July 11, 2017

Okaloosa County BOCC — July 11, 2017 — Constantine Task Order 34 — agenda request

Constantine Task Order 34 — agenda request in the July 11, 2017 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the July 11, 2017 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1421). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used July 1, 2017; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
July 11, 2017
Publisher
Okaloosa County Board of County Commissioners
Where to find it
3
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Constantine Task Order 34 — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 7.1 KB · 3

Download ↓

Constantine Task Order 34 — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 81.8 KB · 3

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Constantine Task Order 34 — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: July 11, 2017 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Constantine Task Order 34 DEPARTMENT: Water and Sewer BCC DISTRICT: 5 STATEMENT OF ISSUE: Okaloosa County Water & Sewer (OCWS) staff requests Board of County Commissioners (BCC) approval for Task Order 34 with Constantine Engineering, Inc., per the terms of Contract #C13-2068-WS for a total not to exceed cost of $178,300.00. Task Order 34, for professional engineering services related to the North Lakeshore Area Sanitary Sewer Improvements, is attached for your review. This project is on the west/north side of Lake Pippin. BACKGROUND: For well over the past 20 years, OCWS has gone into many existing neighborhoods and constructed sanitary sewer systems that have taken literally hundreds of septic tanks out of service, in order to improve water quality in our lakes, bays, and bayous. These are very expensive projects for the County. Connection to the sewer system is mandatory, so the homeowners end up having to pay thousands of dollars (would be around $10K in 2017) for the Sewer Capacity Expansion Charges (CECs, $3,200), for a contractor/plumber to install the service line and properly abandon the septic tank and drain field, and for some, grinder station installation. Lake Pippin is one of the larger outstanding coastline residential areas not on public sewer in Okaloosa County and is located directly on the north shore of Choctawhatchee Bay. There are approximately 125 single family residential units, each of which has a septic tank. The drain fields from the septic tanks are discharging treated sewage effluent into the water table that has a direct connection to Lake Pippin and Choctawhatchee Bay. While we are not aware of any written studies on the water quality of Lake Pippin itself, public sewer treatment (with nutrient removal) is a proven higher level of treatment than septic tanks. Septic tanks do not provide for nutrient removal, such as nitrogen and phosphorous. Over time, nutrient loading is harmful to water quality, fish life, and the ecosystem. With this in mind, OCWS applied for a state appropriation for the entire project, knowing it was over a $4M project. The application was for public sewer on both sides of the lake - approximately 20 lots on the west/north side (North Lakeshore Drive) and the remainder on the east/south side (end of County Line Road). The application included funding for both design and construction of the public sewer system and the homeowners' typical responsibility (CECs, service line, and septic tank abatement). We were fortunate to be awarded a $2M appropriation, which was administered via a Florida Department of Environmental Protection (FDEP) Grant Agreement. The Grant Agreement was approved by the BCC in 2015. Since the Grant Agreement was executed, numerous action items have occurred. The challenge was to figure out how to best spend the $2M on a project with a total cost that is well above that amount. Via Task Order 7, CH2M HILL Engineering conducted an alternatives analysis. This engineering study primarily consisted of analyzing gravity sewer vs. low pressure sewer, data gathering (geotechnical and septic tank information), preliminary design, and cost estimates. The result of this study was a recommendation to design gravity sewer, with a rough order of magnitude cost exceeding $5M - for design and construction of all needed infrastructure on both sides of the lake. While the alternatives analysis was occurring, OCWS staff sought feedback from Eglin AFB and the affected public. Staff submitted an easement request to Eglin Real Estate and coordinated with Eglin Environmental. Staff conducted two Town Hall meetings with our Lake Pippin customer base. These meetings were very well attended, and lots of fe

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — July 11, 2017 — Constantine Task Order 34 — agenda request.” July 11, 2017. Action Item Printout. Crypt of Echoes evidence ID LED-2026-dcad4b62368d4858b13c1d15557122d4. https://cryptofechoes.com/evidence/LED-2026-dcad4b62368d4858b13c1d15557122d4. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Constantine Task Order 34 — agenda request, meeting materials for July 11, 2017. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=26109&MeetingID=1421

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