This Deployment:________________________
°
Latitude:_____ ______.___ ___ ___’ North Longitude:______ °_______.___ ___ ___’ West
Degrees minutes decimal minutes Degrees minutes decimal minutes
GPS Brand:__________________ GPS Model number:___________
Geographical Location: ______________ at __________degrees from ___________________________________
(nautical miles) (bearing) (reference inlet)
Water Depth:________ feet (minus) Max. Material Height: ________feet (equals) Actual Vertical Clearance: ______feet
TYPE AND AMOUNT OF MATERIAL DEPLOYED AT THE LOCATION DESCRIBED ABOVE:
(ATTACH A PHOTOGRAPH OF THE MATERIAL ON THE BARGE IMMEDIATELY PRIOR TO DEPLOYMENT)
Primary Type of Material:____________________________________________ Number of Pieces:__________
Dimensions:________________________________________________________________________________
Secondary Type of Material:_________________________________________ Number of Pieces:__________
Dimensions:________________________________________________________________________________
How was tonnage calculated?(Check all that apply, attach additional sheets if necessary): Before & after barge draft calculation
Known weight of individual pieces
TOTAL TONNAGE FOR THIS DEPLOYMENT: _______________________ Trucking receipts
I DO HEREBY CERTIFY THAT THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE
Observer’s Name: _________________________________ Title: _________________________________
(PLEASE PRINT) (PLEASE PRINT)
Observer’s Signature: _______________________________ Date: __________________________________
Observer’s Remarks: __________________________________________________________________________
___________________________________________________________________________________________
I DO HEREBY CERTIFY THAT THE ABOVE INFORMATION COMPLIES WITH THE ABOVE REFERENCED PERMIT CONDITIONS
Permittee’s Staff Name: _________________________________ Title: __________________________________
(PLEASE PRINT) (PLEASE PRINT)
Permittee’s Staff Signature: ______________________________ Date: _________________________________
Local Tracking number ______________ FWC Tracking number _______________ Entered by _________ on _________
Rev. 4/23/2007 FWC initials date
SELF-CERTIFICATION STATEMENT OF COMPLIANCE
Permit Number: SAJ-2013-02668 (SP-SWA)
Permittee’s Name & Address (please print or type): __________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Telephone Number: ____________________________________________________________________
Location of the Work: __________________________________________________________________
_____________________________________________________________________________________
Date Work Started: __________________________ Date Work Completed: ______________________
Description of the Work (e.g. bank stabilization, residential or commercial filling, docks, dredging, etc.):
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Acreage or Square Feet of Impacts to Waters of the United States: _______________________________
Describe Mitigation completed (if applicable): ______________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Describe any Deviations from the Permit (attach drawing(s) depicting the deviations):
_____________________________________________________________________________________
_____________________________________________________________________________________
I certify that all work, and mitigation (if applicable) was done in accordance with the limitations and
conditions as described in the permit. Any deviations as described above are depicted on the attached
drawing(s).
______________________________
Signature of Permittee
______________________________
Date