Action Item Printout from the Okaloosa County BOCC meeting of April 1, 2014 (IQM2 meeting #1196). Original portal label: Action Item Printout. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Action Item Printout
- Date
- April 1, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Action Item Printout (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 344.4 KB
Download ↓Machine-extracted text — 119-Action Item Printout.pdf
Text extracted on 2026-10-31 from 119-Action Item Printout.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 2.5 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: April 1, 2014
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Constantine Task Order 70 Revision 1
DEPARTMENT: Water and Sewer
BCC DISTRICT: 1&5
STATEMENT OF ISSUE: OCWS has requested the services of Constantine Engineering under
Task Order 70 Revision 1 per the terms of Contract #C05-1154-WS. Revision 1 (attached) adds
$12,800.00 to the current Task Order amount, for a new Task Order total of $164,300.00.
BACKGROUND: Constantine Task Order 70, for $151,500, was approved by the BCC in
February 2013. Task Order 70 directed Constantine to design, permit, and manage the
construction of a new 4.2 MGD sewer repumping station. The project includes installing a new
repump station to
allow OCWS to divert the flow from the old Niceville Valparaiso Regional WWTF and pump all
of the wastewater received from the East County Sewer Service Area via the Meigs-Seminole
Pump Station to the Arbennie Pritchett Water Reclamation Facility (APWRF). For a more
detailed background on Constantine Task Order 70, please see the attached past agenda request.
This same background applies to Revision 1.
As part of this project, a building will be constructed to house the above-ground pumps and
electrical equipment, in a climate-controlled environment. When the scope of work was defined
early on (before design began) and included with Task Order 70, staff did not know the type,
size, or method of building construction. Our plan now is to put together bid documents to
contract out the construction of this building, that would include a metal building (approximately
45' x 25'), the foundation, MEP (mechanical, electrical, and plumbing work non-associated with
the pumps & panels), and other appurtenances. As bid documents are formulated, architectural
services are needed to design this building and associated infrastructure. Revision 1 of Task
Order 70 adds $12,800 in scope of work for architectural design services and associated support
(permitting assistance, bid phase services, and services during construction).
OPTIONS: Approve or deny.
RECOMMENDATIONS: OCWS requests BCC approval to authorize the Chairman to execute
Constantine Task Order 70 Revision 1, adding $12,800.00, for a total not to exceed amount of
$164,300.00 on the Task Order.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator