Advertisement, Proposal, Contract Documents,
General Conditions and Specifications
Repair & Paint Countryview
and Bluewater Tanks (2014)
Okaloosa County Water and Sewer System
Okaloosa County, Florida
The Board of County Commissioners
County Bid No.
Chairman
Don Amunds
Board Members
Nathan Boyles
Wayne R. Harris
Dave Parisot
Kelly Windes
Clerk
Don W. Howard
County Administrator
Ernie Padgett
Okaloosa County Water & Sewer System
Jeff Littrell, Director
Bids Feb S, C_35.l%ph
December 2013
Job No. 41-459
~\) POLYENGINEERING
ARCHITECTURE. ENGINEERING. SOLUTIONS.
PO Box 841 SHALIMAR, FLORIDA 32579
CA-1818 /AACOOI551
850.609.1100 850.609.1101 (FAX)
WWW.POLYENGINEERING.COM
ADDENDUM RECEIPT
Addendum No: 1 and Final Date: Feb. 3, 2014
Project: Repair & Paint Countryview & BW Tanks Job No.: 41-459
Board of County Commissioners,
Okaloosa County, Florida
Pages to Follow: 3
Anneri Gh Snareft Cb On
COMPANY
ka. “DZ
AUTHORIZED SIGNATURE
Keo Polhrx/
PRINTED NAME
2/3/z014
DATE
It shall be the responsibility of Prime Bidders to insure that
Subcontractors and/or Suppliers receive addenda which could impact
their respective portions of the project. Additional instructions for
addenda acknowledgement can be found in the contract documents.
Addendum No. | - Page | of 4
United States of America
State of Ohio
Office of the Secretary of State
e duly elected, qualified and
ify that [am th
and as such have custody
I, Jennifer Brunner, do hereby certt
present acting Secretary of State for the State of Ohio,
of the records of Ohio and Foreign business entities; that said records show
AMERICAN S UNCRAFT CONSTRUCTION CO., an Ohio corporation, Charter
No. 762570, having its principal location in Medway, County of Clark, was
11, 1989 and is currently in GOQD STANDING upon
incorporated on December
the records of this office.
Witness my hand and the seal of the
Secretary of State at Columbus, Ohio
this 16th day of August, A.D. 2010
Ohio Secretary of State
Validation Number: ¥2010228A4753E
1 Maapawyen — oui vie. UayLUN FepOrs) - Lertiricate https://www.bwe.oh10.gov/employer/services/Payroll/nlowe/Certiticate...
Ohi Oo Bureau of Workers’ 30 W. Spring St
. . Spring St.
Compensation Columbus, OH 43215
Certificate of Premium Payment
This certifies the employer listed below has paid into the Ohio State Insurance Fund as
required by law. Therefore, the employer is entitled to the rights and benefits of the
fund for the period specified. For more information, call 1-800-OHIOBWC.
This certificate must be conspicuously posted.
Policy No. and Employer Period Specified Below
1043531 01/01/2014 Thru 08/31/2014
AMERICAN SUNCRAFT CO INC
AMERICAN SUNCRAFT CONSTRUCTION CO
10836 SCHILLER RD
MEDWAY, OH 45341-9743
ohiobwe.com Lenk (3. e ] .
Administrator/CEO
You can reproduce this certificate as needed.
Ohio Bureau of Workers' Compensation
Required Posting
Effective Oct. 13, 2004, Section 4123.54 of the Ohio Revised Code
requires notice of rebuttable presumption. Rebuttable presumption
means an employee may dispute or prove untrue the presumption
(or belief) that alcohol or a controlled substance not prescribed
by the employee's physician is the proximate cause (main reason)
of the work-related injury.
The burden of proof is on the employee to prove the presence of
alcohol or a controlled substance was not the proximate cause of
the work-related injury. An employee who tests positive or refuses
to submit to chemical testing may be disqualified for compensation
and benefits under the Workers’ Compensation Act.
td] ’
Ohio Bureau of Workers You must post this language with the certificate of premium payment.
Compensation
DP-29 BWC-1629 7/7/08
) ®@
ACORD
a
CERTIFICATE OF LIABILITY INSURANCE
DATE (MMIDDIYYYY)
1/30/2014
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
~ cohen agence eee
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
certificate holder in lieu of such endorsement(s).
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
PRODUCER CONTACT is
Brower insurance Agency PHONE 549.707. FAX 542 907.
eaO e Moruciont hue Quite 400 (ve No.ext:5 713-707-5011 | (AG, No:513-707-5671
Dayton OH 45402 Appress:dbrummett@browerinsurance.com
INSURER(S) AFFORDING COVERAGE NAIC #
INSURER A :Torus Specialty Insurance Co 5496
INSURED AMERS8C INSURER B -Westfield Group 24112
american Suncraft Construction INSURER C :
6 iller .
Medway OH 45341 RASURERD :
INSURER E:
INSURER F :
COVERAGES CERTIFICATE NUMBER: 361155712 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ADDL ISUBR} POLICY EFF | POLICY EXP
LTR TYPE OF INSURANCE INSR | WD POLICY NUMBER (MMIDDIYYYY) | (MMIDDIYYYY) LIMITS
B | GENERAL LIABILITY Y |Y__ |TRA0756627 H/1/2014 1/1/2015 EACH OCCURRENCE $1,000,000
x] DAMAGE TO RENTED
COMMERCIAL GENERAL LIABILITY PREMISES (Ea occurrence) _| $500,000
| CLAIMS-MADE OCCUR MED EXP (Any one person) $5,000
PERSONAL & ADV INJURY _ | $1,000,000
GENERAL AGGREGATE $2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG | $2,000,000
X | poucy ARO: LOC $
B | AUTOMOBILE LIABILITY Y ly | TRA07S6627 hi2014.—*/1/2015 COMBINED SINGLE TIMI | $1,000,000
X | ANY AUTO BODILY INJURY (Per person) | $
ALL OWNED SCHEDULED ;
AUTOS eUTOS BODILY INJURY (Per accident) | $
—_ NON-OWNED PROPERTY DAMAGE $
HIRED AUTOS AUTOS (Per accident)
Hired Car PD $125,000
A UMBRELLA LIAB X | occur Y WN 31164C141ALI 1/1/2014 1/4/2015 EACH OCCURRENCE $9,000,000
x | EXCESS LIAB CLAIMS-MADE AGGREGATE $
DED | | RETENTION $ $
B | WORKERS COMPENSATION ITRAO756627 1/1/2014 11/4/2015 WC STATU- OTH iab.
AND EMPLOYERS’ LIABILITY YIN N Lee tits |__[ck*| Employers Liab
ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $
OFFICER/MEMBER EXCLUDED? NIA
(Mandatory in NH) E.L. DISEASE - EA EMPLOYEE] $
if yes, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT | $
B | Leased/Rented Equipment ITRAQ756627 4/1/2014 1/1/2015 UR Equip. Limit: 225,000
Deductible: 4,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks
Project: Repair and Paint Countryview and Bluewater Tanks 2014
General Liability as required by written contract.
Schedule, if more space is required)
Polyengineering and Okaloosa County Board of County Commissioners are areincluded as Additional Insured with respects to the above
CERTIFICATE HOLDER
CANCELLATION
Board of County Commissioners
Okaloosa County, Florida
302 N. Wilson St.
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED iN
ACCORDANCE WITH THE POLICY PROVISIONS.
Crestview FL 32536 wy "1. LEE =
© 1988-2010 ACORD CORPORATION. All rights reserved.
ACORD 25 (2010/05) The ACORD name and Iogo are registered marks of ACORD
JhioBWC ~- Employer - Service: (Payroll reports) - Certiticate https://www.bwe.ohi0.gov/employer/services/Payroll/nibwe/Certnicate...
Ohi O | Bureau of Workers’ 30 W. Spring St
Compensation Columbus, OH 43215
Certificate of Premium Payment
This certifies the employer listed below has paid into the Ohio State Insurance Fund as
required by law. Therefore, the employer is entitled to the rights and benefits of the
fund for the period specified. For more information, call 1-800-OHIOBWC.
This certificate must be conspicuously posted.
Policy No. and Employer Period Specified Below
1043531 01/01/2014 Thru 08/31/2014
AMERICAN SUNCRAFT CO INC
AMERICAN SUNCRAFT CONSTRUCTION CO
10836 SCHILLER RD
MEDWAY, OH 45341-9743
ohiobwc.com byl (2 j
Administrator/CEO
You can reproduce this certificate as needed.
Ohio Bureau of Workers' Compensation
Required Posting
Effective Oct. 13, 2004, Section 4123.54 of the Ohio Revised Code
requires notice of rebuttable presumption. Rebuttable presumption
means an employee may dispute or prove untrue the presumption
(or belief) that alcohol or a controlled substance not prescribed
by the employee's physician is the proximate cause (main reason)
of the work-related injury.
The burden of proof is on the employee to prove the presence of
alcohol or a controlled substance was not the proximate cause of
the work-related injury. An employee who tests positive or refuses
to submit to chemical testing may be disqualified for compensation
and benefits under the Workers’ Compensation Act.
. Bureau of Workers’
. You must post this language with the certificate of premium ment.
Ohio Compensation Poe anges cane or Presa ey
DP-29 BWC-1629 7/7/08
lof 1 1/22/2014 12:00 PM
TABLE OF CONTENTS
00020 Advertisement for Bids
00100 Instructions to Bidders
00300 Bid Proposal
00410 Bid Bond
00500 Contract
00610 Performance Bond
00620 Payment Bond
00624 Warranty
00700 General Conditions
00800 Supplementary Conditions
01010 Summary of Work
01060 Regulatory Requirements
01300 Submittals
01700 Contract Closeout
01711 Clean Up
01740 Warranties & Bonds
DIVISION 9 - FINISHES
09870 Paint and Repair Water Tanks
APPENDIX
Maps
Bluewater As-builts
Handrail Sketch
Sand Dollar Logo
Repair & Paint
Countryview & Bluewater Tanks (2014)
DIVISION 0 - CONTRACT & BIDDING REQUIREMENTS
DIVISION 1 - GENERAL REQUIREMENTS
TOC-1
Job No. 41-459
SECTION 00020
ADVERTISEMENT FOR BIDS
Board of County Commissioners - Okaloosa County, Florida
OWNER
Separate sealed bids for the construction of “Repair and Paint Countryview and Bluewater Tanks
(2014)” will be received by th the Board of County Commissioners, Okaloosa County, Flovida in
intil 3 PM. (local
time) 0 on Wed. F eb. 5, 2014 and then publicly opened and read aloud, 3 2S: 3le
A mandatory pre-bid conference is scheduled for 2 PM. (local time) on Wed., Jan. 22, 2014. The
conference will be held at 1804 Lewis Turner Boulevard, Suite 300, Small Conference Room,
Fort Walton Beach, FL. You must attend this pre-bid conference to be allowed to submit a bid.
All bidders must provide references documenting successful completion of a minimum of ten
elevated water tank painting projects within the last five years using the coating systems and
methods specified in the bid documents. In addition, a minimum of 75% of work on this project
shall be completed by the Contractor’s personnel.
The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, and Forms of
Bid Bond, Performance and Payment Bonds, and other contract documents may be examined at
the following: Polyengineering, Inc., (Engineer) located at 102 Sunset Lane, Shalimar, Florida,
32579, or at the Okaloosa County Water & Sewer Office located at 1804 Lewis Turner
Boulevard, Suite 300, Fort Walton Beach, Florida, 32547. Copies may be obtained from
Polyengineering, Inc., 102 Sunset Lane, Shalimar, FL 32579 upon payment of $25, non-
refundable, for each set.
014. The ‘Board of County Commissioners will consider all bids ntoperly submitted " its
scheduled Bid Opening in the Conference & Training Room #305 located at 302 N. Wilson St,
Crestview, FL 32536. Bids may be submitted in the Conference & Training Room #305, prior to
Bid Opening or delivered to the Clerk of Circuit Court, 302 N. Wilson St., #203, Crestview, FL
32536. Note: Crestview is NOT a next day delivery site.
Any bidder failing to mark outside of envelope as set forth herein may not be entitled to have
their bid considered.
All bids should be addressed as follows:
Clerk of Circuit Court - ATTN: Gary Stanford
Newman “Buddy” Brackin Bldg.
302 N. Wilson St., #203
Crestview, Florida 32536
Richard Brannon
Purchasing Director
Repair & Paint
Countryview & Bluewater Tanks (2014) 00020-1 Job No. 41-459
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
Don Amunds
Chairman
Repair & Paint
Countryview & Bluewater Tanks (2014) 00020-2 Job No. 41-459
SECTION 00100
INSTRUCTIONS TO BIDDERS
ARTICLE 1 - DEFINED TERMS.
Terms used in these Instructions to Bidders will have the meanings indicated in the General
Conditions and Supplementary Conditions.
Additional terms used in these Instructions to Bidders have the meanings indicated below which
are applicable to both the singular and plural thereof.
1.01 Bidder - The individual or entity who submits a Bid directly to Owner.
1.02 Successful Bidder - The lowest, responsible Bidder submitting a responsive bid to whom
Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS.
2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any,
stated in the Advertisement or Invitation to Bid may be obtained from the Engineer. The deposit
or a portion thereof will be refunded to each document holder of record who returns a complete
set of Bidding Documents in good condition within thirty (30) days after opening of Bids.
2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither Owner nor
Engineer assume any responsibility for errors or misinterpretations resulting from the use of
incomplete sets of Bidding Documents.
2.03 Owner and Engineer in making copies of Bidding Documents available on the above
terms do so only for the purpose of obtaining Bids on the Work and do not confer a license or
grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS.
3.01 The Contractor’s employees shall be trained in application techniques and procedures for
the specified coating materials for this project. The Contractor shall demonstrate a minimum of
five (5) years of successful experience in each specified application on elevated water storage
tanks. All projects used as a reference must have been completed by the Contractor with in-
house staff. Projects completed by sub-contractors, by current staff while in the employ of other
companies or of structures other than elevated water tanks will not be considered.
3.02 The Contractor shall provide references for a minimum of ten elevated water storage
tanks within the last five years for each specified application. Individual projects that satisfy
more than one area of experience shall be clearly labeled as such in the reference list. The
Contractor is solely responsible for the validity of all contact information provided. No effort
Repair & Paint
Countryview & Bluewater Tanks 00100-1 Job No. 41-459
will be made on part of either Owner or Engineer to locate valid contact information if data
provided is not current.
All references shall include (but not be limited to):
* Name of Project
¢ Project Location
* Owner Name, Address and Telephone Number
¢ Owner Email (if available)
¢ Owner Contact Name
¢ Project Engineer Firm, Address and Telephone Number
¢ Engineer Email (if available)
¢ Engineer Contact Name
3.03 Reference Scope of Work for Exterior Surfaces (10 tanks minimum for each):
* Full containment system with a bonnet, minimum SSPC Guide 6 Class 3 including air
filtration, as specified in Section 09870.
¢ Exterior abrasive blast cleaned to SSPC-SP 10 Near White Finish with recyclable
steel grit.
¢ Application of an organic, zinc-rich urethane primer, epoxy and/or urethane
intermediate and fluoropolymer urethane or polyurethane finish to exterior surface.
3.04 Reference Scope of Work for Interior Surfaces (10 tanks minimum for each):
* Abrasive blast cleaned with recyclable steel grit and using adequately sized air
filtration, as specified in Section 09870.
¢ Installation of a moisture cured, urethane organic, zinc-rich primer.
¢ Installation of 100% solids by volume, heated plural component applied, interior
lining system
* High voltage discontinuity testing of thick film interior lining systems.
3.05 The successful low bidder will be required to acquire a county business license before the
contract will be awarded.
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED
DATA, AND SITE.
4.01 Subsurface and Physical Conditions
A, Reference is made to the Supplementary Conditions for the identification of:
1. Those reports of explorations and tests of subsurface conditions at or
contiguous to the Site, if any, that ENGINEER has used in preparing the
Bidding Documents.
Repair & Paint
Countryview & Bluewater Tanks 00100-2 Job No. 41-459
2. Those drawings of physical conditions in or relating to existing surface
and subsurface structures at or contiguous to the Site (except Underground
Facilities) that ENGINEER has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in paragraph 4.01.A will be made
available by OWNER to any Bidder on request. Those reports and drawings are not part of the
Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to
rely as provided in paragraph 4.02 of the General Conditions has been identified and established
in paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation
or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions
or information contained in such reports or shown or indicated in such drawings.
4.02 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to
existing Underground Facilities at or contiguous to the Site is based upon information and data
furnished to OWNER and ENGINEER by owners of such Underground Facilities, including
OWNER, or others. ENGINEER assumes no responsibility for the accuracy or completeness of
the information furnished by said owners.
4.03 Hazardous Environmental Condition
A. The Supplementary Conditions identify those reports and drawings relating to a
Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in
preparing the Bid Documents.
B. Copies of reports and drawings referenced in paragraph 4.03.A will be made
available by OWNER to any Bidder on request. Those reports and drawings are not part of the
Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to
rely as provided in paragraph 4.06 of the General Conditions has been identified and established
in paragraph 4.06 of the Supplementary Conditions. Bidder is responsible for any interpretation
or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions,
or information contained in such reports or shown or indicated in such drawings.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective
Bidders with respect to subsurface conditions, other physical conditions and Underground
Facilities, and possible changes in the Bidding Documents due to differing or unanticipated
conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions
concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect
to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract
Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site
which was not shown or indicated in the Drawings or Specifications or identified in the Contract
Documents to be within the scope of Work appear in paragraph 4.06 of the General Conditions.
4.05 On request, OWNER will provide Bidder access to the Site to conduct such
Repair & Paint
Countryview & Bluewater Tanks 00100-3 Job No. 41-459
examinations, investigations, explorations, tests, and studies as Bidder deems necessary for
submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former
condition upon completion of such explorations, investigations, tests, and studies.
4.06 Reference is made to Article 7 of the Supplementary Conditions for the identification of
the general nature of other work that is to be performed at the Site by OWNER or others (such as
utilities and other prime contractors) that relates to the Work for which a Bid is to be submitted.
On request, OWNER will provide to each Bidder for examination access to or copies of Contract
Documents (other than portions thereof related to price) for each other work.
4.07 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, including any Addenda and the
other related data identified in the Bidding Documents;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and
Site conditions that may affect cost, progress, and performance of the Work.
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and
Regulations that may affect cost, progress, or performance of the Work;
D. carefully study all reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions in or relating to existing surface or
subsurface structures at or contiguous to the Site (except Underground Facilities) which have
been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General
Conditions, and carefully study all reports and drawings of a Hazardous Environmental
Condition, if any, at the Site which have been identified in the Supplementary Conditions as
provided in paragraph 4.06 of the General Conditions;
E. obtain and carefully study (or assume responsibility for doing so) all examinations,
investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface,
and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or
performance of the Work or which relate to any aspect of the means, methods, techniques,
sequences, and procedures of construction to be employed by Bidder, including any specific
means, methods, techniques, sequences, and procedures of construction expressly required by the
Bidding Documents, and safety precautions and programs incident thereto;
F. agree at the time of submitting its Bid that no further examinations, investigations,
explorations, tests, studies, or data are necessary for the determination of its Bid for performance
of the Work at the price bid and within the times and in accordance with the other terms and
conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by OWNER and
others at the Site that relates to the Work as indicated in the Bidding Documents;
H. correlate the information known to Bidder, information and observations obtained
Repair & Paint
Countryview & Bluewater Tanks 00100-4 Job No, 41-459
from visits to the Site, reports and drawings identified in the Bidding Documents, and all
additional examinations, investigations, explorations, tests, studies, and data with the Bidding
Documents;
I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or
discrepancies that Bidder discovers in the Bidding Documents and confirm that the written
resolution thereof by ENGINEER is acceptable to Bidder; and
J. determine that the Bidding Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that
Bidder has complied with every requirement of this Article 4, that without exception the Bid is
premised upon performing and furnishing the Work required by the Bidding Documents and
applying any specific means, methods, techniques, sequences, and procedures of construction
that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has
given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that
Bidder has discovered in the Bidding Documents and the written resolutions thereof by
ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to
indicate and convey understanding of all terms and conditions for performing and furnishing the
Work.
ARTICLE 5 - SITE AND OTHER AREAS.
5.01 The site is identified in the Bidding Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment, or storage of materials and
equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR.
Easements for permanent structures or permanent changes in existing facilities are to be obtained
and paid for by OWNER unless otherwise provided in the Bidding Documents.
ARTICLE 6 - INTERPRETATIONS AND ADDENDA.
6.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in
response to such questions will be issued by Addenda mailed, emailed, faxed or delivered to all
parties recorded by ENGINEER as having received the Bidding Documents. Questions received
less than ten days prior to the date for opening of Bids may not be answered. Only questions
answered by Addenda will be binding. Oral and other interpretations or clarifications will be
without legal effect.
6.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed
advisable by OWNER or ENGINEER.
ARTICLE 7 - BID SECURITY.
Repair & Paint
Countryview & Bluewater Tanks 00100-5 Job No. 41-459
7.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of 5%
of Bidder’s maximum Bid price and in the form of a cashier’s check or a Bid Bond on the form
attached issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the General
Conditions.
7.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed
the Contract Documents, furnished the required contract security and met the other conditions of
the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails
to execute and deliver the Contract Documents and furnish the required contract security within
15 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security
of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to
have a reasonable chance of receiving the award may be retained by OWNER until the earlier of
seven (7) days after the effective date of the Agreement or thirty-six (36) days after the bid
opening whereupon Bid security furnished by such Bidder will be returned.
7.03 Bid security of other Bidders whom OWNER believes do not have a reasonable chance of
receiving the award will be returned within seven days after the Bid opening.
ARTICLE 8 - CONTRACT TIMES.
8.01 The number of days within which, or the dates by which, the Work is to be (a)
Substantially Completed and (b) also completed and ready for final payment are set forth in the
Agreement.
ARTICLE 9 - LIQUIDATED DAMAGES.
9.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 10 - SUBSTITUTE AND “OR-EQUAL” ITEMS.
10.01 The Contract, if awarded, will be on the basis of materials and equipment specified or
described in the Bidding Documents without consideration of possible substitute or “or-equal”
items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-
equal” item of material or equipment may be furnished or used by CONTRACTOR if acceptable
to ENGINEER, application for such acceptance will not be considered by ENGINEER until after
the Effective Date of the Agreement. The procedure for submission of any such application by
CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and
may be supplement in the General Requirements.
Repair & Paint
Countryview & Bluewater Tanks 00100-6 Job No. 41-459
ARTICLE 11 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS.
11.01 The Contractor shall perform a minimum of 75 percent of work by his own work forces
unless specifically authorized by the Owner and Engineer and no Subcontractor shall be allowed
to perform work on the project unless they are acceptable to the Owner and Engineer.
11.02 If OWNER requests the identity of certain Subcontractors, Suppliers, individuals, or
entities to be submitted to OWNER in advance of the Effective Date of the Agreement as
provided for in paragraph 6.06.B.1) of the Supplementary Conditions, the apparent Successful
Bidder, and any other Bidder so requested, shall within seven (7) days after receipt of a written
request from the OWNER or the ENGINEER, submit to OWNER a list of all such
Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for
which such identification is required. Such list shall be accompanied by an experience statement
with pertinent information regarding similar projects and other evidence of qualification for each
such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or
ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor,
Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request
apparent Successful Bidder to submit a substitute, in which case apparent Successful Bidder shall
submit an acceptable substitute, Bidder’s Bid price will be increased (or decreased) by the
difference in cost occasioned by such substitution, and OWNER may consider such price
adjustment in evaluating Bids and making the contract award.
11.03 If apparent Successful Bidder declines to make any such substitution, OWNER may
award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors,
Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute
grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual,
or entity so listed and against which OWNER or ENGINEER makes no written objection prior to
the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER
subject to revocation of such acceptance after the Effective Date of the Agreement as provided in
paragraph 6.06 of the General Conditions.
11.04 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual,
or entity against whom CONTRACTOR has reasonable objection.
ARTICLE 12 - PREPARATION OF BID.
12.01 The bid form is included with the Bidding Documents. Additional copies may be
obtained from ENGINEER.
“bid form. —
12.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the
Bid signed. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit
price item, and unit price item listed therein, or the words “No Bid”, “No Change”, or “Not
Applicable” entered.
Repair & Paint
Countryview & Bluewater Tanks 00100-7 Job No. 41-459
12.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-
president or other corporate officer who has legal authority to sign. The corporate seal shall be
affixed and attested by the secretary or an assistant secretary. The corporate address and state of
incorporation shall be shown below the signature.
12.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature). The official address of the partnership shall be
shown below the signature.
12.05 A Bid by a limited liability company shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of the firm
and the official address of the firm must be shown below the signature.
12.06 A Bid by an individual shall show the Bidder’s name and official address.
12.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated
on the Bid form. The official address of the joint venture must be shown below the signature.
12.08 All names shall be typed or printed in ink below the signature.
12.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of
which shall be filled in on the Bid form.
12.10 The address and telephone number for communications regarding the Bid shall be shown.
12.11 If the Bidder is an out-of-state corporation, the Bid shall contain evidence of Bidder’s
authority and qualification to do business as an out-of-state corporation in the State of Florida in
accordance with Article 3. Bidder’s state contractor license number for the State of Florida shall
also be shown on the Bid form, if applicable. Contractor shall be licensed in accordance with the
requirements of Chapter 489 of the Florida Statues.
ARTICLE 13 - BASIS OF BID; EVALUATION OF BIDS.
13.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the
Bid schedule.
B. The total of all estimated prices will be determined as the sum of the products of the
estimated quantity of each item and the unit price Bid for the item. The final quantities and
Contract Price will be determined in accordance with paragraph 11.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be
resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of
figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies
Repair & Paint
Countryview & Bluewater Tanks 00100-8 Job No. 41-459
between words and figures will be resolved in favor of the words.
13.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and
profit on account of cash allowances, if any, named in the Contract Documents as provided in
paragraph 11.02 of the General Conditions.
13.03 When completion times are not set forth in the agreement but instead are to be specified
by the BIDDER, bid prices will be compared after adjusting for differences in the time
designated by Bidders for Substantial Completion. The adjusting amount will be determined at
the rate set forth in the Contract Documents for liquidated damages for failing to achieve
Substantial Completion for each day before or after the desired date appearing in Article 9.
ARTICLE 14-SUBMITTAL OF BID.»
14.01 A Bid shall be submitted no later than the date and time prescribed and at the place
indicated in the advertisement or invitation to Bid and shall be enclosed in an opaque sealed
envelope plainly marked with the Project title (and, if applicable, the designated portion of the
Project for which the Bid is submitted), the name and address of the Bidder, and shall be
accompanied by the Bid security and other required documents. If a Bid is sent by mail or other
delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope
plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be
addressed to:
Clerk of Cireuit:C
ATTN: Gary Stanford _
Crestview, FL 325 . 536
NOTE: CRESTVIEW IS NOT A NEXT DAY DELIVERY SITE FOR OVERNIGHT
CARRIERS.
ARTICLE 15 - MODIFICATION AND WITHDRAWAL OF BID.
15.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the
manner that a Bid must be executed and delivered to the place where Bids are to be submitted
prior to the date and time for the opening of Bids.
15.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice
with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER
that there was a material and substantial mistake in the preparation of its Bid, that Bidder may
withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that
Bidder will be disqualified from 1) further bidding on the Work, and 2) doing any work on the
Contract, either as a subcontractor or in any other capacity.
ARTICLE 16 - OPENING OF BIDS.
Repair & Paint
Countryview & Bluewater Tanks 00100-9 Job No. 41-459
16.01 Bid opening shall be public, on the date and time specified on the Bid form. It is the
Bidder’s responsibility to assure that his bid is delivered at the proper time and place. Offers by
email, telegram, facsimile or telephone are not acceptable.
16.02 Bids will be opened at the time and place indicated in the advertisement or invitation to
Bid and, unless obviously non-responsive, read aloud publicly. A tabulation of the amounts of
Bids will be made available to Bidders after the opening of Bids.
ARTICLE 17 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE.
17.01 All Bids will remain subject to acceptance for thirty-five (35) days after the day of the bid
opening, but the OWNER may, in its sole discretion, release any Bid and return the Bid security
prior to the end of this period.
ARTICLE 18 - AWARD OF CONTRACT.
18.01 Right to Waive and Reject:
A. The Board, in its absolute discretion, may reject any Bid of a Bidder that has failed, in the
opinion of the Board, to complete or perform an Okaloosa County contracted project ina
timely fashion or has failed in any other way, in the opinion of the Board, to perform a
prior contract in a satisfactory manner, and has directed the Okaloosa County Purchasing
Director to emphasize this condition to potential proposers.
B. There is no obligation on the part of the County to award the Bid to the lowest Bidder,
and the County reserves the right to award the Bid to Bidder submitting a responsive Bid
with a resulting negotiated agreement which is most advantageous and in the best interest
of Okaloosa County and to reject any and all Bids or to waive any irregularity or
technicality in Bids received. Okaloosa County shall be the sole judge of the Bid and the
resulting negotiated agreement that is in its best interest and its decision shall be final.
C. The Board of County Commissioners reserves the right to waive any informalities or
reject any and all Bids, in whole or part, to utilize any applicable state contracts in lieu of
or in addition to this Bid and to accept the Bid that in its judgement will best serve the
interest of the County.
D. The Board of County Commissioners specifically reserves the right to reject any
conditional Bids and will normally reject those which made it impossible to determine the
true amount of the Bid. Each item must be Bid separately and no attempt is to be made to
tie any item or items to any other item or items.
18.02 Disqualification of Bidders:
Any of the following reasons may be considered as sufficient for the disqualification of a Bidder
and the rejection of his Bid or Bids:
Repair & Paint
Countryview & Bluewater Tanks 00100-10 Job No. 41-459
A. More than one Bid for the same work from an individual, firm or corporation under the
same or different name.
B. Evidence that the Bidder has a financial interest in the firm of another Bidder for the
same work.
C. Evidence of collusion among Bidders. Participants in such collusion will receive no
recognition as Bidders for any future work of the County until such participant shall have
been reinstated as a qualified Bidder.
D. Uncompleted work which in the judgement of the County might hinder or prevent the
prompt completion of additional work if awarded.
E. Failure to pay or satisfactorily settle all bills due for labor and material on former
contracts in force at the time of advertisement for bids.
F. Default under previous contract.
G. Listing of the Bidder by the Federal Government on its barred/suspended vendor list.
ARTICLE 19 - CONTRACT SECURITY AND INSURANCE.
19.01 Article 5 of the General Conditions, as may be modified by the Supplementary
Conditions, sets forth OWNER’s requirements as to performance and payment Bonds and
insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it must be
accompanied by such Bonds and Insurance Certificates.
ARTICLE 20 - SIGNING OF AGREEMENT.
20.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be
accompanied by the required number of unsigned counterparts of the Agreement with the other
Contract Documents which are identified in the Agreement as attached thereto. Within 15 days
thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the
Agreement and attached documents to OWNER. Within ten days thereafter, OWNER shall
deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings
with appropriate identification.
ARTICLE 21 - PUBLIC ENTITY CRIME INFORMATION.
21.01 A person or affiliate who has been placed on the convicted vendor list following a
conviction for a public entity crime may not submit a bid on a contract to provide any goods or
services to a public entity, may not submit a bid on a contract with a public entity for the
construction or repair of a public building or public work, may not submit bids on leases of real
property to a public entity, may not be awarded or perform work as contractor, supplier,
subcontractor, or consultant under a contract with any public entity, and may not transact
Repair & Paint
Countryview & Bluewater Tanks 00100-11 Job No. 41-459
business with any public entity in excess of the threshold amount provided in Section 287.017,
for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted
vendor list.
ARTICLE 22 - CONFLICT OF INTEREST.
22.01 The award hereunder is subject to the provision of Chapter 112, Florida Statutes. All
bidders must disclose with their bid proposal the name of any officer, director, or agent who is
also a public officer or an employee of the Okaloosa County Board of County Commissioners, or
any of its agencies. Further, all bidders must disclose with their bid proposal the name of any
County officer or employee who owns, directly or indirectly, an interest of five percent (5%) or
more in the firm or any of its branches.
22.02 The Contractor, prior to or at the time of submission of the bid proposal, must file a
statement with the Clerk of Circuit Court of Okaloosa County, or other designated official in the
case of another owner, if he is an officer or employee of the County, disclosing his or spouse's or
child's interest and the nature of the intended business.
Note: (For Bidder's convenience, this form of Conflict of Interest Disclosure is enclosed as
Attachment "A" with Section 00300 "Bid Proposal" and is made a part of the Bid
Package.)
ARTICLE 23 - PRE-BID CONFERENCE.
23.01 A mandatory Pre-Bid conference will be held at 2:00 PM on Wednesday, January 22,
2014 in the Small Conference Room, 1804 Lewis Turner Bivd., Fort Walton Beach, FL 32547.
Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are
required to attend and participate in the conference. ENGINEER will transmit to all prospective
Bidders of record such Addenda as ENGINEER considers necessary to response to questions
arising at the conference. Oral statements may not be relied upon and will not be binding or
legally effective.
ARTICLE 24 - IDENTICAL TIE PROPOSALS
24.01 Preference shall be given to businesses with drug-free workplace programs. Should two
or more proposals which are equal with respect to price, quality and service be received by the
County for the procurement of commodities or contractual services, a proposal received from a
business that certifies that it has implemented a drug-free workplace program shall be given
preference in the award process. In order to determine whether or not a business has such a
program, the enclosed Drug-Free Workplace Certification form must be submitted with the bid.
Failure to submit this Certification will result in your bid being declared non-responsive;
provided, however, that the low bidder may be given the opportunity to submit the Certification
to the County within five (5) calendar days after notification by the County if this is determined
to be in the best interest of the County.
Repair & Paint
Countryview & Bluewater Tanks 00100-12 Job No. 41-459
24.02 Established procedures for processing tie proposals will be followed if none of the tied
vendors have a drug-free workplace program.
Note: (For Bidder's convenience, this form of Drug-Free Workplace Certification is enclosed
as Attachment "B" with Section 00300 "Bid Proposal" and is made a part of the Bid
Package.)
ARTICLE 25 - INDEMNIFICATION AND HOLD HARMLESS
25.01 Each Bidder must submit with his bid an executed sworn certification that he will
comply with the Hold Harmless in accordance with the provisions of Florida Statutes, Section
725.06
To the fullest extent permitted by law, CONTRACTOR shall indemnify hold harmless OWNER,
its officers and employees from liabilities, damages, losses, and costs including but not limited to
reasonable attorney fees, to the extent caused by the negligence, recklessness, or intentionally
wrongful conduct of the CONTRACTOR and other persons employed or utilized by the
CONTRACTOR in the performance of this Agreement.
Note: (For Bidder's convenience, this Certification Form is enclosed as Attachment "C"
with Section 00300 "Bid Proposal" and is made a part of the Bid Package.)
ARTICLE 26 - DISCRIMINATION
26.01 An entity or affiliate who has been placed on the discriminatory vendor list may not
submit a bid on a contract to provide goods or services to a public entity, may not
submit a bid on a contract with a public entity for the construction or repair of a public
building or public work, may not submit bids on leases of real property to a public entity,
may not award or perform work as a contractor, supplier, subcontractor, or consultant
under contract with any public entity, and may not transact business with any public
entity.
ARTICLE 27 - INSURANCE
27.1. Each Bidder along with his insurance agent/carrier shall review the insurance
requirements for this project and each Bidder shall submit with his bid an executed sworn
certification that insurance policies currently in effect meet the requirements or that a
quotation for additional policies or policy modifications was obtained to meet the
requirements of this project.
Note: (For Bidder’s convenience, this Insurance Compliance Certification Form is enclosed
as Attachment “D” with Section 00300 “Bid Proposal” and is made a part of the Bid
Package.)
ARTICLE 28 - REFERENCES
Repair & Paint
Countryview & Bluewater Tanks 00100-13 Job No. 41-459
28.1
Note:
Each Bidder shall provide a listing of references as outlined in Paragraph 3 of this
Section.
(For Bidder’s convenience, a Reference Form is enclosed as Attachment “E” with
Section 00300 “Bid Proposal” and is made a part of the Bid Package. Bidder may
substitute reference listing of their own format for Attachment “E” if said listing includes
all information for each project outlined in Paragraph 3 of this Section.)
ARTICLE 29 - NO CONTACT CLAUSE
28.1
Note:
The Okaloosa County Board of County Commissioners has established a solicitation
silence policy (No Contact Clause) that prohibits oral and written communication
regarding all formal solicitations for goods and services (formal bids, Request for
Proposals, Requests for Qualifications) issued by the Board through the County
Purchasing Department. The period commences when the procurement document is
received and terminates when the Board of County Commissioners approves an award.
Each Bidder shall review and sign the enclosed form indicating that the Bidder agrees to
abide by the County’s “No Contact Clause” and understands that a violation of this policy
shall result in disqualification of their bid.
(For Bidder’s convenience, this No Contact Clause Form is enclosed as Attachment
“F” with Section 00300 “Bid Proposal” and is made a part of the Bid Package.)
ARTICLE 30 - PROTECTION OF RESIDENT WORKERS
29.1
Note:
The Okaloosa County Board of County Commissioners actively supports the Immigration &
Nationality Act (INA) which includes provisions addressing employment eligibility,
employment verification, and nondiscrimination. Under the INA, employers may hire only
persons who may legally work in the United States, (.e., citizens and nationals of the U.S.)
and aliens authorized to work in the U. S. the employer must verify the identity and
employment eligibility of anyone to be hired, which includes completing the Employment
Eligibility Verification. The contractor shall establish appropriate procedures and controls so
no services or products under the contract documents will be performed or manufactured by
any worker who is not legally eligible to perform such services or employment. Okaloosa
County reserves the right to request documentation showing compliance with the requirement.
(For Bidder’s convenience, this Protection of Resident Workers form is enclosed as
Attachment “G” with Section 00300 “Bid Proposal” and is made a part of the Bid
Package.)
