ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
DATE: May 26, 2015
RFP #: WS 01-15
ADDENDUM NO. 3
TO THE RFQ DOCUMENTS:
Request for Proposals
Arbennie Pritchett WRF Expansion Design-Build Project
Okaloosa County Water and Sewer System
Okaloosa County, Florida
To All Document Holders:
The following modifications, additions, and or deletions are hereby made a part of the Request
for Proposals for the Arbennie Pritchett Water Reclamation Facility Expansion Design-Build
Project, RFP # WS 01-15 as fully and completely as if the same were fully set forth therein:
Procurement Documents – Volume I
REQUEST FOR PROPOSALS (RFP) & PROPOSER’S ACKNOWLEDGEMENT
Cover Page, RPF OPENING DATE AND TIME:
CHANGE the Proposal Due Date from May 29, 2015 4:00 P.M. CT to June 5, 2015 4:00 P.M
Request for Proposal (RFP) and Proposer’s Acknowledgment page
RFP OPENING DATE & TIME:
CHANGE May 29, 2015 4:00 P.M. CT to June 5, 2015 4:00 P.M
LAST DAY FOR QUESTIONS:
CHANGE May 15, 2015 3:00 P.M. CT to May 22, 2015 4:00 P.M. CT
Section 3.3 Pre-Proposal Proprietary Design Review Meetings
Page 3-2,REVISE the Location and Meeting No.2 dates and times to the following:
a. DELETE in its entirety, the second sentence that ends with “..at the Okaloosa Admin
Building” and REPLACE it with ”…at the Arbennie Pritchett WRF Training Room.”
b. CHANGE the following meeting:
CDM Smith from May 14, 2015 to May 21, 2015, 9:00 am to 11:00 am
c. DELETE the following:
Garney Construction, May 14, 2015
Crowder Construction, May 14, 2015
ADDENDUM NO. 3
Project No. 100557 Revised: 5/26/2015
1
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
Section 3.11 Schedule
Page 3-5, DELETE in its entirety Table 2- Procurement Schedule and REPLACE with the
following:
Table 2
Procurement Schedule
Activity Date
RFP Issuance March 30, 2015
Pre-Proposal Meeting and Site Visit April 14, 2015, 2:00 pm
Meetings with Each Proposer As Outlined in 3.3 Above
Deadline for Written Questions/ Comments from Proposers May 22, 2015
Deadline for Issuance of Final Addenda May 27, 2015
Proposal Due Date June 5, 2015
Proposer Interviews June 25, 2015
Technical Ranking and Identification of Recommended June 25, 2015
Proposer (Unless additional clarification is
deemed necessary)
Board Approval of Technical Ranking and Recommended Ratified at first Board of
Proposer Commissioners Meeting following
Recommendation
Negotiations with Recommended Proposer To begin upon Board Approval of
Recommended Proposer
Notice to Proceed To begin upon Board approval of
Recommended Proposer
Section 4.2.1 Proposal Deadline and Address for Submittal
REVISE first sentence to read: “Proposals shall be submitted on or before 4:00 p.m., CST on
June 5, 2015.”
Procurement Documents – Volume II DCP
Page 1-5, DCP Section 1.2.5.2.2 Revise paragraph to read:
“Install improvements to increase the velocity in the influent channels to eliminate scum build up in
channels. Operators report that there is a buildup of scum in the influent channels downstream of
the influent screens and upstream of the grit handling equipment. OCWS is requesting alternative
solutions to eliminate or reduce the buildup of scum in this section of the influent channels.”
Questions and Answers
1. Q: Section 2.2.1.1, Bullet 4 - i. 1.5 lb O2/lb BOD5 would be used for an extended aeration
system at SRTs well beyond 8 days. There is published literature relating SRT to this ratio.
Could these be used instead?
A: In response to the question regarding the application of an alternative oxygen demand
based on BOD5, REFER to Page 2-3, the fourth bullet that begins with “Oxygen
ADDENDUM NO. 3
Project No. 100557 Revised: 5/26/2015
2
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
Requirements – Either…”. The determination of alternative oxygen requirements shall
comply with this requirement of the Design Criteria Package.
2. Q; 2.13.1 2 Our Professional Liability is with a carrier not licensed (but authorized) to do
business in Florida. Is this acceptable.
A: An authorized “Surplus Lines” carrier will be acceptable.
3. Q: 2.13.1.7 The only way to provide insurance as required in section 2.13.1.7 is to provide a
“Project Specific” Insurance policy. Is this what you want?
A: The D/B Contractor (Prime Contractor) shall name the County as an additional insured
and reference the Project. The Prime Contractor’s policy should automatically include
coverage for sub-contractors unless they are specifically excluded in the policy. In addition,
the Prime Contractor should have their subcontractor name both the County and the Prime
Contractor as an additional insured for the Project.
4. Q: 2.13.1.8 Certified copies of policies are generally no longer provided. An “uncertified”
copy of the policy could be provided at your discretion, will this be acceptable.
A: A notarized copy will be an acceptable.
5. Q: 2.13.3.2 Contractual Liability and Broad Form Property Damage (BFPD) are not specific
coverages that are specified in any policy. Please specifically define what you require. BFPD
was eliminated in 1986 and largely incorporated in to standard policies please specify exactly
what you want.
A: DELETE “Broad Form Property Damage (BFPD)”.
6. Q: 2.13.3.4 “Independent Respondent’s Liability” is not generally provided – if you require
this insurance a “project specific “policy will have to be provided. Is this what you want?
A: DELETE “Independent Respondent’s Liability”.
All Document Holders shall acknowledge receipt and acceptance of Addendum No. 1 in the
Proposal or by submitting the executed Addendum to Constantine Engineering prior to Proposal
Submittal.
Constantine Engineering
//Signed//
Joey G. Crews
Receipt acknowledged and conditions agreed to this
_________day of , 2015
BIDDER
ADDENDUM NO. 3
Project No. 100557 Revised: 5/26/2015
3
ARBENNIE PRITCHETT WRF EXPANSION DESIGN-BUILD PROJECT
By
END OF ADDENDUM NO. 3
ADDENDUM NO. 3
Project No. 100557 Revised: 5/26/2015
4