March 17, 2015

Okaloosa County BOCC — March 17, 2015 — Task Order 3

Task Order 3 in the March 17, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-generated OCR reading text.

FILED WITH

About this source

Preserved among the March 17, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1251). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used Feb 18, 2014; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Task Order 3
Date
March 17, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
4
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source identity and meeting date checked. OCR text has not received independent human proofreading; consult the scan for names, numbers and uncertain characters.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Task Order 3 — extracted reading text

Machine OCR from page images of the unchanged preserved PDF with source page boundaries retained. Not independently human proofread; consult the original scan for uncertain characters.

Text · 9.7 KB · 4

Download ↓

Task Order 3 — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 1.3 MB · 4

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Task Order 3 — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

TASK ORDER APPROVAL FORM CONTRACT #: C13-2069-WS TASK ORDER #: 3 TASK ORDER AMOUNT: $ 82,500.00 OFFERED BY CONSULTANT: CH2M HILL Engineers, Inc FIRM'S NAME David Stejskal REPJSENTATIVE S PRINTED NAME c\fl—/@ /(Z/Qg;) SIGNATURE 7 Geographic Operations Manager Urwlys TITLE RECOMMENDED FOR APPROVAL (Department Director) R SIGNATURE V'V Water & Sewer Director TITLE 2/27/20l5 DATE ot COLV?ADMWATOR (if applicable) Sl DATE DATE APPROVED BY OKALOOSA COUNTY (Per Purchasing Manual) $25,000 or less approved by Purchasing Director Between $25,001 and $50,000 approved by Purchasing Director and County Administrator In excess of $50,000 approved by the Board. \/ L(A_\Lt\bl@ lLJJL PUR@\SING DIRECTOR 2, , ferdiverd. 3z DATE CHAIRMAN (if applicable) DATE CONTRACT #C13-2069-WS Task Order 3 THIS TASK ORDER IS ISSUED PURSUANT TO THE AGREEMENT FOR CONSULTING SERVICES DATED OCTOBER 1, 2013 FOR THE BOARD OF COUNTY COMMISSIONERS OF OKALOOSA COUNTY, FLORIDA (COUNTY), WHICH IS INCORPORATED HEREIN BY THIS REFERENCE, WITH RESPECT TO: Professional Engineering Services for Water Supply Alternatives Analysis Article A. Purpose: Okaloosa County (COUNTY) is working to plan for the development of an additional potable water source to meet the future needs of the County's citizens, businesses and military establishments. In 2006, the North West Florida Water Management District (NWFWMD) completed an alternative evaluation of potential water supply projects for the COUNTY, which identified approaches for increasing water supply capacity in the future. Follow up evaluations and studies were completed, including the Water Supply Needs Analysis-Okaloosa County Technical Memorandum (TM), which was completed in July 2012. This TM presents four potential alternatives including: 1) No Action Alternative, 2) Surface Water Offline Reservoir, 3) Surface Water Direct Withdrawal, and 4) Enhanced Conservation and or Reuse Alternative. The purpose of this project is to ensure that a range of alternatives, to include all reasonable alternatives, is considered and fully analyzed prior to proceeding further with identifying a preferred alternative. This Scope of Work (SOW) will confirm, refine and evaluate, where needed, the four water supply alternatives presented in the July 2012 TM. In addition, as per the recommendation from the TM, this SOW will further examine potentially practicable alternatives for meeting the County's overall future needs, including alternate water sources (i.e., surface water, groundwater, or other appropriate naturally occurring sources, and other techniques to enhance, sustain, or optimize the naturally occurring sources (e.g., water conservation, use of reclaimed water, water supply systems interconnections, artificial recharge of aquifer.)) A key component of this SOW will be to analyze water supply alternatives in order to apbropriately capture all effects (economic, environmental and social) associated with plan selection leading implementation by OCWS. Article B. Scope of Services Task 1- Define Range of Water Supply Alternatives Given the on-going concerns regarding the sustainability of Floridian aquifer groundwater production along the coast, the draft 2013 water supply alternatives (WSA) from the NWFWMD notes that future demands may be met through development of alternative inland groundwater or surface water sources and that the NWFWMD will continue to evaluate alternative sources under the Regional Water Supply Plan (RWSP) including surface water, expanded use of the sand and gravel aquifer, conservation, and reuse. In light of these recent revisions, there is a need to further define the appropriate methodology for the evaluation of the alternatives with the intent of building on the existing TMs prepared to date. In conjunction with tasks to be completed by the U.S Army Corps of Engineers Mobile District {(USACE), CH2M HILL will assist the COUNTY to further define the appropriate methodology for t

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — March 17, 2015 — Task Order 3.” March 17, 2015. Task Order 3. Crypt of Echoes evidence ID LED-2026-d3e0565bdaab4b948423e95b3eb01b86. http://127.0.0.1:58097/evidence/LED-2026-d3e0565bdaab4b948423e95b3eb01b86. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Task Order 3, meeting materials for March 17, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=7624&MeetingID=1251

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