END OF SECTION 00100.
Repair & Paint
Countryview & Bluewater Tanks 00100-14 Job No. 41-459
SECTION 00300
BID PROPOSAL
Place Mecha , Ohio.
j csIt
Date (1 30f 26 14
Project No. _ 41-459
Proposal of AmeB (Car Suncr aft Ce _ Ar.
(hereinafter called "Bidder") *a corporation, organized and existing under the laws of the State of
0} 7 © __, *a partnership, or an individual doing business as mMer* Can Vin Z of.
to the Okaloosa County Board of Commissioners (hereinafter called "Owner".
1.01 The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an
agreement with OWNER in the form included in the Bidding Documents to perform and
furnish all Work as specified or indicated in the Bidding Documents for the Bid Price
and within the Bid Times indicated in this Bid and in accordance with the other terms
and conditions of the Bidding Documents.
2.01 BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to
Bid and Instructions to Bidders, including without limitation those dealing with the
disposition of Bid security. This Bid will remain subject to acceptance for thirty-five
(35) days after the day of Bid Opening. BIDDER will sign and deliver the required
number of counterparts of the Agreement with the Bonds and other documents required
by the Bidding Requirements within fifteen (15) days after the date of OWNER's Notice
of Award.
3.01 In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement,
that:
A. _ BIDDER hasexamined and carefully studied the Bidding Documents, the other
related data identified in the Bidding Documents, and the following Addenda
receipt of all which is hereby acknowledged:
(List Addenda by Addendum Number and Date)
Adldenolin He I Jf3/ 2o/4
Adklendun HQ 2/3) 2ote4
* Insert Corporation, Partnership or Individual as applicable.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00300-1 Job No. 41-459
Repair & Paint
BIDDER has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, performance of
the Work;
BIDDER is familiar with and is satisfied as to all federal, state and local Laws
and Regulations that may affect cost, progress, performance of the Work.
BIDDER has carefully studied all: (1) reports of explorations and tests of
subsurface conditions at or contiguous to the site, if any, and all drawings of
physical conditions in or relating to existing surface or subsurface structures at
or contiguous to the site (except Underground Facilities) which have been
identified in the Supplementary Conditions as provided in paragraph 4.02 of the
General Conditions, and (2) reports and drawings of a Hazardous Environmental
Condition, if any, which has been identified in the Supplementary Conditions as
provided in paragraph 4.06 of the General Conditions.
Bidder has obtained and carefully studies (or assumes responsibility for having
done so) all additional or supplementary examinations, investigations,
explorations, tests, studies and data concerning conditions (surface, subsurface
and Underground Facilities) at or contiguous to the Site which may affect cost,
progress, or performance of the Work or which relate to any aspect of the means,
methods, techniques, sequences, and procedures of construction to be employed
by Bidder, including applying the specific means, methods, techniques,
sequences, and procedures of construction expressly required by the Bidding
Documents to be employed by Bidder, and safety precautions and programs
incident thereto.
Bidder does not consider that any further examinations, investigations,
explorations, tests, studies, or data are necessary for the determination of this Bid
for performance of the Work at the price(s) bid and within the times and in
accordance with the other terms and conditions of the Bidding Documents.
BIDDER is aware of the general nature of Work to be performed by OWNER
and others at the site that relates to the Work as indicated in the Bidding
Documents.
BIDDER has correlated the information known to BIDDER, information and
observations obtained from visits to the site, reports and drawings identified in
the Bidding Documents and all additional examinations, investigations,
explorations, tests, studies and data with the Bidding Documents.
BIDDER has given ENGINEER written notice ofall conflict, errors, ambiguities
or discrepancies that BIDDER has discovered in the Bidding Documents and the
written resolution thereof by ENGINEER is acceptable to BIDDER
Countryview & Bluewater Tanks (2014) 00300-2 Job No. 41-459
J. The Bidding Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for the performance of the Work for
which this Bid is submitted.
4.01 This Bid is genuine and not made in the interest of or on behalf of any undisclosed
person, firm or corporation and is not submitted in conformity with any agreement or
rules of any group, association, organization or corporation; BIDDER has not directly
or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
BIDDER has not solicited or induced any person, firm or corporation to refrain from
bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over
any other Bidder or over OWNER.
5.01 Bidder will complete the Work in accordance with the Contract Documents for the
following price(s):
Repair & Paint
Countryview & Bluewater Tanks (2014) 00300-3 Job No. 41-459
Ls
Ld
BID SCHEDULE - REPAIR AND PAINT COUNTRYVIEW AND BLUWATER TANKS (2014)
NOTE: BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES.
BASE BID
EST.
QTY.
ITEM AND
UNIT
1 1 LS
2 1 EA
3 1 EA
4 20 LF
5 1 LS
6 1 EA
Repair & Paint
Furnish and install all materials and labor to paint
the Countryview using OCS-4 (modified) and
ICS-4 (modified) as described in the specifications
complete and in place for the lump sum amount of $ 195,550.27 “$ 195, 550,0°
Furnish and install all materials and labor to install
painted logo (fluoro-urethane paint) on the
Countryview Tank (20' diameter) complete and in
place for $1,550." $ 1,550.°°
Furnish and install new 30" roof hatch on
Countryview Water Tank as described in the 5 oO
specifications, complete and in place for $2,400" $$ 2 pt 00. q
Seal weld various locations on Countryview
Water Tank as directed by Engineer and described 00 00
in the spe it lace for 446 ‘ $ Foo a
ona
Furnish and install all materials and labor to paint
the Bluewater Tank using OCS-4 (modified) and
ICS-4 (modified) as described in the specifications 40 2
complete and in place for the lump sum amount of g tal 8 ES $ Jo | $7S. 6
Furnish and install all materials and labor to install
painted logo (fluoro-urethane paint) on the
Bluewater Tank (to match existing) complete and
in place for | $.5,.500,°° $_5, S50 0°
Countryview & Bluewater Tanks (2014) 00300-4 Job No, 41-459
iJ
8 1
9 1
10 20
Furnish and install new 30" roof hatch on .
Bluewater Water Tank as described in the n° Pt)
specifications, complete and in place for $2), 4 50. ¢ od Yu,
EA _ Furnish and install new 24" roof vent on
Bluewater Water Tank as described in the
specifications, complete and in place for $5 00. ¢ 5, $60 ,7e
EA _ Replace screened end of Bluewater Water Tank
overflow pipe with weighted flapper and screen as
described in the specifications, complete and in
place for $ $00 SO 3 00,90
LF Seal weld various locations on Bluewater Water
Tank as directed by Engineer and described in the 0 D
specifications, complete and in place for ¢ 4D.°% ¢ Joo. i
TOTAL BASE BID $_O* 3, 4¢@0, °°
TOTAL BASE BID AMOUNT Is Live. Hundred Forty Three Thousand,
Four Hundred E. ghty Dollars (This‘amount will be read aloud at bid opening)
6.01
6.02
Repair & Paint
Unit Prices have been computed in accordance with paragraph 11.03.B of the General
Conditions.
BIDDER acknowledges that estimated quantities are not guaranteed and are solely for the
purpose of comparison of bids and final payment will be based on actual quantities provided,
determined as provided in the Contract Documents.
Bidder agrees that the Work will be substantially complete within 120 calendar days after the
date when the Contract Times commence to run as provided in paragraph 2.03 of the General
Conditions, and completed and ready for final payment in accordance with the paragraph
14.07.B of the General Conditions within 180 calendar days after the date when the Contract
Times commence to run.
Bidder agrees that he shall perform a minimum of 75 percent of work by his own work forces
unless specifically authorized by the Owner and Engineer and no Subcontractor shall be
allowed to perform work on the project unless they are acceptable to the Owner and Engineer.
Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure
to complete the Work within the times specified above, which shall be stated in the Agreement.
Countryview & Bluewater Tanks (2014) 00300-5 Job No. 41-459
id
Ld
ae
7.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of bid- Bon d
8.01 The terms used in this Bid with initial capital letters have the meanings indicated in the
Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
SUBMITTED ON February S ; , 2016
IF BIDDER IS:
An Individual
Name (typed or printed):
By: (SEAL)
(Individual’s signature)
Doing business as:
Business address:
Phone No.: FAX No.
A Partnership
Partnership Name: , (SEAL)
By.
(Signature of general partner)
Name (typed or printed):
Business address:
Phone No.: FAX No.
A Corporation
Repair & Paint
Countryview & Bluewater Tanks (2014) 00300-6 Job No. 41-459
Cnn
Rerercaesncninst
=)
Corporation Name: Amer. (Cait) Sunoreoft (b - dnt (SEAL)
State of Incorporation: Ohid
By: Low Ban
: (Sigitéture Of Person Authorized To Sign)
Name (typed or printed): Pon &o | Nor
Title: Da esi den &
~ (CORPORATE SEAL)
Attest Ler er | @ TNR fur
(Signature of Corporate Secretary)
pusiness address: /OX-3b <Schillee Read
(Meduacy, Os 45341
rose wo: 43.1 849- HIS raxnos_13.7-849- 9V-Y
Date of Qualification to do business is December il _ 1484
A Joint Venture
Joint Venturer Names: ___ (SEAL)
By:
(Signature of joint venture partner)
Name (typed or printed):
Title:
Business address:
Phone No.: FAX No.:
Joint Venturer Name: (SEAL)
By:
(Signature)
Name (typed or printed):
Repair & Paint
Countryview & Bluewater Tanks (2014) 00300-7 Job No. 41-459
Title:
Business address:
Phone No.: FAX No.:
Phone and FAX Number, and Address for receipt of official communications:
wt
(Each joint venturer must sign. The manner of signing for each individual, partnership, and
corporation that is a party to the joint venture shall be in the manner indicated above.)
Repair & Paint
Countryview & Bluewater Tanks (2014) 00300-8 Jub Nu. 41-459
vi
1€
ATTACHMENT “A”
CONFLICT OF INTEREST DISCLOSURE FORM
For purposes of determining any possible conflict of interest, all bidders/proposers must disclose if any
Okaloosa County employee(s), elected official(s), or if any of its’ agencies is also an owner, corporate
officer, agency, employee, etc., of their business.
Indicate either “YES” (a county employee, elected official, or agency is also associated with your
business), or “NO”. If yes, give persons name(s) and position(s) with your business.
YES __ NO
NAME(S) and POSITIONS(S):
FIRM wantin Mh onan
BY (printed): Pon foling’
BY (inure; Lame Ex OG
TITLE: Paesclen +
appress: 0836 Schiller &. rad
iedene _Ohm YS34I
PHONE: ey, E4F- PEDS
Repair & Paint
Countryview & Bluewater Tanks (2014) 00300-9 Job No. 41-459
oem
Ld
ATTACHMENT “B”
DRUG-FREE WORKPLACE CERTIFICATION
THE BELOW SIGNED BIDDER CERTIFIES that it has implemented a drug-free workplace program.
In order to have a drug-free workplace program, a business shall:
1.
Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing,
possession, or use of a controlled substance is prohibited in the workplace and specifying the
actions that will be taken against employees for violations of such prohibition.
Inform employees about the dangers of drug abuse in the workplace, the business’s policy of
maintaining a drug-free workplace, any available drug counseling, rehabilitation and employee
assistance programs, and the penalties that may be imposed upon employees for drug abuse
violations.
Give each employee engaged in providing the commodities or contractual services that are under
bid a copy of the statement specified in subsection 1.
In the statement specified in subsection 1, notify the employees that, as a condition of working
on the commodities or contractual services that are under bid, the employee will abide by the
terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo
contendere to, any violation of Chapter 893 or of any controlled substance law of the United
States or any state, for a violation occurring in the workplace no later than five (5) days after
such conviction.
Impose a sanction on, or require the satisfactory participation in drug abuse assistance or
rehabilitation program if such is available in the employee’s community, by any employee who
is convicted.
Make a good faith effort to continue to maintain a drug-free workplace through implementation
of this section.
As the person authorized to sign this statement, I certify that this firm complies fully with the above
requirements.
DATE: U3 0/2014 SIGNATURE:
COMPANY: Amerjcan Santrafe NAME: Ron NG
ADDRESS: $36 Sc/ullee Kal __ (Typed or Printed)
elasey / Ohro 4YS34¢) TLE: Desi d ent-
PHONE: $37- SY9- GB
Repair & Paint
Countryview & Rluewater Tanks (2014) 00300-10 Job No. 41-459
ATTACHMENT “C”
INDEMNIFICATION AND HOLD HARMLESS
To the fullest extent permitted by law, CONTRACTOR shall indemnify hold harmless OWNER, its
officers and employees from liabilities, damages, losses, and costs including but not limited to
reasonable attorney fees, to the extent caused by the negligence, recklessness, or intentionally wrongful
conduct of the CONTRACTOR and other persons employed or utilized by the CONTRACTOR in the
performance of this Agreement.
American Sutras} Cb.Ina Kon. bkf
Bidder’s Company Name Authorized Signature - Manual
/b§36 Schiltee Koad, Ron Boling
er ddress Authorized Signature ~Ty ‘yped
jane ay ° Pe esident
Mailing Address Title
739-241-145 BI 849- 9Y
Phone Number FAX Number
939- FIBNVS IFV- BIZ-NUS
Cellular Number After-Hours Number(s)
/ / 30 [ro if
Date '
(REVISED: JANUARY 12, 2001)
Repair & Paint
Countryview & Bluewater Tanks (2014) 00300-11 Job No. 41-459
i’
:
aad
ATTACHMENT “D”
INSURANCE COMPLIANCE
This form is to be completed and signed by you certifying that your policy either meets the insurance
requirements as specified in Bid No. 4/- 4ASY , or that the insurance company has reviewed
the bid requirements and certifies that you were quoted any price increase due to required coverage.
CONTRACTOR
I certify that the insurance requirements have been reviewed.
Company Name Ameri ican Sunaratt Co. Lrc.
Address /0 §3(6 Sch) her Be Qa od
Medway, Ohio 4534!
serene Don baling | | VA % i
Title Paes dlent-
Phone Number 93 q- g Y q-F YTS
Repair & Paint
Countryview & Bluewater Tanks (2014) 000300-12 Job No. 41-459
American Suncraft Co., Inc.
10836 Schiller Road, Medway, Ohio 45341
Phone (937) 849-9475 Fax (937) 849-9474
Specializing in Water
Storage Tank Maintenance
- American Suncraft FC22 Projects
Indiana American Water
Clearwater 1 MG Tank, Noblesville, indiana
Patrick Brown, PE, TIC 317-271-3100
Roy Francis, PE, Indiana American Water 317-885-2417
Indiana American Water
Barberry 500,000 Gallon Tank, West Lafayette, indiana
Patrick Brown, PE, TIC, 317-271-3100
Roy Francis, PE, Indiana American Water 317-885-2417
ilinois American Water
Route 116 Tank, Hanna City, [Illinois
Lori Horstman, Water Superintendent, 309-303-0826
Michael Jackson, PE, 617-830-1771
West Virginia American Water
KVWTP Clarifier No. 3, Charleston, WV
Patrick Brown, TIC — 317-271-3100
Shelley Porter, WVAW ~ 304-340-2974
West Virginia American Water
Cross Lanes Tank, Cross Lanes, WV
Patrick Brown, TIC — 317-271-3100
Shelley Porter, WVAW, 304-340-2974
Aqua Ohio, Inc.
Bunker Hill Tank, 2,920,000 MG Tank
Ashtabula, Ohio
Patrick Brown, PE, TIC 317-271-3100
Joe Flahiff, Plant Manager 440-964-8114
American Suncraft Co., Inc.
10836 Schiller Road, Medway, Ohio 45341
Phone (937) 849-9475 Fax (937) 849-9474
Salietua ga Water
Specahzing in Water
Storage Tank Maintenance
_ American Suncraft Projects List for 2013
City of Columbus, Ohio
Rome Hilliard East & East Broad North Interior Tank Painting
Contract Price: $919,875.00 — 99% Complete
Cindi Fitzpatrick, P.E., 614-645-6802
Delco Water 2013 Tank Project
Tank 11 Scioti JCF
Tank 26 Stelzer Court
Contract Price: $474,225.00 - 100% Complete
Shane Clark, P.E., 740-272-2220
City of Dayton, Ohio
Airport Tank
Contract Price: $331,395.00 — 99% Complete
Jeff Dahlin, P.E., 937-902-7787
illinois American Water
Aldrich Units 5&6
Contract Price: $684,980.00 — 100% Complete
Michael Jackson, P.E., 618-239-3238
Indiana American Water
Kokomo North Tank
Contract Price: $632,530.00 — 99% Complete
Roy Francis, P.E., 317-885-2417
Kentucky American Water
Tates Creek Tank
Contract Price: $495,375.00-- 90% Complete
Zach Dukes, P.E., 859-268-6352
Okaloosa County Water and Sewer System - 2012
Okaloosa, Florida
Lead Abatement
Contract Amount: $1,418,350.00
100% Complete
Contact: Beth Brant, P.E. - Polyengineering
850-609-1100
2012 Potable Water Tanks Modifications & Repairs
Birmingham, Alabama
Three Tanks, Contract Amount: $1,307,302.00
100% Complete
Robert Lang, P.E., City Engineer
205-244-4211
City of Dayton, Ohio
2 MG Tank - Mt. Auburn
100% Complete
Contract Amount: $1,193,324.00
Steve Tiefert, P.E.,
937-333-6134
Aldrich Units 1,2,3,4
HWlinois American Water
Contract Amount: $1,395,880.00
100% Complete
TIC - Patrick Brown, P.E.
317-271-3100
Illinois American Water, Michael Jackson, P.E.
618-239-3238
American Suncraft Co., Inc.
10836 Schiller Road, Medway, Ohio 45341
Phone (937) 849-9475 Fax (937) 849-9474
Specializing in Water
Storage Tank Maintenance
References for American Suncraft 2011 - Public Works Projects
City of Amarillo, Texas — 2011
Repainting and Restoration of Water Storage Tanks
1 2MG Elevated Storage Tank (Soncy)
1 2MG Ground Storage Tank (Osage)
1 2MG Gallon Ground Storage (Masterson #13)
1 1MG Ground Storage (Masterson #12)
100% Complete
$1,709,475.00
Contact: Jonathan Gresham, P.E., City of Amarillo
806-378-4265
Water Works Board of the City of Birmingham
2011 Potable Water Tanks Modifications & Painting (4 Tanks)
$1,824,525.00
100% Complete
Robert Lang, P.E., City Engineer
205-244-4211
City of Dayton, Ohio - 2011
Strand Water Storage Improvements
2 MG Elevated Tank
Contract Amount: $2,500,000.00 — 100% Complete
Contact: Steve Tiefert, P.E, City of Dayton, Ohio
937-333-6134
City of Dayton, Ohio - 2011
Repainting of the Lime Sludge Tanks, Wash Water Tank and Canopy Miami Water Treatment Plant
Contract Amount: $378,994.00 — 100% Complete
Contact: Steve Tiefert, P.£, City of Dayton, Ohio
937-333-6134
City of Springfield, Missouri — 2011
Rehabilitation of One 4 MG Southwest Ground Storage Tank No. 1
Contract Amount: $916,202.00 — 100% Complete
Contact: James Okumu, P.E., Project Manager
417-831-8843
American Suncraft Co., Inc.
10836 Schiller Road, Medway, Ohio 45341
Phone (937) 849-9475 Fax (937) 849-9474
Specializing in Water
Storage Tank Maintenance
References for American Suncraft Company
Virginia American Water — 2010
Rehabilitation of 1MG Elevated Tank (Minnieville Tank)
Contract Amount: $819,019.00
100% Complete
Contact: Janet Rogel, P.E.
804:239-2010
Kentucky American Water - 2010
(Two 1MG Gallon Tanks), Cox Street Ground and Cox Street Elevated
Contract Amount $593,335.00
100% Complete
Contact: Patrick Brown, P.E. - TIC
317-271-3100
lowa American Water -- 2009/2010
Two 1MG Tanks
Bettendorf and Harrison Street Tanks
Contract Amount: $1,800,000.00
100% Complete
Contact: Patrick Brown, P.E. - TIC
317-271-3100
City of Dayton, Ohio — 2010
Burkhardt 1MG Standpipe
Contract Amount: $521,099.00 — 100% Complete
Contact: Steve Tiefert, PE, City of Dayton, Ohio
937-333-6134
City of Dayton, Ohio - 2010
Nordale 2MG Elevated Water Tower
Contract Amount: $963,469.00 — 100% Complete
Contact: Steve Tiefert, PE, City of Dayton, Ohio
937-333-6134
Mobile Area Water and Sewer System — 2010
Mississippi Street Water Tank — 500,000 Gallion Tank, 100% Complete
Contact: Bryan V. Peacock, P.E., Volkert Engineering
251-450-0819
vIOL-S9Z-F19
‘a'd ‘207 "y erey yoejyu07)
yu] pareaaly Uolley) 000‘SZT
URL, payeaaly UoTey 000'SL
s}uawaaoiduyy uraysAsS UONGLYSIG 1378, Y1eg ayeis yaar) 1esae)
£002 - (sad.1mosay fe.mjeN jo yuaUn.Ledag O1YQ) OFYO Jo a7e}5
OZ772-ZLZ-OFL
Suliaaulsugq “Ag ‘YrepD aueys :39e U0)
(quowiajeqy pee) yur, ole) 000‘0ST - Yue] peoy a7eI5 PIO
(quaurayeqy peay) xu], OTe) 000‘00Z - peoy auloH
800Z - “ou ‘Aueduio7 1338 0-[9q
VVSP-ISE-OEE
‘Ad ‘Aawery ‘W ppoy :39e3u07
(quawazeqy peat) yur payeaayy volley 000‘0SZ
JaJUaD [0.4U0) UOnNT[Og 1a7e A,
800Z - OTYQ ‘dojQUR: Jo ARID
02272-ZLZ-00L
Sullaauisuy “q'q ‘Yael aueYs RU
Quaurayeqy pea) yue], voTTeD OOO‘OST - HURL peoy ayers PIO
Quoeurayeqy pes) yuel uoTeD 000‘00Z - peoy euoH
800Z - “au ‘Aueduio7 1338 05-[9q
2089-SP9-FT9 :ou0Ud “A'd ‘Yoaedzy1y [pur :joejuoD
ue L UOTeD 000000 ‘T - 398.05 peoig iseq
que L UOlTeD 000'000'Z - swioy paren
800Z — OFYO ‘snquinjo) jo AW1D
O22?-72LZ-00L
suLaaulsug “A'q ‘Yre[D aueys :39eqU07
Qquawayeqy pea) yue], uoleD 000'0SZ - yuk] asel[IA 1aqUe7)
600Z - ‘2Uy ‘Auedui0) 12384 075-[aq
Z089-SP9-PL9 ‘auoUd “aq ‘YoMedzHYy Ipury 392105
YUP] 000‘000'T - 388M OTL
600Z -OFYO ‘snquinjo> Jo A315
V9ZT-809-LE6 :auoug
JostAjadns soUueUaUIep] - SUTIN assaf pe WO?
Qquawiazeqy peat) xue 1, uoTTeD 000'000'T
600Z - O1YO ‘B.nqsturelp Jo A115
SdDUdIIJOyy]
yeuNs uedteury
ATTACHMENT “E”
f REFERENCES
- (Attach reference list as specified in Instructions to Bidders
u - Section 00100 Article 3 - following this sheet.)
Repair & Paint
Countryview & Bluewater Tanks (2014) 000300-13 Job No. 41-459
poe
ATTACHMENT “F”
NO CONTACT CLAUSE
The Okaloosa County Board of County Commissioners have established a solicitation silence policy
(No Contact Clause) that prohibits oral and written communication regarding all formal solicitations
for goods and services (formal bids, Request for Proposals, Requests for Qualifications) issued by the
Board through the County Purchasing Department.
The period commences when the procurement document is advertised and terminates when the Board
of County Commissioners approves an award.
When the solicitation silence period is in effect, no oral or written communication is allowed
regarding the solicitation between prospective bidders/proposers and members of the Board of
County Commissioners, the County Administrator or members of the Board Approved Review
Committee. All questions or requests for information regarding the solicitation must be directed to
the designated Purchasing Representative listed in the solicitation.
Any information thought to affect the committee or staff recommendation submitted after bids are
due, should be directed to the Purchasing Director or his appointed representative. It shall be the
Purchasing Director's decision whether to consider this information in the decision process.
Any attempt by a vendor/proposer to influence a member or members of the aforementioned shall be
grounds to disqualify the proposer from consideration during the selection process.
All proposers must agree to comply with this policy by signing the following statement and including
it with their submittal.
I ld (OL representing Amercan Sire: alf G he .
7 a a
Signature Company Name
Hereby agree to abide by the County's "No Contact Clause" and understand violation of this policy
shall result in disqualification of my proposal/submittal.
Repair & Paint
Countryview & Bluewater Tanks (2014) 000300-14 Job No. 41-459
beicwerscrtrsn ns
ATTACHMENT “G”
PROTECTION OF RESIDENT WORKERS
The Okaloosa County Board of County Commissioners actively supports the Immigration & Nationality
Act (INA) which includes provisions addressing employment eligibility, employment verification, and
nondiscrimination. Under the INA, employers may hire only persons who may legally work in the United
States, (i.e., citizens and nationals of the U.S.) and aliens authorized to work in the U. S. the employer
must verify the identity and employment eligibility of anyone to be hired, which includes completing the
Employment Eligibility Verification. The contractor shall establish appropriate procedures and controls so
no services or products under the contract documents will be performed or manufactured by any worker
who is not legally eligible to perform such services or employment. Okaloosa County reserves the right to
request documentation showing compliance with the requirement.
I ‘a BLY. representingMMEriZan Ma reraff (bh Macy
Signature U Company Name
Hereby agree to abide with the provisions of the INA and the provisions outlined above.
END OF SECTION 00300.
Repair & Paint
Countryview & Bluewater Tanks (2014) 000300-15 Job No. 41-459
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, American Suncraft
Canstruction Co., Inc., as Principal, and _Ohio Farmers Insurance Company , as Surety, are
hereby held firmly bound unto Board of Commissione loosa Co , as Owner, in the penal sum
of _Five percent of the total amount bid for the payment of which, well and truly
to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors
and assigns.
Signed, this _ 5th day of _February. , 2014, Board of
Commissioners
The condition of the above obligation is such that whereas the Principal has submitted to Okaloosa
County, FL____a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in
writing, for the Renair and Repaint Countryview and Bluewater Tanks (2014)
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the
Form of Contract attached hereto (properly completed in accordance with said Bid) and
shall furnish a bond for his faithful performance of said contract, and for the payment of
all persons performing labor or furnishing materials in connection therewith, and shall in
all other respects perform the agreement created by the acceptance of said Bid, then this
obligation shall be void, otherwise the same shall remain in force and effect; it being
expressly understood and agreed that the liability of the Surety for any and all claims
hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and
its bond shall be in no way impaired or affected by an extension of the time within which the Owner may
accept such Bid; and said Surety does hereby waive notice of any such extension.
Repair & Paint ;
Countryview & Bluewater Tanks (2014) 00410-1 Job No. 41-459
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals,
and such of them as are corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by the proper officer, the day and year first set forth above.
men LY Inc.
X F ou LS.
Principal F
Ohio Farmers Insurance Company
Surety
BY: Wh Ve
Anne Tierney, Attorney-in-Fact
SEAL:
Repair & Paint
Countryview & Bluewater Tanks (2014) 00410-2 Job No, 41-459
{ y ~
POWER NO. 3401942 07
General
Bower . Westfield Insurance Co.
of Attorney Westfield National Insurance Co.
Ohio Farmers Insurance Co.
CERTIFIED COPY Westfield Center, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a “Company” and collectively as “Companies,” duly
organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio, do by these
presents make, constitute and appoint
THOMAS D. CASSADY, LOUIS R. FISHER, THOMAS W. CHATHAM, PAULETTE M. AERNI, FRANK J. LECH, PAUL J.
SCHUELER, JR., RICHARD A. DAVIS, ANNE TIERNEY, LINDA L. HOGLE, JOINTLY OR SEVERALLY
of CINCINNATI and State of OH its true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship- - - -----------+---- mot tt tt te te ee ee ee ee ee ee ee ee eee eee
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in
the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
“Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company’s liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary.”
“Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.” (Each adopted at a meeting
held on February 8, 2000).
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 21st day of
JANUARY A.D., 2008 .
Corporate “Suna gi Stipa’, WESTFIELD INSURANCE COMPANY
Seal Wee Preston Vg” ? WSU iS
antived SS PS S <2. Mn, WESTFIELD NATIONAL INSURANCE COMPANY
Soundings Se OHIO FARMERS INSURANCE COMPANY
tga }
* Mcoscaneet® . wd . > .
“he, i Nason’ s ’, .
A “Ny Li A Vite 3 aoe .
State of Ohio amie “eangageo® By
County of Medina Ss. Richard L. Kinnaird, Jr., Senior Executive
On this 21st day of JANUARY = A.D., 2008 , before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duly
sworn, did depose and say, that he resides in Medina, Ohio; that he is Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above
instrument; that he knows the seals of said Companies; that the seals affixed to said instrument are such corporate seals; that they were so affixed
by order of the Boards of Directors of said Companies; and that he signed his name thereto by like order.
se, OTT Ld) hal -
Affixed LENT a
| Sa.
William J. Kahelin, Avorney at Law, Notary Public
My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code)
State of Ohio
County of Medina SS.:
TE OF Oy
a
*Peeeevgan nee”
|, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies, which is still in full force and effect: and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, | have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this SM aay of
A.D., .
Febrva cine Y eee, . eeoeutstteen,
oe ay R ‘A nn, 7 Ne \ ON: A L i 7 a wie Gn,
é. "oe Nerrenle % wee Oe gel, .
Se te Gt ; Ly, SQ an
tay: 4B 4 a > . ee 4 TT
Hi SEAL 2: 7 CHARTERED: ' .
H “i BS SEAL im: 2 i: Secretary
Y ne S, 3s B. IASB IS? Frank A. Carrino, Secret
"4,
ep,
Peeeoee”
"e
%, %. ‘ ~~ +
hy, bere ad ,, at
‘ taeet < 4,
ee 4, ) y
ty * a M0, ‘ at
rang yanee vengne
BPOAC2 (combined) (06-02)
%,
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned,
, as Principal, and , as Surety, are
hereby held firmly bound unto Board of Commissioners, Okaloosa County, FL, as Owner, in the penal sum
of for the payment of which, well and truly
to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors
and assigns.
Signed, this day of , 2014.
The condition of the above obligation is such that whereas the Principal has submitted to
acertain Bid, attached hereto and hereby made a part hereof to enter into a contract in
writing, for the
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) __ If said Bid shall be accepted and the Principal shall execute and deliver a contract in the
Form of Contract attached hereto (properly completed in accordance with said Bid) and
shall furnish a bond for his faithful performance of said contract, and for the payment of
all persons performing labor or furnishing materials in connection therewith, and shall in
all other respects perform the agreement created by the acceptance of said Bid, then this
obligation shall be void, otherwise the same shall remain in force and effect; it being
expressly understood and agreed that the liability of the Surety for any and all claims
hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and
its bond shall be in no way impaired or affected by an extension of the time within which the Owner may
accept such Bid; and said Surety does hereby waive notice of any such extension.
Repair & Paint
Countryview & Bluewater Tanks (2014) 004.10-1 Job No. 41-459
| IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals,
and such of them as are corporations have caused their corporate seals to be hereto affixed and these
J presents to be signed by the proper officer, the day and year first set forth above.
LS.
i Principal
Surety
BY:
SEAL:
i Repair & Paint
Countryview & Bluewater Tanks (2014) 00410-2 Job No. 41-459
SECTION 00500
EJCDC
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is by and between Board of County Commissioners, Okaloosa County, FL
(hereinafter called OWNER) and (hereinafter called
CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants
hereinafter set forth, agree as follows:
ARTICLE 1. WORK
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
The Work is generally described as follows:
Repair and Paint Countryview and Bluewater Tanks (2014)
ARTICLE 2 - THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a
part is generally described as follows:
Repair and Paint Countryview and Bluewater Tanks (2014)
ARTICLE 3 - ENGINEER
3.01 The Project has been designed by POLYENGINEERING, INC. who is hereinafter called
ENGINEER and whois to act as OWNER's representative, assume all duties and responsibilities and
have the rights and authority assigned to ENGINEER in the Contract Documents in connection with
completion of the Work in accordance with the Contract Documents.
ARTICLE 4- CONTRACT TIME
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and
readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Days to Achieve Substantial Completion and Final Payment
A. The Work will be substantially completed within 120 calendar days from the date
when the Contract Time commences to run as provided in paragraph 2.03 of the General
Repair & Paint
Countryview & Bluewater Tanks (2014) 00500-1 Job No. 41-459
Conditions, and completed and ready for final payment in accordance with paragraph 14.07.B of
the General Conditions within 180 calendar days from the date when the Contract Time
commences to run.
4.03 Liquidated Damages.
A. Amount: In case of failure on the part of the Contractor to complete the work within the
time(s) specified in paragraph 4.02 above, or within such additional time(s) as may be
granted by Okaloosa County in accordance with Article 12 of the General Conditions, the
County will suffer damage, the amount of which is difficult, if not impossible, to ascertain.
Therefore, the Contractor shall pay to the County, as liquidated damages, the amount
established in the schedule below for each calendar day of delay that actual completion
extends beyond the time limit specified until such reasonable time as may be required for
final completion of the work. In no way shall costs for liquidated damages be construed as
penalty on the contractor.
Original Contract Amount Daily Charge Per Calendar Day
$50,000 and under $311
Over $50,000 but less than $250,000 $972
$250,000 but less than $500,000 $1,584
$500,000 but less than $2,500,000 $1,924
$2,500,000 but less than $5,000,000 $2,694
$5,000,000 but less than $10,000,000 $3,902
$10,000,000 but less than $15,000,000 $6,102
$15,000,000 but less than $20,000,000 $7,022
$20,000,000 and over $7,022
plus 0.2% for any amount over $20 million
B. Determination of Number of Days of Default: For all contracts, regardless of whether the
contract time is stipulated in calendar days or working days, the default days shall be counted
in calendar days.
C. Conditions under which Liquidated Damages are imposed: Should the Contractor or, in
case of his default, the Surety, fail to complete the work within the time stipulated in
paragraph 4.02 above, or within such extra time as may have been granted by the County in
accordance with Article 12 of the General Conditions, the Contractor or, in case of his
default, the Surety, shall pay to the County, not as a penalty, but as liquidated damages, the
amount so due as determined by the Code requirements, as provided above.
D. Right of Collection: The County shall have the right to apply as payment on such liquidated
damages any money which is due to the Contractor by the County.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00500-2 Job No. 41-459
E. Permitting Contractor to Finish Work: Permitting the Contractor to continue and to finish
the work, or any part of it, after the expiration of the contract time allowed, including
extensions of time granted to the Contractor, shall in no way act as a waiver on the part of
the County the liquidated damages due under the contract.
F, Completion of Work by County: In case of default of the contract and the completion of
the work by the County, the Contractor and his Surety shall be liable for the liquidated
damages under the contract, but no liquidated damages shall be chargeable for any delay in
the final completion of the work by the County due to any unreasonable action or delay on
the part of the County.
ARTICLE 5 - CONTRACT PRICE
5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents an amount in current funds equal to the sum of the amounts determined
pursuant to paragraphs 5.01.A below:
A. For all Work, at the prices stated in CONTRACTOR’s Bid, attached hereto in Section 00300.
As provided in paragraph 11.03 of the General Conditions, estimated quantities are not
guaranteed, and determinations of actual quantities and classifications are to be made by
ENGINEER as provided in paragraph 9.08 of the General Conditions. Unit prices have been
computed as provided in paragraph 11.03 of the General Conditions.
Contract Amount of
ARTICLE 6 - PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14
of the General Conditions. Applications for Payment will be processed by ENGINEER as provided
in the General Conditions.
6.02 Progress Payments; Retainage
A. OWNER shall make progress payments on account of the Contract Price on the basis of
CONTRACTOR's Applications for Payment on or about the 10th day of each month during
performance of the work as provided in Paragraphs 6.02.A.1 and 6.02.A.2 below. All such
payments will be measured by the schedule of values established in paragraph 2.07.A of the General
Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the
event there is no schedule of values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to
the percentage indicated below, but, in each case, less the aggregate of payments previously made
Repair & Paint
Countryview & Bluewater Tanks (2014) 00500-3 Job No*41-459
and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance
with paragraph 14.02 of the General Conditions.
a. Ninety percent (90%) of Work completed (with the balance being retainage).
If Work has been fifty percent (50%) completed as determined by ENGINEER, and
if the character and progress of the Work have been satisfactory to OWNER and
ENGINEER, OWNER on recommendation of ENGINEER, may determine that as
long as the character and progress of the Work remain satisfactory to them, there will
be no retainage on account of Work subsequently completed, in which case the
remaining progress payments prior to Substantial Completion will be in an amount
equal to 100% of the Work completed less the aggregate of payments previously
made; and
b. Ninety percent (90%) of cost of materials and equipment not incorporated in
the Work (with the balance being retainage).
2. Upon Substantial Completion, OWNER shall pay an amount sufficient to increase total
payments to CONTRACTOR to ninety-five percent (95%) of the Work completed, less such
amounts as ENGINEER shall determine in accordance with paragraph 14.02.B.5 of the General
Conditions and less 100% of ENGINEER’s estimate of the value of Work to be completed or
corrected as shown on the tentative list of items to be completed or corrected attached to the
certificate of Substantial Completion.
6.03 Final Payment.
A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07
of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended
by ENGINEER as provided in said paragraph 14.07.
ARTICLE 7 - INTEREST
7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear
interest at the rate of 12% per annum.
ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
8.01 Inorder to induce OWNER to enter into this Agreement CONTRACTOR makes the following
representations:
A. CONTRACTOR has examined and carefully studied the Contract Documents and the
other related data identified in the Bidding Documents.
B. CONTRACTOR has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, performance of the Work.
C. CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws
and Regulations that may affect cost, progress, performance of the Work.
Repair & Paint ;
Countryview & Bluewater Tanks (2014) 00500-4 Job No. 41-459
D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of
subsurface conditions at or contiguous to the site and all drawings of physical conditions in or
relating to existing surface or subsurface structures at or contiguous to the site (except Underground
Facilities) which have been identified in the Supplementary Conditions as provided in paragraph
4.02 of the General Conditions and (2) reports and drawings of a Hazardous Environmental
Condition, if any, at the site which has been identified in the Supplementary Conditions as provided
in paragraph 4.06 of the General Conditions.
E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for
having done so) all additional or supplementary examinations, investigations, explorations, tests,
studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or
contiguous to the Site which may affect cost, progress, or performance of the Work or which relate
to any aspect of the means, methods, techniques, sequences, and procedures of construction to be
employed by CONTRACTOR, including applying the specific means, methods, techniques,
sequences, and procedures of construction, if any, expressly required by the Contract Documents to
be employed by CONTRACTOR, and safety precautions and programs incident thereto
F. CONTRACTOR does not consider that any further examinations, investigations, tests,
studies, or data are necessary for the performance of the Work at the Contract Price, within the
Contract Times, and in accordance with the other terms and conditions of the Contract Documents.
G. CONTRACTOR is aware of the general nature of work to be performed by OWNER
and others at the site that relates to the Work as indicated in the Contract Documents.
H. CONTRACTOR has correlated the information known to CONTRACTOR, information
and observations obtained from visits to the site, reports and drawings identified in the Contract
Documents and all additional examinations, investigations, explorations, tests, studies, and data with
the Contract Documents.
I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities
or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR
J. The Contract Documents are generally sufficient to indicate and convey understanding
of all terms and conditions for performance and furnishing of the Work.
ARTICLE 9 - CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement (pages 00500-1 to 00500-8, inclusive);
2. Performance Bond (pages 00610-1 to 00610-2, inclusive);
3. Payment Bond (pages 00620-1 to 00620-2, inclusive);
Repair & Paint
Countryview & Bluewater Tanks (2014) 00500-5 Job No. 41-459
4, General Conditions (pages 00700-1 to 00700-43, inclusive);
5. Supplementary Conditions (pages 00800-1 to 00800-7, inclusive);
6. Specifications as listed in the table of contents of the Project Manual, including
the Appendix;
7. Addenda (numbers , inclusive);
8. Exhibits to this Agreement (enumerated as follows):
a. Notice to Proceed (page_l inclusive);
b. CONTRACTOR's Bid (pages__00300-1 _ to _00300-15 , inclusive),
c. Documentation submitted by CONTRACTOR prior to Notice of Award
(pages__ to ___, inclusive);
d.
9. The following which may be delivered or issued after the Effective Date of the
Agreement and are not attached hereto:
a. Written Amendments;
b. Work Change Directives;
c. Change Order(s).
B. The documents listed in paragraph 9.01.A are attached to this Agreement (except as
expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemental as
provided in paragraph 3.05 of the General Conditions.
ARTICLE 10 - MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings indicated in the General
Conditions.
10.02 Assignment of Contract
Repair & Paint
Countryview & Bluewater Tanks (2014) 00500-6 Job No. 41-459
A. No assignment by a party hereto of any rights or interests in the Contract will be
binding on another party hereto without the written consent of the party sought to be bound; and,
specifically but without limitation, moneys that may become due and moneys that are due may not
be assigned without such consent (except to the extent that the effect of this restriction may be
limited by law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty or responsibility
under the Contract Documents.
10.03 Successors and Assigns
A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and
legal representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect of all covenants, agreements and obligations contained in the Contract
Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue
to be valid and binding upon OWNER and CONTRACTOR, whoagree that the Contract Documents
shall be reformed to replace such stricken provision or part thereof with a valid and enforceable
provision that comes as close as possible to expressing the intention of the stricken provision.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00500-7 Job No. 41-459
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in
triplicate. One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER.
All portions of the Contract Documents have been signed or identified by OWNER and
CONTRACTOR or on their behalf.
This Agreement will be effective on
, 2014 (which is the Effective
Date of the Agreement).
OWNER CONTRACTOR
BOARD OF COUNTY COMMISSIONERS,
OKALOOSA COUNTY, FLORIDA
By: By:
Don Amunds (Chairman)
[ SEAL] [CORPORATE SEAL]
Attest Attest
Gary Stanford - Deputy Clerk of Courts
Address for giving notices:
302 N. Wilson St., Suite #203
Address for giving notices:
Crestview, FL 32536
Designated Representative: License No.
(Where Applicable)
Name:
Title: Agent for Service of Process:
Address:
Phone: Designated Representative:
Facsimile: Name:
Title:
Address:
Phone:
Facsimile:
END OF SECTION 00500
Repair & Paint
00500-8 Job No. 41-459
Countryview & Bluewater Tanks (2014)
SECTION 00610
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That we (1)
a (2) hereinafter called "Principal" and (3)
of State of hereinafter called the "Surety", are held and firmly bound unto
(4) Board of Commissioners, Okaloosa County, FL hereinafter called "OWNER", in the penal sum of.
($ ) in lawful money of the
United States for the payment of which sum well and truly to be made, we bind ourselves, our heirs,
executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the Owner, dated the day of , 2014, a copy of which is hereto attached
and made a part hereof for the construction of:
Repair and Paint Countryview and Bluewater Tanks (2014)
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said contract during the original term thereof,
and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if
he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save
harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall
reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any
default, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby-stipulates and agrees that no
charges, extension of time, alteration or addition to the terms of the contract or to the work to be performed
thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond,
and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of
the contract or to the work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge
the right of any beneficiary hereunder, whose claim may be unsatisfied.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00610-1 Job No. 41-459
IN WITNESS WHEREOF, this instrument is executed in five (5) counterparts, each one of which shall
. be deemed an original, this the day of , 2014.
ATTEST:
| (Principal) Secretary”
(Address)
~Wimnessasto Principal)
(Address)
Surety) Secretary “" Attomey-in-Fact
"Witness as to Surety (Address)
(Address)
NOTE: Date of Bond must not be prior to date of Contract.
(1) Correct name of Contractor.
(2) A Corporation, A Partnership or an Individual as case may be.
(3) Correct name of Surety.
(4) Correct name of Owner.
(5) If Contractor is Partnership, all partners should execute bond.
END OF SECTION 00610
Repair & Paint
Countryview & Bluewater Tanks (2014) 00610-2 Job No. 41-459
SECTION 00620
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: That we (1)
a (2) hereinafter called "Principal" and (3)
of State of hereinafter called "Surety", are held and firmly bound unto
(4) Board of Commissioners, Okaloosa County, FL hereinafter called "Owner", in the penal sum of
($ ), in lawful
money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our
heirs, executors, administrators and successors, jointly and severally firmly by these presents:
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the Owner, dated the ___ day of , 2014, a copy of which is hereto attached and
made a part hereof for the construction of:
Repair and Paint Countryview and Bluewater Tanks (2014)
NOW, THEREFORE, if the Principal shall promptly make payments to all persons, firms, subcontractors,
and corporations furnishing materials for or performing labor in the prosecution of the work provided for in
such contract, and any authorized extension or modification thereof, including all amounts due for materials,
lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in
connection with the construction of such work, and all insurance premiums on said work, and for all labor,
performed in such work, whether by subcontractor or otherwise, then this obligation shall be void; otherwise
to remain in full force and effect.
PROVIDED, FURTHER, that the said surety, for value received hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the contract or to the work to be in any wise
affect its obligation on this bond, and it does hereby waive notice of any such changes, extension of time,
alteration or addition to the terms of the contractor or to the work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge
the right of any beneficiary hereunder, whose claim may be unsatisfied.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00620-1 Job No. 41-459
IN WITNESS WHEREOF, this instrument is executed in five (5) counterparts, each one of which
shall be deemed in original, this the day of , 2014.
ATTEST:
~ Principal - -
_ oe : By _ ws
(Principal) Secretary
(SEAL)
~ “"""""“(WitmessastoPrinciplly =” (Address) ~~
(Address) _ oe
ATTEST:
oe "Surety —_ i
(Surety) Secretary Attorney-in-Fact
(SEAL)
oe ~"WimessastoSurety = SS 7 eee (Address) oe
ee ne a . _ _
NOTE: Date of Bond must not be prior to date of contract.
(1) Correct name of Contractor
(2) A Corporation, a Partnership, or an Individual, as case may be.
(3) Correct Name of Surety.
(4) Correct Name of Owner.
(5) If Contractor is Partnership, all partners should execute bond.
END OF SECTION 00620
Repair & Paint
Countryview & Bluewater Tanks (2014) 00620-2 Job No. 41-459
SECTION 00624
WARRANTY
1/30/2014
(Date)
Project: Repair and Paint Countryview and Bluewater Tanks (2014
by mec can Surer aft Co. lnc. warrants that all work shall
remain in serviceable and good condition and without failure (as defined in Section 02956 - 3.5 of this
contract) for a period of five (5) years from the date of final acceptance of the work, unless otherwise
specified in the contract documents, and states that they will repair or replace without cost to Okaloosa
County, any imperfection in whole or in part which may develop in the work during the period above
stated. Required bonds %. & in effect forthe initial two (2) years of this warranty.
6
SIGNATURE:
NAME: Ron Baling”
(Typed or Printed)
TITLE: PRES dent
of_Ameritan Suneraft Co. Wr.
(Contractor)
State of Oh 10
County of Clq KK
Before me this day personally appeared, am Bo Ine
who, being first duly sworn, deposes and says that he/she executtd the foregoing instrument for the uses
and purposes set forth therein.
Sworn to and subscribed before me this son day of A anus iia ; 2Ol]
Sign: C . Fay he
Print/Type: Ronda Cc. Mrwetn
Notary Public, State of Ohio
My Commission Expires:__ppenpa c MARTIN, Notary Public
In and for the State of Chio |
My Commission Expires July 7, 2014
Repair & Paint
Countryview & Bluewater Tanks (2014) 00624-1 Job No. 41-459
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or
modification. This document should be adapted to the particular circumstances of the contemplated Project and the
Controlling Law.
STANDARD
GENERAL CONDITIONS
OF THE
CONSTRUCTION CONTRACT
Prepared by
ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE
and
Issued and Published Jointly By
| AMERICAN CONSULTING
= & ENGINEERS COUNCIL
PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE ~
a practice division of the
NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS
AMERICAN CONSULTING ENGINEERS COUNCIL
AMERICAN SOCIETY OF CIVIL ENGINEERS
This document has been approved and endorsed by
The Associated General Contractors of America
Construction Specifications Institute
9
These General Conditions have been prepared for use with the Owner-Contractor Agreements (No. 1910-8-A-1 or 1910-8-
A-2) (1996 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other.
Comments concerning their usage are contained in the EJCDC User’s Guide (No. 1910-50). For guidance in the
preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (No. 1910-17) (1996
Edition).
iJCDC No. 1910-8 (1996 Edition)
General Conditions Page 00700-1
Copyright ©1996
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314
American Consulting Engineers Council
1015 15th Street N.W., Washington, DC 20005
American Society of Civil Engineers
345 East 47th Street, New York, NY 10017
General Conditions
Page 00700-2
TABLE OF CONTENTS
Page
ARTICLE 1 - DEFINITIONS AND TERMINOLOGY ..........::sssssssssssensseseesersssscsssssssnssnsassnerssnsssnesareseaesssenensaeneneasasacnearesessasse nes 6
1.01 Defined Terms ...cccssscscsssssssescsssssssssnsssssnsssesnnenaseeguneeessresesseassayeeessnsneesQeegeeueenMOeGAMeseQQseeeUTUSMUO RA GAMe RRNA ee eee 200 6
1.02 Terminology snccsssscssescssssccssesesseesssesssssesessecsseesssesseeniessueeenaeessueessseeeesanenneeneeeeseeeneeeeaegeeeneHasUaeeeQueeeaneneesseeeen ent 8
ARTICLE 2 - PRELIMINARY MATTERS. .....sccccssssecsssstercceenssssssrssssacseasesessessnenensensseasacensaseonenstesaensnssanenencancenseneseonseansreseaeanes 9
2.01 Delivery of BONS .....ccsssssccscssssessssssssesssssssessaessneesneeesnceeneessnessssueseesneenaeesgseeeeeeneeneeeneueseUeTAMOeesU eG eeeeeaeengeeegee net 9
2.02 Copies of DOCUMENTS ...s.essssssscscsssscsernceseesnieesneesesseessenseeneenseeesseneeegaueet Oe EAOUUAOETCUO TEESE AU TEMEEAEO AEE OTER UATE 9
2.03 Commencement of Contract Times; Notice to Proceed.......cssssssecsesnsiees tes see ete ne tee A eA Tae 9
2.04 Starting the Work .....cssssssssssssessseecnscsssseneesneeseesneseeeesesssesseeeeneeaeeeneseeeueeeOeenAeEOU eG EAO AGA UTEA EGU RATT ROU R EU eg ete 9
2.05 Before Starting CONStruction ...coscsoscsvcsssssseecsecseeeeesseenetseneeeeeenten seen ene eeGe eA RAN EEUU AREA AE ROO 9
2.06 Preconstruction COnference.........ssssssessssrsssensssnssrescsstsaesneneesssensensesesusnesseseesesaancesanenegnseasoesaasesegeenanseenesseessgeas 10
2.07 Initial Acceptance of Schedules ....s.scsessvesssssvscsvecssscsensecsneesneesneeseeessneein eee eennenanee ee eee ce Ae Og AAA LAU REO RE AOA E REN 10
ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE .......:-:-sccsssessssesssssesssenessensssenssseensaeenceersentesesvenes 10
BOL Urttennt ....seescccrssesseeseeeeses
3.02 Reference Standards
3.03 Reporting and Resolving Discrepancies .........cscssesecv sss eses ieee eee tt Ree ATE LR RAGA 11
3.04 Amending and Supplementing Contract DOCUMENES ......-..sssecsssssseseeet tee ee TE AT 1]
3.05 Reuse of DOCUMENES o.....escsssssvssssscsecsnesssssessensecsseenseeaeseetesseetesssueesseeeasenesessueneHeeeeeaneeeMeseeUeeeceseeeneeneges eens ete 11
ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE
POINTS wiceessescsscesesssssessescsscacccenesesessssssessesansceeceanesssaneanenenenereases sasauecssvsssseveasacsesseutscaesesseseseaesecosecscosscssssusansescessaeansanses 11
4.01 Availability of Lands secseusuuusaniasansnssonususasasasnassanssesnecececgeeeustunuasnesesssusvsussssssnnsoceeneegeeeeeeceuensnnansscenanssessnsasss a
4.02 Subsurface and Physical COnditions .......cssssesccssesseceesiiessseeseeeesaeees essen eee ee Gee Ae ENON LEELA ETA et 12
4.03 Differing Subsurface or Physical Conditions ..........ssssovecssseeeess sees nese et tt A tt ThE EE EE aed 12
4.04 Underground Facilities ......cscssscsssssssssseenscsessesestesseesesesensnesenteeae een ees aes eneen eee eeC TAA eg EEE ESE TEUU RTA AT ae tent a8 13
4.05 Reference POIUKS .....csscsesssssscssssssssssssessssessacesnsccnesssnsesneesneessueessueeeseseseaeeeeueenseeeeenaneeneaTeeseAGeenteseeeennenen gegen eee enr0e8 14
4.06 Hazardous Environmental Condition at Site ......csccsccsessssscssesssenssssssssneneneseeanessesesensengnecaeaeneseseseenersenaaeansnags 14
ARTICLE 5 - BONDS AND INSURANCE .......cccccssccsssssesseseseseetsseessssesnsssnssscsearssenenesunsessessgeneseasessensnnssesssacessecsesnnansenrengonenasanagans 15
5.01 Performance, Payment, and Other BOnds ......+..+sssesessssssesesseeteesensneesaecenncananneenerneteansenittes seteesseseesnsessees 15
5.02 Licensed Suretios ANd IMSUrers ..sccsscscssccssssscesscssenesesesnseessecsenesescssesesesnsesesesenenessseseneseseaeecurnenescaenesenenesarseaeseneneas 15
5.03 Certificates of INSUrance ....essssssessssseesssessseccssessuesgsnseesoneessneceeronsseecssecensnsecsanecssnsensasacceneconsseceanisessanenenanesesgges 15
5.04 CONTRACTOR’ Liability Insurance...c.sssscssssssesessssrssersensessennecccenecgeesseacsenesanneanssseenscnseqanennecnacesseaseenngsees 15
5.05 OWNER’ Liability INSUrance.....s.scesssssesvesvesssssessscessseseeseeneeneeneeeeeenesestNARE SAO AEA AEG EA AR LAU SOU ECU EAE ENE SOOEEO EEA 16
5.06 Property InSUrannce.....ccscscssssssssssssesseeseeeseesee nese netseesseseeeeeneeeeeeeneensassneesOnenUneOUhe A GOAN DELO ELUTE AEA AOUSEOAE eee eget 16
5.07 Waiver of Right ...scccsssscsssssecssssssssesssessessusssvesucsseesseesnecnsecsssoneesansssissesesanensnecsuccnecsnccasqansnarocgsconscsensessenseneneseggnseee 17
5.08 Receipt and Application of Insurance Proceeds........csscssessvess sistent EEE TA A 18
5.09 Acceptance of Bonds and Insurance; Option to Replace ......sssssssesriserseeec nee ett ee tee ett eee 18
5.10 Partial Utilization, Acknowledgment of Property [nSUPe? ...cesssssssnccese iene insnsreensenanennenteaesnanteneaaanenn sents ees 18
ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES. .........ssssscssessssessssssesssssseseasssesscsensseeseseessneseneaassasanssesenenennensenenagsenenogaeseeses 18
6.01 Supervision and Superintendence .......sssssecceercssiccsssranesseecssssssaveccesssansesceernnanennannasenssssanseesensesesssnenennetes 19
6.02 Labor; Working HOUrs ...scsccssessssvssvessssssesesseeesscnnessnessesseceneeeaeetshenseueeeeeeeeeneeneeeeeeeesGaeeAeeAMenGMANGOeeAseeane geen eat 19
6.03 Services, Materials, and Equipment .....c.ccsssscsssusssessscsesssnsnesenesenneneenssesssenenenenennaeaceneunenaneeneasennsensseeneene eens 19
6.04 Progress Schedule ...sssscssssessssssscssnssscesesneesneeseesesseeseaeesseeeeeesneeeenseeeggeeeegensaeeuegeeeeeeO ene OAETOMA Ae Aee Oe eee ee eee 19
6.05 Substitutes and “Or-Equalls” .....ssssssssssssssesssssescsesssessesssesssssseesteensesscssessasenceseesseneeseqscanenncnnearecsnsesteaseessensegss 19
6.07 Patent Fees and Royalties .......csssssssssssvesssesssssssesesssesnsessneesneessnsensnetavessnessneaneeasenseensansasnsacaaransesseenasencganessgnes 21
6.08 Permits coccccccccscccsccesscceccecerecrcscsssssesecesecscsescsssesenenesssesuessasarssssesequsseseesasssseaseneneausagacsavesensnosenssaeseasenensesegennenenenegs 22
6.09 Laws and Regulations .......scssssssesvecssereeeesessecseesseeeneeseenensenseseenesan een ene eae eeaeGneae eet UA ate EEE OETA AERA RE g 08 22
6.10 TEKS voeccccccscsseccssscssscseccecocsscsesessesssecsscescseuseserecsecsscessaseessosssessenensssecenssessesesensaenenaseunennsansanatsesescenenanansnenanasesenenansys 22
General Conditions Page 00700-3
6.11 Use of Site and Other Areas ..cscscssssssesscscscssssesssssreaccseesuensasssecnssssscnsasneeneasneeseusscsssessasgeeusasussessacarenesceneneseneesases 22 i
6.13 Safety ard Protections o...cececcsscscsserscessssessesssscenesssesssueesvesseccesesneceeceseseasseersccesaseasseseadecaseavasssatacacsesaseaeevsnavsneeeses 23
6.14 Safety Representative oo... ccscscssssercssseceesscsssescsessscsessssssssesssesssnsesssesssoessossessuessaussossssenssuueeseresenssscnsaneseensenisee ees 23 i
6.15 Hazard Communication Programs u.....cssssssccsesssesssssssssscssevssssesesescssssserssssesecnesesarsssensacen seeesenseassetseetessessecneaes 23
6.16 Emergencies ...ecccccccscsssssssessesssscsssscesecssenenssescrssesssnesessnessssasaesequcsesecasseseeasseaesenecerasasavscenssceensesscassascesasessesasseesaes 24
6.17 Shop Drawings arid Samples ...cccccscsscssssvsssssssssscssssssssesssssssssenssssssavsnecssnsaseacsucssseqsesseneauansessesesseceaseaeeqnensensensesees 24
6.18 Continuing the Work cccccsscsssscscecsscosscssescenssensesscssesseaeatsesensesssscessassesensecesesansecenssenersseeessenedenseaseasessenesssseesens 25 i
6.19 CONTRACTOR ’s General Warranty and Guarantee ......cssccscccscsssecsvseseeevenenensesenseceenesescesssesesensessessiesaseensnats 25
6.20 IndemnifiCation.....cccscersseesscscsrcsessencrssseressesessonensesevensesssesseacaccesesesesseseatsessseseceneaasseeansseceetteceeerarsresseenesssassenenegs 25 i
ARTICLE 7 - OTHER WORK ......cccccssssssssssserssrssesssssseonsesescnssnassesnenssseaeseseenenecesessenecessesssvecsseseneqeeneacaesenseesesesesensectecneatectnessseeoteed 26
7.01 Related Work at Site .......scsccsscssesssesecevesseessesesenesesesseesssecesessseseseaesenssnedsceesssousssaecseseesacsdsuecesesesesesnssusescanseeeaes 26
7.02 COOrGINATION ...scccscsevsesseccseseseseeesenececeeseccestatsescenessasconessseaessanecseansneseoescsesesescssscnsoesssenscasenanseesstassssssssussasscseesenees 26 i
ARTICLE 8 - OWNER’S RESPONSIBILITIES .....
8.01 Communications 10 CON ACIOF ....cccccssssessseserssssessesssecssesecssecsesseseasseseessesesesensensnscesesessenssssscscassessasenseasscrnteseets |
8.02 Replacement of ENGINEER. ..........ssccssssssssseseeseesesesssees
8.03 Furnish Data ..cccecssesssccsssscssseserscsscesssssssesssesseneessessecessessssnscasenseesensesnstesesssssesseeseesonseaeeasssessunsseaeaseusansusseaessee ees
8.04 Pay Promptly When Due...
8.05 Lands and Easements; Reports and Tests i
8.06 LASUPANCE 0. cecsseseesessseceseceseceaseeecceccseseeesessscessceseseoesessssesensssscessesseassacscneseesasseceasaseoesscaususdseccesusuausnadensaenesevaentereees
8.07 Change OFders ...cccscescsscccssssssesssesenscsscsssocecestenenersccerssneesssdveneevectanssssorsssssusesesssssssensseseogonsesanssssasseessanesssegeresesneet
8.08 Inspections, Tests, and Approvals............... |
8.09 Limitations on OWNER’S Responsibilities ........ccsssssesssssseesesseneeens eassteesesecesesneesnseecsessesseseeecesesssnerssesosenssases 27
8.10 Undisclosed Hazardous Environmental Condition .......cccscsesssesssssssescsssessseesesoncesessensessssessosssseescescasaseesenees 27
8.11 Evidence of Financial Arrangemenits....... eseececesscesesescaeseseeeseseasaceesesesseusesensasesnseeeecsseusossanstseeeuenseneses ees 27 i
ARTICLE 9 - ENGINEER’S STATUS DURING CONSTRUCTION ...........ccsssscsssscessssssnseseeseeesesenecsssesecseenseaseessesssoesnsesessnassses 27
9.01 OWNER’S Representative ..........ssccecsscsceeveresessssesesessssssesessssesoseesseoesssessnsessacnsenessuusssscansessessseeeseanensnsanseensanasets 27
9.02 Visits t0 Site... eseesecesscessssssseesesesssesessesecessscssessenaseesesesesecessossesoensescsssssssussesaessanseseeanssnescensaseasecaseesesenenenesenentaraes 27 |
9.03 Project Representative ......sssesesssssscecsseseesssessscsssescneccssscssassesunsensacscssscasacensesesssessacessenesessusseceeseaennassesesensenseesass 28
9.04 Clarifications and Interpretations........c.c.ecseccsssssevssrsssssesesnsssssessesesseesssossssssessegnsseaseuassessersssecasseenseneasaneneesensaes 28
9.05 Authorized Variations in WOrk.......ccccccssscsssessssscesesseseseseceessnscesneseeneneseassceneaeessssesenescnsoessenansassseaessessnesestseesaeees 28 |
9.06 Rejecting Defective WOrk .......cccssssssssssssseeenesesnensecssecerseeneneasesssesecseaessasdsedcasesssesonssensssesnasssoresecensansesueerenanensaens 28
9.07 Shop Drawings, Change Orders and Payment .......csccscssssssesssesssssssssescesssssssssesssssssesnsenseasenensseeasansetenseneneatens 28
9.08 Determinations for Unit Price Work... seeeeenes sence ene aececaseestsacesssenesetseteDO
9.09 Decisions on Requirements of Contract ‘Documents ‘and Acceptability of Work... sesseseneneneneegsesseesensrensecesesaeeseae 29 i
9.10 Limitations on ENGINEER'S Authority and Responsibilities .......c.scscsscssvsssssssssssssssssseessssesssseeneseseeneneeseenaes 29
ARTICLE 10 - CHANGES IN THE WORK; CLAIMS ......ccccsssscscssssssscsesessssscesesscaseussesesneuesesececaeseseseneasnesaeeserseerssssssessseasseessonsa 29 |
10.01 Authorized Changes in the WOrK .....cccccscssssssssssessecessstesestsnecsesenenesescnssececuendecaaeseaeeseseosseasessesesensnsassneneassaeens 29
10.02 Unauthorized Changes in the Work .......ccssssssossssseserevesssessenssesesenesseussessessensraseescansesusasecsassensasssensnseeeeeseseea 29
10.03 Execution of Change Orders ........sssccscsscscsssecesessecceneesonecsesssneenessesssasscsossesesnenuseusnanssessesseseusesensausatarsasssasesenseas 29 |
10.04 Notification to SUrety.....ccscccsssceseccessssccasecssesseesecsesssosesesssessescsssesssaecseseseseesssseesssssssssansensoseasesereseessenrseataeseeses 30
10.05 Claims and Disputes....ceccccssccsecsscecscscssccsessssncssnesecesesssecssessessaescesessesecssesnsseceseeeesssanasessassssesesaasonensnsnennaasesesees 30
ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK..........cssssssssssssssssssensseessersnenssnessesesess 31 |
11.01 Cost of the Work... cecssccsssssseesssscecseeveneseneeseseceessessseaeseaesessacceseeessesenssasenesesonsesasoquaensacsearsesunsssseenessseesseasssenenee 31
11.02 Cash ALOWQnCES .occcsssscssesecsseesesessescnenenessscneesececenssecesesenecesenecucueseseseseusneseecersensasscuensecesessaeacseasseanesacssennsensaaveces 32
11,03 Unit Price WOrk.......ssscccsssssssssscsssssssetsscsecsssscseseseseseucsssessseseesensosnsoneseressessaseasesesseseesessusseassesssasecssatsassacassesenens 33 |
ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES .........seeseeseesesesesscsereenesessesseesssseseanes 33
12.01 Change of Contract Price .....c.cccccscsssssssssssssesescssscsestsessssesessssesesscseseseeueseacaesceesessseceseceeonenensseaesedseseaneseassueses 33 |
12.02 Change of Contract Times ......cccssecsssssssccsessesssssesecssnssesssesessecesseseseaescccesseeseneceseensnseeseneneneseesdsssesesssusssensssseoues 34
12.03 Delays Beyond CONTRACTOR'S Control w.cscssecessssescssesssssssssstsncescncesencesenseneasenescsesscnensassssessassseeseussasssseseesas 34
12.04 Delays Within CONTRACTOR'S Control ......s.sscsssssssssssssssessscutsesssscsesessecesensnecsesesesesesesesseseeensneeeseneseseeneaneeess 34
12.06 Delay Damages w....ecscscscessssssvecesessesssesesesesesessssensesesesesesesescesanesesesenecesesesessseaessedeacseasenscasansessoeassesssesenscessnouses 34 |
General Conditions Page 00700-4 J
ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK.....ccssscscsscscssssssssessssesescssssesessesesecucorseecenevssssesosossessssnsneseansuescaseeesesessnssseeatiecsnesisagseasansenanessessacone 34
13.01 Notice Of Defects... eeesccscsesssssssessesesseesstecsssesenssssesneseeseeessseseesneeneraeensneeaeerensenereaneanes asesanensseeeneecensanesensesensensns 34
13.02 Access 10 WOrk .occcccscscssecsscssssscsseesscssensseseecececessassnssnssesaesansccesenesssssesesessuasqeececassenenseseneeesegtesaeeresoseenscansnseatenaesens 35
13.03 Tests arid INSPectiOns .......ssecesvesssssssssessetsensveensessseceeseccsaesessseuaseccerscaneaecenncaeeseanesesnsasresseseesnenenecseaseneenesnegngns 35
13.04 Uncoverirag Work ....secccsssssssssssessscssssssssessessseescnsesenassaeseesenansasensnucasenscnenssassecassneasaneaneeataasnssasanssaeesnarsneaeeees 35
13.05 OWNER May Stop the Work .......sssssssssscssssssesssssseesesccsesesessesseseeseenarsesesmneneneeseendsesesanaensastesseeaasensesesecassnenatens 35
13.06 Correction or Removal of Defective WOrK...c.cceccssessessicscceessnesssissesceseceessensenenrennsasasssouinonseseencentanssenaeenys 36
13.07 Correction Period. .cscccssscsccsssssscccsscsssssssssssssesesssscesesssessssussssensssssessssossuaeseceaeaesceeneneeseneneneeeneneessegoeuasasanseyeeseneas 36
13.08 Acceptance of Defective WOTK .......sssssssssessssecssssssssessesssssssssensecnsnereetensenesenneassassscninatesssuescenasesaqeeseeesennenans 36
13.09 OWNER May Correct Defective WOrk.....cssscsssssscsceecsessreensssenscneneseneesensengessessesensseacsesensensnscasanasaasensaegn tas 36
ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION ........cscsssssssssssesssessessssensnessenesesesseasesssessensenceseeseerasanens 37
14.01 Schedule of Values ....ccccccccscsseosccvecesssssssseessessssessseneesssssneenecneasscsusscsacsanenessensecnssseansersesseusenetausatencssenenneesaeens 37
14.02 Progress Payment .........cssssssssnssccesssesosssessnssessssssensesecesssstesseneeneasentensensanssasoueassaseseneeveqsseenenensenasnesasensanens 37
14.03 CONTRACTOR'S Warranty of Tithe .sesscsscosssssvsessessssessssssssesssenstscecessseessseneansensesenseneacceeresseseussuassesnensentanse 39
14.04 Substantial Completion ........:cscsssssssessescssssesesssecssssenesesssnnanscsesenssseneecesecesenecersennssersossesanuanssegsessensssesseasenens 39
14.05 Partial Utilizationi.....scccecscssesssssssssscsssesesessensnesesessscssseseuenssssecseseeaescnsssenseesesensensseananeseseqressgnesenonsensananenseneaeaes 39
14.06 Firtal Inspectin..cc.scsccsscescsesssssseeseesesnesssssessesssseesssossessensesesseessesscesessusssenaeseesnesecaeauanansnesensoqsetsteatanseasenseneensas etd 40
14.07 Final Payment ..sccccccccsssssssssssssecssessesecsessesecesnesssacsseessssseasanessssesassssanssnsaseuesesessecnensensssenscnssseeserartaeausaenarsananenease 40
14.08 Final Completion Delayed ...........ssssssssssssssessnescsssanssanessssessensensesecsenesneneensensnsansennaseanevesnensgounagesseseantanenegns 40
14.09 Waiver of CLAIMS .ocsceccscsssssessnsecsssecsssensseesssnssessesessesesscsenseseassnceacaucanenecsesnssecassnsasaneasseeasenenenasesossesoascasenmsacansonass 41
ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION ........:cccscssssssssssssssssssssesessseanecsesesenensencassesensotsaseenseesanencansneces 4l
15.01 OWNER May Suspend Work .........scccssssscssssssessessesessesscsnensenesssnsanscacensaesensenssssssssconsssaneersesausnaessessenesenns 41
15.02 OWNER May Terminate for CaUse........ssssssssscssseessessssenessessessessssessenesseseenscesacenennsasenedsensansenaneasessanseassseese 41
15.03 OWNER May Terminate For Convenience ......sccceccssiiescsscsesssniesnesesesecestersaeansssrsesnarsctienasnannanacansseentagand 41
15.04 CONTRACTOR May Stop Work or Terminate ........ccscccsssssecssscessenseneseenennesesssneseasseegnoconseeseeessansensnsesanan aed 42
ARTICLE 16 - DISPUTE RESOLUTION ........ccssssssssscecsssssessecssssssssssssssssssssessusaseecessnenesesaeseseasansansesssseneaseeesaacansusessosseacesenessenean aed 42
16.01 Methods and Procedures ..essecssscscsssssssssssscscssscssceetsnsesnensenenseessssesesnssanscauassosonesasaqacsenssesesasesesscauenaresegesnseranensngee 42
ARTICLE 17 - MISCELLANEOUG........c:ccssscscssssseeseeseeesessseesesesssesssssenseensensessseseeserecaranesesenseacansesecsaoeseseaeacanssqsesieosssonscenssneausersa ats 42
17.01 Givirng NOtiCE...seseescssccecsssecssesessessensessssesssssesseneseseseessatseasscaessesansssessssesecseneneensnsstoesecuquessnmsstonssenesnaceasaseaeseansansey 42
17.02 Computation of Times ......csccccccscsssesvssssesssssssssssneassensensuesessessessessesssanssenecseeseneenensenensonanssasseanoeaaseqaeaeanensensets 42
17.03 Cumulative Remedies ...cccccccscecscssessssseccssssesessccecsesssesssesescaessssenssensssssesnossesessorsceseqscesensssesananeseaeanananesneeanenseend 42
17.04 Survival of ODLigatiOns.....scscsscsssescsessseevsesetssessesssseessssssconsensussedecseesorseasesensesenessenessneaestensonenssaesesasarsnesasagavenens 42
17.05 Control lirag LAW w.ccscssssssssesvesssssssssssenessssensseeneasesssnsscesssnsceassscsasecscsueaesscaessnsussenesesessceassecosonsneeneneensseasegsogonsnnents 43
General Conditions Page 00700-5
ARTICLE | - DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in the Contract Documents and
printed with initial or all capital letters, the terms listed
below will have the meanings indicated which are
applicable to both the singular and plural thereof.
1. Addenda--Written or graphic instruments
issued prior to the opening of Bids which clarify, correct, or
change the Bidding Requirements or the Contract
Documents.
2. Agreement--The written instrument which is
evidence of the agreement between OWNER and
CONTRACTOR covering the Work.
3. Application for Payment--The form
acceptable to ENGINEER which is to be used by CON-
TRACTOR during the course of the Work in requesting
progress or final payments and which is to be accompanied
by such supporting documentation as is required by the
Contract Documents.
4, Asbestos--Any material that contains more
than one percent asbestos and is friable or is releasing
asbestos fibers into the air above current action levels
established by the United States Occupational Safety and
Health Administration.
5. Bid--The offer or proposal of a_ bidder
submitted on the prescribed form setting forth the prices for
the Work to be performed.
6. Bidding Documents--The Bidding
Requirements and the proposed Contract Documents (in-
cluding all Addenda issued prior to receipt of Bids).
7. Bidding Requirements--The Advertisement or
Invitation to Bid, Instructions to Bidders, Bid security form,
if any, and the Bid form with any supplements.
8. Bonds--Performance and payment bonds and
other instruments of security.
9. Change Order-A document recommended by
ENGINEER which is signed by CONTRACTOR and
OWNER and authorizes an addition, deletion, or revision in
the Work or an adjustment in the Contract Price or the
Contract Times, issued on or after the Effective Date of the
Agreement.
10. Claim--A demand or assertion by OWNER or
CONTRACTOR seeking an adjustment of Contract Price or
Contract Times, or both, or other relief with respect to the
GENERAL CONDITIONS
_ terms of the Contract. A demand for money or services by a
third party is not a Claim.
11. Contract--The entire and integrated written
agreement between the OWNER and CONTRACTOR
concerning the Work. The Contract supersedes prior
negotiations, representations, or agreements, whether
written or oral.
12. Contract Documents--The Contract Docu-
ments establish the rights and obligations of the parties and
include the Agreement, Addenda (which pertain to the
Contract Documents), CONTRACTOR’s Bid (including
documentation accompanying the Bid and any post Bid
documentation submitted prior to the Notice of Award)
when attached as an exhibit to the Agreement, the Notice to
Proceed, the Bonds, these General Conditions, the
Supplementary Conditions, the Specifications and the
Drawings as the same are more specifically identified in the
Agreement, together with all Written Amendments, Change
Orders, Work Change Directives, Field Orders, and
ENGINEER’s written interpretations and _ clarifications
issued on or after the Effective Date of the Agreement.
Approved Shop Drawings and the reports and drawings of
subsurface and physical conditions are not Contract
Documents. Only printed or hard copies of the items listed
in this paragraph are Contract Documents. Files in
electronic media format of text, data, graphics, and the like
that may be furnished by OWNER to CONTRACTOR are
not Contract Documents.
13. Contract Price-The moneys payable by
OWNER to CONTRACTOR for completion of the Work in
accordance with the Contract Documents as stated in the
Agreement (subject to the provisions of paragraph 11.03 in
the case of Unit Price Work).
