READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 11, 2017 — Constantine Task Order 34 — agenda request — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Constantine Task Order 34 — agenda request — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: July 11, 2017
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Constantine Task Order 34
DEPARTMENT: Water and Sewer
BCC DISTRICT: 5
STATEMENT OF ISSUE: Okaloosa County Water & Sewer (OCWS) staff requests Board of
County Commissioners (BCC) approval for Task Order 34 with Constantine Engineering, Inc.,
per the terms of Contract #C13-2068-WS for a total not to exceed cost of $178,300.00. Task
Order 34, for professional engineering services related to the North Lakeshore Area Sanitary
Sewer Improvements, is attached for your review. This project is on the west/north side of Lake
Pippin.
BACKGROUND: For well over the past 20 years, OCWS has gone into many existing
neighborhoods and constructed sanitary sewer systems that have taken literally hundreds of
septic tanks out of service, in order to improve water quality in our lakes, bays, and bayous.
These are very expensive projects for the County. Connection to the sewer system is mandatory,
so the homeowners end up having to pay thousands of dollars (would be around $10K in 2017)
for the Sewer Capacity Expansion Charges (CECs, $3,200), for a contractor/plumber to install
the service line and properly abandon the septic tank and drain field, and for some, grinder
station installation.
Lake Pippin is one of the larger outstanding coastline residential areas not on public sewer in
Okaloosa County and is located directly on the north shore of Choctawhatchee Bay. There are
approximately 125 single family residential units, each of which has a septic tank. The drain
fields from the septic tanks are discharging treated sewage effluent into the water table that has a
direct connection to Lake Pippin and Choctawhatchee Bay. While we are not aware of any
written studies on the water quality of Lake Pippin itself, public sewer treatment (with nutrient
removal) is a proven higher level of treatment than septic tanks. Septic tanks do not provide for
nutrient removal, such as nitrogen and phosphorous. Over time, nutrient loading is harmful to
water quality, fish life, and the ecosystem.
With this in mind, OCWS applied for a state appropriation for the entire project, knowing it was
over a $4M project. The application was for public sewer on both sides of the lake -
approximately 20 lots on the west/north side (North Lakeshore Drive) and the remainder on the
east/south side (end of County Line Road). The application included funding for both design and
construction of the public sewer system and the homeowners' typical responsibility (CECs,
service line, and septic tank abatement). We were fortunate to be awarded a $2M appropriation,
which was administered via a Florida Department of Environmental Protection (FDEP) Grant
Agreement. The Grant Agreement was approved by the BCC in 2015.
Since the Grant Agreement was executed, numerous action items have occurred. The challenge
was to figure out how to best spend the $2M on a project with a total cost that is well above that
amount. Via Task Order 7, CH2M HILL Engineering conducted an alternatives analysis. This
engineering study primarily consisted of analyzing gravity sewer vs. low pressure sewer, data
gathering (geotechnical and septic tank information), preliminary design, and cost estimates.
The result of this study was a recommendation to design gravity sewer, with a rough order of
magnitude cost exceeding $5M - for design and construction of all needed infrastructure on both
sides of the lake. While the alternatives analysis was occurring, OCWS staff sought feedback
from Eglin AFB and the affected public. Staff submitted an easement request to Eglin Real
Estate and coordinated with Eglin Environmental. Staff conducted two Town Hall meetings with
our Lake Pippin customer base. These meetings were very well attended, and lots of feedback
was provided at the meetings and via phone calls and emails. None of the impacted customers
expressed a desire for low pressure sewer, as they would each have a grinder station; in fact,
there was strong opposition to this solution. Of those that contacted staff via phone and email,
100% of the customers on the west/north side of the lake were in favor of public sewer, and
approximately 40% of the customers on the east/south side of the lake were in favor of public
sewer.
Based on all the information above and knowing that $2M is available, staff recommends the
following project scope and approximate breakdown of funding, subject to change, pending final
design:
~$40,000 - Engineering Evaluation Services (completed)
~$400,000 - Capacity Expansion Charges on both sides of the lake; funding to go directly
towards cost of current Arbennie Pritchett Water Reclamation Facility (APWRF) Expansion
project
~$178,300 - Engineering design (see attached map) and technical services during construction
~$1,381,700 - Construction-related expenses of gravity sewer for lots on west/north side (North
Lakeshore Drive); North Lakeshore Drive Lift Station and associated force main to connect with
existing system on White Point Road; rehab of existing White Point Road Lift Station;
restoration of North Lakeshore Dr. right-of-way (pavement); plumbing from each home to the
proposed public sewer system (right-of-way line); septic tank abatement; dollar amount also
includes any necessary easement acquisition.
Staff believes that the above solution is a win-win for the County and the customer base of Lake
Pippin. The above concept was presented at the latest Town Hall meeting in February 2017, and
was met with overwhelming support. To accomplish the above, for Board consideration and
approval, staff proposes Task Order 34 with Constantine Engineering, not to exceed $178,300.
The scope of work includes engineering design, permitting, bid phase assistance, and
construction phase assistance to accomplish the construction of the above-mentioned
infrastructure. This amount will be reimbursable from the FDEP Grant Agreement. Staff also
intends to move forward with a final CEC count on both sides of the lake, payment of CDM
(design-build contractor for APWRF Expansion), and reimbursement of this approximate $400K
expense. Once these transactions are complete, OCWS staff will apply a payment/credit of 1
CEC per lot, water meter, and/or structure that is built or being designed/permitted by a
homeowner. In other words, if a customer has a single-family home with a detached structure
(i.e. mother-in-law structure), they will receive 2 CEC credits on their account; vacant lots will
receive 1 CEC credit. Staff feels like this solution honors the intent of the grant application and
subsequent grant agreement. All expenses associated with the grant agreement are being
coordinated with FDEP.
OPTIONS: Approve or deny.
RECOMMENDATIONS: Motion for BCC approval to authorize the Chairman to execute
Task Order 34 with Constantine Engineering, Inc. for professional engineering services for the
North Lakeshore Area Sanitary Sewer Improvements project for a not-to-exceed amount of
$178,300.00.