TASK ORDER APPROVAL FORM
CONITRACT #:_C14-2078-PW
TASK ORDER #:_06
TASK ORDER AMOUNT:_$138.367.19
OFFERED BY CONSULTANT:
HDR Engineering, Inc.
FIRM'S NAME
EDWARo J )Hupet
P
[
REPRESENTATIVE)PRI%TED NAME
SIGNATURE 4
SENLo PROTECT GNGINEER
3//7//5’
TITLE
RECOMMENDED FOR APPROVAL
(Department Director)
b
IGNATURE ~ \/
{ ‘
Public Wo‘?ks Director
TITLE
[ B
. n/ (5
DATE |
COUNTY ADMINISTRATOR (if applicable)
DATE
DATE /
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
o $25,000 or less approved by Purchasing
Director
o Between $25,001 and $50,000 approved by
Purchasing Director and County
Administrator
¢ Inexcess of $50,000 approved by the Board.
PURCHASING DIRECTOR
DATE
CHAIRMAN (if applicable)
DATE
FoR
February 23, 2015
Mr. Jason Autrey P.E.
County Engineer
Okaloosa County Public Works
1759 S. Ferdon Blvd.
Crestview, FL 32536
County Project Name: Martin Luther King Jr. Blvd. & Green Acres Road Rehabilitation
County: Okaloosa
RE: Fee Proposal — Task Work Order
Dear Mr. Autrey,
HOR is requesting a Task Order for the amount of $138,367.19. This Task Order will cover the expenses needed
to provide Okaloosa County with Construction Engineering and Inspection (CEl) for the above mentioned
project.
if you have any guestions or comments, please contact me at 850.835.1561.
Sincerely,
Ed Hudec H§.E!
Senior Prdject Engineer
hdrinc.com
19805 US Highway 331 South, Freeport, FL 32439.4743
(850} 835-1561
FoR
Martin Luther King Blvd. & Green Acres Road Rehabilitation
Construction Engineer and Inspection Services
¢ Total Not to Exceed Amount $138,367.18
Ed. Hudec P.E. Senior Project Engineer
Print Name Title
“i{; . |
ignature
hdrinc.com
19805 US Highway 331 South, Freeport, FL 32439.4743
(850) 835-1561
CEI SCOPE OF SERVICES
TABLE OF CONTENTS
TASK SERIES 1000 - MEETINGS ADMINISTRSATION
1005 - Preconstruction Conference
1010 - Construction Meetings
TASK SERIES 1100 - SUBMITTALS ADMINISTRATION
1105 - Review and Approval of Shop Drawing Submittal Schedule
1110 - General Administration of Submittals
1115 - Review of Shop Drawing Status and Scheduling
1120 - Evaluate Requests for Substitution
TASK SERIES 1200 - SCHEDULE ADMINISTRATION
1205 - Review and Approval of Initial Construction Schedule
1210 - Documentation of Construction Progress
1215 - Review Actual Construction versus Schedule Status
TASK SERIES 1300 - CONSTRUCTION OBSERVATION AND INSPECTION
1305 - General Construction Observation
1310 - Site Conditions Review
1315 - Verification Testing & Inspection
1320~ Coordinate and Review Soils Testing
1325-Coordinate and Review Concrete Testing
1330 -Coordinate and Review Asphalt Testing
1335 - Stored Materials/Equipment Review
1340 - Design Discipline Site Visitations
1345 - Coordinate Project Photo and Video Documentation
1350 - Record Drawing Review
1355 - Develop a Progressive List of items Requiring Correction
1360 - OWNER Noatification of Accident Damage/Injury
TASK SERIES 1400 - CONTRACT INTERPRETATIONS AND MODIFICATIONS
ADMINISTRATION
1405 - Ceordinate Interpretations Review
1410 - Administration of Changed Work
1415 - Coordinate and Issue Interim Field Change Agreements (IFCA)
1420 - Coordinate and Issue Requests for Proposals (RFP's)
1425 - Work Change Directives (WCD's)
1430 - Change Orders (CO's)
TASK SERIES 1500 - MEASUREMENT AND PAYMENT ADMINISTRATION
1505 - Review and Process Progress Payments
TASK SERIES 1600 - PROJECT CLOSEOUT
1605 - Review Substantial Completion Submittal
1610 - Conduct Substantial Completion Inspection
1615 - Issue Certificate of Substantial Completion and Punch List
1625 - Document Project Warranties
1630 - Review Final Completion Submittal
1635 - Conduct Final Completion inspection
1640 - Recommend Final Payment
CONSTRUCTION ENGINEERING & INSPECTION (CEIl)
SCOPE OF SERVICES
SCOPE STATEMENT AND OBJECTIVE
This Scope of Services is for HDR Construction Control Corp. {"Consultant”) to provide
construction engineering, inspection, and construction contract administration services
("Services") to Okaloosa County ("OWNER") related to the CEl Services for MLK Jr. Blvd. &
Green Acres Road Rehabilitation {"Praject”).
SCOPE OF SERVICES
CONSULTANT will assist OWNER with ongoing Project implementation by conducting the
following tasks:
TASK SERIES 1000 - MEETING ADMINISTRATION
Objective: Canduct and document construction phase meetings in order fo facilitate
effective Projectcommunications.
CONSULTANT
Activities: 1005 - Preconstruction Conference
+ |dentify with OWNER and Contractor the parties to be included in the
meeting.
= Notify all parties as to the time and place of the meeting. Provide
preliminary agenda for attendee input.
= Prepare final meeting agenda and produce copies for all expected
participants for distribution at meeting.
= Prepare meeting place and provide for meeting documentation.
= |ncorporate meeting discussions in final preconstruction meeting
minutes.
= Distribute meeting minutes to all persons in attendance and to
parties on meeting notice list not in attendance.