14. Contract Times-The number of days or the
dates stated in the Agreement to: (i) achieve Substantial
Completion; and (ii) complete the Work so that it is ready
for final payment as evidenced by ENGINEER’s written
recommendation of final payment.
15. CONTRACTOR--The individual or entity with
whom OWNER has entered into the Agreement.
16. Cost of the Work-See paragraph 11.01.A for
definition.
17. Drawings--That part of the Contract
Documents prepared or approved by ENGINEER which
graphically shows the scope, extent, and character of the
Work to be performed by CONTRACTOR. Shop
Drawings and other CONTRACTOR submittals are not
Drawings as so defined.
General Conditions
Page 00700-6
18. Effective Date of the Agreement--The date
indicated in the Agreement on which it becomes effective,
but if no such date is indicated, it means the date on which
the Agreement is signed and delivered by the last of the two
parties to sign and deliver.
19. ENGINEER--The individual or entity named
as such in the Agreement.
20. ENGINEER's Consultant--An individual or
entity having a contract with ENGINEER to furnish
services as ENGINEER’s independent professional
associate or consultant with respect to the Project and who
is identified as such in the Supplementary Conditions.
21. Field Order-A written order issued by
ENGINEER which requires minor changes in the Work but
which does not involve a change in the Contract Price or the
Contract Times. ,
22. General Requirements--Sections of Division
1 of the Specifications. The General Requirements pertain
to all sections of the Specifications.
23. Hazardous Environmental Condition~The
presence at the Site of Asbestos, PCBs, Petroleum,
Hazardous Waste, or Radioactive Material in such
quantities or circumstances that may present a substantial
_danger to persons or property exposed thereto in connection
with the Work.
24, Hazardous Waste--The term Hazardous
Waste shall have the meaning provided in Section 1004 of
the Solid Waste Disposal Act (42 USC Section 6903) as
amended from time to time.
25. Laws and Regulations; Laws or Regulations--
Any and all applicable laws, rules, regulations, ordinances,
codes, and orders of any and all governmental bodies,
agencies, authorities, and courts having jurisdiction.
26. Liens--Charges, security interests, or
encumbrances upon Project funds, real property, or personal
property.
27. Milestone--A principal event specified in the
Contract Documents relating to an intermediate completion
date or time prior to Substantial Completion of all the
Work.
28. Notice of Award--The written notice by
OWNER to the apparent successful bidder stating that upon
timely compliance by the apparent successful bidder with
the conditions precedent listed therein, OWNER will sign
and deliver the Agreement.
29. Notice to Proceed--A written notice given by
OWNER to CONTRACTOR fixing the date on which the
Contract Times will commence to run and on which
CONTRACTOR shall start to perform the Work under the
Contract Documents.
30. OWNER--The individual, entity, public body,
or authority with whom CONTRACTOR has entered into
the Agreement and for whom the Work is to be performed.
31. Partial Utilization--Use by OWNER of a
substantially completed part of the Work for the purpose for
which it is intended (or a related purpose) prior to
Substantial Completion of all the Work.
32. PCBs--Polychlorinated biphenyls.
33. Petroleum--Petroleum, including crude oil or
any fraction thereof which is liquid at standard conditions of
temperature and pressure (60 degrees Fahrenheit and 14.7
pounds per square inch absolute), such as oil, petroleum,
fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil
mixed with other non-Hazardous Waste and crude oils.
34. Project--The total construction of which the
Work to be performed under the Contract Documents may
be the whole, or a part as may be indicated elsewhere in the
Contract Documents.
35. Praject Manual--The bound documentary
information prepared for bidding and constructing the
Work. A listing of the contents of the Project Manual,
which may be bound in one or more volumes, is contained
in the table(s) of contents.
36. Radioactive _Material-Source, _ special
nuclear, or byproduct material as defined by the Atomic
Energy Act of 1954 (42 USC Section 2011 et seq.) as
amended from time to time.
37. Resident Project Representative--The
authorized representative of ENGINEER who may be
assigned to the Site or any part thereof.
38. Samples--Physical examples of materials,
equipment, or workmanship that are representative of some
portion of the Work and which establish the standards by
which such portion of the Work will be judged.
39. Shop Drawings--All drawings, diagrams,
illustrations, schedules, and other data or information which
are specifically prepared or assembled by or for CON-
TRACTOR and submitted by CONTRACTOR to illustrate
some portion of the Work.
40. Site--Lands or areas indicated in the Contract
Documents as being furnished by OWNER upon which the
Work is to be performed, including rights-of-way and
easements for access thereto, and such other lands furnished
General Conditions
Page 00700-7
by OWNER which are designated for the use of
CONTRACTOR.
Al. Specifications--That part of the Contract
Documents consisting of written technical descriptions of
materials, equipment, systems, standards, and workmanship
as applied to the Work and certain administrative details
applicable thereto.
42. Subcontractor--An individual or entity having
a direct contract with CONTRACTOR or with any other
Subcontractor for the performance of a part of the Work at
the Site.
43. Substantial Completion--The time at which
the Work (or a specified part thereof) has progressed to the
point where, in the opinion of ENGINEER, the Work (or a
specified part thereof) is sufficiently complete, in
accordance with the Contract Documents, so that the Work
(or a specified part thereof) can be utilized for the purposes
for which it is intended. The terms “substantially complete”
and “substantially completed” as applied to all or part of the
Work refer to Substantial Completion thereof.
44. Supplementary Conditions--That part of the
Contract Documents which amends or supplements these
General Conditions.
45. Supplier--A manufacturer, fabricator, suppli-
er, distributor, materialman, or vendor having a direct
contract with CONTRACTOR or with any Subcontractor to
furnish materials or equipment to be incorporated in the
Work by CONTRACTOR or any Subcontractor.
46. Underground Feacilities-All underground
pipelines, conduits, ducts, cables, wires, manholes, vaults,
tanks, tunnels, or other such facilities or attachments, and
any encasements containing such facilities, including those
that convey electricity, gases, steam, liquid petroleum
products, telephone or other communications, cable
television, water, wastewater, storm water, other liquids or
chemicals, or traffic or other control systems.
47. Unit Price Work--Work to be paid for on the
basis of unit prices.
48. Work--The entire completed construction or
the various separately identifiable parts thereof required to
be provided under the Contract Documents. Work includes
and is the result of performing or providing all labor,
services, and documentation necessary to produce such
construction, and furnishing, installing, and incorporating
all materials and equipment into such construction, all as
required by the Contract Documents.
49. Work Change Directive--A written statement
to CONTRACTOR issued on or after the Effective Date of
the Agreement and signed by OWNER and recommended
by ENGINEER ordering an addition, deletion, or revision
in the Work, or responding to differing or unforeseen
subsurface or physical conditions under which the Work is
to be performed or to emergencies. A Work Change
Directive will not change the Contract Price or the Contract
Times but is evidence that the parties expect that the change
ordered or documented by a Work Change Directive will be
incorporated in a subsequently issued Change Order
following negotiations by the parties as to its effect, if any,
on the Contract Price or Contract Times.
50. Written Amendment--A written statement
modifying the Contract Documents, signed by OWNER and
CONTRACTOR on or after the Effective Date of the
Agreement and normally dealing with the nonengineering or
nontechnical rather than strictly construction-related aspects
of the Contract Documents.
1.02 Terminology
A. Intent of Certain Terms or Adjectives
1. Whenever in the Contract Documents the
terms “as allowed,” “as approved,” or terms of like
effect or import are used, or the adjectives “reasonable,”
“suitable,” “acceptable,” “proper,” “satisfactory,” or
adjectives of like effect or import are used to describe
an action or determination of ENGINEER as to the
Work, it is intended that such action or determination
will be solely to evaluate, in general, the completed
Work for compliance with the requirements of and
information in the Contract Documents and
conformance with the design concept of the completed
Project as a functioning whole as shown or indicated in
the Contract Documents (unless there is a specific
statement indicating otherwise). The use of any such
term or adjective shall not be effective to assign to
ENGINEER any duty or authority to supervise or direct
the performance of the Work or any duty or authority to
undertake responsibility contrary to the provisions of
paragraph 9.10 or any other provision of the Contract
Documents.
B. Day
1. The word “day” shall constitute a
calendar day of 24 hours measured from midnight to
the next midnight.
C. Defective
1. The word “defective,” when modifying
the word “Work,” refers to Work that is
unsatisfactory, faulty, or deficient in that it does not
conform to the Contract Documents or does not
meet the requirements of any inspection, reference
standard, test, or approval referred to in the Contract
Documents, or has been damaged prior to
General Conditions
Page 00700-8
ENGINEER’s recommendation of final payment
(unless responsibility for the protection thereof has
been assumed by OWNER at Substantial
Completion in accordance with paragraph 14.04 or
14.05).
D. Furnish, Install, Perform, Provide
1. The word “furnish,” when used in
connection with services, materials, or equipment,
shall mean to supply and deliver said services,
materials, or equipment to the Site (or some other
specified location) ready for use or installation and
in usable or operable condition.
2. The word “install,” when used in
connection with services, materials, or equipment,
shall mean to put into use or place in final position
said services, materials, or equipment complete and
ready for intended use.
3. The words “perform” or “provide,” when
used in connection with services, materials, or
equipment, shall mean to furnish and install said
services, materials, or equipment complete and
ready for intended use.
4. When “furnish,” “install,” “perform,” or “pro-
vide” is not used in connection with services, materials,
or equipment in a context clearly requiring an obligation
of CONTRACTOR, “provide” is implied.
E. Unless stated otherwise in the Contract Docu-
ments, words or phrases which have a well-known technical
or construction industry or trade meaning are used in the
Contract Documents in accordance with such recognized
meaning.
ARTICLE 2 - PRELIMINARY MATTERS
2.01 Delivery of Bonds
A. When CONTRACTOR delivers the executed
Agreements to OWNER, CONTRACTOR shall also deliver
to OWNER such Bonds as CONTRACTOR may be
required to furnish.
2.02 Copies of Documents
SEE SUPPLEMENTARY CONDITIONS (SECTION
00800)
2.03 Commencement of Contract Times; Notice to
Proceed
A. The Contract Times will commence to run on the
thirtieth day after the Effective Date of the Agreement or, if
a Notice to Proceed is given, on the day indicated in the
Notice to Proceed. A Notice to Proceed may be given at
any time within 30 days after the Effective Date of the
Agreement. In no event will the Contract Times commence
to run later than the sixtieth day after the day of Bid opening
or the thirtieth day after the Effective Date of the
Agreement, whichever date is earlier.
2.04 = Starting the Work
SEE SUPPLEMENTARY CONDITIONS (SECTION
00800)
2.05 Before Starting Construction
A. CONTRACTOR’s Review of Contract Documents:
Before undertaking each part of the Work,
CONTRACTOR shall carefully study and compare the
Contract Documents and check and verify pertinent figures
therein and all applicable field measurements.
CONTRACTOR shall promptly report in writing to
ENGINEER any conflict, error, ambiguity, or discrepancy
which CONTRACTOR may discover and shall obtain a
written interpretation or clarification from ENGINEER
before proceeding with any Work affected thereby;
however, CONTRACTOR shall not be liable to OWNER
or ENGINEER for failure to report any conflict, error,
ambiguity, or discrepancy in the Contract Documents unless
CONTRACTOR knew or reasonably should have known
thereof.
B. Preliminary Schedules: Within ten days after the
Effective Date of the Agreement (unless otherwise specified
in the General Requirements), CONTRACTOR shall
submit to ENGINEER for its timely review:
1. a preliminary progress schedule
indicating the times (numbers of days or dates) for
starting and completing the various stages of the
Work, including any Milestones specified in the
Contract Documents;
2. a preliminary schedule of Shop Drawing
and Sample submittals which will list each required
submittal and the times for submitting, reviewing,
and processing such submittal; and
General Conditions
Page 00700-9
3. apreliminary schedule of values for all of
the Work which includes quantities and prices of
items which when added together equal the Contract
Price and subdivides the Work into component parts
in sufficient detail to serve as the basis for progress
payments during performance of the Work. Such
prices will include an appropriate amount of
overhead and profit applicable to each item of
Work.
SEE SUPPLEMENTARY CONDITIONS (SECTION 00800)
2.06 Preconstruction Conference
SEE SUPPLEMENTARY CONDITIONS (SECTION
00800)
2.07 Initial Acceptance of Schedules
SEE SUPPLEMENTARY CONDITIONS (SECTION 00800)
INTENT,
ARTICLE 3 - CONTRACT DOCUMENTS:
AMENDING, REUSE
3.01 Intent
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
A. The Contract Documents are complementary,
what is called for by one is as binding as if called for by all.
B. It is the intent of the Contract Documents to
describe a functionally complete Project (or part thereof) to
be constructed in accordance with the Contract Documents.
Any labor, documentation, services, materials, or
equipment that may reasonably be inferred from the
Contract Documents or from prevailing custom or trade
usage as being required to produce the intended result will
be provided whether or not specifically called for at no
additional cost to OWNER.
C. Clarifications and interpretations of the Contract
Documents shall be issued by ENGINEER as provided in
Article 9.
3.02 Reference Standards
A. Standards, Specifications, Codes, Laws, and
Regulations
1. Reference to standards, specifications,
manuals, or codes of any technical society,
organization, or association, or to Laws or
Regulations, whether such reference be specific or
by implication, shall mean the standard,
specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the
Effective Date of the Agreement if there were no
Bids), except as may be otherwise specifically stated
in the Contract Documents.
General Conditions
Page 00700-10
2. No provision of any such standard,
specification, manual or code, or any instruction of a
Supplier shall be effective to change the duties or
responsibilities of OWNER, CONTRACTOR, or
ENGINEER, or any of their subcontractors,
consultants, agents, or employees from those set
forth in the Contract Documents, nor shall any such
provision or instruction be effective to assign to
OWNER, ENGINEER, or any of ENGINEER’s
Consultants, agents, or employees any duty or
authority to supervise or direct the performance of
the Work or any duty or authority to undertake
responsibility inconsistent with the provisions of the
Contract Documents.
3.03 Reporting and Resolving Discrepancies
_ A. Reporting Discrepancies
1. If, during the performance of the Work,
CONTRACTOR discovers any conflict, error,
ambiguity, or discrepancy within the Contract
Documents or between the Contract Documents and
any provision of any Law or Regulation applicable
to the performance of the Work or of any standard,
specification, manual or code, or of any instruction
of any Supplier, CONTRACTOR shall report it to
ENGINEER in writing at once. CONTRACTOR
shall not proceed with the Work affected thereby
(except in an emergency as required by paragraph
6.16.A) until an amendment or supplement to the
Contract Documents has been issued by one of the
methods indicated in paragraph 3.04; provided,
however, that CONTRACTOR shall not be liable to
OWNER or ENGINEER for failure to report any
such conflict, error, ambiguity, or discrepancy unless
CONTRACTOR knew or reasonably should have
known thereof.
B. Resolving Discrepancies
1. | Except as may be otherwise specifically
stated in the Contract Documents, the provisions of
the Contract Documents shall take precedence in
resolving any . conflict, error, ambiguity, or
discrepancy between the provisions of the Contract
Documents and:
a. the provisions of any standard,
specification, manual, code, or instruction
(whether or not specifically incorporated by
reference in the Contract Documents); or
b. the provisions of any Laws or
Regulations applicable to the performance of the
Work (unless such an interpretation of the
provisions of the Contract Documents would
result in violation of such Law or Regulation).
3.04 Amending and Supplementing Contract
Documents
A. The Contract Documents may be amended to
provide for additions, deletions, and revisions in the Work
or to modify the terms and conditions thereof in one or
more of the following ways: (i) a Written Amendment, (ii) a
Change Order; or (iii) a Work Change Directive.
B. The requirements of the Contract Documents may
be supplemented, and minor variations and deviations in the
Work may be authorized, by one or more of the following
ways: (i) a Field Order; (ii) ENGINEER’s approval of a
Shop Drawing or Sample; or (iii) ENGINEER’s written
interpretation or clarification.
3.05 Reuse of Documents
A. CONTRACTOR and any Subcontractor or
Supplier or other individual or entity performing or
furnishing any of the Work under a direct or indirect
contract with OWNER: (i) shall not have or acquire any title
to or ownership rights in any of the Drawings,
Specifications, or other documents (or copies of any
thereof) prepared by or bearing the seal of ENGINEER or
ENGINEER’s Consultant, including electronic media
editions; and (ii) shall not reuse any of such Drawings,
Specifications, other documents, or copies thereof on
extensions of the Project or any other project without
written consent of OWNER and ENGINEER and specific
written verification or adaption by ENGINEER. This
prohibition will survive final payment, completion, and
acceptance of the Work, or termination or completion of the
Contract. Nothing herein shall preclude CONTRACTOR
from retaining copies of the Contract Documents for record
purposes.
ARTICLE 4 - AVAILABILITY OF LANDS;
SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
4.01 Availability of Lands
A. OWNER shall furnish the Site. OWNER shall
notify CONTRACTOR of any encumbrances or restrictions
not of general application but specifically related to use of
the Site with which CONTRACTOR must comply in
performing the Work. OWNER will obtain in a timely
manner and pay for easements for permanent structures or
permanent changes in existing _ facilities. If
CONTRACTOR and OWNER are unable to agree on
entitlement to or on the amount or extent, if any, of any
adjustment in the Contract Price or Contract Times, or both,
as a result of any delay in OWNER’s furnishing the Site,
CONTRACTOR may make a Claim therefor as provided in
paragraph 10.05.
General Conditions
Page 00700-11
B. Upon reasonable written request, OWNER shall
furnish CONTRACTOR with a current statement of record
legal title and legal description of the lands upon which the
Work is to be performed and OWNER’s interest therein as
necessary for giving notice of or filing a mechanic's or
construction lien against such lands in accordance with
applicable Laws and Regulations.
C. CONTRACTOR shall provide for all additional
lands and access thereto that may be required for temporary
construction facilities or storage of materials and equip-
ment.
4.02 Subsurface and Physical Conditions
A. Reports and Drawings: The Supplementary
Conditions identify:
1. those reports of explorations and tests of
subsurface conditions at or contiguous to the Site
that ENGINEER has used in preparing the Contract
Documents; and
2. those drawings of physical conditions in
or relating to existing surface or subsurface
Structures at or contiguous to the Site (except
Underground Facilities) that ENGINEER has used
in preparing the Contract Documents.
’ B. Limited Reliance by CONTRACTOR on Technical
Data Authorized) CONTRACTOR may rely upon the
general accuracy of the “technical data” contained in such
reports and drawings, but such reports and drawings are not
Contract Documents. Such “technical data” is identified in
the Supplementary Conditions. Except for such reliance on
such “technical data,” CONTRACTOR may not rely upon
or make any Claim against OWNER, ENGINEER, or any
of ENGINEER’s Consultants with respect to:
1. the completeness of such reports and
drawings for CONTRACTOR’s purposes, including,
but not limited to, any aspects of the means,
methods, techniques, sequences, and procedures of
construction to be employed by CONTRACTOR,
and safety precautions and programs incident
thereto; or
2. other data, interpretations, opinions, and
information contained in such reports or shown or
indicated in such drawings; or
3. any CONTRACTOR interpretation of or
conclusion drawn from any "technical data" or any
such other data, interpretations, opinions, or
information.
4.03 Differing Subsurface or Physical Conditions
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
A. Notice: If CONTRACTOR believes that any
subsurface or physical condition at or contiguous to the Site
that is uncovered or revealed either:
1. is of such a nature as to establish that any
“technical data” on which CONTRACTOR is
entitled to rely as provided in paragraph 4.02 is
materially inaccurate; or
2. is of such a nature as to require a change
in the Contract Documents; or
3. differs materially from that shown or
indicated in the Contract Documents; or
4. is of an unusual nature, and differs materially from
conditions ordinarily encountered and generally recognized
as inherent in work of the character provided for in the
Contract Documents;
then CONTRACTOR shall, promptly after becoming aware
thereof and before further disturbing the subsurface or
physical conditions or performing any Work in connection
therewith (except in an emergency as required by paragraph
6.16.A), notify OWNER and ENGINEER in writing about
such condition. CONTRACTOR shali not further disturb
such condition or perform any Work in connection
therewith (except as aforesaid) until receipt of written order
to do so.
B. ENGINEER’s Review: After receipt of written
notice as required by paragraph 4.03.A, ENGINEER will
promptly review the pertinent condition, determine the
necessity of OWNER's obtaining additional exploration or
tests with respect thereto, and advise OWNER in writing
(with a copy to CONTRACTOR) of ENGINEER’s findings
and conclusions.
C. Possible Price and Times Adjustments
1. The Contract Price or the Contract
Times, or both, will be equitably adjusted to the
extent that the existence of such differing subsurface
or physical condition causes an increase or decrease
in CONTRACTOR’s cost of, or time required for,
performance of the Work; subject, however, to the
following:
a. such condition must meet any one or
more of the categories described in paragraph
4.03.A; and
General Conditions
Page 00700-12
EEEEEEIEIIETE Tc re
4.04
b. with respect to Work that is paid for on a
Unit Price Basis, any adjustment in Contract
Price will be subject to the provisions of para-
graphs 9.08 and 11.03.
2. | CONTRACTOR shall not be entitled to
any adjustment in the Contract Price or Contract
Times if:
a. CONTRACTOR knew of the existence
of such conditions at the time CONTRACTOR
made a final commitment to OWNER in respect
of Contract Price and Contract Times by the
submission of a Bid or becoming bound under a
negotiated contract; or
b. the existence of such condition could
reasonably have been discovered or revealed as a
result of any examination, investigation,
exploration, test, or study of the Site and
contiguous areas required by the Bidding
Requirements or Contract Documents to be
conducted by or for CONTRACTOR prior to
CONTRACTOR's making such final com-
mitment; or
c. CONTRACTOR failed to give the
written notice within the time and as required by
paragraph 4.03.A.
3. If OWNER and CONTRACTOR are
unable to agree on entitlement to or on the amount
or extent, if any, of any adjustment in the Contract
Price or Contract Times, or both, a Claim may be
made therefore as provided in paragraph 10.05.
However, OWNER, ENGINEER, and
ENGINEER’s Consultants shall not be liable to
CONTRACTOR for any claims, costs, losses, or
damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other
dispute resolution _ costs) sustained — by
CONTRACTOR on or in connection with any other
project or anticipated project.
Underground Facilities
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
A. Shown or Indicated: The information and data
shown or indicated in the Contract Documents with respect
to existing Underground Facilities at or contiguous to the
Site is based on information and data furnished to OWNER
or ENGINEER by the owners of such Underground
Facilities, including OWNER, or by others. Unless it is
otherwise expressly provided in the Supplementary
Conditions:
1. OWNER and ENGINEER shall not be
responsible for the accuracy or completeness of any
such information or data; and
2. the cost of all of the following will be
included in the Contract Price, and CONTRACTOR
shall have full responsibility for:
a. reviewing and checking all such
information and data,
b. locating all Underground Facilities
shown or indicated in the Contract Documents,
c. coordination of the Work with the
owners of such Underground Facilities,
including OWNER, during construction, and
d. the safety and protection of all such
Underground Facilities and repairing any
damage thereto resulting from the Work.
B. Not Shown or Indicated
1. If an Underground Facility is uncovered
or revealed at or contiguous to the Site which was
not shown or indicated, or not shown or indicated
with reasonable accuracy in the Contract
Documents, CONTRACTOR shall, promptly after
becoming aware thereof and before further
disturbing conditions affected thereby or performing
any Work in connection therewith (except in an
emergency as required by paragraph 6.16.A),
identify the owner of such Underground Facility and
give written notice to that owner and to OWNER
and ENGINEER. ENGINEER will promptly review
the Underground Facility and determine the extent,
if any, to which a change is required in the Contract
Documents to reflect and document the
consequences of the existence or location of the
Underground Facility. During such time,
CONTRACTOR shall be responsible for the safety
and protection of such Underground Facility.
2. IfENGINEER concludes that a change in
the Contract Documents is required, a Work Change
Directive or a Change Order will be issued to reflect
and document such consequences. An equitable
adjustment shall be made in the Contract Price of
Contract Times, or both, to the extent that they are
attributable to the existence or location of any
Underground Facility that was not shown or
indicated or not shown or indicated with reasonable
accuracy in the Contract Documents and that
CONTRACTOR did not know of and could not
reasonably have been expected to be aware of or to
have anticipated. If OWNER and CONTRACTOR
General Conditions
Page 00700-13
are unable to agree on entitlement to or on the
amount or extent, if any, of any such adjustment in
Contract Price or Contract Times, OWNER or
CONTRACTOR may make a Claim therefor as
provided in paragraph 10.05.
4.05 Reference Points
A. OWNER shall provide engineering surveys to
establish reference points for construction which in
ENGINEER’s judgment are necessary to enable CON-
TRACTOR to proceed with the Work. CONTRACTOR
shall be responsible for laying out the Work, shall protect
and preserve the established reference points and property
monuments, and shall make no changes or relocations
without the prior written approval of OWNER.
CONTRACTOR shall report to ENGINEER whenever any
reference point or property monument is lost or destroyed or
requires relocation because of necessary changes in grades
or locations, and shall be responsible for the accurate
replacement or relocation of such reference points or
property monuments by professionally qualified personnel.
4.06 Hazardous Environmental Condition at Site
A. Reports and Drawings: Reference is made to the
Supplementary Conditions for the identification of those
reports and drawings relating to a Hazardous Environmental
Condition identified at the Site, if any, that have been
utilized by the ENGINEER in the preparation of: the
Contract Documents.
B. Limited Reliance by CONTRACTOR on Technical
Data Authorized) CONTRACTOR may rely upon the
general accuracy of the “technical data” contained in such
reports and drawings, but such reports and drawings are not
Contract Documents. Such “technical data” is identified in
the Supplementary Conditions. Except for such reliance on
such “technical data,” CONTRACTOR may not rely upon
or make any Claim against OWNER, ENGINEER or any of
ENGINEER’s Consultants with respect to:
1. the completeness of such reports and
drawings for CONTRACTOR’s purposes, including,
but not limited to, any aspects of the means,
methods, techniques, sequences and procedures of
construction to be employed by CONTRACTOR
and safety precautions and programs incident
thereto; or
2. other data, interpretations, opinions and
information contained in such reports or shown or
indicated in such drawings; or
3. any CONTRACTOR interpretation of or
conclusion drawn from any “technical data” or any
such other data, interpretations, opinions or
information.
C. CONTRACTOR shall not be responsible for any
Hazardous Environmental Condition uncovered or revealed
at the Site which was not shown or indicated in Drawings or
Specifications or identified in the Contract Documents to be
within the scope of the Work. CONTRACTOR shall be
responsible for a Hazardous Environmental Condition
created with any materials brought to the Site by
CONTRACTOR, Subcontractors, Suppliers, or anyone else
for whom CONTRACTOR is responsible.
D. If CONTRACTOR encounters a Hazardous
Environmental Condition or if CONTRACTOR or anyone
for whom CONTRACTOR is responsible creates a
Hazardous Environmental Condition, CONTRACTOR
shall immediately: (i) secure or otherwise isolate such
condition; (ii) stop all Work in connection with such
condition and in any area affected thereby (except in an
emergency as required by paragraph 6.16); and (iii) notify
OWNER and ENGINEER (and promptly thereafter confirm
such notice in writing). OWNER shall promptly consult
with ENGINEER concerning the necessity for OWNER to
retain a qualified expert to evaluate such condition or take
corrective action, if any.
E. CONTRACTOR shall not be required to resume
Work in connection with such condition or in any affected
area until after OWNER has obtained any required permits
related thereto and delivered to CONTRACTOR written
notice: (i) specifying that such condition and any affected
area is or has been rendered safe for the resumption of
Work; or (ii) specifying any special conditions under which
such Work may be resumed safely. If OWNER and
CONTRACTOR cannot agree as to entitlement to or on the
amount or extent, if any, of any adjustment in Contract Price
or Contract Times, or both, as a result of such Work stop-
page or such special conditions under which Work is agreed
to be resumed by CONTRACTOR, either party may make a
Claim therefor as provided in paragraph 10.05.
F. If after receipt of such written notice
CONTRACTOR does not agree to resume such Work
based on a reasonable belief it is unsafe, or does not agree
to resume such Work under such special conditions, then
OWNER may order the portion of the Work that is in the
area affected by such condition to be deleted from the
Work. If OWNER and CONTRACTOR cannot agree as to
entitlement to or on the amount or extent, if any, of an
adjustment in Contract Price or Contract Times as a result
of deleting such portion of the Work, then either party may
make a Claim therefor as provided in paragraph 10.05.
OWNER may have such deleted portion of the Work
performed by OWNER’s own forces or others in accor-
dance with Article 7.
G. To the fullest extent permitted by Laws and
Regulations, OWNER shall indemnify and hold harmless
CONTRACTOR, Subcontractors, ENGINEER,
ENGINEER’s Consultants and the officers, directors,
General Conditions
Page 00700-14
partners, employees, agents, other consultants, and
subcontractors of each and any of them from and against all
claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys,
and other professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to a
Hazardous Environmental Condition, provided that such
Hazardous Environmental Condition: (i) was not shown or
indicated in the Drawings or Specifications or identified in
the Contract Documents to be included within the scope of
the Work, and (ii) was not created by CONTRACTOR or
by anyone for whom CONTRACTOR is responsible.
Nothing in this paragraph 4.06.E shall obligate OWNER to
indemnify any individual or entity from and against the
consequences of that individual’s or entity’s own
negligence.
H. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless OWNER, ENGINEER, ENGINEER’s Consul-
tants, and the officers, directors, partners, employees,
agents, other consultants, and subcontractors of each and
any of them from and against all claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
arising out of or relating to a Hazardous Environmental
Condition created by CONTRACTOR or by anyone for
whom CONTRACTOR is responsible. Nothing in this
paragraph 4.06.F shall obligate CONTRACTOR to
indemnify any individual or entity from and against the
consequences of that individual’s or entity’s own
negligence.
I. The provisions of paragraphs 4.02, 4.03, and
4.04 are not intended to apply to a Hazardous
Environmental Condition uncovered or revealed at the
Site.
ARTICLE 5 - BONDS AND INSURANCE
5.01 Performance, Payment, and Other Bonds
A. CONTRACTOR shall furnish performance and
payment Bonds, each in an amount at least equal to the
Contract Price as security for the faithful performance and
payment of all CONTRACTOR’s obligations under the
Contract Documents. These Bonds shall remain in effect at
least until one year after the date when final payment
becomes due, except as provided otherwise by Laws or
Regulations or by the Contract Documents.
CONTRACTOR shall also furnish such other Bonds as are
required by the Contract Documents.
B. All Bonds shall be in the form prescribed by the
Contract Documents except as provided otherwise by Laws
or Regulations, and shall be executed by such sureties as are
named in the current list of “Companies Holding
Certificates of Authority as Acceptable Sureties on Federal
Bonds and as Acceptable Reinsuring Companies” as
published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, USS.
Department of the Treasury. All Bonds signed by an agent
must be accompanied by a certified copy of such agent’s
authority to act.
C. If the surety on any Bond furnished by CON-
TRACTOR is declared bankrupt or becomes insolvent or its
right to do business is terminated in any state where any part
of the Project is located or it ceases to meet the
requirements of paragraph 5.01.B, CONTRACTOR shall
within 20 days thereafter substitute another Bond and
surety, both of which shall comply with the requirements of
paragraphs 5.01.B and 5.02.
5.02 Licensed Sureties and Insurers
A. All Bonds and insurance required by the Contract
Documents to be purchased and maintained by OWNER or
CONTRACTOR shall be obtained from surety or insurance
companies that are duly licensed or authorized in the
jurisdiction in which the Project is located to issue Bonds or
insurance policies for the limits and coverages so required.
Such surety and insurance companies shall also meet such
additional requirements and qualifications as may be
provided in the Supplementary Conditions.
5.03 Certificates of Insurance
A. CONTRACTOR shall deliver to OWNER, with
copies to each additional insured identified in the Supple-
mentary Conditions, certificates of insurance (and other
evidence of insurance requested by OWNER or any other
additional insured) which CONTRACTOR is required to
purchase and maintain. OWNER shall deliver to
CONTRACTOR, with copies to each additional insured
identified in the Supplementary Conditions, certificates of
insurance (and other evidence of insurance requested by
CONTRACTOR or any other additional insured) which
OWNER is required to purchase and maintain.
5.04 CONTRACTOR’: Liability Insurance
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
A. CONTRACTOR shall purchase and maintain such
liability and other insurance as is appropriate for the Work
being performed and as will provide protection from claims
set forth below which may arise out of or result from
CONTRACTOR’s performance of the Work and
CONTRACTOR’s other obligations under the Contract
Documents, whether it is to be performed by
CONTRACTOR, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to
General Conditions
Page 00700-15
perform any of the Work, or by anyone for whose acts any
of them may be liable:
1. claims under workers’ compensation,
disability benefits, and other similar employee
benefit acts;
2. claims for damages because of bodily
injury, occupational sickness or disease, or death of
CONTRACTOR’s employees;
3. claims for damages because of bodily
injury, sickness or disease, or death of any person
other than CONTRACTOR’s employees;
4. claims for damages insured by
reasonably available personal injury _ liability
coverage which are sustained: (i) by any person as a
result of an offense directly or indirectly related to
the employment of such person by CONTRACTOR,
or (ii) by any other person for any other reason;
5. claims for damages, other than to the
Work itself, because of injury to or destruction of
tangible property wherever located, including loss of
use resulting there from; and
6. claims for damages because of bodily
injury or death of any person or property damage
arising out of the ownership, maintenance or use of
any motor vehicle.
B. The policies of insurance so required by this
paragraph 5.04 to be purchased and maintained shall:
1. with respect to insurance required by
paragraphs 5.04.A.3 through 5.04.A.6 inclusive,
include as additional insureds (subject to any
customary exclusion in respect of professional
liability) OWNER, ENGINEER, ENGINEER's
Consultants, and any other individuals or entities
identified in the Supplementary Conditions, all of
whom shall be listed as additional insureds, and
include coverage for the respective officers,
directors, partners, employees, agents, and other
consultants and subcontractors of each and any of all
such additional insureds, and the insurance afforded
to these additional insureds shall provide primary
coverage for all claims covered thereby;
2. include at least the specific coverages and
be written for not less than the limits of liability
provided in the Supplementary Conditions or
required by Laws or Regulations, whichever is
greater;
3. include completed operations insurance;
4. include contractual liability insurance
covering CONTRACTOR’s indemnity obligations
under paragraphs 6.07, 6.11, and 6.20;
5. contain a provision or endorsement that
the coverage afforded will not be canceled,
materially changed or renewal refused until at least
thirty days prior written notice has been given to
OWNER and CONTRACTOR and to each other
additional insured identified in the Supplementary
Conditions to whom a certificate of insurance has
been issued (and the certificates of insurance
furnished by the CONTRACTOR pursuant to
paragraph 5.03 will so provide);
6. remain in effect at least until final
payment and at all times thereafter when CON-
TRACTOR may be correcting, removing, or replac-
ing defective Work in accordance with paragraph
13.07; and
7. — with respect to completed operations
insurance, and any insurance coverage written on a
claims-made basis, remain in effect for at least two
years after final payment (and CONTRACTOR shall
furnish OWNER and each other additional insured
identified in the Supplementary Conditions, to
whom a certificate of insurance has been issued,
evidence satisfactory to OWNER and any such
additional insured of continuation of such insurance
at final payment and one year thereafter).
5.05 OWNER’ Liability Insurance
A. In addition to the insurance required to be provid-
ed by CONTRACTOR under paragraph 5.04, OWNER, at
OWNER’s option, may purchase and maintain at
OWNER’s expense OWNER’s own liability insurance as
will protect OWNER against claims which may arise from
operations under the Contract Documents.
5.06 Property Insurance
SEE SUPPLEMENTARY CONDITIONS (SECTION
00800)
General Conditions
Page 00700-16
5.07 Waiver of Rights
SEE SUPPLEMENTARY CONDITIONS (SECTION
00800)
General Conditions
Page 00700-17
5.09
Replace
Acceptance of Bonds and Insurance; Option to
A. If either OWNER or CONTRACTOR has any
objection to the coverage afforded by or other provisions of
the Bonds or insurance required to be purchased and
maintained by the other party in accordance with Article 5
on the basis of non-conformance with the Contract
Documents, the objecting party shall so notify the other
party in writing within 10 days after receipt of the
certificates (or other evidence requested) required by
paragraph 2.05.C. OWNER and CONTRACTOR shall
each provide to the other such additional information in
respect of insurance provided as the other may reasonably
request. If either party does not purchase or maintain all of
the Bonds and insurance required of such party by the Con-
tract Documents, such party shall notify the other party in
writing of such failure to purchase prior to the start of the
Work, or of such failure to maintain prior to any change in
the required coverage. Without prejudice to any other right
or remedy, the other party may elect to obtain equivalent
Bonds or insurance to protect such other party's interests at
the expense of the party who was required to provide such
coverage, and a Change Order shall be issued to adjust the
Contract Price accordingly.
5.10 Partial Utilization, Acknowledgment of Property
Insurer
A. If OWNER finds it necessary to occupy or use a
portion or portions of the Work prior to Substantial
Completion of all the Work as provided in paragraph 14.05,
no such use or occupancy shall commence before the
insurers providing the property insurance pursuant to
paragraph 5.06 have acknowledged notice thereof and in
writing effected any changes in coverage necessitated
thereby. The insurers providing the property insurance shall
consent by endorsement on the policy or policies, but the
property insurance shali not be canceled or permitted to
lapse on account of any such partial use or occupancy.
ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES
General Conditions
Page 00700-18
6.01 Supervision and Superintendence
A. CONTRACTOR shall supervise, inspect, and
direct the Work competently and efficiently, devoting such
attention thereto and applying such skills and expertise as
may be necessary to perform the Work in accordance with
the Contract Documents. CONTRACTOR shall be solely
responsible for the means, methods, techniques, sequences,
and procedures of construction, but CONTRACTOR shall
not be responsible for the negligence of OWNER or
ENGINEER in the design or specification of a specific
means, method, technique, sequence, or procedure of
construction which is shown or indicated in and expressly
required by the Contract Documents. CONTRACTOR
shall be responsible to see that the completed Work
complies accurately with the Contract Documents.
