READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 4, 2014 — reading text
Part 1 of 13. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Budget Workshop
Okaloosa County Board of Commissioners
Monday, August 4, 2014– 6:00 PM
Crestview Courthouse
I. Update From Previous Workshop
II. Road/Bridge Construction – pg. 2
III. Traffic Maintenance – pg. 54
IV. Engineering – pg. 58
V. Road Department – pg. 66
VI. Stormwater Management – pg. 70
VII. Solid Waste – pg. 76
VIII. Mosquito Control – pg. 77
IX. County/Unincorporated Parks – pg. 81
X. Court Services/Judicial – pg. 87
XI. Agriculture/Extension – pg. 92
XII. Public Comments
Okaloosa County adheres to the Americans with Disabilities Act and will make reasonable accommodations for
access to this meeting upon request. Please call the County Administrator’s Office at (850) 651-7515 to make a
request. For Hearing Impaired, Dial 1-800-955-8771 (TDD), and 1-800-955-8770 (Voice). Requests must be
received at least 48 hours in advance of the meeting in order for Okaloosa County to provide the requested service.
Revised: 8/1/2014 3:04 PM Page 1 of 1
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: August 4, 2014
TO: Honorable Chairman and Members of the Board
FROM: Ernie Padgett, County Administrator
SUBJECT: Road/Bridge Construction
The attached document provides the Performance-Based Budget for Road/Bridge Construction.
Packet Pg. 2
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: ROAD/BRIDGE CONSTRUCTION
PROGRAM DESCRIPTION: The Public Works Department provides to the public; road and stormwater
construction, enhancement, and replacement; resurfacing and open graded hot mix asphalt (formerly cold mix
base stabilization); bridge construction; and other major infrastructure construction services. Projects are
performed by in-house staff as well as contract services. The division also provides both rescue and recovery
operations during disasters and other emergencies which impact road and stormwater infrastructure
REVENUE: Road and Bridge Construction is funded within the Road & Bridge Construction Fund.
Supporting revenue of the Road & Bridge Construction Fund are “non-discretionary” (local option gas tax
(LOGT)) fuel taxes, constitutional gas taxes (CGT), interest, other miscellaneous revenue and state grants.
EXPENDITURES:
Expenditures Budget
FY12 FY13 FY14 FY15
Category Actual $ Actual $ Original $ Approved $
Operating Expenses 496,662 1,009,302 2,025,000 1,502,000
Capital Outlay 3,495,141 2,210,441 6,531,000 12,417,161
Grants & Aid 308,167 0 0 0
Budget-Transfer 0 800,000 0 0
Reserves 0 0 5,486,500 359,839
Total 4,299,970 4,019,743 14,042,500 14,279,000
MAJOR ACCOMPLISHMENTS LAST YEAR:
Clear Creek Road – Dirt to pave
West Plympton – Dirt to pave
Reeves Road Bridge – Timber to Concrete/Steel Bridge Conversion
Millings Conversion Roads
o Stateline Road
o John B. Cadenhead Road
Foxwood Subdivision Phase II – Drainage improvements and resurface.
Resurfacing:
9.0 miles of restored/preserved hot mix roads (resurface list)
5.3 miles of restored cold mix road (cold mix preservation list)
Packet Pg. 3
PROGRAM GOAL: The mission of the Okaloosa County Public Works Department is to provide
transportation and infrastructure services to residents and visitors of Okaloosa County. The goal is to
accomplish this mission through its six primary divisions: Engineering, Environmental Services, Traffic
Operations, Roads, Resources, and Administrative Services.
KEY OBJECTIVES:
1. To construct the roads, bridges, and associated infrastructure to support the transportation needs of
unincorporated Okaloosa County.
