Okaloosa County BOCC — February 18, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text

Part 3 of 35. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 90-Repair _ Paint Countryview _ Bluewater Tanks.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. ARTICLE 5 - SITE AND OTHER AREAS. 5.01 The site is identified in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. ARTICLE 6 - INTERPRETATIONS AND ADDENDA. 6.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed, emailed, faxed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by OWNER or ENGINEER. ARTICLE 7 - BID SECURITY. Repair & Paint Countryview & Bluewater Tanks 00100-5 Job No. 41-459 7.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of Bidder’s maximum Bid price and in the form of a cashier’s check or a Bid Bond on the form attached issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the General Conditions. 7.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of seven (7) days after the effective date of the Agreement or thirty-six (36) days after the bid opening whereupon Bid security furnished by such Bidder will be returned. 7.03 Bid security of other Bidders whom OWNER believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening. ARTICLE 8 - CONTRACT TIMES. 8.01 The number of days within which, or the dates by which, the Work is to be (a) Substantially Completed and (b) also completed and ready for final payment are set forth in the Agreement. ARTICLE 9 - LIQUIDATED DAMAGES. 9.01 Provisions for liquidated damages, if any, are set forth in the Agreement. ARTICLE 10 - SUBSTITUTE AND “OR-EQUAL” ITEMS. 10.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or- equal” item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and may be supplement in the General Requirements. Repair & Paint Countryview & Bluewater Tanks 00100-6 Job No. 41-459 ARTICLE 11 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS. 11.01 The Contractor shall perform a minimum of 75 percent of work by his own work forces unless specifically authorized by the Owner and Engineer and no Subcontractor shall be allowed to perform work on the project unless they are acceptable to the Owner and Engineer. 11.02 If OWNER requests the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to OWNER in advance of the Effective Date of the Agreement as provided for in paragraph 6.06.B.1) of the Supplementary Conditions, the apparent Successful Bidder, and any other Bidder so requested, shall within seven (7) days after receipt of a written request from the OWNER or the ENGINEER, submit to OWNER a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, in which case apparent Successful Bidder shall submit an acceptable substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and OWNER may consider such price adjustment in evaluating Bids and making the contract award. 11.03 If apparent Successful Bidder declines to make any such substitution, OWNER may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the General Conditions. 11.04 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom CONTRACTOR has reasonable objection. ARTICLE 12 - PREPARATION OF BID. 12.01 The bid form is included with the Bidding Documents. Additional copies may be obtained from ENGINEER. “bid form. — 12.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the Bid signed. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit price item, and unit price item listed therein, or the words “No Bid”, “No Change”, or “Not Applicable” entered. Repair & Paint Countryview & Bluewater Tanks 00100-7 Job No. 41-459 12.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice- president or other corporate officer who has legal authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature. 12.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature). The official address of the partnership shall be shown below the signature. 12.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown below the signature. 12.06 A Bid by an individual shall show the Bidder’s name and official address. 12.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid form. The official address of the joint venture must be shown below the signature. 12.08 All names shall be typed or printed in ink below the signature. 12.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid form. 12.10 The address and telephone number for communications regarding the Bid shall be shown. 12.11 If the Bidder is an out-of-state corporation, the Bid shall contain evidence of Bidder’s authority and qualification to do business as an out-of-state corporation in the State of Florida in accordance with Article 3. Bidder’s state contractor license number for the State of Florida shall also be shown on the Bid form, if applicable. Contractor shall be licensed in accordance with the requirements of Chapter 489 of the Florida Statues. ARTICLE 13 - BASIS OF BID; EVALUATION OF BIDS. 13.01 Unit Price A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule. B. The total of all estimated prices will be determined as the sum of the products of the estimated quantity of each item and the unit price Bid for the item. The final quantities and Contract Price will be determined in accordance with paragraph 11.03 of the General Conditions. C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies Repair & Paint Countryview & Bluewater Tanks 00100-8 Job No. 41-459 between words and figures will be resolved in favor of the words. 13.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in paragraph 11.02 of the General Conditions. 13.03 When completion times are not set forth in the agreement but instead are to be specified by the BIDDER, bid prices will be compared after adjusting for differences in the time designated by Bidders for Substantial Completion. The adjusting amount will be determined at the rate set forth in the Contract Documents for liquidated damages for failing to achieve Substantial Completion for each day before or after the desired date appearing in Article 9. ARTICLE 14-SUBMITTAL OF BID.» 14.01 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the advertisement or invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of the Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to: Clerk of Cireuit:C ATTN: Gary Stanford _ Crestview, FL 325 . 536 NOTE: CRESTVIEW IS NOT A NEXT DAY DELIVERY SITE FOR OVERNIGHT CARRIERS. ARTICLE 15 - MODIFICATION AND WITHDRAWAL OF BID. 15.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a