B. At all times during the progress of the Work,
CONTRACTOR shall .assign a competent resident
superintendent thereto who shall not be replaced without
written notice to OWNER and ENGINEER except under
extraordinary circumstances. The superintendent will be
CONTRACTOR’s representative at the Site and shall have
authority to act on behalf of CONTRACTOR. All
communications given to or received from the superin-
tendent shall be binding on CONTRACTOR.
6.02 Labor; Working Hours
A. CONTRACTOR shall provide competent, suitably
qualified personnel to survey, lay out, and construct the
Work as required by the Contract Documents.
CONTRACTOR shall at all times maintain good discipline
and order at the Site.
B. Except as otherwise required for the safety or
protection of persons or the Work or property at the Site or
adjacent thereto, and except as otherwise stated in the
Contract Documents, all Work at the Site shall be
performed during regular working hours, and CON-
TRACTOR will not permit overtime work or the
performance of Work on Saturday, Sunday, or any legal
holiday without OWNER’s written consent (which will not
be unreasonably withheld) given after prior written notice to
ENGINEER.
6.03 Services, Materials, and Equipment
A. Unless otherwise specified in the General Re-
quirements, CONTRACTOR shall provide and assume full
responsibility for all services, materials, equipment, labor,
transportation, construction equipment and machinery,
tools, appliances, fuel, power, light, heat, telephone, water,
sanitary facilities, temporary facilities, and all other
facilities and incidentals necessary for the performance,
testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the
Work shall be as specified or, if not specified, shall be of
good quality and new, except as otherwise provided in the
Contract Documents. All warranties and guarantees
specifically called for by the Specifications shall expressly
run to the benefit of OWNER. If required by ENGINEER,
CONTRACTOR shall furnish satisfactory evidence
(including reports of required tests) as to the source, kind,
and quality of materials and equipment. All materials and
equipment shall be stored, applied, installed, connected,
erected, protected, used, cleaned, and conditioned in
accordance with instructions of the applicable Supplier,
except as otherwise may be provided in the Contract Docu-
ments.
6.04 Progress Schedule
A. CONTRACTOR shall adhere to the progress
schedule established in accordance with paragraph 2.07 as it
may be adjusted from time to time as provided below.
1. | CONTRACTOR shall submit to ENGI-
NEER for acceptance (to the extent indicated in
paragraph 2.07) proposed adjustments in the prog-
ress schedule that will not result in changing the
Contract Times (or Milestones). Such adjustments
will conform generally to the progress schedule then
in effect and additionally will comply with any
provisions of the General Requirements applicable
thereto.
2. Proposed adjustments in the progress
schedule that will change the Contract Times (or
Milestones) shall be submitted in accordance with
the requirements of Article 12. Such adjustments
may only be made by a Change Order or Written
Amendment in accordance with Article 12.
6.05 Substitutes and “Or-Equals”
A. Whenever an item of material or equipment is
specified or described in the Contract Documents by using
the name of a proprietary item or the name of a particular
Supplier, the specification or description is intended to
establish the type, function, appearance, and quality
required. Unless the specification or description contains or
is followed by words reading that no like, equivalent, or
“or-equal” item or no substitution is permitted, other items
of material or equipment or material or equipment of other
Suppliers may be submitted to ENGINEER for review
under the circumstances described below.
L. “Or-Equal” Items: 1f in ENGINEER’s
sole discretion an item of material or equipment
proposed by CONTRACTOR is functionally equal
to that named and sufficiently similar so that no
change in related Work will be required, it may be
considered by ENGINEER as an “or-equal” item, in
General Conditions
Page 00700-19
which case review and approval of the proposed
item may, in ENGINEER’s sole discretion, be
accomplished without compliance with some or all
of the requirements for approval of proposed
substitute items. For the purposes of this paragraph
6.05.A.1, a proposed item of material or equipment
will be considered functionally equal to an item so
named if:
a. in the exercise of reasonable judgment
ENGINEER determines that: (i) it is at least
equal in quality, durability, appearance, strength,
and design characteristics; (ii) it will reliably
perform at least equally well the function
imposed by the design concept of the completed
Project as a functioning whole, and;
b. CONTRACTOR certifies that: (i) there is
no increase in cost to the OWNER; and (ii) it
will conform substantially, even with deviations,
to the detailed requirements of the item named in
the Contract Documents.
2. Substitute Items
a. If in ENGINEER’s sole discretion an
item of material or equipment proposed by
CONTRACTOR does not qualify as an “or-
equal” item under paragraph 6.05.A.1, it will be
considered a proposed substitute item.
b. CONTRACTOR shall submit sufficient
information as provided below to allow ENGI-
NEER to determine that the item of material or
equipment proposed is essentially equivalent to
that named and an acceptable substitute therefor.
Requests for review of proposed substitute items
of material or equipment will not be accepted by
ENGINEER from anyone other than CON-
TRACTOR.
c. The procedure for review by ENGI-
NEER will be as set forth in paragraph
6.05.A.2.d, as supplemented in the General
Requirements and as ENGINEER may decide is
appropriate under the circumstances.
d. CONTRACTOR shail first make written
application to ENGINEER for review of a
proposed substitute item of material or
equipment that CONTRACTOR seeks to furnish
or use. The application shall certify that the
proposed substitute item will perform adequately
the functions and achieve the results called for
by the general design, be similar in substance to
that specified, and be suited to the same use as
that specified. The application will state the
extent, if any, to which the use of the proposed
substitute item will prejudice CONTRACTOR’s
achievement of Substantial Completion on time,
whether or not use of the proposed substitute
item in the Work will require a change in any of
the Contract Documents (or in the provisions of
any other direct contract with OWNER for work
on the Project) to adapt the design to the
proposed substitute item and whether or not
incorporation or use of the proposed substitute
item in connection with the Work is subject to
payment of any license fee or royalty. All
variations of the proposed substitute item from
that specified will be identified in the applica-
tion, and available engineering, _ sales,
maintenance, repair, and replacement services
will be indicated. The application will also
contain an itemized estimate of all costs or
credits that will result directly or indirectly from
use of such substitute item, including costs of
redesign and claims of other contractors affected
by any resulting change, all of which will be
considered by ENGINEER in evaluating the
proposed substitute item. ENGINEER may
require CONTRACTOR to furnish additional
data about the proposed substitute item.
B. Substitute Construction Methods or Procedures:
If a specific means, method, technique, sequence, or
procedure of construction is shown or indicated in and
expressly required by the Contract Documents, CON-
TRACTOR may fumish or utilize a substitute means,
method, technique, sequence, or procedure of construction
approved by ENGINEER. CONTRACTOR shall submit
sufficient information to allow ENGINEER, in
ENGINEER’s sole discretion, to determine that the
substitute proposed is equivalent to that expressly called for
by the Contract Documents. The procedure for review by
ENGINEER will be similar to that provided in sub
paragraph 6.05.A.2.
C. Engineer’s Evaluation: ENGINEER will be
allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to paragraphs 6.05.A
and 6.05.B. ENGINEER will be the sole judge of
acceptability. No “or-equal” or substitute will be ordered,
installed or utilized until ENGINEER’s review is complete,
which will be evidenced by either a Change Order for a
substitute or an approved Shop Drawing for an “or equal.”
ENGINEER will advise CONTRACTOR in writing of any
negative determination.
D. Special Guarantee) ©QWNER may require
CONTRACTOR to furnish at CONTRACTOR’s expense a
special performance guarantee or other surety with respect
to any substitute.
E. ENGINEER’s Cost Reimbursement: ENGINEER
will record time required by ENGINEER and
General Conditions
Page 00700-20
EDI SSSS'SSCS<SSCS =
f
X. i
f
ENGINEER’s Consultants in evaluating substitute proposed
or submitted by CONTRACTOR pursuant to paragraphs
6.05.A.2 and 6.05.B and in making changes in the Contract
Documents (or in the provisions of any other direct contract
with OWNER for work on the Project) occasioned thereby.
Whether or not ENGINEER approves a substitute item so
proposed or submitted by CONTRACTOR,
CONTRACTOR shall reimburse OWNER for the charges
of ENGINEER and ENGINEER’s Consultants for
evaluating each such proposed substitute.
F. CONTRACTOR’s Expense: CONTRACTOR shall
provide all data in support of any proposed substitute or
“or-equal” at CONTRACTOR’s expense.
6.06 Concerning Subcontractors, Suppliers, and Others
A. CONTRACTOR shall not employ any Subcon-
tractor, Supplier, or other individual or entity (including
those acceptable to OWNER as indicated in paragraph
6.06.B), whether initially or as a replacement, against whom
OWNER may have reasonable objection. CONTRACTOR
shall not be required to employ any Subcontractor, Supplier,
or other individual or entity to furnish or perform any of the
Work against whom CONTRACTOR has reasonable
objection.
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
B. If the Supplementary Conditions require the
identity of certain Subcontractors, Suppliers, or other
individuals or entities to be submitted to OWNER in
advance for acceptance by OWNER by a specified date prior
to the Effective Date of the Agreement, and if
CONTRACTOR has submitted a list thereof in accordance
with the Supplementary Conditions, OWNER’s acceptance
(either in writing or by failing to make written objection
thereto by the date indicated for acceptance or objection in
the Bidding Documents or the Contract Documents) of any
such Subcontractor, Supplier, or other individual or entity so
idéntified may be revoked on the basis of reasonable
objection after due investigation. CONTRACTOR shall
submit an acceptable replacement for the rejected
Subcontractor, Supplier, or other individual or entity, and the
Contract Price will be adjusted by the difference in the cost
occasioned by such replacement, and an appropriate Change
Order will be issued or Written Amendment signed. No
acceptance by OWNER of any such Subcontractor, Supplier,
or other individual or entity, whether initially or as a
replacement, shall constitute a waiver of any right of
OWNER or ENGINEER to reject defective Work.
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
C. CONTRACTOR shall be fully responsible to
OWNER and ENGINEER for all acts and omissions of the
Subcontractors, Suppliers, and other individuals or entities
performing or furnishing any of the Work just as
CONTRACTOR is responsible for CONTRACTOR’s own
acts and omissions. Nothing in the Contract Documents
shall create for the benefit of any such Subcontractor,
Supplier, or other individual or entity any contractual
relationship between OWNER or ENGINEER and any such
Subcontractor, Supplier or other individual or entity, nor
shall it create any obligation on the part of OWNER or
ENGINEER to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or
entity except as may otherwise be required by Laws and
Regulations.
D. CONTRACTOR shall be solely responsible for
scheduling and coordinating the Work of Subcontractors,
Suppliers, and other individuals or entities performing or
furnishing any of the Work under a direct or indirect
contract with CONTRACTOR.
E. CONTRACTOR shall require all Subcontractors,
Suppliers, and such other individuals or entities performing
or furnishing any of the Work to communicate with
ENGINEER through CONTRACTOR.
F. The divisions and sections of the Specifications
and the identifications of any Drawings shall not control
CONTRACTOR in dividing the Work among Subcon-
tractors or Suppliers or delineating the Work to be
performed by any specific trade.
G. All Work performed for CONTRACTOR by a
Subcontractor or Supplier will be pursuant to an appropriate
agreement between CONTRACTOR and the Subcontractor
or Supplier which specifically binds the Subcontractor or
Supplier to the applicable terms and conditions of the
Contract Documents for the benefit of OWNER and
ENGINEER. Whenever any such agreement is with a
Subcontractor or Supplier who is listed as an additional
insured on the property insurance provided in paragraph
5.06, the agreement between the CONTRACTOR and the
Subcontractor or Supplier will contain provisions whereby
the Subcontractor or Supplier waives all rights against
OWNER, CONTRACTOR, ENGINEER, ENGINEER’s
Consultants, and all other individuals or entities identified in
the Supplementary Conditions to be listed as insureds or
additional insureds (and the officers, directors, partners,
employees, agents, and other consultants and subcontractors
of each and any of them) for all losses and damages caused
by, arising out of, relating to, or resulting from any of the
perils or causes of loss covered by such policies and any
other property insurance applicable to the Work. If the
insurers on any such policies require separate waiver forms
to be signed by any Subcontractor or Supplier,
CONTRACTOR will obtain the same.
6.07 Patent Fees and Royalties
General Conditions
Page 00700-21
A. CONTRACTOR shail pay ail license fees and
royalties and assume all costs incident to the use in the
performance of the Work or the incorporation in the Work
of any invention, design, process, product, or device which
is the subject of patent rights or copyrights held by others.
If a particular invention, design, process, product, or device
is specified in the Contract Documents for use in the
performance of the Work and if to the actual knowledge of
OWNER or ENGINEER its use is subject to patent rights or
copyrights calling for the payment of any license fee or
royalty to others, the existence of such rights shall be
disclosed by OWNER in the Contract Documents. To the
fullest extent permitted by Laws and Regulations,
CONTRACTOR shall indemnify and hold harmless
OWNER, ENGINEER, ENGINEER’s Consultants, and the
officers, directors, partners, employees or agents, and other
consultants of each and any of them from and against all
claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys,
and other professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to any
infringement of patent rights or copyrights incident to the
use in the performance of the Work or resulting from the
incorporation in the Work of any invention, design, process,
product, or device not specified in the Contract Documents.
6.08 Permits
A. Unless otherwise provided in the Supplementary
Conditions, CONTRACTOR shall obtain and pay for all
construction permits and licenses. OWNER shall assist
CONTRACTOR, when necessary, in obtaining such
permits and licenses. CONTRACTOR shall pay all
governmental charges and inspection fees necessary for the
prosecution of the Work which are applicable at the time of
opening of Bids, or, if there are no Bids, on the Effective
Date of the Agreement. CONTRACTOR shall pay all
charges of utility owners for connections to the Work, and
OWNER shall pay all charges of such utility owners for
capital costs related thereto, such as plant investment fees.
6.09 Laws and Regulations
A. CONTRACTOR shall give all notices and comply
with all Laws and Regulations applicable to the
performance of the Work. Except where otherwise
expressly required by applicable Laws and Regulations,
neither OWNER nor ENGINEER shall be responsible for
monitoring CONTRACTOR’s compliance with any Laws
or Regulations.
B. If CONTRACTOR performs any Work knowing
or having reason to know that it is contrary to Laws or
Regulations, CONTRACTOR shall bear all claims, costs,
losses, and damages (including but not limited to all fees
and charges of engineers, architects, attorneys, and. other
professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to such Work;
however, it shall not be CONTRACTOR’s primary
responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but
this shail not relieve CONTRACTOR of CONTRACTOR’s
obligations under paragraph 3.03.
C. Changes in Laws or Regulations not known at the
time of opening of Bids (or, on the Effective Date of the
Agreement if there were no Bids) having an effect on the
cost or time of performance of the Work may be the subject
of an adjustment in Contract Price or Contract Times. If
OWNER and CONTRACTOR are unable to agree on
entitlement to or on the amount or extent, if any, of any such
adjustment, a Claim may be made therefore as provided in
paragraph 10.05.
6.10 Taxes
A. CONTRACTOR shall pay all sales, consumer,
use, and other similar taxes required to be paid by
CONTRACTOR in accordance with the Laws and
Regulations of the place of the Project which are applicable
during the performance of the Work.
6.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas
1. CONTRACTOR shall confine
construction equipment, the storage of materials and
equipment, and the operations of workers to the Site
and other areas permitted by Laws and Regulations,
and shall not unreasonably encumber the Site and
other areas with construction equipment or other
materials or equipment. CONTRACTOR shall
assume full responsibility for any damage to any
such land or area, or to the owner or occupant
thereof, or of any adjacent land or areas resulting
from the performance of the Work.
2. Should any claim be made by any such
owner or occupant because of the performance of
the Work, CONTRACTOR shall promptly settle
with such other party by negotiation or otherwise
resolve the claim by arbitration or other dispute
resolution proceeding or at law.
3. To the fullest extent permitted by Laws
and Regulations, CONTRACTOR shall indemnify
and hold harmless OWNER, ENGINEER,
ENGINEER’s Consultant, and the officers,
directors, partners, employees, agents, and other
consultants of each and any of them from and
against all claims, costs, losses, and damages
(including but not limited to all fees and charges of
engineers, architects, attorneys, and other
professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to
General Conditions
Page 00700-22
any claim or action, legal or equitable, brought by
any such owner or occupant against OWNER,
ENGINEER, or any other party indemnified
hereunder to the extent caused by or based upon
CONTRACTOR's performance of the Work.
B. Removal of Debris During Performance of the
Work: During the progress of the Work CONTRACTOR
shall keep the Site and other areas free from accumulations
of waste materials, rubbish, and other debris. Removal and
disposal of such waste materials, rubbish, and other debris
shall conform to applicable Laws and Regulations.
C. Cleaning: Prior to Substantial Completion of the
Work CONTRACTOR shall clean the Site and make it
ready for utilization by OWNER. At the completion of the
Work CONTRACTOR shall remove from the Site all tools,
appliances, construction equipment and machinery, and
surplus materials and shall restore to original condition all
property not designated for alteration by the Contract
Documents.
D. Loading Structures: CONTRACTOR shall not
load nor permit any part of any structure to be loaded in any
manner that will endanger the structure, nor shall
CONTRACTOR subject any part of the Work or adjacent
property to stresses or pressures that will endanger it.
6.12 Record Documents
A. CONTRACTOR shall maintain in a safe place at
the Site one record copy of all Drawings, Specifications,
Addenda, Written Amendments, Change Orders, Work
Change Directives, Field Orders, and written interpretations
and clarifications in good order and annotated to show
changes made during construction. These record
documents together with all approved Samples and a
counterpart of all approved Shop Drawings will be available
to ENGINEER for reference. Upon completion of the
Work, these record documents, Samples, and Shop
Drawings will be delivered to ENGINEER for OWNER.
6.13. Safety and Protection
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
A. CONTRACTOR shall be solely responsible for
initiating, maintaining and supervising all safety precautions
and programs in connection with the Work.
CONTRACTOR shall take all necessary precautions for the
safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be
affected by the Work;
2. all the Work and materials and equip-
ment to be incorporated therein, whether in storage
on or off the Site; and
3. other property at the Site or adjacent
thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and
Underground Facilities not designated for removal,
relocation, or replacement in the course of
construction.
B. CONTRACTOR shall comply with all applicable
Laws and Regulations relating to the safety of persons or
property, or to the protection of persons or property from
damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection.
CONTRACTOR shall notify owners of adjacent property
and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall
cooperate with them in the protection, removal, relocation,
and replacement of their property. All damage, injury, or
loss to any property referred to in paragraph 6.13.A.2 or
6.13.A.3 caused, directly or indirectly, in whole or in part,
by CONTRACTOR, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by
any of them to perform any of the Work, or anyone for
whose acts any of them may be liable, shall be remedied by
CONTRACTOR (except damage or loss attributable to the
fault of Drawings or Specifications or to the acts or
omissions of OWNER or ENGINEER or ENGINEER’s
Consultant, or anyone employed by any of them, or anyone
for whose acts any of them may be liable, and not
attributable, directly or indirectly, in whole or in part, to the
fault or negligence of CONTRACTOR or = any
Subcontractor, Supplier, or other individual or entity
directly or indirectly employed by any of them).
CONTRACTOR?’s duties and responsibilities for safety and
for protection of the Work shall continue until such time as
all the Work is completed and ENGINEER has issued a
notice to OWNER and CONTRACTOR in accordance with
paragraph 14.07.B that the Work is acceptable (except as
otherwise expressly provided in connection with Substantial
Completion).
6.14 Safety Representative
A. CONTRACTOR shall designate a qualified and
experienced safety representative at the Site whose duties
and responsibilities shall be the prevention of accidents and
the maintaining and supervising of safety precautions and
programs.
6.15 Hazard Communication Programs
A. CONTRACTOR shall be responsible for coordi-
nating any exchange of material safety data sheets or other
hazard communication information required to be made
General Conditions
Page 00700-23
available to or exchanged between or among employers at
the Site in accordance with Laws or Regulations.
6.16 Emergencies
A. In emergencies affecting the safety or protection of
persons or the Work or property at the Site or adjacent
thereto, CONTRACTOR is obligated to act to prevent
threatened damage, injury, or loss. CONTRACTOR shall
give ENGINEER prompt written notice if CONTRACTOR
believes that any significant changes in the Work or
variations from the Contract Documents have been caused
thereby or are required as a result thereof. If ENGINEER
determines that a change in the Contract Documents is
required because of the action taken by CONTRACTOR in
response to such an emergency, a Work Change Directive
or Change Order will be issued.
6.17 Shop Drawings and Samples
A. CONTRACTOR shall submit Shop Drawings to
ENGINEER for review and approval in accordance with the
acceptable schedule of Shop Drawings and Sample
submittals. All submittals will be identified as ENGINEER
may require and in the number of copies specified in the
General Requirements. The data shown on the Shop
Drawings will be complete with respect to quantities,
dimensions, specified performance and design criteria,
materials, and similar data to show ENGINEER the
services, materials, and equipment CONTRACTOR
proposes to provide and to enable ENGINEER to review
the information for the limited purposes required by
paragraph 6.17.E.
B. CONTRACTOR shall also submit Samples to
ENGINEER for review and approval in accordance with the
acceptable schedule of Shop Drawings and Sample
submittals. Each Sample will be identified clearly as to
material, Supplier, pertinent data such as catalog numbers,
and the use for which intended and otherwise as
ENGINEER may require to enable ENGINEER to review
the submittal for the limited purposes required by paragraph
6.17.E. The numbers of each Sample to be submitted will
be as specified in the Specifications.
C. Where a Shop Drawing or Sample is required by
the Contract Documents or the schedule of Shop Drawings
and Sample submittals acceptable to ENGINEER as
required by paragraph 2.07, any related Work performed
prior to ENGINEER’s review and approval of the pertinent
submittal will be at the sole expense and responsibility of
CONTRACTOR.
D. Submittal Procedures
I. Before submitting each Shop Drawing or
Sample, CONTRACTOR shall have determined and
verified:
a. all field measurements, quantities,
dimensions, specified performance criteria,
installation requirements, materials, catalog
numbers, and similar information with respect
thereto;
b. all materials with respect to intended use,
fabrication, shipping, handling, storage,
assembly, and installation pertaining to the
performance of the Work;
c. all information relative to means,
methods, techniques, sequences, and procedures
of construction and safety precautions and
programs incident thereto; and
d. CONTRACTOR - shall also have
reviewed and coordinated each Shop Drawing or
Sample with other Shop Drawings and Samples
and with the requirements of the Work and the
Contract Documents.
2. Each submittal shall bear a stamp or
specific written indication that CONTRACTOR has
satisfied CONTRACTOR’s obligations under the
Contract Documents with respect _— to
CONTRACTOR’s review and approval of that
submittal.
3. At the time of each submittal, CON-
TRACTOR shall give ENGINEER specific written
notice of such variations, if any, that the Shop
Drawing or Sample submitted may have from the
requirements of the Contract Documents, such
notice to be in a written communication separate
from the submittal; and, in addition, shall cause a
specific notation to be made on each Shop Drawing
and Sample submitted to ENGINEER for review
and approval of each such variation.
E. ENGINEER’s Review
1. ENGINEER will timely review and
approve Shop Drawings and Samples in accordance
with the schedule of Shop Drawings and Sample
submittals acceptable to ENGINEER.
ENGINEER’s review and approval will be only to
determine if the items covered by the submittals will,
after installation or incorporation in the Work, con-
form to the information given in the Contract Docu-
ments and be compatible with the design concept of
the completed Project as a functioning whole as
indicated by the Contract Documents.
2. | ENGINEER’s review and approval will
not extend to means, methods, techniques,
sequences, or procedures of construction (except
General Conditions
Page 00700-24
where a particular means, method, technique,
sequence, oF procedure of construction is
specifically and expressly called for by the Contract
Documents) or to safety precautions or programs
incident thereto. The review and approval of a
separate item as such will not indicate approval of
the assembly in which the item functions.
3. | ENGINEER’s review and approval of
Shop Drawings or Samples shall not relieve CON-
TRACTOR from responsibility for any variation
from the requirements of the Contract Documents
unless CONTRACTOR has in writing called
ENGINEER’s attention to each such variation at the
time of each submittal as required by paragraph
6.17.D3 and ENGINEER has given written
approval of each such variation by specific written
notation thereof incorporated in or accompanying
the Shop Drawing or Sample approval; nor will any
approval by ENGINEER relieve CONTRACTOR
from responsibility for complying with the require-
ments of paragraph 6.17.D.1.
F. Resubmittal Procedures
1. CONTRACTOR shall make corrections
required by ENGINEER and shall return the
required number of corrected copies of Shop
Drawings and submit as required new Samples for
review and approval. CONTRACTOR shail direct
specific attention in writing to revisions other than
the corrections called for by ENGINEER on
previous submittals.
6.18 Continuing the Work
A. CONTRACTOR shall carry on the Work and
adhere to the progress schedule during all disputes or
disagreements with OWNER. No Work shall be delayed or
postponed pending resolution of any disputes or
disagreements, except as permitted by paragraph 15.04 or as
OWNER and CONTRACTOR may otherwise agree in
writing.
6.19 CONTRACTOR’s General Warranty and
Guarantee
A. CONTRACTOR warrants and guarantees to
OWNER, ENGINEER, and ENGINEER’s Consultants that
all Work will be in accordance with the Contract
Documents and will not be defective. CONTRACTOR’s
warranty and guarantee hereunder excludes defects or
damage caused by:
1. abuse, modification, or improper main-
tenance or operation by persons other than CON-
TRACTOR, Subcontractors, Suppliers, or any other
individual or entity for whom CONTRACTOR is
responsible; or
2. normal wear and tear under normal
usage.
B. CONTRACTOR’s obligation to perform and
complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will
constitute an acceptance of Work that is not in accordance
with the Contract Documents or 4 release of
CONTRACTOR’ obligation to perform the Work in
accordance with the Contract Documents: '
1. observations by ENGINEER;
2. recommendation by ENGINEER or
payment by OWNER of any progress or final
payment;
3. the issuance of a certificate of Substantial
Completion by ENGINEER or any payment related
thereto by OWNER;
4. _ use or occupancy of the Work or any part
thereof by OWNER;
5. any acceptance by OWNER or any
failure to do so;
6. any review and approval of a Shop Draw-
ing or Sample submittal or the issuance of a notice
of acceptability by ENGINEER;
7. any inspection, test, or approval by
others; or
8. any correction of defective Work by
OWNER.
6.20 Indemnification
A. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless OWNER, ENGINEER, ENGINEER’s Consul-
tants, and the officers, directors, partners, employees,
agents, and other consultants and subcontractors of each and
any of them from and against all claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
arising out of or relating to the performance of the Work,
provided that any such claim, cost, loss, or damage:
1. _ is attributable to bodily injury, sickness,
disease, or death, or to injury to or destruction of
tangible property (other than the Work itself),
including the loss of use resulting therefrom; and
General Conditions
Page 00700-25
—E—————————
2. is caused in whole or in part by any negli-
gent act or omission of CONTRACTOR, any Sub-
contractor, any Supplier, or any individual or entity
directly or indirectly employed by any of them to
perform any of the Work or anyone for whose acts
-any of them may be liable, regardless of whether or
not caused in part by any negligence or omission of
an individual or entity indemnified hereunder or
whether liability is imposed upon such indemnified
party by Laws and Regulations regardless of the
negligence of any such individual or entity.
B. In any and all claims against OWNER or ENGI-
NEER or any of their respective Consultants, agents,
officers, directors, partners, or employees by any employee
(or the survivor or personal representative of such
employee) of CONTRACTOR, any Subcontractor, any
Supplier, or any individual or entity directly or indirectly
employed by any of them to perform any of the Work, or
anyone for whose acts any of them may be liable, the
indemnification obligation under paragraph 6.20.A shall not
be limited in any way by any limitation on the amount or
type of damages, compensation, or benefits payable by or
for CONTRACTOR or any such Subcontractor, Supplier,
or other individual or entity under workers’ compensation
acts, disability benefit acts, or other employee benefit acts.
C. The indemnification obligations of CONTRAC-
TOR under paragraph 6.20.A shall not extend to the
liability of ENGINEER and ENGINEER’s Consultants or
to the officers, directors, partners, employees, agents, and
other consultants and subcontractors of each and any of
them arising out of:
1. the preparation or approval of, or the
failure to prepare or approve, maps, Drawings,
opinions, reports, surveys, Change Orders, designs,
or Specifications; or
2. giving directions or instructions, or
failing to give them, if that is the primary cause of
the injury or damage.
ARTICLE 7 - OTHER WORK
7.01 Related Work at Site
A. OWNER may perform other work related to the
Project at the Site by OWNER’s employees, or let other
direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the
Contract Documents, then:
1. written notice thereof will be given to
CONTRACTOR prior to Starting any such other
work; and
2. if OWNER and CONTRACTOR are
unable to agree on entitlement to or on the amount
or extent, if any, of any adjustment in the Contract
Price or Contract Times that should be allowed as a
result of such other work, a Claim may be made
therefore as provided in paragraph 10.05.
B. CONTRACTOR shall afford each other contractor
who is a party to such a direct contract and each utility
owner (and OWNER, if OWNER is performing the other
work with OWNER’s employees) proper and safe access to
the Site and a reasonable opportunity for the introduction
and storage of materials and equipment and the execution of
such other work and shall properly coordinate the Work
with theirs. Unless otherwise provided in the Contract
Documents, CONTRACTOR shall do ail cutting, fitting,
and patching of the Work that may be required to properly
connect or otherwise make its several parts come together
and properly integrate with such other work. CON-
TRACTOR shall not endanger any work of others by
cutting, excavating, or otherwise altering their work and will
only cut or alter their work with the written consent of
ENGINEER and the others whose work will be affected.
The duties and responsibilities of CONTRACTOR under
this paragraph are for the benefit of such utility owners and
other contractors to the extent that there are comparable
provisions for the benefit of CONTRACTOR in said direct
contracts between OWNER and such utility owners and
other contractors.
C. If the proper execution or results of any part of
CONTRACTOR’s Work depends upon work performed by
others under this Article 7, CONTRACTOR shall inspect
such other work and promptly report to ENGINEER in
writing any delays, defects, or deficiencies in such other
work that render it unavailable or unsuitable for the proper
execution and results of CONTRACTOR’s Work.
CONTRACTOR’s failure to so report will constitute an
acceptance of such other work as fit and proper for
integration with CONTRACTOR’s Work except for latent
defects and deficiencies in such other work.
7.02 Coordination
A. If OWNER intends to contract with others for the
performance of other work on the Project at the Site, the
following will be set forth in Supplementary Conditions:
1. the individual or entity who will have
authority and responsibility for coordination of the
activities among the various contractors will be
identified;
General Conditions
Page 00700-26
SSS '~S';SéC~ rrr
2. the specific matters to be covered by such
authority and responsibility will be itemized; and
3. the extent of such authority and responsi-
bilities will be provided.
B. Unless otherwise provided in the Supplementary
Conditions, OWNER shall have sole authority and respon-
sibility for such coordination.
ARTICLE 8 - OWNER’S RESPONSIBILITIES
8.01 Communications to Contractor
A. Except as otherwise provided in these General
Conditions, OWNER shall issue all communications to
CONTRACTOR through ENGINEER.
8.02 Replacement of ENGINEER
A. In case of termination of the employment of
ENGINEER, OWNER shall appoint an engineer to whom
CONTRACTOR makes no reasonable objection, whose
status under the Contract Documents shall be that of the
former ENGINEER.
8.03 Furnish Data
A. OWNER shall promptly furnish the data required
of OWNER under the Contract Documents.
8.04 Pay Promptly When Due
A. OWNER shall make payments to CONTRACTOR
promptly when they are due as provided in paragraphs
14.02.C and 14.07.C.
8.05 Lands and Easements; Reports and Tests
A. OWNER’s duties in respect of providing lands and
easements and providing engineering surveys to establish
reference points are set forth in paragraphs 4.01 and 4.05.
Paragraph 4.02 refers to OWNER’s identifying and making
available to CONTRACTOR copies of reports of
explorations and_ tests of subsurface conditions and
drawings of physical conditions in or relating to existing
surface or subsurface structures at or contiguous to the Site
that have been utilized by ENGINEER in preparing the
Contract Documents.
8.06 Insurance
A. OWNER’s responsibilities, if any, in respect to
purchasing and maintaining liability and property insurance
are set forth in Article 5.
8.07 Change Orders
A. OWNER is obligated to execute Change Orders as
indicated in paragraph 10.03.
8.08 Inspections, Tests, and Approvals
A. OWNER’s responsibility in respect to certain
inspections, tests, and approvals is set forth in paragraph
13.03.B.
8.09 Limitations on OWNER’s Responsibilities
A. The OWNER shali not supervise, direct, or have
control or authority over, nor be responsible for,
CONTRACTOR’s means, methods, techniques, sequences,
or procedures of construction, or the safety precautions and
programs incident thereto, or for any failure of CON-
TRACTOR to comply with Laws and Regulations applica-
ble to the performance of the Work. OWNER will not be
responsible for CONTRACTOR’s failure to perform the
Work in accordance with the Contract Documents.
8.10 Undisclosed Hazardous Environmental
Condition
A. OWNER’s responsibility in respect to an undis-
closed Hazardous Environmental Condition is set forth in
paragraph 4.06.
8.11 Evidence of Financial Arrangements
A. Ifand to the extent OWNER has agreed to furnish
CONTRACTOR reasonable evidence that financial
arrangements have been made to satisfy OWNER’s
obligations under the Contract Documents, OWNER’s
responsibility in respect thereof will be as set forth in the
Supplementary Conditions.
ARTICLE 9 - ENGINEER’S STATUS DURING
CONSTRUCTION
9.01 OWNER’S Representative
A. ENGINEER will be OWNER’s representative
during the construction period. The duties and responsi-
bilities and the limitations of authority of ENGINEER as
OWNER’s representative during construction are set forth
in the Contract Documents and will not be changed without
written consent of OWNER and ENGINEER.
9.02 Visits to Site
A. ENGINEER will make visits to the Site at inter-
vals appropriate to the various stages of construction as
ENGINEER deems necessary in order to observe as an
General Conditions
Page 00700-27
experienced and qualified design professional the progress
that has been made and the quality of the various aspects of
CONTRACTOR’s executed Work. Based on information
obtained during such visits and observations, ENGINEER,
for the benefit of OWNER, will determine, in general, if the
Work is proceeding in accordance with the Contract
Documents. ENGINEER will not be required to make
exhaustive or continuous inspections on the Site to check
the quality or quantity of the Work. ENGINEER’s efforts
will be directed toward providing for OWNER a greater
degree of confidence that the completed Work will conform
generally to the Contract Documents. On the basis of such
visits and observations, ENGINEER will keep OWNER
informed of the progress of the Work and will endeavor to
guard OWNER against defective Work.
B. ENGINEER’s visits and observations are subject
to all the limitations on ENGINEER’s authority and
responsibility set forth in paragraph 9.10, and particularly,
but without limitation, during or as a result of ENGINEER's
visits or observations of CONTRACTOR's Work
ENGINEER will not supervise, direct, control, or have
authority over or be responsible for CONTRACTOR’s
means, methods, techniques, sequences, or procedures of
construction, or the safety precautions and programs
incident thereto, or for any failure of CONTRACTOR to
comply with Laws and Regulations applicable to the
performance of the Work.
9.03 Project Representative
A. If OWNER and ENGINEER agree, ENGINEER
will furnish a Resident Project Representative to assist
ENGINEER in providing more extensive observation of the
Work. The responsibilities and authority and limitations
thereon of any such Resident Project Representative and
assistants will be as provided in paragraph 9.10 and in the
Supplementary Conditions. If OWNER designates another
representative or agent to represent OWNER at the Site
who is not ENGINEER’s Consultant, agent or employee,
the responsibilities and authority and limitations thereon of
such other individual or entity will be as provided in the
Supplementary Conditions.
9.04 Clarifications and Interpretations
A. ENGINEER will issue with reasonable promptness
such written clarifications or interpretations of the require-
ments of the Contract Documents as ENGINEER may
determine necessary, which shall be consistent with the
intent of and reasonably inferable from the Contract Docu-
ments. Such written clarifications and interpretations will
be binding on OWNER and CONTRACTOR. If OWNER
and CONTRACTOR are unable to agree on entitlement to
or on the amount or extent, if any, of any adjustment in the
Contract Price or Contract Times, or both, that should be
allowed as a result of a written clarification or interpre-
tation, a Claim may be made therefor as provided in
paragraph 10.05.
9.05 Authorized Variations in Work
A. ENGINEER may authorize minor variations in the
Work from the requirements of the Contract Documents
which do not involve an adjustment in the Contract Price or
the Contract Times and are compatible with the design
concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be
accomplished by a Field Order and will be binding on
OWNER and also on CONTRACTOR, who shall perform
the Work involved promptly. If OWNER and CONTRAC-
TOR are unable to agree on entitlement to or on the amount
or extent, if any, of any adjustment in the Contract Price or
Contract Times, or both, as a result of a Field Order, a
Claim may be made therefor as provided in paragraph
10.05.
9.06 Rejecting Defective Work
A. ENGINEER will have authority to disapprove or
reject Work which ENGINEER believes to be defective, or
that ENGINEER believes will not produce a completed
Project that conforms to the Contract Documents or that
will prejudice the integrity of the design concept of the
completed Project as a functioning whole as indicated by
the Contract Documents. ENGINEER will also have
authority to require special inspection or testing of the Work
as provided in paragraph 13.04, whether or not the Work is
fabricated, installed, or completed.
9.07 Shop Drawings, Change Orders and Payments
A. In connection with ENGINEER’s authority as to
Shop Drawings and Samples, see paragraph 6.17.
