Recommendation of Award — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
May 28, 2015
Mr. Tracy Stage, A.A.E.
Deputy Director
Okaloosa County Airports
1701 State Road 85 N
Eglin AFB, Florida 32542‐1413
Re: Recommendation of Award; Bid No. AP 37‐15
Checked Baggage Screening
Destin – Fort Walton Beach Airport
Dear Mr. Stage,
We have reviewed the bids submitted on April 29, 2015 for the above referenced project.
The County had a total of three bidders. A summary of their bids is provided below:
Base Alt 1 Alt 2 Alt 3 Alt 4 Total
Lord and Son Construction,
$3,502,100 $139,200 $75,400 $93,000 $17,300 $3,827,000
Inc.
Cathey Construction and
$3,515,582 $143,167 $77,864 $95,590 $18,027 $3,850,230
Development LLC
Pinnacle Construction Support
$3,890,326 $142,360 $77,063 $95,052 $17,600 $4,222,401
Group, Inc.
Lord and Son Construction, Inc., (L&S) has been determined to be the lowest responsive
bidder. Details of their bid are listed below:
o History‐ L&S is based out of Fort Walton Beach and has been in business for 40 years.
They have successfully performed numerous projects in the area, for the County of
Okaloosa and at the Airport.
o Size of Firm‐ Bonding capacity is $50M single project and $100M aggregate.
o Subcontractor‐ The conveyor mechanical system equipment supplier and installer they
identify Logan Teleflex. They have current relevant airport experience in baggage
handling systems and have a good reputation throughout the industry. They are based
out of Louisville Kentucky.
5020 West Linebaugh Avenue
Suite 240 | Tampa, FL 33624
(813) 889-3892 | (813) 889-3893 Fax
o DBE participation‐ The County goal is 4.3%. L&S does not list any DBE suppliers or
subcontractors but they have adequately completed the form “Statement of Good
Faith Effort”.
o A bid bond and copy of insurance was provided. All required forms were satisfactory
completed. All six addendums were acknowledged. In our review, we found no major
unbalanced unit prices and no irregularities with their bid.
Funding‐ The cost for this project is funded exclusively through a $4,318,169 Other
Transaction Agreement (OTA) agreement with the Department of Homeland Security
Transportation Security Administration. No local funds are anticipated.
A description of the alternates is provided below for your consideration.
ALTERNATE No. 01: To furnish and install a new flat plate conveyor at the TC-1 line within the baggage make up
area as part of the new BHS system. The work shall include programming, integration of the new flat plate, removal of
the existing flat plate, and all work required for a complete and functioning system.
ALTERNATE No. 02: To remove and reinstall the new temporary flat plate conveyor at the TC- 2 line within the
baggage make-up area, as part of the new BHS system, after the temporary line is no longer needed. The work shall
include programming, integration of the new flat plate, removal of the existing flat plate at TC-2, and all work required
for a complete and functioning system.
ALTERNATE No. 03: To furnish and install two new in-line power faced-baggage-diverters, that shall be networked
with the entire BHS system, including removal of the two existing diverters between the ticket counter and the
Baggage Screening area (CBIS), if this alternate is accepted by the owner.
ALTERNATE No. 04: To furnish and provide Owner-Directed Baggage Handling System software and integration
Programming modifications after Initial Owner and TSA