Okaloosa County BOCC — July 21, 2015 — Agenda Request 01.07.2014
Agenda Request 01.07.2014 in the July 21, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.
Preserved among the July 21, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1274). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used June 2, 2015; the meeting date was corrected using the agenda/minutes heading and matching source filename.
Original publication
Agenda Request_01.07.2014
Date
July 21, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
3
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)
Source date and document identity checked for this intake. Machine text has not received independent human proofreading.
HOW FAR THIS HAS BEEN CHECKED
File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Agenda Request 01.07.2014 — extracted reading text
Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.
Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.
Agenda Request 01.07.2014 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: January 7, 2014
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Arbennie Pritchett WRF Expansion - Engineering RFQ & Review
Committee
DEPARTMENT: Water and Sewer
BCC DISTRICT: All
STATEMENT OF ISSUE: OCWS and Purchasing staff request permission to move forward
with a qualifications based selection process for a contract with an engineering consultant for the
Arbennie Pritchett WRF Expansion Project to serve as the Owner's Representative and Design
Criteria Professional.
BACKGROUND: Construction of the Arbennie Pritchett Water Reclamation Facility (APWRF)
was completed in 2009 and has an annual average daily flow (AADF) capacity of 10 million
gallons per day (MGD). This $65M program with 5 sub-projects was a huge success. The
project was completed within budget and on-time. This state-of-the-art WRF has now been
operating efficiently for about 4 years with parameters well below our state permit requirements.
In addition, the APWRF has been the foundation for many related agreements that have
generated revenue or reduced expenses for the Water & Sewer Enterprise Fund: 7th Special
Forces, City of Ft. Walton Beach, Eglin Air Force Beach (Duke Field, Camp Rudder, Main Base,
and the Navy EOD school), and Niceville/Valparaiso (diverting East County flow).
Currently, the actual AADF is approximately 6.3 MGD. With the additional flow of the above-
mentioned projects and other ongoing development, we anticipate being above 8 MGD of actual
AADF in about 2 years. On paper, the capacity reserved is approximately 8.5 MGD. Although
we have about 15% capacity remaining of the average daily flow, this puts us in an
uncomfortable position for the long-term and the short-term during peak flow events, such as
storms or hi-flow summer weekends. Because of this, OCWS has a 5 MGD plant expansion in
our approved 5-year CIP: $2M in FY2014, $8M in FY2015, and $3M in FY2016. Most
importantly, we expect this $13M total to be funded with cash. In account 411-4199-599360,
OCWS has been saving up Capacity Expansion Charges (CECs) that have been received on the
above-mentioned projects and other large projects, such as some of the recent hotels. We
currently have approximately $4.5M in this account and are under contract with Eglin AFB for
another $8.5M, which is expected to be received in the summer of 2014. Staff feels that the
responsible thing to do is fund the 5 MGD needed expansion from the $13M to be in this
account. There is also a desire to proceed with the expansion before the amount of CEC funds
available is rendered insufficient by construction material inflation. Fortunately, the APWRF
was designed and constructed with a future expansion in mind, from 10 MGD to 15 MGD.
Certain components (i.e. head works, UV channels, admin building, etc.) have already been
constructed for 15 MGD AADF, and room on the site has been left available for the needed
expansion (oxidation ditch, clarifier, etc.).
As Okaloosa County did in the late 2000s, when APWRF went through the procurement and
design process, staff is proposing the design-build method of procurement, following Florida
Statues and Design Build Institute of America (DBIA) requirements/guidelines. We feel that
design-build is the best approach to large, high-dollar projects; with 1 company doing both the
design and construction, it avoids finger pointing and potentially litigious situations, thereby
lowering risk to the owner. The bidding process of selecting a design-build (D-B) contractor is
qualifications based. Interested firms would submit both qualifications and bids in separate
envelopes. The most qualified D-B contractor would be selected with the intent to negotiate a
contract. The other set of envelopes would then be opened with their actual bid price.
Negotiation then occurs with
Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.
Citation & reuse
Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — July 21, 2015 — Agenda Request 01.07.2014.” July 21, 2015. Agenda Request_01.07.2014. Crypt of Echoes evidence ID LED-2026-cb6e23b1e48e4d3b84fc588ac3cdc8b5. http://127.0.0.1:58097/evidence/LED-2026-cb6e23b1e48e4d3b84fc588ac3cdc8b5. Accessed [date].
Catalogue citation: Okaloosa County Board of County Commissioners, Agenda Request 01.07.2014, meeting materials for July 21, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=8833&MeetingID=1274
Preserved county public-record source. Third-party attachments may retain their original rights.