B. In connection with ENGINEER’s authority as to
Change Orders, see Articles 10, 11, and 12.
C. In connection with ENGINEER’s authority as to
Applications for Payment, see Article 14,
9.08 Determinations for Unit Price Work
A. ENGINEER will determine the actual quantities
and classifications of Unit Price Work performed by
CONTRACTOR. ENGINEER will review with CON-
TRACTOR the ENGINEER’s preliminary determinations
on such matters before rendering a written decision thereon
(by recommendation of an Application for Payment or
otherwise). ENGINEER’s written decision thereon will be
final and binding (except as modified by ENGINEER to
reflect changed factual conditions or more accurate data)
upon OWNER and CONTRACTOR, subject to the
provisions of paragraph 10.05.
General Conditions
Page 00700-28
— ee
9.09 Decisions on Requirements of Contract
Documents and Acceptability of Work
A. ENGINEER will be the initial interpreter of the
requirements of the Contract Documents and judge of the
acceptability of the Work there under. Claims, disputes and
other matters relating to the acceptability of the Work, the
quantities and classifications of Unit Price Work, the
interpretation of the requirements of the Contract
Documents pertaining to the performance of the Work, and
Claims seeking changes in the Contract Price or Contract
Times will be referred initially to ENGINEER in writing, in
accordance with the provisions of paragraph 10.05, with a
request for a formal decision.
B. When functioning as interpreter and judge under
this paragraph 9.09, ENGINEER will not show partiality to
OWNER or CONTRACTOR and will not be liable in
connection with any interpretation or decision rendered in
good faith in such capacity. The rendering of a decision by
ENGINEER pursuant to this paragraph 9,09 with respect to
any such Claim, dispute, or other matter (except any which
have been waived by the making or acceptance of final
payment as provided in paragraph 14.07) will bea condition
precedent to any exercise by OWNER or CONTRACTOR
of such rights or remedies as either may otherwise have
under the Contract Documents or by Laws or Regulations in
respect of any such Claim, dispute, or other matter.
9.10 Limitations on ENGINEER’s Authority and
Responsibilities
A. Neither ENGINEER’s authority or responsibility
under this Article 9 or under any other provision of the
Contract Documents nor any decision made by ENGINEER
in good faith either to exercise or not exercise such
authority or responsibility or the undertaking, exercise, or
performance of any authority or responsibility by
ENGINEER shall create, impose, or give rise to any duty in
contract, tort, or otherwise owed by ENGINEER to
CONTRACTOR, any Subcontractor, any Supplier, any
other individual or entity, or to any surety for or employee
or agent of any of them.
B. ENGINEER will not supervise, direct, control, or
have authority over or be responsible for CONTRACTOR’s
means, methods, techniques, sequences, or procedures of
construction, or the safety precautions and programs
incident thereto, or for any failure of CONTRACTOR to
comply with Laws and Regulations applicable to the perfor-
mance of the Work. ENGINEER will not be responsible
for CONTRACTOR’: failure to perform the Work in accor-
dance with the Contract Documents.
C. ENGINEER will not be responsible for the acts or
omissions of CONTRACTOR or of any Subcontractor, any
Supplier, or of any other individual or entity performing
any of the Work.
D. ENGINEER’s review of the final Application for
Payment and accompanying documentation and all mainte-
nance and operating instructions, schedules, guarantees,
Bonds, certificates of inspection, tests and approvals, and
other documentation required to be delivered by paragraph
14.07.A will only be to determine generally that their
content complies with the requirements of, and in the case
of certificates of inspections, tests, and approvals that the
results certified indicate compliance with, the Contract
Documents.
E. The limitations upon authority and responsibility
set forth in this paragraph 9.10 shall also apply to
ENGINEER’s Consultants, Resident Project Repre-
sentative, and assistants.
ARTICLE 10 - CHANGES IN THE WORK; CLAIMS
10.01 Authorized Changes in the Work
A. Without invalidating the Agreement and without
notice to any surety, OWNER may, at any time or from time
to time, order additions, deletions, or revisions in the Work
by a Written Amendment, a Change Order, or a Work
Change Directive. Upon receipt of any such document,
CONTRACTOR shall promptly proceed with the Work
involved which will be performed under the applicable
conditions of the Contract Documents (except as otherwise
specifically provided).
B. If OWNER and CONTRACTOR are unable to
agree on entitlement to, or on the amount or extent, if any,
of an adjustment in the Contract Price or Contract Times, or
both, that should be allowed as a result of a Work Change
Directive, a Claim may be made therefore as provided in
paragraph 10.05.
10.02 | Unauthorized Changes in the Work
A. CONTRACTOR shall not be entitled to an
increase in the Contract Price or an extension of the
Contract Times with respect to any work performed that is
not required by the Contract Documents as amended,
modified, or supplemented as provided in paragraph 3.04,
except in the case of an emergency as provided in paragraph
6.16 or in the case of uncovering Work as provided in
paragraph 13.04.B.
10.03 Execution of Change Orders
A. OWNER and CONTRACTOR shall execute
appropriate Change Orders recommended by ENGINEER
(or Written Amendments) covering:
1. changes in the Work which are: (i)
ordered by OWNER pursuant to paragraph 10.01.A,
(ii) required because of acceptance of defective
General Conditions
————
Page 00700-29
Work under paragraph 13.08.A or OWNER’s
correction of defective Work under paragraph 13.09,
or (iii) agreed to by the parties;
2. changes in the Contract Price or Contract
Times which are agreed to by the parties, including
any undisputed sum or amount of time for Work
actually performed in accordance with a Work
Change Directive; and
3. changes in the Contract Price or Contract
Times which embody the substance of any written
decision rendered by ENGINEER pursuant to para-
graph 10.05; provided that, in lieu of executing any
such Change Order, an appeal may be taken from
any such decision in accordance with the provisions
of the Contract Documents and applicable Laws and
Regulations, but during any such appeal,
CONTRACTOR shall carry on the Work and adhere
to the progress schedule as provided in paragraph
6.18.A.
10.04 Notification to Surety
A. If notice of any change affecting the general scope
of the Work or the provisions of the Contract Documents
(including, but not limited to, Contract Price or Contract
Times) is required by the provisions of any Bond to be
given to a surety, the giving of any such notice will be
CONTRACTOR’s responsibility. The amount of each
applicable Bond will be adjusted to reflect the effect of any
such change.
10.05 Claims and Disputes
A. Notice: Written notice stating the general nature
of each Claim, dispute, or other matter shall be delivered by
the claimant to ENGINEER and the other party to the
Contract promptly (but in no event later than 30 days) after
the start of the event giving rise thereto. Notice of the
amount or extent of the Claim, dispute, or other matter with
supporting data shall be delivered to the ENGINEER and
the other party to the Contract within 60 days after the start
of such event (unless ENGINEER allows additional time
for claimant to submit additional or more accurate data in
support of such Claim, dispute, or other matter). A Claim
for an adjustment in Contract Price shall be prepared in
accordance with the provisions of paragraph 12.01.B. A
Claim for an adjustment in Contract Time shall be prepared
in accordance with the provisions of paragraph 12.02.B.
Each Claim shall be accompanied by claimant's written
statement that the adjustment claimed is the entire
adjustment to which the claimant believes it is entitled as a
result of said event. The opposing party shall submit any
response to ENGINEER and the claimant within 30 days
after receipt of the claimant’s last submittal (unless
ENGINEER allows additional time).
B. ENGINEER'’s Decision: ENGINEER will render
a formal decision in writing within 30 days after receipt of
the last submittal of the claimant or the last submittal of the
opposing party, if any. ENGINEER’s written decision on
such Claim, dispute, or other matter will be final and
binding upon OWNER and CONTRACTOR unless:
1. an appeal from ENGINEER’s decision is
taken within the time limits and in accordance with
the dispute resolution procedures set forth in Article
16; or
2. if no such dispute resolution procedures
have been set forth in Article 16, a written notice of
intention to appeal from ENGINEER’s written
decision is delivered by OWNER or
CONTRACTOR to the other and to ENGINEER
within 30 days after the date of such decision, and a
formal proceeding is instituted by the appealing
party in a forum of competent jurisdiction within 60
days after the date of such decision or within 60 days
after Substantial Completion, whichever is later
(unless otherwise agreed in writing by OWNER and
CONTRACTOR), to exercise such rights or
remedies as the appealing party may have with
respect to such Claim, dispute, or other matter in
accordance with applicable Laws and Regulations.
C. If ENGINEER does not render a formal decision
in writing within the time stated in paragraph 10.05.B, a
decision denying the Claim in its entirety shall be deemed to
have been issued 31 days after receipt of the last submittal
General Conditions
Page 00700-30
ES S=SASS:;éS=
of the claimant or the last submittal of the opposing party, if
any.
D. No Claim for an adjustment in Contract Price or
Contract Times (or Milestones) will be valid if not
submitted in accordance with this paragraph 10.05.
ARTICLE 11 - COST OF THE WORK; CASH
ALLOWANCES; UNIT PRICE WORK
11.01 Cost of the Work
A. Costs Included: The term Cost of the Work means
the sum of all costs necessarily incurred and paid by
CONTRACTOR in the proper performance of the Work.
When the value of any Work covered by a Change Order or
when a Claim for an adjustment in Contract Price is
determined on the basis of Cost of the Work, the costs to be
reimbursed to CONTRACTOR will be only those
additional or incremental costs required because of the
change in the Work or because of the event giving rise to
the Claim. Except as otherwise may be agreed to in writing
by OWNER, such costs shall be in amounts no higher than
those prevailing in the locality of the Project, shall include
only the following items, and shall not include any of the
costs itemized in paragraph 11.01.B.
1. Payroll costs for employees in the direct
employ of CONTRACTOR in the performance of
the Work under schedules of job classifications
agreed upon by OWNER and CONTRACTOR.
Such employees shall include without limitation
superintendents, foremen, and other personnel
employed full time at the Site. Payroll costs for
employees not employed full time on the Work shall
be apportioned on the basis of their time spent on the
Work. Payroll costs shall include, but not be limited
to, salaries and wages plus the cost of fringe
benefits, which shall include social security
contributions, unemployment, excise, and payroll
taxes, workers’ compensation, health and retirement
benefits, bonuses, sick leave, vacation and holiday
pay applicable thereto. The expenses of performing
Work outside of regular working hours, on Saturday,
Sunday, or legal holidays, shall be included in the
above to the extent authorized by OWNER.
4. Cost of all materials and equipment
furnished and incorporated in the Work, including
costs of transportation and storage thereof, and
Suppliers’ field services required in connection
therewith. All cash discounts shall accrue to
CONTRACTOR unless OWNER deposits funds
with CONTRACTOR with which to make pay-
ments, in which case the cash discounts shall accrue
to OWNER. All trade discounts, rebates and
refunds and returns from sale of surplus materials
and equipment shall accrue to OWNER, and
CONTRACTOR shall make provisions so that they
may be obtained.
3. Payments made by CONTRACTOR to
Subcontractors for Work performed by
Subcontractors. If required by OWNER, CON-
TRACTOR shall obtain competitive bids from
subcontractors acceptable to OWNER and CON-
TRACTOR and shall deliver such bids to OWNER,
who will then determine, with the advice of
ENGINEER, which bids, if any, will be acceptable.
If any subcontract provides that the Subcontractor is
to be paid on the basis of Cost of the Work plus a
fee, the Subcontractor’s Cost of the Work and fee
shall be determined in the same manner as
CONTRACTOR’s Cost of the Work and fee as
provided in this paragraph 11.01.
4. Costs of special consultants (including
but not limited to engineers, architects, testing
laboratories, surveyors, attorneys, and accountants)
employed for services specifically related to the
Work.
5. Supplemental costs including — the
following:
a. The proportion of necessary transportation,
travel, and subsistence expenses of
CONTRACTOR’s employees incurred in discharge
of duties connected with the Work.
b. Cost, including transportation and
maintenance, of all materials, supplies, equipment,
machinery, appliances, office, and temporary
facilities at the Site, and hand tools not owned by the
workers, which are consumed in the performance of
the Work, and cost, less market value, of such items
used but not consumed which remain the property of
CONTRACTOR.
c. Rentals of all construction equipment and
machinery, and the parts thereof whether rented
from CONTRACTOR or others in accordance with
rental agreements approved by OWNER with the
advice of ENGINEER, and the costs of
transportation, loading, unloading, assembly,
dismantling, and removal thereof. Alli such costs
shall be in accordance with the terms of said rental
agreements. The rental of any such equipment,
machinery, or parts shall cease when the use thereof
is no longer necessary for the Work.
d. Sales, consumer, use, and other similar
taxes related to the Work, and for which CON-
General Conditions
Page 00700-31
TRACTOR is liable, imposed by Laws and Regu-
lations.
e. Deposits lost for causes other than negli-
gence of CONTRACTOR, any Subcontractor, or
anyone directly or indirectly employed by any of
them or for whose acts any of them may be liable,
and royalty payments and fees for permits and
licenses.
f. Losses and damages (and related
expenses) caused by damage to the Work, not
compensated by insurance or otherwise, sustained by
CONTRACTOR in connection with the perfor-
mance of the Work (except losses and damages
within the deductible amounts of property insurance
established in accordance with paragraph 5.06.D),
provided such losses and damages have resulted
from causes other than the negligence of
CONTRACTOR, any Subcontractor, or anyone
directly or indirectly employed by any of them or for
whose acts any of them may be liable. Such losses
Shall include settlements made with the written
consent and approval of OWNER. No such losses,
damages, and expenses shall be included in the Cost
of the Work for the purpose of determining
CONTRACTOR’s fee.
g- The cost of utilities, fuel, and sanitary
facilities at the Site.
h. Minor expenses such as telegrams, long
distance telephone calls, telephone service at the
Site, expressage, and similar petty cash items in
connection with the Work.
i. When the Cost of the Work is used to
determine the value of a Change Order or of a
Claim, the cost of premiums for additional Bonds
and insurance required because of the changes in the
Work or caused by the event giving rise to the
Claim.
j. When all the Work is performed on the basis
of cost-plus, the costs of premiums for all Bonds and
insurance CONTRACTOR is required by the
Contract Documents to purchase and maintain.
B. Costs Excluded: The term Cost of the Work shall
not include any of the following items:
1. Payroll costs and other compensation of
CONTRACTOR’s officers, executives, principals
(of partnerships and sole proprietorships), general
managers, engineers, architects, _ estimators,
attorneys, auditors, accountants, purchasing and
contracting agents, expediters, timekeepers, clerks,
and other personnel employed by CONTRACTOR,
whether at the Site or in CONTRACTOR’s principal
or branch office for general administration of the
Work and not specifically included in the agreed
upon schedule of job classifications referred to in
paragraph 11.01.A.1 or specifically covered by
paragraph 11.01.A.4, all of which are to be
considered administrative costs covered by the
CONTRACTOR’s fee.
2. Expenses of CONTRACTOR’s principal
and branch offices other than CONTRACTOR’s
office at the Site.
3. Any part of CONTRACTOR’s capital
expenses, including interest on CONTRACTOR’s
capital employed for the Work and charges against
CONTRACTOR for delinquent payments.
4. Costs due to the negligence of CON-
TRACTOR, any Subcontractor, or anyone directly
or indirectly employed by any of them or for whose
acts any of them may be liable, including but not
limited to, the correction of defective Work, disposal
of materials or equipment wrongly supplied, and
making good any damage to property.
5. Other overhead or general expense costs
of any kind and the costs of any item not specifically
and expressly included in paragraphs 11.01.A and
11.01.B.
C. CONTRACTOR’s Fee: When all the Work is
performed on the basis of cost-plus, CONTRACTOR’s fee
shall be determined as set forth in the Agreement. When
the value of any Work covered by a Change Order or when
a Claim for an adjustment in Contract Price is determined
on the basis of Cost of the Work, CONTRACTOR’s fee
shall be determined as set forth in paragraph 12.01.C.
D. Documentation: Whenever the Cost of the Work
for any purpose is to be determined pursuant to paragraphs
11.01.A and 11.01.B, CONTRACTOR will establish and
maintain records thereof in accordance with generally
accepted accounting practices and submit in a form
acceptable to ENGINEER an itemized cost breakdown
together with supporting data.
11.02 Cash Allowances
A. It is understood that CONTRACTOR has included
in the Contract Price all allowances so named in the
Contract Documents and shall cause the Work so covered to
be performed for such sums as may be acceptable to
OWNER and ENGINEER. CONTRACTOR agrees that:
1. the allowances include the cost to
CONTRACTOR (less any applicable trade
discounts) of materials and equipment required by
General Conditions
Page 00700-32
the allowances to be delivered at the Site, and all
applicable taxes; and
2. CONTRACTOR’s costs for unloading
and handling on the Site, labor, installation costs,
overhead, profit, and other expenses contemplated
for the allowances have been included in the
Contract Price and not in the allowances, and no
demand for additional payment on account of any of
the foregoing will be valid.
B. Prior to final payment, an appropriate Change
Order will be issued as recommended by ENGINEER to
reflect actual amounts due CONTRACTOR on account of
Work covered by allowances, and the Contract Price shall
be correspondingly adjusted.
11.03 Unit Price Work
A. Where the Contract Documents provide that all or
part of the Work is to be Unit Price Work, initially the
Contract Price will be deemed to include for all Unit Price
Work an amount equal to the sum of the unit price for each
separately identified item of Unit Price Work times the
estimated quantity of each item as indicated in the
Agreement. The estimated quantities of items of Unit Price
Work are not guaranteed and are solely for the purpose of
comparison of Bids and determining an initial Contract
Price. Determinations of the actual quantities and
classifications of Unit Price Work performed by
CONTRACTOR will be made by ENGINEER subject to
the provisions of paragraph 9.08.
B. Each unit price will be deemed to include an
amount considered by CONTRACTOR to be adequate to
cover CONTRACTOR’s overhead and profit for each
separately identified item.
SEE SUPLEMENTARY CONDITIONS (SECTION 00800)
ARTICLE 12 - CHANGE OF CONTRACT PRICE;
CHANGE OF CONTRACT TIMES
12.01 Change of Contract Price
A. The Contract Price may only be changed by a
Change Order or by a Written Amendment. Any Claim for
an adjustment in the Contract Price shall be based on
written notice submitted by the party making the Claim to
the ENGINEER and the other party to the Contract in
accordance with the provisions of paragraph 10.05.
B. The value of any Work covered by a Change
Order or of any Claim for an adjustment in the Contract
Price will be determined as follows:
1. where the Work involved is covered by
unit prices contained in the Contract Documents, by
application of such unit prices to the quantities of the
items involved (subject to the provisions of
paragraph 11.03 ); or
2. where the Work involved is not covered
by unit prices contained in the Contract Documents,
by a mutually agreed lump sum (which may include
an allowance for overhead and profit not necessarily
in accordance with paragraph 12.01.C.2); or
3. where the Work involved is not covered
by unit prices contained in the Contract Documents
and agreement to a lump sum is not reached under
paragraph 12.01.B.2, on the basis of the Cost of the
Work (determined as provided in paragraph 11.01)
plus a CONTRACTOR’ fee for overhead and profit
(determined as provided in paragraph 12.01.C).
C. CONTRACTOR’s Fee: The CONTRACTOR’s
fee for overhead and profit shall be determined as follows:
1. amutually acceptable fixed fee; or
2. if'a fixed fee is not agreed upon, then a
fee based on the following percentages of the
various portions of the Cost of the Work:
a. for costs incurred under paragraphs
11.01.A.1 and 11.01.A.2, the CONTRACTOR’s
fee shall be 15 percent;
b. for costs incurred under paragraph
11.01.4.3, the CONTRACTOR’s fee shall be
five percent;
General Conditions
Page 00700-33
c. where one or more tiers of subcontracts
are on the basis of Cost of the Work plus a fee
and no fixed fee is agreed upon, the intent of
paragraph 12.01.C.2.a is that the Subcontractor
who actually performs the Work, at whatever
tier, will be paid a fee of 15 percent of the costs
incurred by such Subcontractor under paragraphs
11.01.A.1 and 11.01.A.2 and that any higher tier
Subcontractor and CONTRACTOR will each be
paid a fee of five percent of the amount paid to
the next lower tier Subcontractor;
d. no fee shall be payable on the basis of
costs itemized under paragraphs 11.01.A.4,
11.01.A.5, and 11.01.B;
e. the amount of credit to be allowed by
CONTRACTOR to OWNER for any change
which results in a net decrease in cost will be the
amount of the actual net decrease in cost plus a
deduction in CONTRACTOR’s fee by an
amount equal to five percent of such net
decrease; and
f; when both additions and credits are in-
volved in any one change, the adjustment in
CONTRACTOR’s fee shal! be computed on the
basis of the net change in accordance with
paragraphs 12.01.C.2.a through 12.01.C.2.,
inclusive.
12.02 Change of Contract Times
A. The Contract Times (or Milestones) may only be
changed by a Change Order or by a Written Amendment.
Any Claim for an adjustment in the Contract Times (or
Milestones) shall be based on written notice submitted by
the party making the claim to the ENGINEER and the other
party to the Contract in accordance with the provisions of
paragraph 10.05.
B. Any adjustment of the Contract Times (or
Milestones) covered by a Change Order or of any Claim for
an adjustment in the Contract Times (or Milestones) will be
determined in accordance with the provisions of this
Article 12.
12.03 Delays Beyond CONTRACTOR’s Control
A. Where CONTRACTOR is prevented from
completing any part of the Work within the Contract Times
(or Milestones) due to delay beyond the control of
CONTRACTOR, the Contract Times (or Milestones) will
be extended in an amount equal to the time lost due to such
delay if a Claim is made therefore as provided in paragraph
12.02.A. Delays beyond the control of CONTRACTOR
shall include, but not be limited to, acts or neglect by
OWNER, acts or neglect of -utility owners or other
contractors performing other work as contemplated by
Article 7, fires, floods, epidemics, abnormal weather
conditions, or acts of God.
12.04 Delays Within CONTRACTOR’s Control
A. The Contract Times (or Milestones) will not be
extended due to delays within the control of
CONTRACTOR. Delays attributable to and within the
control of a Subcontractor or Supplier shall be deemed to be
delays within the control of CONTRACTOR.
12.05 Delays Beyond OWNER’s and CONTRACTOR’s
Control
A. Where CONTRACTOR is prevented from
completing any part of the Work within the Contract Times
(or Milestones) due to delay beyond the control of both
OWNER and CONTRACTOR, an extension of the
Contract Times (or Milestones) in an amount equal to the
time lost due to such delay shall be CONTRACTOR’s sole
and exclusive remedy for such delay.
12.06 Delay Damages
A. In no event shall OWNER or ENGINEER be
liable to CONTRACTOR, any Subcontractor, any Supplier,
or any other person or organization, or to any surety for or
employee or agent of any of them, for damages arising out
of or resulting from:
1. delays caused by or within the control of
CONTRACTOR; or
2. delays beyond the control of both
OWNER and CONTRACTOR including but not
limited to fires, floods, epidemics, abnormal weather
conditions, acts of God, or acts or neglect by utility
owners or other contractors performing other work
as contemplated by Article 7.
B. Nothing in this paragraph 12.06 bars a change in
Contract Price pursuant to this Article 12 to compensate
CONTRACTOR due to delay, interference, or disruption
directly attributable to actions or inactions of OWNER or
anyone for whom OWNER is responsible.
ARTICLE 13 - TESTS AND INSPECTIONS;
CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
13.01 Notice of Defects
A. Prompt notice of all defective Work of which
OWNER or ENGINEER has actual knowledge will be
given to CONTRACTOR. All defective Work may be
General Conditions
Page 00700-34
ee
rejected, corrected, or accepted as provided in this
Article 13.
13.02 Access to Work
A. OWNER, ENGINEER, ENGINEER’s Con-
sultants, other representatives and personnel of OWNER,
independent testing laboratories, and governmental agencies
with jurisdictional interests will have access to the Site and
the Work at reasonable times for their observation,
inspecting, and testing. CONTRACTOR shall provide
them proper and safe conditions for such access and advise
them of CONTRACTOR’s Site safety procedures and
programs so that they may comply therewith as applicable.
13.03 Tests and Inspections
SEE SUPLEMENTARY CONDITIONS (SECTION 00800)
C. If Laws or Regulations of any public body having
jurisdiction require any Work (or part thereof) specifically
to be inspected, tested, or approved by an employee or other
representative of such public body, CONTRACTOR shall
assume full responsibility for arranging and obtaining such
inspections, tests, or approvals, pay all costs in connection
therewith, and furnish ENGINEER the required certificates
of inspection or approval.
D. CONTRACTOR shall be responsible for
arranging and obtaining and shall pay all costs in connection
with any inspections, tests, or approvals required for
OWNER’s and ENGINEER’s acceptance of materials or
equipment to be incorporated in the Work; or acceptance of
materials, mix designs, or equipment submitted for approval
prior to CONTRACTOR’s purchase thereof for
incorporation in the Work. Such inspections, tests, or
approvals shall be performed by organizations acceptable to
OWNER and ENGINEER.
E. If any Work (or the work of others) that is to be
inspected, tested, or approved is covered by CONTRAC-
TOR without written concurrence of ENGINEER, it must,
if requested by ENGINEER, be uncovered for observation.
F. Uncovering Work as provided in paragraph
13.03.E shall be at CONTRACTOR’s expense unless
CONTRACTOR has given ENGINEER timely notice of
CONTRACTOR’s intention to cover the same and
ENGINEER has not acted with reasonable promptness in
response to such notice.
13.04 Uncovering Work
A. If any Work is covered contrary to the written
request of ENGINEER, it must, if requested by ENGI-
NEER, be uncovered for ENGINEER’s observation and
replaced at CONTRACTOR’s expense.
B. If ENGINEER considers it necessary or advisable
that covered Work be observed by ENGINEER or
inspected or tested by others, CONTRACTOR, at
ENGINEER’s request, shall uncover, expose, or otherwise
make available for observation, inspection, or testing as
ENGINEER may require, that portion of the Work in
question, furnishing all necessary labor, material, and
equipment. If it is found that such Work is defective,
CONTRACTOR shall pay all Claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
arising out of or relating to such uncovering, exposure,
observation, inspection, and testing, and of satisfactory
replacement or reconstruction (including but not limited to
all costs of repair or replacement of work of others); and
OWNER shall be entitled to an appropriate decrease in the
Contract Price. If the parties are unable to agree-as to the
amount thereof, OWNER may make a Claim therefor as
provided in paragraph 10.05. If, however, such Work is not
found to be defective, CONTRACTOR shall be allowed an
increase in the Contract Price or an extension of the
Contract Times (or Milestones), or both, directly attribut-
able to such uncovering, exposure, observation, inspection,
testing, replacement, and reconstruction. If the parties are
unable to agree as to the amount or extent thereof,
CONTRACTOR may make a Claim therefore as provided
in paragraph 10.05.
13.05 OWNER May Stop the Work
A. Ifthe Work is defective, or CONTRACTOR fails
to supply sufficient skilled workers or suitable materials or
equipment, or fails to perform the Work in such a way that
the completed Work will conform to the Contract
Documents, OWNER may order CONTRACTOR to stop
General Conditions
Page 00700-35
the Work, or any portion thereof, until the cause for such
order has been eliminated; however, this right of OWNER
to stop the Work shall not give rise to any duty on the part
of OWNER to exercise this right for the benefit of
CONTRACTOR, any Subcontractor, any Supplier, any
other individual or entity, or any surety for, or employee or
agent of any of them.
13.06 | Correction or Removal of Defective Work
A. CONTRACTOR shall correct all defective Work,
whether or not fabricated, installed, or completed, or, if the
Work has been rejected by ENGINEER, remove it from the
Project and replace it with Work that is not defective.
CONTRACTOR shall pay all Claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
arising out of or relating to such correction or removal
(including but not limited to all costs of repair or
replacement of work of others).
13.07 Correction Period
A. If within one year after the date of Substantial
Completion or such longer period of time as may be
prescribed by Laws or Regulations or by the terms of any
applicable special guarantee required by the Contract
Documents or by any specific provision of the Contract
Documents, any Work is found to be defective, or if the
repair of any damages to the land or areas made available
for CONTRACTOR’s use by OWNER or permitted by
Laws and Regulations as contemplated in paragraph 6.11.A
is found to be defective, CONTRACTOR shall promptly,
without cost to OWNER and in accordance with OWNER’s
written instructions: (i) repair such defective land or areas,
or (ii) correct such defective Work or, if the defective Work
has been rejected by OWNER, remove it from the Project
and replace it with Work that is not defective, and (iii)
satisfactorily correct or repair or remove and replace any
damage to other Work, to the work of others or other land
or areas resulting there from. If CONTRACTOR does not
promptly comply with the terms of such instructions, or in
an emergency where delay would cause serious risk of loss
or damage, OWNER may have the defective Work
corrected or repaired or may have the rejected Work
removed and replaced, and all Claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
arising out of or relating to such correction or repair or such
removal and replacement (including but not limited to all
costs of repair or replacement of work of others) will be
paid by CONTRACTOR.
B. In special circumstances where a particular item of
equipment is placed in continuous service before
Substantial Completion of all the Work, the correction
period for that item may start to run from an earlier date if
so provided in the Specifications or by Written Amendment.
C. Where defective Work (and damage to other Work
resulting there from) has been corrected or removed and
replaced under this paragraph 13.07, the correction period
hereunder with respect to such Work will be extended for
an additional period of one year after such correction or
removal and replacement has been satisfactorily completed.
D. CONTRACTOR’s | obligations under __ this
paragraph 13.07 are in addition to any other obligation or
warranty. The provisions of this paragraph 13.07 shall not
be construed as a substitute for or a waiver of the provisions
of any applicable statute of limitation or repose.
13.08 Acceptance of Defective Work
A. If, instead of requiring correction or removal and
replacement of defective Work, OWNER (and, prior to
ENGINEER’s recommendation of final payment,
ENGINEER) prefers to accept it, OWNER may do so.
CONTRACTOR shall pay all Claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
attributable to OWNER’s evaluation of and determination
to accept such defective Work (such costs to be approved
by ENGINEER as to reasonableness) and the diminished
value of the Work to the extent not otherwise paid by
CONTRACTOR pursuant to this sentence. If any such
acceptance occurs prior to ENGINEER’s recommendation
of final payment, a Change Order will be issued
incorporating the necessary revisions in the Contract
Documents with respect to the Work, and OWNER shall be
entitled to an appropriate decrease in the Contract Price,
reflecting the diminished value of Work so accepted. If the
parties are unable to agree as to the amount thereof,
OWNER may make a Claim therefore as provided in
paragraph 10.05. If the acceptance occurs after such
recommendation, an appropriate amount will be paid by
CONTRACTOR to OWNER.
13.09 OWNER May Correct Defective Work
A. If CONTRACTOR fails within a reasonable time
after written notice from ENGINEER to correct defective
Work or to remove and replace rejected Work as required
by ENGINEER in accordance with paragraph 13.06.A, or if
CONTRACTOR fails to perform the Work in accordance
with the Contract Documents, or if CONTRACTOR fails to
comply with any other provision of the Contract
Documents, OWNER may, after seven days written notice
to CONTRACTOR, correct and remedy any such
deficiency.
B. In exercising the rights and remedies under this
paragraph, OWNER shall proceed expeditiously. In
General Conditions
Page 00700-36
CC ___X=___ a ee
‘
connection with such corrective and remedial action,
OWNER may exclude CONTRACTOR from all or part of
the Site, take possession of all or part of the Work and
suspend CONTRACTOR’s services related thereto, take
possession of CONTRACTOR’s tools, appliances, con-
struction equipment and machinery at the Site, and
incorporate in the Work all materials and equipment stored
at the Site or for which OWNER has paid CONTRACTOR
but which are stored elsewhere. CONTRACTOR shall
allow OWNER, OWNER’s representatives, agents and
employees, OWNER’s other contractors, and ENGINEER
and ENGINEER’s Consultants access to the Site to enable
OWNER to exercise the rights and remedies under this
paragraph.
C. All Claims, costs, losses, and damages (including
but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or
arbitration or other dispute resolution costs) incurred or
sustained by OWNER in exercising the rights and remedies
under this paragraph 13.09 will be charged against
CONTRACTOR, and a Change Order will be issued
incorporating the necessary revisions in the Contract
Documents with respect to the Work; and OWNER shail be
entitled to an appropriate decrease in the Contract Price. If
the parties are unable to agree as fo the amount of the
adjustment, OWNER may make a Claim therefore as
provided in paragraph 10.05. Such claims, costs, losses and
damages will include but not be limited to all costs of
repair, or replacement of work of others destroyed or
damaged by correction, removal, or replacement of
CONTRACTOR’s defective Work.
D. CONTRACTOR shall not be allowed an extension
of the Contract Times (or Milestones) because of any delay
in the performance of the Work attributable to the exercise
by OWNER of OWNER’s rights and remedies under this
paragraph 13.09.
ARTICLE 14 - PAYMENTS TO CONTRACTOR AND
- COMPLETION
14.01 Schedule of Values
A. The schedule of values established as provided in
paragraph 2.07.A will serve as the basis for progress
payments and will be incorporated into a form of Applica-
tion for Payment acceptable to ENGINEER. _ Progress
payments on account of Unit Price Work will be based on
the number of units completed.
14.02 Progress Payments
A. Applications for Payments
1. At least 20 days before the date estab-
lished for each progress payment (but not more often
than once a month), CONTRACTOR shall submit to
ENGINEER for review an Application for Payment
filled out and signed by CONTRACTOR covering
the Work completed as of the date of the
Application and accompanied by such supporting
documentation as is required by the Contract
Documents. If payment is requested on the basis of
’ materials and equipment not incorporated in the
Work but delivered and suitably stored at the Site or
at another location agreed to in writing, the
Application for Payment shall also be accompanied
by a bill of sale, invoice, or other documentation
warranting that OWNER has received the materials
and equipment free and clear of all Liens and
evidence that the materials and equipment are
covered by appropriate property insurance or other
arrangements to protect OWNER’s interest therein,
all of which must be satisfactory to OWNER.
2. Beginning with the second Application
for Payment, each Application shall include an
affidavit of CONTRACTOR stating that all previous
progress payments received on account of the Work
have been applied on account to discharge
CONTRACTOR’s legitimate obligations associated
with prior Applications for Payment.
3. The amount of retainage with respect to
pro-gress payments will be as stipulated in the
Agreement.
B. Review of Applications
i. ENGINEER will, within 10 days after
receipt of each Application for Payment, either
indicate in writing a recommendation of payment
and present the Application to OWNER or return the
Application to CONTRACTOR indicating in writing
ENGINEER’s reasons for refusing to recommend
payment. In the latter case, CONTRACTOR may
make the necessary corrections and resubmit the
Application.
2. | ENGINEER’s recommendation of any
payment requested in an Application for Payment
will constitute a representation by ENGINEER to
OWNER, based on ENGINEER’s observations on
the Site of the executed Work as an experienced and
qualified design professional and on ENGINEER's
review of the Application for Payment and the
accompanying data and schedules, that to the best of
ENGINEER’s knowledge, information and belief:
General Conditions
Page 00700-37
a. the Work has progressed to the point
indicated;
b. the quality of the Work is generally in
accordance with the Contract Documents
(subject to an evaluation of the Work as a
functioning whole prior to or upon Substantial
Completion, to the results of any subsequent
tests called for in the Contract Documents, to a
final determination of quantities and
classifications for Unit Price Work under
paragraph 9.08, and to any other qualifications
stated in the recommendation); and
c. the conditions precedent to
CONTRACTOR’s being entitled to such pay-
ment appear to have been fulfilled in so far as it
is ENGINEER’s responsibility to observe the
Work.
3. By recommending any such payment
ENGINEER will not thereby be deemed to have
represented that: (i) inspections made to check the
quality or the quantity of the Work as it has been
performed have been exhaustive, extended to every
aspect of the Work in progress, or involved detailed
inspections of the Work beyond the responsibilities
specifically assigned to ENGINEER in the Contract
Documents; or (ii) that there may not be other
matters or issues between the parties that might
entitle CONTRACTOR to be paid additionally by
OWNER or entitle OWNER to withhold payment to
CONTRACTOR.
4. Neither ENGINEER’s review of
CONTRACTOR’s Work for the purposes of
recommending payments nor ENGINEER’s
recommendation of any payment, including final
payment, will impose responsibility on ENGINEER
to supervise, direct, or control the Work or for the
means, methods, techniques, sequences, or
procedures of construction, or the safety precautions
and programs incident thereto, or for
CONTRACTOR’s failure to comply with Laws and
Regulations applicable to CONTRACTOR’s
performance of the Work. Additionally, said review
or recommendation will not impose responsibility on
ENGINEER to make any examination to ascertain
how or for what purposes CONTRACTOR has used
the moneys paid on account of the Contract Price, or
to determine that title to any of the Work, materials,
or equipment has passed to OWNER free and clear
of any. Liens.
SEE ALSO SUPLEMENTARY CONDITIONS
(SECTION 00800)
5. | ENGINEER may refuse to recommend
the whole or any part of any payment if, in
ENGINEER’s opinion, it would be incorrect to
make the representations to OWNER referred to in
paragraph 14,02.B.2. ENGINEER may also refuse
to recommend any such payment or, because of
subsequently discovered evidence or the results of
subsequent inspections or tests, revise or revoke any
such payment recommendation previously made, to
such extent as may be necessary in ENGINEER’s
opinion to protect OWNER from loss because:
a. the Work is defective, or completed
Work has been damaged, requiring correction or
replacement;
b. the Contract Price has been reduced by
Written Amendment or Change Orders;
c. OWNER has been required to correct
defective Work or complete Work in accordance
with paragraph 13.09; or
d. ENGINEER has actual knowledge of the
occurrence of any of the events enumerated in
paragraph 15.02.A.
C. Payment Becomes Due
1. Ten days after presentation of the
Application for Payment to OWNER with
ENGINEER’s recommendation, the amount recom-
mended will (subject to the provisions of paragraph
14.02.D) become due, and when due will be paid by
OWNER to CONTRACTOR.
