About this source
MX-2300N_20140709_114918 from the Okaloosa County BOCC meeting of July 15, 2014 (IQM2 meeting #1221). Original portal label: MX-2300N_20140709_114918. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- MX-2300N_20140709_114918
- Date
- July 15, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Machine-extracted text — 35-MX-2300N_20140709_114918.pdf
Text extracted on 2026-10-31 from 35-MX-2300N_20140709_114918.pdf using optical character recognition (ocrmypdf/tesseract). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 2.1 KB
Download ↓MX-2300N_20140709_114918 (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 60.1 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
Appendix
APPENDIX - A
Public Assistance Alternative Procedures Pilot Program
for Debris Removal Acknowledgement
In accordance with the Sandy Recovery Improvement Act of 2013, the Federal Emergency
Management Agency (FEMA) is implementing alternative procedures for the Public Assistance
(PA) Program through a pilot program.
As a representative of the Subgrantee, we elect to participate in the following:
}& Accelerated debris removal - increased federal cost share (sliding scale)
O Recycling Revenue (Subgrantee retention of income from debris recycling without a grant
offset)
{) One-time incentive for a FEMA-accepted debris management plan and identification of at
least one pre-qualified contractor
4 Reimbursement of straight time force account labor costs for debris removal
1. The pilot is voluntary, and the Subgrantee must apply the selected alternative procedures to all
of its debris removal! subgrants.
2. For the sliding scale, the Subgrantee accepts responsibility for any costs related to debris
operations after six months from the date of the incident unless, based on extenuating
circumstances, FEMA grants a time extension.
3. The Subgrantee acknowledges that FEMA may request joint quantity evaluations and details
regarding Subgrantee operations necessary to assess the pilot program procedures,
4, All contracts must comply with local, State, and Federal requirements for procurement,
incliding provisions of 44 CFR Part 13.
5. The Subgrantee must comply with all Federal, State and local environmental and historic
preservation laws, regulations, and ordinances.
6. The Office of Inspector General may audit any Subgrantee and’or subgrant.
7. Once a subgrant is awarded/obligated using a debris removal alternative procedure, the subgrant
cannot revert back to standard program procedures.
Letache KL. Ebanhe— LoL LLY.
ature of Subgrantee’s Authorized Representative Date
Marcella B. Eubanks, Contracts & Grants Manager
Printed Name and Title
Okaloosa County 091-99091-00
Subgrantee Name PA ID Number
O We elect to not participate in the Alternative Procedures for Debris Removal.
March 12, 2014 - 10
Related sources
This mx-2300n_20140709_114918 is part of the Okaloosa County BOCC meeting of July 15, 2014.