1010 - Construction Meetings
* Provide standard formats for meeting agenda, notes and attendance
rosters to promote consistent identification of meeting notes for filing
and cross referencing purposes.
Establish date, place and agenda for regular construction meetings.
Determine who is to be involved and notify them of schedule.
Arrange for adeguate meeting room and furnishings.
Prepare agenda and distribute copies to those in attendance.
Conduct meetings and document discussions.
Distribute meeting minutes to all in attendance, and predetermined
attendees not in attendance, within one week of meeting.
TASK SERIES 1100 - SUBMITIALS ADMINISTRATION
Objective: Provide administrative and technical support for the administration,
review and approval of Contractor's submittals to determine Contractor's
understanding of material and equipment requirements.
CONSULTANT
Activities:
1105 - Review / Approval - Shop Drawing Submittal Schedule - EOR
Review Shop Drawing Submittal Schedule.
Notify Contractor of acceptance or rejection noting deficiencies and
requesting correction of them and resubmittal.
Distribute copies of approved schedule to design team members
responsible for Shop Drawing reviews.
1110 - General Administration of Submittals
Receive, log and distribute submittals received from Contractor to
design team for review,
Provide timely review and re-distribution of Shop Drawings,
miscellaneous submittals, and other submittal information.
Establish organized storage for samples and a tracking log for
samples.
1115 - Review of Shop Drawing Status and Scheduling
Review weekly the approved submitted schedule and the actual
Shop Drawing Log for comparison.
Review Shop Drawing Submittal Log in regard to requirements that
all Shop Drawings must be submitted and approved prior to percent
completion defined in Contract Decuments.
Utilize Shop Drawings Submittal Schedule as a checklist item for
application for payment.
Notify Contractor of deficiencies.
Address general status of Shop Drawings at Construction Meetings.
Address Contractor's requests for Shop Drawing review of critical
equipment and materials prior to having an approved submittal
schedule.
1120 - Evaluate Requests for Substitution
Review substitution requests in terms of quality, cost, constructability
and secondary Project impact.
Assist OWNER in negotiating any cost or time considerations,
additive or deductive, associated with a product substitution.
TASK SERIES 1200 - SCHEDULE ADMINISTRATION
Objective:
CONSULTANT
Activities:
Obtain, through the Contractor, a detailed construction schedule (CPM)
that meets the Contract Document requirements and is useful for
monitoring construction progress throughout the Project.
1205 - Review and Approval of Initial Construction Schedule
Review schedule for major elements of the Project and for
conformance to any specified schedule sequences and completion
dates.
Notify Contractor with acceptance or rejection noting deficiencies
and requesting correction and re-submittal.
Meet with OWNER and Contractor to reconcile disputed schedule
deficiencies and document reconciliation of disputed deficiencies.
1210 - Documentation of Construction Progress
« Estimate value of partially completed elements of the Schedule of
Values.
* Provide monthly reports to OWNER as back-up to recommendation
of monthly progress payment.
1215 - Review Actual Construction versus Schedule Status
= Identify critical path activities that have not reached scheduled
milestenes.
+ Identify critical path activities whose durations have not expired that
are obviously realizing lower productivity rates than reflected in the
schedule.
= Identify non-critical activities whose durations are about to equal or
exceed the remaining float along that path.
* Identify critical path activities that are scheduled to start but have not
been started.
» Notify Contractor in writing of schedule deficiencies and request a
corrective action plan and revised schedule indicating the means of
regaining schedule losses.
« Observe construction activity to verify implementation of corrective
action plan.
TASK SERIES 1300 - CONSTRUCTION OBSERVATION AND INSPECTION
Objective:
CONSULTANT
Activities:
Provide part-time (as needed) observation, inspection, recording and
reporting of the Contractor's work progress to determine the work is in
general conformance with the requirements of the Contract Documents.
Document activity observed making note of deficiencies and any issues
requiring resolution.
1305 - General Construction Observation
* Create and file daily work reports defining specified work completed
and Contractor work force figures.
= Monitor construction activity to verify conformance with Contract
Documents and document activities and observations.
= Record weather condition information
= Record Requests for Interpretation of Contract Document's
provisions.
* Note construction deficiencies and punch list items.
= Generate photographic or video dacumentation.
1310 - Site Conditions Review
» Review overall condition of site for excessive construction debris or
erosion, and proper drainage and access
* Review protection provisions for existing structures, piping, trees and
other items designated to be protected.
* Document deficiencies and notify the Contractor,
1315 -Verification Testing & Inspection {As Required)
= Provide (as needed) verification testing & inspection for earthwork,
structures, Asphalt and concrete per Okaloosa County specifications
and frequency of testing schedule.
= Utilize a materials testing laboratory for all material testing in
conjunction with field verification testing.
1320 - Coordinate and Review Testing of Earthwork (as required)
= Establish communication of test result procedures and protocols with
testing laboratory and Contractor.
* Review all test results to verify compliance with specified
requirements and maintain Project L.og or Density Log Book.
= Verify areas of failing compaction are corrected to specified criteria.
1326 - Coordinate and Review Concrete Testing (as required)
= Review concrete mix design with the Engineer and Contractor to
establish specification compliance relative to addition of water to
concrete on site.
= Initiate & verify a sampling program to verify the correct numbers of
cylinders are taken as called for in the specifications.
* Review field data to verify other items such as slump, air entrainment
and special admixtures are in accordance with the Contract
Documents.
* Review each failing compressive strength test to determine structural
implications and course of corrective action required.
= Notify Contractor of subsequent testing which is required.
1330 -Coordinate and Review Asphalt Testing (as required)
= Provide verification testing & inspection for asphalt and bituminous
materials.
* Determine and/for review Composite Pay Factors
1335 -