D. Reduction in Payment
1. OWNER may refuse to make payment of
the full amount recommended by ENGINEER
because:
a. claims have been made against OWNER
on account of CONTRACTOR’s performance or
furnishing of the Work;
b. Liens have been filed in connection with
the Work, except where CONTRACTOR has
delivered a specific Bond satisfactory to OWN-
ER to secure the satisfaction and discharge of
such Liens;
c. there are other items entitling OWNER to
a set off against the amount recommended; or
d. OWNER has actual knowledge of the
occurrence of any of the events enumerated in
General Conditions
Page 00700-38
paragraphs 14.02.B.5.a through 14.02.B.5.c or
paragraph 15.02.A.
2. If OWNER refuses to make payment of
the full amount recommended by ENGINEER,
OWNER must give CONTRACTOR immediate
written notice (with a copy to ENGINEER) stating
the reasons for such action and promptly pay
CONTRACTOR any amount remaining after
deduction of the amount so withheld. OWNER shall
promptly pay CONTRACTOR the amount so
withheld, or any adjustment thereto agreed to by
OWNER and CONTRACTOR, when
CONTRACTOR corrects to OWNER’s satisfaction
the reasons for such action.
3. If it is subsequently determined that
OWNER’s refusal of payment was not justified, the
amount wrongfully withheld shall be treated as an
amount due as determined by paragraph 14.02.C.1.
14.03 CONTRACTOR’s Warranty of Title
A. CONTRACTOR warrants and guarantees that title
to all Work, materials, and equipment covered by any
Application for Payment, whether incorporated in the
Project or not, will pass to OWNER no later than the time
of payment free and clear of all Liens.
14.04 Substantial Completion
A. When CONTRACTOR considers the entire Work
ready for its intended use CONTRACTOR shall notify
OWNER and ENGINEER in writing that the entire Work is
substantially complete (except for items specifically listed
by CONTRACTOR as incomplete) and request that
ENGINEER issue a certificate of Substantial Completion.
Promptly thereafter, OWNER, CONTRACTOR, and
ENGINEER shall make an inspection of the Work to
determine the status of completion. If ENGINEER does not
consider the Work substantially complete, ENGINEER will
notify CONTRACTOR in writing giving the reasons
therefore. If ENGINEER considers the Work substantially
complete, ENGINEER will prepare and deliver to OWNER
a tentative certificate of Substantial Completion which shall
fix the date of Substantial Completion. There shall be
attached to the certificate a tentative list of items to be
completed or corrected before final payment. OWNER
shall have seven days after receipt of the tentative certificate
during which to make written objection to ENGINEER as
to any provisions of the certificate or attached list. If, after
considering such objections, ENGINEER concludes that the
Work is not substantially complete, ENGINEER will within
14 days after submission of the tentative certificate to
OWNER notify CONTRACTOR in writing, stating the
reasons therefore. If, after consideration of OWNER’s
objections, ENGINEER considers the Work substantially
complete, ENGINEER will within said 14 days execute and
deliver to OWNER and CONTRACTOR a definitive
certificate of Substantial Completion (with a revised
tentative list of items to be completed or corrected)
reflecting such changes from the tentative certificate as
ENGINEER believes justified after consideration of any
objections from OWNER. At the time of delivery of the
tentative certificate of Substantial Completion ENGINEER
will deliver to OWNER and CONTRACTOR a written
recommendation as to division of responsibilities pending
final payment between OWNER and CONTRACTOR with
respect to security, operation, safety, and protection of the
Work, maintenance, heat, utilities, insurance, and warranties
and guarantees. Unless OWNER and CONTRACTOR
agree otherwise in writing and so inform ENGINEER in
writing prior to ENGINEER’s issuing the definitive
certificate of Substantial Completion, ENGINEER’s
aforesaid recommendation will be binding on OWNER and
CONTRACTOR until final payment.
B. OWNER shall have the right to exclude
CONTRACTOR from the Site after the date of Substantial
Completion, but OWNER shall allow CONTRACTOR
reasonable access to complete or correct items on the
tentative list.
14.05 Partial Utilization
A. Use by OWNER at OWNER’s option of any
substantially completed part of the Work which has
specifically been identified in the Contract Documents, or
which OWNER, ENGINEER, and CONTRACTOR agree
constitutes a separately functioning and usable part of the
Work that can be used by OWNER for its intended purpose
without significant interference with CONTRACTOR’s
performance of the remainder of the Work, may be
accomplished prior to Substantial Completion of all the
Work subject to the following conditions.
1. OWNER at any time may request CON-
TRACTOR in writing to permit OWNER to use any
such part of the Work which OWNER believes to be
ready for its intended use and substantially complete.
If CONTRACTOR agrees that such part of the
Work is substantially complete, CONTRACTOR
will certify to OWNER and ENGINEER that such
part of the Work is substantially complete and
request ENGINEER to issue a certificate of
Substantial Completion for that part of the Work.
CONTRACTOR at any time may notify OWNER
and ENGINEER in writing that CONTRACTOR
considers any such part of the Work ready for its
intended use and substantially complete and request
ENGINEER to issue a certificate of Substantial
Completion for that part of the Work. Within a
reasonable time after either such request, OWNER,
CONTRACTOR, and ENGINEER shall make an
inspection of that part of the Work to determine its
status of completion. If ENGINEER does not
General Conditions
Page 00700-39
consider that part of the Work to be substantially
complete, ENGINEER will notify OWNER and
CONTRACTOR in writing giving the reasons
therefore. If ENGINEER considers that part of the
Work to be substantially complete, the provisions of
paragraph 14.04 will apply with respect to
certification of Substantial Completion of that part
of the Work and the division of responsibility in
respect thereof and access thereto.
SEE SUPLEMENTARY CONDITIONS (SECTION
00800)
14.06 Final Inspection
A. Upon written notice from CONTRACTOR that
the entire Work or an agreed portion thereof is complete,
ENGINEER will promptly make a final inspection with
OWNER and CONTRACTOR and will notify CON-
TRACTOR in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective.
CONTRACTOR shall immediately take such measures as
are necessary to complete such Work or remedy such
deficiencies.
14.07 Final Payment
A. Application for Payment
1. After CONTRACTOR has, in the
opinion of ENGINEER, satisfactorily completed all
corrections identified during the final inspection and
has delivered, in accordance with the Contract
Documents, all maintenance and operating
instructions, schedules, guarantees, | Bonds,
certificates or other evidence of insurance
certificates of inspection, marked-up record
documents (as provided in paragraph 6.12), and
other documents, CONTRACTOR may make
application for final payment following the
procedure for progress payments.
2. The final Application for Payment shall
be accompanied (except as previously delivered) by:
(i) all documentation called for in the Contract
Documents, including but not limited to the
evidence of insurance required by subparagraph
5.04.B.7; (ii) consent of the surety, if any, to final
payment; and (iii) complete and legally effective
releases or waivers (satisfactory to OWNER) of all
Lien rights arising out of or Liens filed in connection
with the Work.
3. In lieu of the releases or waivers of Liens
specified in paragraph 14.07.A.2 and as approved by
OWNER, CONTRACTOR may furnish receipts or
releases in full and an affidavit of CONTRACTOR
that: (i) the releases and receipts include all labor,
services, material, and equipment for which a Lien
could be filed; and (ii) all payrolls, material and
equipment bills, and other indebtedness connected
with the Work for which OWNER or OWNER's
property might in any way be responsible have been
paid or otherwise satisfied. If any Subcontractor or
Supplier fails to furnish such a release or receipt in
full, CONTRACTOR may furnish a Bond or other
collateral satisfactory to OWNER to indemnify
OWNER against any Lien.
B. Review of Application and Acceptance
1. If, on the basis of ENGINEER’s observa-
tion of the Work during construction and final
inspection, and ENGINEER’s review of the final
Application for Payment and accompanying docu-
mentation as required by the Contract Documents,
ENGINEER is satisfied that the Work has been
completed and CONTRACTOR’s other obligations
under the Contract Documents have been fulfilled,
ENGINEER will, within ten days after receipt of the
final Application for Payment, indicate in writing
ENGINEER’s recommendation of payment and
present the Application for Payment to OWNER for
payment. At the same time ENGINEER will also
give written notice to OWNER and CON-
TRACTOR that the Work is acceptable subject to
the provisions of paragraph 14.09. Otherwise,
ENGINEER will return the Application for Payment
to CONTRACTOR, indicating in writing the reasons
for refusing to recommend final payment, in which
case CONTRACTOR shall make the necessary
corrections and resubmit the Application for
Payment.
C. Payment Becomes Due
1. Thirty days after the presentation to
OWNER of the Application for Payment and
accompanying documentation, the amount
recommended by ENGINEER will become due and,
when due, will be paid by OWNER to CON-
TRACTOR.
14.08 Final Completion Delayed
A. If, through no fault of CONTRACTOR, final
completion of the Work is significantly delayed, and if
ENGINEER so confirms, OWNER shall, upon receipt of
CONTRACTOR’s final Application for Payment and
recommendation of ENGINEER, and without terminating
the Agreement, make payment of the balance due for that
General Conditions
Page 00700-40
portion of the Work fully completed and accepted. If the
remaining balance to be held by OWNER for Work not
fully completed or corrected is less than the retainage
stipulated in the Agreement, and if Bonds have been
furnished as required in paragraph 5.01, the written consent
of the surety to the payment of the balance due for that
portion of the Work fully completed and accepted shall be
submitted by CONTRACTOR to ENGINEER with the
Application for such payment. Such payment shall be made
under the terms and conditions governing final payment,
except that it shall not constitute a waiver of Claims.
14.09 Waiver of Claims
A. The making and acceptance of final payment will
constitute:
1, a waiver of all Claims by OWNER
against CONTRACTOR, except Claims arising
from unsettled Liens, from defective Work
appearing after final inspection pursuant to
paragraph 14.06, from failure to comply with the
Contract Documents or the terms of any special
guarantees specified therein, or from
CONTRACTOR’s continuing obligations under the
Contract Documents; and
2. a waiver of all Claims by CONTRAC-
TOR against OWNER other than those previously
made in writing which are still unsettled.
ARTICLE 15 - SUSPENSION OF WORK AND
TERMINATION
15.01 OWNER May Suspend Work
A. At any time and without cause, OWNER may
suspend the Work or any portion thereof for a period of not
more than 90 consecutive days by notice in writing to
CONTRACTOR and ENGINEER which will fix the date
on which Work will be resumed. CONTRACTOR shall
resume the Work on the date so fixed. CONTRACTOR
shall be allowed an adjustment in the Contract Price or an
extension of the Contract Times, or both, directly
attributable to any such suspension if CONTRACTOR
makes a Claim therefor as provided in paragraph 10.05.
15.02 OWNER May Terminate for Cause
A. The occurrence of any one or more of the
following events will justify termination for cause:
L. CONTRACTOR’s persistent failure to
perform the Work in accordance with the Contract
Documents (including, but not limited to, failure to
supply sufficient skilled workers or suitable materi-
als or equipment or failure to adhere to the progress
schedule established under paragraph 2.07 as:
adjusted from time to time pursuant to paragraph
6.04);
2. CONTRACTOR’s disregard of Laws or
Regulations of any public body having jurisdiction,
3. CONTRACTOR’s disregard of the
authority of ENGINEER; or
4. CONTRACTOR’s violation in any
substantial way of any provisions of the Contract
Documents.
B. Ifone or more of the events identified in paragraph
15.02.A occur, OWNER may, after giving CONTRACTOR
(and the surety, if any) seven days written notice, terminate
the services of CONTRACTOR, exclude CONTRACTOR
from the Site, and take possession of the Work and of all
CONTRACTOR’s tools, appliances, construction equip-
ment, and machinery at the Site, and use the same to the full
extent they could be used by CONTRACTOR (without
liability to CONTRACTOR for trespass or conversion),
incorporate in the Work all materials and equipment stored
at the Site or for which OWNER has paid CONTRACTOR
but which are stored elsewhere, and finish the Work as
OWNER may deem expedient. In such case,
CONTRACTOR shall not be entitled to receive any further
payment until the Work is finished. If the unpaid balance of
the Contract Price exceeds all claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
sustained by OWNER arising out of or relating to
completing the Work, such excess will be paid to
CONTRACTOR. If such claims, costs, losses, and
damages exceed such unpaid balance, CONTRACTOR
shall pay the difference to OWNER. Such claims, costs,
losses, and damages incurred by OWNER will be reviewed
by ENGINEER as to their reasonableness and, when so
approved by ENGINEER, incorporated in a Change Order.
When exercising any rights or remedies under this
paragraph OWNER shall not be required to obtain the
lowest price for the Work performed.
C. Where CONTRACTOR’s services have been so
terminated by OWNER, the termination will not affect any
rights or remedies of OWNER against CONTRACTOR
then existing or which may thereafter accrue. Any retention
or payment of moneys due CONTRACTOR by OWNER
will not release CONTRACTOR from liability.
15.03 OWNER May Terminate For Convenience
A. Upon seven days written notice to CON-
TRACTOR and ENGINEER, OWNER may, without cause
and without prejudice to any other right or remedy of
General Conditions
Page 00700-41
OWNER, elect to terminate the Contract. In such case,
CONTRACTOR shall be paid (without duplication of any
items):
1. for completed and acceptable Work
executed in accordance with the Contract Docu-
ments prior to the effective date of termination,
including fair and reasonable sums for overhead and
profit on such Work;
2. for expenses sustained prior to the
effective date of termination in performing services
and furnishing labor, materials, or equipment as
required by the Contract Documents in connection
with uncompleted Work, plus fair and reasonable
sums for overhead and profit on such expenses;
3. for all claims, costs, losses, and damages
(including but not limited to all fees and charges of
engineers, architects, attorneys, and other
professionals and all court or arbitration or other
dispute resolution costs) incurred in settlement of
terminated contracts with Subcontractors, Suppliers,
and others; and
4. for reasonable expenses directly
attributable to termination.
B. CONTRACTOR shall not be paid on account of
loss of anticipated profits or revenue or other economic loss
arising out of or resulting from such termination.
15.04 CONTRACTOR May Stop Work or Terminate
A. If, through no act or fault of CONTRACTOR, the
Work is suspended for more than 90 consecutive days by
OWNER or under an order of court or other public
authority, or ENGINEER fails to act on any Application for
Payment within 30 days after it is submitted, or OWNER
fails for 30 days to pay CONTRACTOR any sum finally
determined to be due, then CONTRACTOR may, upon
seven days written notice to OWNER and ENGINEER, and
provided OWNER or ENGINEER do not remedy such
suspension or failure within that time, terminate the
Contract and recover from OWNER payment on the same
terms as provided in paragraph 15.03. In lieu of terminating
the Contract and without prejudice to any other right or
remedy, if ENGINEER has failed to act on an Application
for Payment within 30 days after it is submitted, or
OWNER has failed for 30 days to pay CONTRACTOR any
sum finally determined to be due, CONTRACTOR may,
seven days after written notice to OWNER and
ENGINEER, stop the Work until payment is made of all
such amounts due CONTRACTOR, including interest
thereon. The provisions of this paragraph 15.04 are not
intended to preclude CONTRACTOR from making a Claim
under paragraph 10.05 for an adjustment in Contract Price
or Contract Times or otherwise for expenses or damage
directly attributable to CONTRACTOR’s stopping the
Work as permitted by this paragraph.
ARTICLE 16 - DISPUTE RESOLUTION
16.01 Methods and Procedures
A. Dispute resolution methods and procedures, if any,
shall be as set forth in the Supplementary Conditions. If no
method and procedure has been set forth, and subject to the
provisions of paragraphs 9.09 and 10.05, OWNER and
CONTRACTOR may exercise such rights or remedies as
either may otherwise have under the Contract Documents or
by Laws or Regulations in respect of any dispute.
ARTICLE 17 - MISCELLANEOUS
17.01 Giving Notice
A. Whenever any provision of the Contract
Documents requires the giving of written notice, it will be
deemed to have been validly given if delivered in person to
the individual or to a member of the firm or to an officer of
the corporation for whom it is intended, or if delivered at or
sent by registered or certified mail, postage prepaid, to the
last business address known to the giver of the notice.
17.02 Computation of Times
A. When any period of time is referred to in the
Contract Documents by days, it will be computed to exclude
the first and include the last day of such period. If the last
day of any such period falls on a Saturday or Sunday or on a
day made a legal holiday by the law of the applicable
jurisdiction, such day will be omitted from the computation.
17.03 Cumulative Remedies
A. The duties and obligations imposed by these
General Conditions and the rights and remedies available
hereunder to the parties hereto are in addition to, and are not
to be construed in any way as a limitation of, any rights and
remedies available to any or all of them which are otherwise
imposed or available by Laws or Regulations, by special
warranty or guarantee, or by other provisions of the
Contract Documents, and the provisions of this paragraph
will be as effective as if repeated specifically in the Contract
Documents in connection with each particular duty,
obligation, right, and remedy to which they apply.
17.04 Survival of Obligations
A. All representations, indemnifications, warranties,
and guarantees made in, required by, or given in accordance
General Conditions
Page 00700-42
with the Contract Documents, as well as all continuing
obligations indicated in the Contract Documents, will
survive final payment, completion, and acceptance of the
Work or termination or completion of the Agreement.
17.05 Controlling Law
A. This Contract is to be governed by the law of the
state in which the Project is located.
General Conditions
Page 00700-43
SECTION 00800
SUPPLEMENTARY CONDITIONS
These Supplementary Conditions amend or supplement the Standard General Conditions of the
Construction Contract (No. 1910-8, 1996 ed.) and other provisions of the Contract Documents as indicated
below. All provisions which are not so amended or supplemented remain in full force and effect.
The terms used in these Supplementary Conditions have the meanings assigned to them in the
General Conditions. Additional terms used in these Supplementary Conditions have the meanings
indicated below, which are applicable to both the singular and plural thereof.
SC-2.02 OWNER shall furnish to CONTRACTOR up to four (4) copies of the Contract Documents
as are reasonably necessary for the execution of the Work. Additional copies will be furnished, upon
request, at the cost of reproduction.
SC-2.04 CONTRACTOR shall start to perform the Work on the date when the Contract Time
commences to run, but no Work shall be done at the site prior to the Effective Date of the Agreement.
SC-2.05.C | The CONTRACTOR shall furnish the ENGINEER with five (5) copies of Certificates of
Insurance on all required policies of insurance showing limits of liability as specified. All policies must
provide thirty (30) days advance notice to the OWNER and ENGINEER in the event of cancellation,
expiration or alteration. Each certificate shall be accompanied by a notarized statement itemizing each and
every exclusion of the policy. All certificates shall be submitted with the Agreement for execution.
SC-2.06 Within twenty (20) days after the Effective Date of the Agreement, a conference attended
by CONTRACTOR, ENGINEER and others as appropriate may be held to establish a working
understanding among the parties as to the work and to discuss the schedules referred to in paragraph 2.05.B
of the General Conditions, procedures for handling Shop Drawings and other submittals, processing
Applications for Payment, and maintaining required records.
SC-2.07 If requested by the OWNER or ENGINEER, at least ten (10) days before submission of the
first Application for Payment a conference attended by CONTRACTOR, ENGINEER and others as
appropriate will be held to review for acceptability to ENGINEER as provided below the schedules
submitted in accordance with paragraph 2.05.B of the General Conditions. CONTRACTOR shall have
an additional ten (10) days to make corrections and adjustments and to complete and resubmit the
schedules. No progress payment shall be made to CONTRACTOR until the schedules are submitted to
and acceptable to ENGINEER as provided below. The progress schedule will be acceptable to ENGINEER
as providing an orderly progression of the Work to completion within any specified Milestones and the
Contract Times, but such acceptance will neither impose on ENGINEER responsibility for the sequencing,
scheduling or progress of the Work nor interfere with or relieve CONTRACTOR from CONTRACTOR's
full responsibility therefor. CONTRACTOR's schedule of Shop Drawing and Sample submissions will be
acceptable to ENGINEER as providing a workable arrangement for reviewing and processing the required
submittals.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00800-1 Job No. 41-459
Contractors schedule of values will be acceptable to Engineer as to form and substance if it provides a
reasonable allocation of the contract price to component parts of the work.
SC-3.01 In the event of aconflict between the various items which make up the Contract Documents,
the following Hierarchy of Documents shall prevail:
Contract Change Orders
Addenda
Special Conditions
Agreement
Instructions To Bidders
Supplementary Conditions
General Conditions
Technical Specifications
Drawings.
WPAN NAMNR WN
SC-4.02 When reports of subsurface explorations and tests at the project site are included in the
Bidding Documents, the CONTRACTOR may rely upon the accuracy of the Technical Data contained in
such reports as per paragraphs 4.02.B of the General Conditions. Information included in such reports
which may be considered Technical Data are: The Boring Method, Plan and Logs, Level of Subsurface
Water, Laboratory Test Methods and Results and Similar Factual Data, all as of the dates made. These
reports are not part of the Contract Documents, but the Technical Data contained therein upon which the
CONTRACTOR is entitled to rely as provided in G.C. 4.02 as identified above are incorporated therein
by reference.
SC-4.03, 4.04 The plans show certain features of the topography and certain underground utilities,
but they do not purport to show in detail all such lines or obstructions. Such topography and notes on the
plans were inserted from records available and are for the CONTRACTOR's convenience only, and shall
not be used as basis for any claims of extra compensation.
All pipes or other underground utilities shall be maintained in continuous service where possible and shall
be properly protected and supported. In no case shall interruptions to utilities be allowed to exist outside
of working hours.
Prior to starting the work, the proper authorities of all utilities shall be notified by the Contractor and the
Contractor shall cooperate in every way possible with these authorities. Whenever necessary to determine
the location of existing pipes, valves or other underground structures, the CONTRACTOR shall examine
all available records and shall make all explorations and excavations necessary for such purpose.
SC-5.01 Add the following new paragraph immediately after paragraph 5.01.C of the General
Conditions:
D. Prior to commencing work, payment and performance bonds required by this contract shall be filed
in the public records of the county where said is performed pursuant to the requirements of Title
XVIII, Section 255.05, Florida Statutes.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00800-2 Job No. 41-459
SC-5.04 Add the following new paragraph immediately after paragraph 5.04.B of the General
Conditions:
C. The limits of liability for the insurance required by paragraph 5.04 of the General Conditions
shall provide coverage for not less than the following amounts or greater where required by Laws and
Regulations:
1. Workers' Compensation and related coverages under paragraphs 5.04.A.1 and 5.04.A.2 of the
General Conditions:
a.) State: Statutory
b.) Applicable Federal (e.g. Longshoreman's): Statutory
c.) Employer’s Liability $1,000,000
2. CONTRACTOR 's Liability Insurance under paragraphs 5.04.A.3 through A.6 of the General
Conditions which shall also include completed operations and product liability coverages and eliminate the
exclusion with respect to property under the care custody and control of the CONTRACTOR:
a.) General Aggregate
(Except Products - Completed Operations) $2,000,000
b.) Products - Completed Operations Aggregate $2,000,000
c.) Personal and Advertising
Injury (Per Person/Organization) $1,000,000
d.) Each Occurrence
(Bodily Injury and Property Damage) $1,000,000
e.) Property Damage Liability Insurance will provide Explosion,
Collapse and Underground coverages where applicable.
f.) Excess Liability
General Aggregate $2,000,000
Each Occurrence $2,000,000
3. Automobile Liability:
a.) Bodily Injury: $1,000,000 Each Person
$1,000,000 Each Accident
b.) Property Damage: $500,000 Each Accident
OR
c.) Combined Single Limit
Repair & Paint
Countryview & Bluewater Tanks (2014) 00800-3 Job No. 41-459
(Bodily Injury and Property Damage): $2,000,000 Each Accident
4. In addition to the requirements of Paragraph 5.04.B.1 of the General Conditions concerning
the naming of the Owner, Engineer, and Engineer's consultants as additional insureds under the
CONTRACTOR's General Liability Policy. Also, the CONTRACTOR shall at his expense provide an
OWNER's and CONTRACTOR's Protective Liability Policy issued in the name of the OWNER and
ENGINEER covering the CONTRACTOR's obligations under Paragraph 5.04.B.4 of the General
Conditions. Coverage shall be provided under this policy for not less than the following amounts:
(1) Bodily Injury: $1,000,000 Each Occurrence
(2) Property Damage: $1,000,000 Each Occurrence
$1,000,000 Annual Aggregate
SC-5.07
A. OWNER and CONTRACTOR intend that all policies purchased in accordance with paragraphs SC
5.06 will protect OWNER, CONTRACTOR, Subcontractors, ENGINEER, ENGINEER's Consultants and:
all other persons or entities identified in the Supplementary Conditions to be listed as insured or additional
insureds (and the officers, directors, partners, employees, agents, and other consultants and subcontractors
of each and any of them) in such policies and will provide primary coverage for all losses and damages
caused by the perils or causes of loss covered thereby. All such policies shall contain provisions to the
effect that in the event of payment of any loss or damage the insurers will have no rights of recovery against
any of the insureds or additional insureds thereunder. OWNER and CONTRACTOR waive all rights
against each other and their respective officers, directors, partners, employees, agents and other consultants
and subcontractors of each and any of them for all losses and damages caused by, arising out of or resulting
from any of the perils covered by such policies and any other property insurance applicable to the Work;
and, in addition, waive all such rights against Subcontractors, ENGINEER, ENGINEER's Consultants and
all other individuals or entities identified in the Supplementary Conditions to be listed as insureds or
additional insureds (and the officers, directors, partners, employees, agents, and other consultants and
subcontractors of each and any of them) under such policies for losses and damages so caused. None of
the above waivers shall extend to the rights that any party making such waiver may have to the proceeds
of insurance held by CONTRACTOR as trustee or otherwise payable under any policy so issued.
B. In addition, OWNER waives all rights against CONTRACTOR, Subcontractors, ENGINEER,
ENGINEER's Consultants and the officers, directors, partners, employees and agents and other consultants
and subcontractors of each and any of them, for:
1. loss due to business interruption, loss of use or other consequential loss extending beyond direct
physical loss or damage to OWNER's property or the Work caused by, arising out of or resulting from fire
or other peril, whether or not insured by OWNER; and
2. loss or damage to the completed Project or part thereof caused by, arising out of or resulting from
fire or other insured peril covered by any property insurance maintained on the completed Project or part
thereof by OWNER during partial utilization pursuant to paragraph 14.05, after substantial completion
pursuant to paragraph 14.04 or after final payment pursuant to paragraph 14.07.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00800-4 Job No. 41-459
C. Any insurance policy maintained by CONTRACTOR covering any loss, damage or consequential
loss referred to in this paragraph SC 5.07.B shall contain provisions to the effect that in the event of
payment of any such loss, damage or consequential loss the insurers will have no rights of recovery against
OWNER, Subcontractors, ENGINEER, ENGINEER's Consultants and the officers, directors, partners,
employees, agents and other consultants and subcontractors of each and any of them.
SC-6.06.B |The CONTRACTOR, or apparent successful Bidder, shall identify Subcontractors,
Suppliers, or other persons or organizations as follows:
1) Prior to the Effective Date of the Agreement, the apparent Successful Bidder shall within
seven (7) days of the receipt of a Written Request from the OWNER or the ENGINEER
identify Subcontractors, Suppliers, or others specifically requested. Should such
identification be required, attention is directed to Article 12 of the Information For Bidders.
2) Within thirty (30) days following the Effective Date of the Agreement, all Subcontractors
shall be identified.
SC-6.06.C | OWNERorENGINEER may furnish to any such Subcontractor, Supplier or other individual
or entity, to the extent practicable, information about amounts paid to CONTRACTOR on account of work
performed for Contractor by a particular Subcontractor, supplier, or other individual or entity.
SC-6.13 The following paragraphs shall apply in addition to the requirements in 6.13 of the General
Conditions:
CONTRACTOR agrees to waive any claim against OWNER and OWNER’ s agents, architects, engineers,
consultants, and their employees acting within the scope of their duties, and to defend, indemnify, and hold
them harmless from any claim or liability for injury or loss that allegedly arises from CONTRACTOR’s
performance of the work described herein. CONTRACTOR will require all SUBCONTRACTORS to
conform with this provision before they start any work. CONTRACTOR shall insure this provision in
conformity with the insurance provisions of this CONTRACT.
Until final acceptance of the Work by the ENGINEER as evidenced by approval of the final estimate, the
Work shall be in the custody and under the charge and care of the CONTRACTOR and he shall take every
necessary precaution against injury or damage to any part thereof by the action of the elements or from any
other cause, whether arising from execution or from the non-execution of the Work, unless otherwise
provided for elsewhere in the Specifications or Contract. The CONTRACTOR shall rebuild, repair, restore
and make good, without extra compensation, all injuries or damages to any portion of the work occasioned
by any of the above causes before its completion and acceptance, and shall bear the expenses thereof. In
case of suspension of the Work from any cause whatever, the CONTRACTOR shall be responsible for all
materials and equipment and shall properly store them if necessary and shall provide suitable shelter from
damage and shall erect temporary structures where necessary.
SC-11.03.C | Paragraph 11.03.C of the General Conditions is hereby deleted in its entirety and the
following is substituted in its place:
"C. The unit price of an item of Unit Price Work shall be subject to reevaluation and adjustment under
the following conditions:
Repair & Paint
Countryview & Bluewater Tanks (2014) 00800-5 Job No. 41-459
1. If the total cost of a particular item of Unit Price Work amounts to five percent (5%) or more of the
Contract Price and the variation in the quantity of that particular item of Unit Price Work performed by
Contractor differs by more than twenty-five percent (25%) from the estimated quantity of such item
indicated in the Agreement; and
2. If there is no corresponding adjustment with respect to any other item of Work; and
3. If CONTRACTOR believes that it has incurred additional expense as a result thereof; or if OWNER
believes that the quantity variation entitles it to an adjustment in the Unit Price, either OWNER or
CONTRACTOR may make a claim for an adjustment in the Contract Price in accordance with Article 10
if the parties are unable to agree as to the effect of any such variations in the quantity of Unit Price Work
performed."
SC-13.03.B CONTRACTOR shall employ and pay for the services of an independent testing laboratory
acceptable to the OWNER and the ENGINEER to perform all inspections, tests, or approvals required by
the Contract Documents except:
1. that costs incurred in connection with tests or inspections conducted pursuant to paragraph 13.04.B
of the General Conditions shall be paid as provided in said paragraph 13.04.B; and
2. as otherwise specifically provided in the Contract Documents.
14.02.B.5 In addition to reasons listed in G.C. 14.02.B.5.a through 14.02.B.5.d, the ENGINEER may
refuse to recommend the whole or any part of any payment to the CONTRACTOR because liability for
liquidated damages has been incurred by the CONTRACTOR.
S.C.-14.05.A Add the following new paragraph immediately after paragraph 14.05.A.1 which is to read
as follows:
2. OWNER may at any time request CONTRACTOR in writing to permit OWNER to take over
operation of any such part of the Work although it is not substantially complete. A copy of such request
will be sent to ENGINEER and within a reasonable time thereafter OWNER, CONTRACTOR and
ENGINEER shall make an inspection of that part of the Work to determine its status of completion and will
prepare a list of the items remaining to be completed or corrected thereon before final payment. If
CONTRACTOR does not object in writing to OWNER and ENGINEER that such part of the Work is not
ready for separate operation by OWNER, ENGINEER will finalize the list of items to be completed or
corrected and will deliver such lists to OWNER and CONTRACTOR together with a written
recommendation as to the division of responsibilities pending final payment between OWNER and
CONTRACTOR with respect to security, operation, safety, maintenance, utilities, insurance, warranties
and guarantees for that part of the Work which will become binding upon OWNER and CONTRACTOR
at the time when OWNER takes over such operation (unless they shall have otherwise agreed in writing
and so informed ENGINEER). During such operation and prior to Substantial Completion of such part of
the Work, OWNER shall allow CONTRACTOR reasonable access to complete or correct items on said list
and to complete other related Work.
Repair & Paint
Countryview & Bluewater Tanks (2014) 00800-6 Job No. 41-459
SC-17.01 In addition to the provisions of paragraph 17.01 of the General Conditions, written Notice
- tothe CONTRACTOR shall be deemed to have been given if delivered in person to the CONTRACTOR's
authorized representative on the project site.
END OF SECTION 00800
Repair & Paint
Countryview & Bluewater Tanks (2014) 00800-7 Job No. 41-459
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.1
1.2
1.3
1.4
1.5
WORK COVERED BY CONTRACT DOCUMENTS
Work includes the repair, surface preparation and painting the 300,000 gallon Bluewater
Tank and the 200,000 gallon Countryview Tank including erecting and maintaining a
containment system.
WORK SEQUENCE
Work sequence shall generally be determined by the contractor. However, each tank is in
a separate service area and both may be taken out of service simultaneously.
CONTRACTOR'S USE OF PREMISES
Contractor shall limit his use of the premises for work and for storage.
Contractor shall coordinate use of premises under direction of Owner.
Contractor shall assume full responsibility for the protection and safekeeping of products
under this contract, stored on the site.
Contractor shall move any stored products, under Contractor's control, which interfere with
operations of the Owner.
OWNER OCCUPANCY
Owner will occupy the premises during the entire period of construction for the conduct
of his normal operations. Cooperate with Owner's Representative in all construction
operations to minimize conflict, and to facilitate Owner usage.
SUBSTITUTION OF EQUIPMENT AND MATERIALS
In the Plans and Specifications, certain equipment and materials are identified by
manufacturer in order to establish the quality expected by the Owner and Engineer.
Equipment of equal or better quality may be substituted for those named at the Contractor's
option with the stipulations described below. If this equipment is subsequently
Repair & Paint
Countryview & Bluewater Tanks (2014) 01010-1 Job No. 41-459
disapproved, the Contractor shall resubmit until the equipment he proposes is approved.
The Engineer shall be the final authority on equality.
This substitution paragraph does not apply to those pieces of equipment identified by a
manufacturer followed by the words "to match existing."
Where equipment is identified by manufacturer, the first name appearing on the Plans is
the name of the manufacturer around which the facility was designed. The second name
is a manufacturer known to the Engineer to produce a similar piece of equipment of equal
quality. As described above, the Contractor may choose to install another manufacturer's
equipment. If the Contractor chooses to install any piece of equipment other than the first
named, any modifications or additional components required to provide a complete and
satisfactory installation shall be provided by the Contractor at no additional expense to the
Owner.
END OF SECTION 01010
Repair & Paint
Countryview & Bluewater Tanks (2014) 01010 -2 Job No. 41-459
SECTION 01060
REGULATORY REQUIREMENTS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Permits and Responsibilities.
The Contractor shall, without additional expense to the Owner, be responsible for
obtaining any necessary licenses and permits, and for complying with any applicable
Federal, State and municipal laws, codes, ordinances and regulations, in connection with
the prosecution of the Work. He shall take proper safety and health precautions to protect
the Work, the workers, the public and the property of others. He shall also be responsible
for all materials delivered and work performed until completion and acceptance of the
Work, except for any completed unit of construction thereof which may heretofore have
been accepted.
END OF SECTION 01060
Repair & Paint
Countryview & Bluewater Tanks (2014) Job No. 41-459
SECTION 1300
SUBMITTALS
PART 1 - GENERAL
1.1 DESCRIPTION AND REQUIREMENTS
A. Type of Submittals. This Section of the Specifications describes the procedures for
submittals of Schedule of Submittals, Schedule of Construction, Insurance Certificates, List
of Subcontractors, Anticipated Payment Schedules, Shop Drawings, Product Data,
Samples, and miscellaneous work-related submittals.
B. Related Work Specified Elsewhere:
1. Definitions and Additional Responsibilities of Parties:
a. Section 00700: General Conditions
b. — Section 00800: Supplementary Conditions.
C. Submittal Contents. The submittal contents required are specified in each section and in
this specification.
D. Definitions. Submittals are categorized as follows:
1. Shop Drawings:
a. Shop drawings shall include technical data, drawings, diagrams, performance
curves, schedules, templates, patterns, reports, calculations, instructions,
measurements and similar information as applicable to the specific item for
which the shop drawing is prepared.
b. Provide newly-prepared information, on reproducible sheets, with graphic
information at accurate scale (except as otherwise indicated) or appropriate
number of prints hereof, with name of preparer (firm name) indicated. The
Contract Drawings shall not be traced or reproduced by any method for use as
or in lieu of detail shop drawings. Show dimensions and note which are based
on field measurement. Identify materials and products in the work shown.
Indicate compliance with standards and special coordination requirements. Do
not allow shop drawing copies without appropriate final "Action" markings by
the Engineer to be used in connection with the Work.
2. Product Data:
a. Product data includes standard printed information on materials, products and
systems, not specially prepared for this project, other than the designation of
selections from among available choices printed therein.
Repair & Paint
Countryview & Biuewater Tanks (2014) 01300-1 Job No. 41-459
b. Collect required data into one submittal for each unit of work or system, and
clearly mark each copy to show which choices and options are applicable to
project. Include manufacturer's standard printed recommendations for
application and use, compliance with standards, application of labels and seals,
notation of field measurements which have been checked, and special
coordination requirements.
c. Show all performance characteristics, capacities, clearances required, and
wiring or piping diagrams. Supplement standard information to provide all
information specifically applicable to work.
3. Samples:
a. | Samples include both fabricated and unfabricated physical examples of
materials, products and units of work, both as complete units and as smaller
portions of units of work, either for limited visual inspection or (where
indicated) for more detailed testing and analysis.
b. Provide units identical with final condition of proposed materials or products
for the work. Include "range" samples (not less than three (3) units) where
unavoidable variations must be expected, and describe or identify variations
between units of each set. Provide full set of optional samples where the
Engineer's selection is required. Prepare samples to match the Engineer's
sample where indicated. Include information with each sample to show generic
description, source or product name and manufacturer, limitations, and
compliance with standards. Samples are submitted for review and confirmation
of "kind" by the Engineer. Engineer will not "test" samples (expect as
otherwise indicated) for other requirements, which are the exclusive
responsibility of the Contractor.
c. | Samples shall be of sufficient size to clearly indicate functional characteristics
of the products and full range of color, texture, and pattern.