2. Complete the annual Overlay Program for Commissioner Districts 1 – 5.
3. Rehabilitate cold mix roads that are currently near or beyond their life expectancy
4. Oversee contracted construction projects.
5. Convert wooden bridges to concrete.
6. Oversee/Construct Emergency Watershed Projects.
7. Bridge conversion from timber to concrete.
8. Stabilize dirt roads with millings.
9. Antioch Road – Drainage improvements and resurface.
10. Okaloosa Lane – Dirt to pave.
11. Gilmore Road – Dirt to pave.
12. Kervin Road – Install drainage swales and stabilize road.
13. Lighthouse Church Road – Drainage improvements and resurface.
14. Robinson Road – Dirt to pave.
15. Stateline Road – Dirt to pave.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY11/12 FY12/13 FY13/14
Number of FTEs 95 95 94
Input
Constitutional / Local Option Gas Tax Projected Revenue $3,450,000 $3,450,000 $3,450,000
Miles of roads resurfaced 19.8 20.1 20
Output
Miles of roads restriped 24.7 25 13.2
Jurisdictional miles of roads maintained 939 942 944
Efficiency
Miles of cold mix stabilized roads rehabilitated 8 10 5.3
Effectivenes
Miles of dirt roads improved 0.9 0.84 10
Bridge conversions 2 1 3
Packet Pg. 4
Road & Bridge
Road
Traffic
Engineering
Stormwater
Solid Waste
Recycling
Mosquito Control
Parks
FY15 Budget
Packet Pg. 5
Road/Bridge
Funded by Local Option and Constitutional Gas Taxes (LOGT / CGT)
1 Program
Description 2 Revenue
3 Key Objectives
Provides to Public Funded with
Fuel Taxes •Overlay Asphalt Roads
•Road & Bridge Construction
•Local Option Gas Taxes •Rehabilitate Cold Mix Roads
•Stormwater Construction (LOGT)
•Watershed Projects
•Resurfacing and Asphalt • Constitutional Gas Taxes
Millings Base Stabilization (CGT) •Convert Wooden Bridges to
Concrete
•Open Graded Hot and Cold •Interest
Mix Road Paving •Stabilize Dirt Roads
•Other miscellaneous
•Rescue & Recovery during
Disasters
Packet Pg. 6
Major Accomplishments
ü Clear Creek Road – Dirt to Pave
ü West Plympton – Dirt to Pave
ü Millings Conversions
• Stateline Road
• John B. Cadenhead Road
ü Foxwood Subdivision Phase II – Drainage Improvements
ü Converted Old River Road at Deadfall Creek and Reeves Road
bridge from timber to steel/concrete
Packet Pg. 7
LOGT & CGT Operating Budget History
FY12 FY13 FY14 FY15
Actual Actual Proposed
Operating Expenses 496,662 1,009,302 2,025,000 1,502,000
Capital Outlay 3,495,141 2,210,441 6,531,000 12,417,161
Grants & Aid 308,167 0 0 0
Budget Transfer 0 800,000 0 0
Reserves 0 0 *5,486,500 359,839
Total 4,299,970 4,019,743 14,042,500 14,279,000
*Previous year project seed monies earmarked for projects dropped back into reserves.
In future budgets monies will carried forward into specific project accounts.
Packet Pg. 8
Available Gas Tax Revenue (LOGT/CGT)
$4,500,000
Net Available Revenue for Projects
$4,000,000
$3,500,000 Annual Recurring Expenses
$3,000,000
Equipment
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$0
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Note: Revenues estimated for 2014 & beyond. Chart reflects
revenues only and is exclusive of reserves and cash carry forward
Packet Pg. 9
Road Division
Packet Pg. 10
Road Division
County Transportation Trust Fund (CTTF)
1 Program
Description 2 Revenue
3 Key Objectives
Provides to Public Funded with
County Transportation •Road Maintenance
•Road & Bridge Maintenance Trust Fund •Paved
•Dirt
•Stormwater Maintenance and •Fuel Taxes
Repairs •Stormwater infrastructure
•Half-cent sales tax maintenance
•Rescue & Recovery during
Disasters •Charges for service •Right-of-way Maintenance
•Interest •Respond to Citizen’s calls
•Transfers •Oversee Contracted
Projects
•Other miscellaneous
Packet Pg. 11
Major Accomplishments
MAINTAINED
ü 671 Miles of PAVED roadway
ü 74 Miles of COLD MIX base stabilized
ü 199 Miles of DIRT roadway graded
ü 223 Retention ponds
ü 727 Miles of right-of-way mowed
ü 1,680 Tons of milled asphalt placed on