4. Miscellaneous submittals related directly to the work (non-administrative) include
warranties, maintenance agreements, workmanship bonds, project photographs,
survey data and reports, physical work records, statements of applicability, quality
testing and certifying reports, copies of industry standards, record drawings, field
measurement data, operating and maintenance materials, and similar information,
devices and materials applicable to the Work but not processed as shop drawings,
product data or samples.
E. List of Required Submittals:
No. Description Section No.
1. List of Subcontractors 00100
2. Insurance Certificates 00700
3. Schedule of Construction 00700
5. Anticipated Payment Schedules 00700
6. Advertisement of Completion (Affidavit) 00800
7. Contractor’s Release of Liens 00800
Repair & Paint .
Countryview & Bluewater Tanks (2014) 01300-2 Job No. 41-459
1.2 GENERAL SUBMITTAL REQUIREMENTS
i D
A. Scheduling. Where appropriate in various required administrative submittals (listings of
products, manufacturers, supplier and subcontractors, and in job progress schedule), show
principle work-related submittal requirements and time schedules for coordination and
integration of submittal activity with related work in each instance.
B. Coordination of Submittal Times. Prepare and transmit each submittal to the Engineer
sufficiently in advance of performing related work or other applicable activities, so the
installation will not be delayed or improperly sequenced by processing times, including
non-approval and resubmittal (if required). Coordinate with other submittals, testing,
purchasing, delivery and similar sequenced activities. No extension of time will be
authorized because of Contractor's failure to transmit submittals to the Engineer sufficiently
in advance of the work.
C. Sequencing Requirements. As applicable in each instance, do not proceed with a unit of
work until submittal procedures have been sequenced with related units of work, in a
manner which will ensure that the action will not need to be later modified or rescinded by
reason of a subsequent submittal which should have been processed earlier or concurrently
for coordination.
Preparation of Submittals. Provide permanent marking on each submittal to identify
project, date, Contractor, subcontractor, submittal name and similar information to
distinguish it from other submittals. Show Contractor's executed review and approval
marking and provide space for the Engineer's "Action" marking. Package each submittal
appropriately for transmittal and handling. Submittals which are received from sources
other than through the Contractor's office will be returned “without action".
E. Transmittal Identification.
1. | Number transmittals in sequence for each Division of the Specifications. The number
before the dash indicates the Section of the Specifications, and the number after the
dash is the sequence number of the transmittal (15140-1 would be the first transmittal
applicable to Section 15140 of the Specifications. 15140-2 would be the second
transmittal for Section 15140, etc.).
2. Identify resubmittals with a letter of the alphabet following the original number,
using A for the first resubmittal, B for the second resubmittal, etc. A resubmittal
affecting transmittal 15140-1 would then be numbered 15140-1A. The 15140-1
would then be entered in the space "Previous Transmittal Number", which is left
blank except on resubmittals.
1.3 SPECIFIC CATEGORY REQUIREMENTS
Repair & Paint
Countryview & Bluewater Tanks (2014) 01300-3 Job No. 41-459
A. General. Except as otherwise indicated in the individual work sections, comply with
general requirements specified herein for each indicated category of submittal.
1. Submittals shall be accompanied by a cover sheet which shall contain:
The date of submission and the dates of any previous submissions.
The Project title and number.
Date.
Contract No.
The names of the:
1) Contractor
2) Supplier
3) Manufacturer
Identification of the product, with the Specification Section number.
A list of all the sheets included in the submittal.
Field dimensions, clearly identified as such.
Relation to adjacent or critical features of the work or materials.
Applicable standards, such as ASTM or Federal Specification numbers.
Notification to the Engineer in writing, at time of submission, of any deviations
on the submittals from requirements of the Contract Documents.
Identification of revisions on resubmittals.
An 8" x 3" blank space for Contractor and Engineer stamps.
Contractor's stamp, initialed or signed, certifying to review of submittal,
verification of products, field measurements and field construction criteria, and
coordination of the information within the submittal with requirements of the
Work and of Contract Documents.
o. Submittal sheets or drawings showing more than the particular item under
consideration shall have all but the pertinent description of the item for which
review is requested crossed out. .
Pp Be sp
wo Ege re
Bog
1.4 CONTRACTOR RESPONSIBILITIES
A. Inaddition to any other requirements of this section, the Contractor shall be responsible to:
1. Review shop drawings, product data and samples prior to submission.
Determine and verify:
a. Field measurements.
b. Field construction criteria and required clearances.
c. Catalog numbers and similar data.
d. Conformance with specifications.
3. Coordinate each submittal with requirements of the work and of the Contract
Documents.
4. Notify the Engineer in writing, at time of submission, of any deviations in the
submittals from requirements of the Contract Documents.
Repair & Paint
Countryview & Bluewater Tanks (2014) 01300-4 Job No. 41-459
5. Begin no fabrication or work which requires submittals until return of submittals
with Engineer approval.
1.5 ROUTING OF SUBMITTALS
A. Submittals and routine correspondence shall be routed as follows:
1. Supplier to Contractor (through representative if applicable) for detailed review.
Contractor to Consulting Engineer for review or comment.
3. Consulting Engineer to Contractor.
4. Contractor to Field Office and Supplier.
1.6 SUBMITTAL COPIES REQUIRED
A. Shop Drawings, Product Data, and Miscellaneous Submittals. All released submittals will
be distributed as follows:
1. For Polyengineering, Inc.
2. For Owner
3. For Contractor
TOTAL
2 copies
2 copies
3 copies
7 copies
B. To the above number may be added additional copies as required by the Contractor.
C. The Engineer will mark all copies of each shop drawing. One will be retained in the
Engineer's office, one sent to the Field Inspection office, one will be retained for the Owner
and the remaining copies sent to the Contractor for his records and distribution.
D. For non-approval items, such as parts lists, five (5) copies are required, unless specified
otherwise:
1. For Polyengineering, Inc. File
2. For Owner Plant Maintenance Division File
3. | For Owner Operating Division File
TOTAL
E. Samples:
2 copies
2 copies
1 copy
5 copies
1. | Submittal. At Contractor's option, provide preliminary submittal of a single set of
samples for the Engineer's review and "action." Otherwise, initial submittal is final
submittal unless returned with "action" which requires resubmittal. Submit two (2)
sets of samples in final submittal; one set will be returned.
Repair & Paint
Countryview & Bluewater Tanks (2014) 01300-5
Job No. 41-459
2.
Quality Control Set. Maintain returned final set of samples at project site, in suitable
condition and available for quality control comparisons by Engineer and by others.
1.7 REVIEW OF SUBMITTALS
A. Review Time. Allow a minimum of two (2) weeks for the Engineer's initial processing of
each submittal requiring review and response, except allow longer periods where
processing must be delayed for coordination with subsequent submittals or when a
sufficiently large number of submittals are sent during a short period. The Engineer will
advise the Contractor promptly when it is determined that a submittal being processed must
be delayed. Allow two weeks for reprocessing each submittal. Advise the Engineer on each
submittal as to whether processing time is critical to progress of the work, and therefore the
work would be expedited if processing time could be foreshortened.
B. Engineer's Action.
1.
Final Unrestricted Release. Work may proceed, provided it complies with contract
documents, when submittal is returned with the following:
a. Marking: "A" - No Exceptions Taken.
Final-But-Restricted Release. Work may proceed, provided it complies with
notations and corrections on submittal and with contract documents, when submittal
is returned with the following:
a. Marking: "B" - Exceptions Taken as Noted.
Returned for Resubmittal. Do not proceed with Work. Revise submittal in
accordance with notations thereon, and resubmit without delay to obtain a different
action marking. Do not allow submittals with the following marking (or unmarked
submittals where a marking is required) to be used in connection with performance
of the work.
a. Marking: "C" - Revise and resubmit.
b. Marking: "D" - Rejected - Does Not Comply with Project Requirements.
Only three (3) copies of items marked "C" or "D" will be reviewed and marked. One
copy will be retained in the Polyengineering, Inc. office, one copy will be sent to the
Polyengineering, Inc. field office, and the other copy with all remaining unmarked
copies will be returned to the contractor for resubmittal.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01300
Repair & Paint
Countryview & Bluewater Tanks (2014) 01300-6 Job No. 41-459
‘SECTION 01700
CONTRACT CLOSEOUT
PART 1 - GENERAL
1.1 DESCRIPTION
A. Comply with requirements stated in General, Supplemental and Special
Conditions and in Specifications for administrative procedures in closing out the
work.
B. Related requirements in other parts of the Project Manual:
(1) Fiscal provisions, legal submittals and additional administrative
requirements: General, Supplementary, and Special Conditions.
C. Related requirements specified in other sections:
(1) Section 01711: Cleanup
12 SUBSTANTIAL COMPLETION
A. When Contractor considers the work is substantially complete, he shall submit to
Engineer:
(1) A written notice that the work, or designated portion thereof, is
substantially complete.
(2) A list of items to be completed or corrected.
B. Within a reasonable time after receipt of such notice, Engineer will make an
inspection to determine the status of completion.
C. Should Engineer determine that the work is not substantially complete:
(1) Engineer will promptly notify the Contractor in writing, giving the reasons
therefor.
(2) Contractor shall remedy the deficiencies in the work, and send a second
written notice of substantial completion to the Engineer.
(3) Engineer will reinspect the work.
Repair & Paint :
Countryview & Bluewater Tanks (2014) 01700-1 Job No. 41-459
Dz. When Engineer finds that the work is substantially complete, he will:
(1) Prepare and deliver to Owner a tentative letter of Substantial Completion
with a tentative list of items to be completed or corrected before final
payment.
(2) After consideration of any objections made by the Owner as provided in
General, Supplemental and Special Conditions, and when Engineer
considers the work substantially complete, he will execute and deliver to
the Owner and the Contractor a definite Letter of Substantial Completion
with a revised tentative list of items to be completed or corrected.
13 FINAL INSPECTION
A. When Contractor considers the work is complete, he shall submit written
certification that:
(1) Contract Documents have been reviewed.
(2) Work has been inspected for compliance with Contract Documents.
(3) Work has been completed in accordance with Contract Documents.
(4) Equipment and systems have been tested in the presence of the Owner's
representative and are operational.
(5) | Work is completed and ready for final inspection.
B. Engineer will make an inspection to verify the status of completion with
reasonable promptness after receipt of such certification. .
C. Should Engineer consider that the work is incomplete or defective:
(1) Engineer will promptly notify the Contractor in writing, listing the
incomplete or defective work.
(2) Contractor shall take immediate steps to remedy the stated deficiencies,
and send a second written certification to Engineer that the work is
complete.
(3) Engineer will reinspect the work.
D. When the Engineer finds that the work is acceptable under the Contract
Documents, he shall request the Contractor to make closeout submittals and begin
project Advertisement of Completion.
Repair & Paint
Countryview & Bluewater Tanks (2014) 01700-2 Job No. 41-459
14 | REINSPECTION FEES
A.
Should the Engineer perform reinspections due to failure of the work to comply
with the claims of status of completion made by the Contractor:
(1) | Owner will compensate Engineer for such additional services.
(2) | Owner will deduct the amount of such compensation from the final
payment to the Contractor.
1.5 = CONTRACTOR'S CLOSEOUT SUBMITTALS TO ENGINEER
A.
B.
Repair & Paint
Section 01720: Project Record Documents
Warranties and Bonds as required, including a letter from the Surety Company
giving consent of final payment and assuring the Owner that the Performance and
Payment Bonds will remain in effect for at least one (1) year from the date final
payment to the Contractor becomes due.
Spare Parts and Maintenance Materials as required.
Release of Liens - A certified letter from the Contractor to release and discharge
the Owner, its officers, agents and employees of and from all liabilities,
obligations, and claims under or arising out of said contract.
Completed Operations Insurance -Contractor shall provide a signed statement
agreeing to continue Commercial General Liability including Completed
Operations and Product Liability coverage for two years following acceptance of
project. Contractor will attach a Certificate of Insurance as evidence of such
insurance and will provide Certificates in the future until the two-year period
expires.
Contractor's Advertisement of Completion - The Contractor immediately after
being notified by the Engineer that all other requirements of his contract have
been completed shall give notice of said completion by an advertisement for a
period of 4 successive weeks in the Northwest Florida Daily News. Proof of
publication of said notice shall be made by the Contractor to the Owner, by
affidavit of the publisher and a printed copy of the published notice.
Countryview & Bluewater Tanks (2014) 01700-3 Job No. 41-459
1.6 FINAL ADJUSTMENT OF ACCOUNTS
A. Submit a final settlement of accounting to Engineer.
B. Statement shall reflect all adjustments to the Contract Sum:
(1) The Original Contract Sum.
(2) Additions and deductions resulting from:
(a) Previous Change Orders
(b) Unit Prices
(c) Deductions for uncorrected work
(d) Penalties and Bonuses
(e) Deductions for liquidated damages
(f) Deductions for reinspection payments
(g) Other adjustments
(3) Total Contract Sum, as adjusted.
(4) Previous Payments
(5) Sum remaining due
C. Engineer will prepare a final change order, reflecting approval adjustments to the
Contract Sum which were not previously made by Change Orders.
1.7. FINAL APPLICATION FOR PAYMENT
Contractor shall submit the final Application for Payment in accordance with procedures
and requirements stated in the Conditions of the Contract. Included in the Final
Application For Payment shall be the affidavit of the Advertisement For Completion,
Release of Liens, Proof of Completed Operations Insurance and Assurance Letter from
Surety Company as outlined in Section 1.5 (A-F) above.
Repair & Paint
Countryview & Bluewater Tanks (2014) 01700-4 Job No. 41-459
ADVERTISEMENT OF COMPLETION
(Contractor)
(Address)
give notice of completion of |
(Project)
and sets as the date of final settlement. All persons and firms
should file all claims for payment to the below address prior to the settlement date:
Okaloosa Board of County Commissioners, (Owner)
c/o Polyengineering, Inc.
P. O. Box 841
Shalimar, FL 32579
By: (Name)
(Title)
Leg: (Publication Dates)
Repair & Paint
Countryview & Bluewater Tanks (2014) 01700-5 Job No. 41-459
CONTRACTOR'S RELEASE OF LIENS
STATE OF:
COUNTY OF:
Before me, the undersigned Notary Public in and for the said County and State personally
appeared , representing the Contractor, , who being duly
sworn according to law deposes and says that all labor, materials, and outstanding claims and
indebtedness of whatever nature arising out of the performance of the Contract with Board of
County Commissioners, Okaloosa County, FL, the Owner, for
Contract No. have been paid in full and that for the final payment in the amount of
$ , the Contractor releases and discharges the Owner and his authorized
representatives from any liens or claims of any nature because of or arising from this contract
and/or its performance, which it has had, has or may have in the future.
By:
Sworn to and subscribed
before me this day of
(Notary Public)
My Commission expires
Repair & Paint
Countryview & Biuewater Tanks (2014) 01700-6 Job No. 41-459
[Date]
Polyengineering, Inc
PO Box 841
Shalimar, FL 32579
Reference: [Project Name]
Dear [Engineer] ,
As required in the contract specifications, upon expiration of our current Certificate of Insurance,
an additional copy will forwarded to you for your records.
[Contractors Name] will maintain our insurance coverage in excess of two (2) years from
completion.
If you have questions or require additional information, please do not hesitate to call.
END OF SECTION 01700
Repair & Paint
Countryview & Bluewater Tanks (2014) 01700-7 Job No. 41-459
SECTION 01711
CLEANUP
1.1 GENERAL
This section covers the general cleaning which the Contractor shall be required to
perform both during construction and before final acceptance of the project unless
otherwise shown on the Drawings or specified elsewhere in these Specifications.
1.2 HAZARD CONTROL
A. The Contractor shal] prevent accumulation of wastes which create hazardous
conditions.
B. Burning or burying rubbish and waste materials on the site shall not be allowed.
C. Disposal of volatile wastes into sanitary or storm sewers shall not be allowed.
1.3. DISPOSAL OF SURPLUS MATERIALS
A. Unless otherwise shown on the Drawings, specified or directed, the Contractor
shall dispose of all surplus excavated materials and equipment from demolition,
legally off the site, and shall provide his own suitable, off-site spoil area, or on a
site designated by the Owner.
14 FINAL CLEANING
The Contractor shall:
A. Remove from the site all plant, material, tools and equipment belonging to him,
and leave the site with an appearance acceptable to the Engineer.
B. The Contractor shall thoroughly clean all equipment materials installed by him
and shall deliver over such materials and equipment in a bright, clean, polished
and new-appearing condition.
C. Restoration of Landscape Damage. Any landscape feature scarred or damaged by
the Contractor's equipment or operations shall be restored as nearly as possible to
its original condition at the Contractor's expense. The Engineer will decide what
method of restoration shall be used.
Repair & Paint
Countryview & Bluewater Tanks (2014) 01711-1 Job No. 41-459
Dz. Post-Construction Cleanup or Obliteration. The Contractor shall obliterate all
signs of temporary construction facilities such as haul roads, work areas,
structures, stockpiles of excess or waste materials, or any other vestiges of
construction, as directed by the Engineer.
END OF SECTION 01711
Repair & Paint
Countryview & Bluewater Tanks (2014) 01711-2 Job No. 41-459
SECTION 01740
WARRANTIES AND BONDS
PART 1 - GENERAL
1.1 PROJECT MAINTENANCE AND WARRANTY
A. Maintain and keep in good repair the improvements covered by these Drawings
and Specifications during the life of the Contract.
B. Indemnify the Owner against any repairs which may become necessary to any part
of the work performed and to items of equipment and systems procured for or
furnished under this Contract, arising from defective workmanship or materials
used therein, for a period of five (5) years after acceptance from the final date of
final resolution of the Owner accepting work.
C. The Contractor shall not be obligated to make replacements which become
necessary because of ordinary wear and tear, or as a result of improper operation
or maintenance, or as a result of improper work or damage by another Contractor
or the Owner, or to perform any work which is normally performed by a
maintenance crew during operation.
In the event of multiple failures of major consequences prior to the expiration of
the five-year warranty described above, the affected unit shall be disassembled,
inspected, and modified or replaced as necessary to prevent further occurrences.
All related components which may have been damaged or rendered non-
serviceable as a consequence of the failure shall be replaced. As used herein,
multiple failures shall be interpreted to mean two (2) or more successive failures
of the same kind in the same item or failures of the same kind in two (2) or more
items. Major failures may include, but are not limited to, cracked or broken
housings, piping, or vessels, excessive deflections, bent or broken shafts, broken
or chipped gear teeth, premature bearing failure, excessive wear, or excessive
leakage around seals. Failures which are directly and clearly traceable to operator
abuse, such as operations in conflict with published operating procedures, or
improper maintenance, such as substitution of unauthorized replacement parts, use
of incorrect lubricants or chemicals, flagrant over- or under-lubrication, and using
maintenance procedures not conforming with published maintenance instructions,
shall be exempted from the scope of the one-year warranty. Should multiple
failures occur in a given time, all products of the same size and type shall be
disassembled, inspected, modified or replaced, as necessary and rewarranted for
one year.
E. The Contractor shall, at his own expense, furnish all labor, materials, tools and
Repair & Paint
Countryview & Bluewater Tanks (2014) 01740-1 Job No. 41-459
mH HH HEHE eH H EE lUEmElUMDlUlU EelCU Eel eelCeeelCUmeeee CU
0
equipment required and shall make such repairs and removals or shall perform
such work or reconstruction as may be made necessary by any structural or
functional defect or failure resulting from neglect, faulty workmanship or faulty
materials, in any part of the Work performed by him. Such repair shall also
include refilling of trenches, excavations or embankments which show settlement
or erosion after backfilling or placement.
Except as noted on the Drawings or as specified, all structures such as
embankments and fences shall be returned to their original condition prior to the
completion of the Contract. Any and all damage to any facility not designated for
removal, resulting from the Contractor's operations, shall be promptly repaired by
the Contractor at no cost to the Owner.
In the event the Contractor fails to proceed to remedy the defects of which he has
been notified within fifteen (15) days of the date of such notice, the Owner
reserves the right to cause the required materials to be procured and the work to be
done, as described in the Drawings and Specifications, and to hold the Contractor
and the sureties on his bond liable for the cost and expense thereof.
Notice to Contractor for repairs and reconstruction will be made in the form of a
registered letter addressed to the Contractor at his home office.
Neither the foregoing paragraphs nor any provision in the Contract Documents,
nor any special guarantee time limit implies any limitation of the Contractor's
liability with the law of the place of construction.
END OF SECTION 01740
Repair & Paint
Countryview & Bluewater Tanks (2014) 01740-2 , Job No. 41-459
SECTION 09870
REPAIRING AND REPAINTING WATER TANKS
PART 1 - GENERAL
1.1. SECTION INCLUDES
Blasting, cleaning, repairing, and painting the Countryview and Bluewater Water Storage
Tanks.
1.2 RELATED SECTIONS
Section 01300 - Submittals
1.3. PROJECT CONDITIONS
A General Arrangement Drawings and Site Plans (See Appendix) of the two tanks to be
painted are included for the Contractor’s convenience and is intended to depict the
tanks’ dimensions. This information should be correlated with field observations prior
to submitting a bid.
14 SUBMITTALS
A. Work Schedule
With the following minimum information prepared for the Northgate Tank work site:
Mobilization and rigging
Begin repairs
Complete repairs
Blast and paint wet surfaces
Blast and paint exterior surfaces
Disinfection
Clean-up and Demobilization.
NAW SEWN
B. Supplier, type and size of abrasive to be used with Material Safety Data Sheets
(MSDS).
C. Material Safety Data Sheets (MSDS) for all coatings, sealers and chemicals used and
Certificate of Compliance with ANSI/NSF Standard 61 for all coatings and sealers in
contact with potable water.
Repair & Paint 009870 - 1
Countryview & Bluewater Tanks (2014) Job No. 41-459
D. Description of proposed method of containing the cleaning debris and paint droplets.
E. Descriptive written plan concerning how abrasive and/or paint damage to automobile,
boats and property will be handled, including a process for quick removal of the
abrasive or paint.
F. Evidence or documentation submitted to verify that the employees have had sufficient
training and experience in industrial painting, safety practices, worker protection,
environmental monitoring, and waste handling procedures to adequately perform the
responsibilities contained in these specifications
G. Welder’s certification papers
1.5 QUALITY ASSURANCE
A. Applicable Standards
1. Welding
a.
All design and welding shall be done in accordance with AWWA D100-05,
Standard for Welded Steel Tanks for Water Storage. Where tolerances and
stresses are not limited by the AWWA Standard, the applicable sections of
the July 1993 revision of the American Petroleum Institute (API) Standard
650 shall apply.
All welders and welding operators shall be certified to the procedures and
processes required to accomplish the work.
2. Repairs, Surface Preparation, and Painting
a.
Repair & Paint
Repairs shall be made in accordance with American Water Works
Association Standard (AWWA) D101-97 and applicable section of AWWA
D100-96.
All blasting and painting operations shall be completed in accordance with
the requirements of the Steel Structures Painting Council (SSPC) Volume 1
and Volume 2, including Commentary Sections and Appendices; AWWA
652-92; the NSF International Standard 61, "Drinking Water System
Components - Health Effects"; the paint manufacturer's published product
data; and these Specifications.
The SSPC "Visual for Abrasive Blast Cleaned Steel" SSPC-VIS 1-89 and the
SSPC "Visual Standard for Power and Hand-Tool Cleaned Steel" SSPC-VIS
3-93 shall also be used taking into account staining from previous paint
applications.
Coatings shall be in accordance with AWWA D102-11, Coating Steel Water-
Storage Tanks.
All coatings shall be acceptable to the controlling state, federal, and/or local
health and environmental regulatory agencies.
009870 - 2
Countryview & Bluewater Tanks (2014) Job No. 41-459
f. All interior coating materials, solvents, and other additives shall comply with
the ANSI/NSF Standard 61 "Drinking Water System Components - Health
Effects."
g. Paints which contain more than 0.06% by weight of lead (or any lead
compounds) shall not be used. The CONTRACTOR shall submit
documentation from the coating manufacturer stating that their paints are in
compliance with this requirement in addition to other requirements of these
Specifications.
h. Where the foregoing standards, recommendations and specifications are
conflicting, the ENGINEER shall be notified of the conflicts. Manufacturer's
published product data shall be adhered to unless changed in writing by the
manufacturer.
3. Other
ANSI Z49.1, "Safety in Welding and Cutting"
OSHA Regulations, 29 CFR 1910.146: Permit - Required confined spaces
AWWA C652-92, Disinfection of Water Storage Facilities
SSPC Guide 6, Guide for Containing Debris Generated During Paint
Removal Operations
ao op
16 SUPERVISOR
A. The CONTRACTOR shall provide a competent superintendent, satisfactory to the
OWNER, for the Work at all times during working hours with full authority to act for
him/her.
B. The CONTRACTOR shall also provide an adequate staff for the proper coordination
and expedition of his/her Work. Should, in the opinion of the OWNER, any language
barrier exist between the on-site superintendent and the OWNER or ENGINEER, the
CONTRACTOR shall employ a qualified full-time interpreter or provide a new on-site
superintendent at no additional cost to the OWNER.
1.7 SAFETY REQUIREMENTS
A. The CONTRACTOR shall comply with all applicable requirements of the
Occupational Safety and Health Act of 1970 (Public Law 91-596) and will hold the
OWNER and ENGINEER harmless from any civil or criminal penalties imposed as a
result of the CONTRACTOR'S noncompliance with such requirements. No additional
compensations for changes in the laws, regulations, or the interpretation thereof shall
be granted by the OWNER.
B. The CONTRACTOR shall comply with and have documented Confined Entry Space
Repair & Paint 009870 - 3
Countryview & Bluewater Tanks (2014) Job No. 41-459
Procedures available at the tank site at all times as required by OSHA 29 CFR
1910.146. The CONTRACTOR shall also comply with any state and/or local
requirements which are more restrictive than the federal requirements.
The CONTRACTOR shall provide adequate worker protection when welding and
flame cutting as required by ANSI Z49.1, “Safety in Welding and Cutting”. All
rigging attachments present on the tank shall be carefully evaluated by the
CONTRACTOR immediately prior to use for the type and magnitude of loads which
CONTRACTOR intends to impose on them. The CONTRACTOR assumes all
responsibility for use of any existing or added attachments.
1.8 WASTE DISPOSAL
A.
Repair & Paint 009870 - 4
Countryview & Bluewater Tanks (2014)
Waste material generated by abrasive blasting operations is a solid waste and shall be
handled in the following order:
Contained
Collected
Stored
Evaluated
Properly disposed
wPwn >
Compliance with local, state, and federal regulations concerning emissions,
transportation or disposal of solid, particulate, liquid, or gaseous matter as a result of
the cleaning, painting, or other operations under this Agreement shall be the
responsibility of the CONTRACTOR. This compliance shall be accomplished
without supervision from the OWNER, ENGINEER, or other direct or indirect agents
of the OWNER. No additional compensations for changes in the laws, regulations, or
other interpretation thereof shall be granted by the OWNER.
No burning of trash (including abrasive bags or other paper or wood products) on the
site shall be permitted.
All shielding, abrasive retrieval, or other methods of using precautions required by the
regulating agencies shall also be accomplished at no additional cost to the OWNER
unless otherwise provided herein. Any fines imposed on the OWNER or ENGINEER
by any regulatory agency as a result of the CONTRACTOR'S noncompliance with
environmental or nuisance regulations shall be paid or reimbursed by the
CONTRACTOR.
Debris Collection:
1. All debris collected by this operation, removed from equipment or filters, or that
has fallen to the ground shall be collected and stored at the tank site for testing,
Job No. 41-459
evaluation and ultimate disposal.
1. Acentralized cleaning station for recyclable steel grit shall be set up at a location
mutually agreed upon by the OWNER, CONTRACTOR and ENGINEER.
2. Storage for debris shall be in covered steel containers. Containers shall be
parked, secured and stored on wooden 6" x 6" timbers so containers are NOT in
contact with the ground.
3. Chain of Custody:
a.
b.
Follow all local, state and federal regulations
A Chain of Custody Form must accompany all composite samples. Included
in this document shall be the name of the person taking the sample, the
Company for which he works, the date and time which the sample was taken,
the tank from which it was taken, the Township and Municipality where the
tank is located and signatures of all persons involved in the Chain of
Custody, including dates possessed and relinquished.
F. Hazardous Waste - Sampling and Testing:
1. The Contractor shall hire a Florida state licensed disposal company to collect at
least four (4) random representative samples of the paint debris from each
container in accordance with USEPA and/or local regulations in the presence of
the Engineer and the Contractor.
a.
Repair & Paint
Each separate sample shall contain at least 100 grams (approximately one
cup) and shall be transported to an approved testing laboratory in accordance
with all laws and regulations. The purpose of gathering these samples is to
perform on each sample all necessary testing, such as Toxicity Characteristic
Leaching Procedure Testing (TCLP Testing), or subsequent testing required
by the Resource Conservation and Recovery Act (RCRA) or local and state
regulations, to determine proper treatment and/or disposal requirements.
All testing required by regulations or by the selected waste hauler or landfill,
including any follow-up testing and the collection of the samples, shall be
done at the Contractor’s expense.
The number of samples from each container will be determined by the degree
of variation of the results of the four (4) initial samples.
Copies of all manifests, testing results and treatment procedure documents
shall be sent to the Engineer and Owner.
Should the results of the random testing of the contents of a container
determine that the removed paint material does not constitute a hazardous
material, the material shall be legally disposed of by the Contractor in
accordance with local, state and federal laws.
The Contractor shall be responsible for removing and properly transporting
all the material from the project site. The material shall be transported in
containers approved by the USEPA and local, state and federal regulations.
The contract Base Bid shall include the cost of the transporting of the
removed paint material to a non-hazardous waste landfill or other stipulated
landfill and any disposal costs at that facility.
009870 - 5
Countryview & Bluewater Tanks (2014) Job No. 41-459
Repair & Paint
Countryview & Bluewater Tanks (2014) Job No. 41-459
Should the results of the random testing of the contents of a container
determine that the removed paint material does in fact constitute a hazardous
material, the material must either be:
1) treated by an approved method to reduce the leachable concentration
levels to below the regulatory limits and disposed of in accordance with
all local and/or state regulations; or
2) recycled and used as a raw material in a product approved by the
appropriate regulatory agencies; and disposed of in a hazardous waste
landfill. Disposal, treatment or recycling of the material shall be in strict
accordance with the federal, state and local laws including, but not
limited to RCRA, Toxic Substance Control Act (TSCA), Hazardous
Materials Transportation Act (HMTA), USEPA and Florida Department
of Environmental Protection (FDEP) regulations.
All costs associated with the recycling, or treatment or disposal in an
approved recycling or hazardous waste facility shall be paid for by the
Owner. The hauler shall obtain the necessary insurance and the necessary
permits for transportation and shall provide evidence of such to the Engineer
and Owner.
If the sample material obtained and tested as described above is determined
to be a hazardous material according to the TCLP testing or subsequent
testing required by RCRA, the Contractor shall delete the standard disposal
for the removed paint residue from the Base Bid.
1) Included under this item is the furnishing of all materials,
equipment, tools, utilities, labor, and supervision necessary for the
completion of the work contained in this item in accordance with the
drawings and specifications. The item generally includes the recycling,
or treatment and transporting and deposition of all hazardous removed
paint material in an approved recycling facility or disposal site,
including obtaining all the necessary insurance and the necessary
permits for transportation and providing evidence of such to the
Engineer and Owner.
2) Transportation:
a) All material classified as hazardous, as determined by the
aforementioned TCLP Testing or subsequent testing required by
RCRA, shall be transported to an approved recycling facility or
hazardous waste landfill.
b) The hauler shall obtain the necessary insurance and the necessary
permits for transportation and shall provide evidence of such to
the additional insureds listed elsewhere in this Specification.
c) The transporter shall submit copies of his/her "Spill Contingency
Plan" to the Engineer and Owner prior to transporting any
009870 - 6
material from the site. The "Spill Contingency Plan" shall detail
how spills or leaks which occur during transport shall be dealt
with.
d) The hauler shall have or shall obtain an identification number
from the USEPA, the Florida Department of Environmental
Protection (FDEP) and all other applicable state and local
licenses and permits.
e) All containers and the labeling of the containers shall adhere to
the U.S. Department of Transportation's regulations (49 CFR
Part 172) and the HMTA.
G. Disposal of Material:
1.
Repair & Paint
Countryview & Bluewater Tanks (2014)
All material classified as hazardous, as determined by the aforementioned TCLP
testing or subsequent testing required by RCRA, shall be transported to:
a. An approved recycling facility, or
b. An approved treatment facility to reduce the leachable concentration levels to
below the allowable regulatory limits and disposed in a local and/or state
approved waste landfill. °
All transporting, recycling, treatment, and disposal shall be in strict accordance
with federal and state laws including but not limited to RCRA, TSCA, HMTA,
the USEPA and the FDEP regulations.
a. The name of the recycling, treatment and/or disposal facility shall be
submitted to the Engineer and Owner for approval prior to removing any
material from the project site.
b. The disposal or recycling facility shall have or shall obtain an identification
number from the USEPA, the Florida Department of Environmental
Protection (FDEP) and all other applicable state and local licenses and
permits.
c. The Contractor shall be responsible for obtaining the proper signatures of the
hauler and designated receiving facility on the "manifest" form.
d. Payment will not be released for this item until this documentation has been
received by the Owner.
Payment :
a. All costs associated with the transporting, recycling of the material or
treatment, and disposal of the material in an approved hazardous waste
facility shall be paid for by the Owner. The Contractor shall still keep the
exterior and interior removed paint debris separate from each other and shall
store the debris in separate leak-proof covered containers.
b. Within 20 days of the Owner contacting the Contractor, the Owner shall
furnish and deliver to the site containers for transporting the hazardous
material.
009870 - 7
Job No. 41-459
The Contractor shall then fill the containers with the hazardous material.
The Owner shall then be responsible for the transporting and recycling of the
material or treatment and/or disposal of the material in an approved hazardous
waste facility.
1.9 HOURS OF OPERATION
No repairing, cleaning or painting is to be done in the night period between sunset and
sunrise. Further, blasting operations or any other operation that requires power equipment
shall be limited to 8 AM - 6 PM (local time) on Saturday and 9 AM - 6 PM (local time) on
Sunday. The times for Work shall also comply with local, state, and federal regulations
and laws regarding working hours, overtime, etc. County ordinances shall be adhered to
regarding noise and interference to surrounding property owners. If temperatures and
weather conditions warrant nighttime work, a written request to the OWNER and
ENGINEER shall be approved prior to any work being initiated.
1.10 EMERGENCY INFORMATION
A. The CONTRACTOR shall post information concerning emergency medical, fire,
rescue and hazardous waste phone numbers from which personnel on the site can
obtain information if needed.
B. The emergency information shall be posted a central position, located so it is visible
and accessible twenty-four (24) hours a day for the entire length of time that the
CONTRACTOR is performing Work at the tank site.
PART 2 - PRODUCTS
2.1 BLAST ABRASIVE
A. General
1.
All of the abrasives shall be steel grit (size 50-80).
2. The abrasive shall be properly stored, and it shall be free from contaminant,
including but not limited to paint, dirt, moisture, oil, or chlorides, which can cause
premature failure of the coating.
3. Use of abrasive on the exterior of the tank shall be based not only on its
compliance with the technical application of the coatings, but also on its lack of
nuisance to surrounding property.
4. The CONTRACTOR shall submit manufacturer's published product data sheets
Repair & Paint 009870 - 8
Countryview & Bluewater Tanks (2014) Job No. 41-459
for the type of abrasive, grade, and the resulting profile of the abrasive to be used
to the ENGINEER for approval prior to the start of any cleaning operations.
2.2. COATINGS
A. All coatings for the job shall be obtained from a single approved coatings
manufacturer. Products proposed for use, other than those specified, must be
submitted in writing at least 10 days before the bid date. Proposal shall include
product data sheets, MSDS sheets, performance criteria as listed in Section 3.12 of
these specifications as well as a list of a minimum of 15 tanks (including location,
Engineer’s name and phone number, Owner name and phone number) which have
utilized the proposed coating system. References shall have rendered satisfactory
service for at least 5 years. It is incumbent upon the proposer to prove that the
materials submitted meet the generic type as well as the performance requirements
established in these specifications.
B. Coatings shall be manufactured by the following approved manufacturer:
Tnemec Company Incorporated
C. Thinners shall be as recommended by the approved coating manufacturer.
D. All materials shall be furnished new and delivered to the project site in the original
factory sealed containers which are clearly and properly labeled by the coating
manufacturer showing the manufacturer’s name, product number, type of coating,
batch number and expiration date.
E. The materials shall be stored, handled and used in accordance with all manufacturers’
published product data, including all requirements listed on the Material Safety Data
Sheets (MSDS).
F. Coating Systems
1. Except as modified herein, all coating systems shall comply with the following:
a. AWWAD102-06 Outside Coating System No. 4 (OCS-4-modified): Generic
Description - A four-coat system comprised of a zinc-rich primer, one
polyamidoamine epoxy and one aliphatic urethane intermediate coat, and a
fluoro-urethane finish coat. All replacement parts (ladders, hatches, etc.) shall
have a five-coat system with the addition of a shop-applied zinc-rich primer to
the above described system.
b. AWWA D102-11 Inside Coating System No. 3 (ICS-3, Modified): Generic
Description - A two coat system consisting of an organic zinc-rich primer,
with a 100% solids, fast setting, epoxy lining. Replacement ladder shall have
Repair & Paint 009870 -9
Countryview & Bluewater Tanks (2014) Job No. 41-459
2.3
2.4
2.5
2.6
a three coat system with the addition of a shop-applied zinc-rich primer to the
above described system.
c. All coatings and coating systems in contact with potable water shall comply
with ANSI/NSF, International Standard 61.
d. Table 1 in the Appendix has been included to summarize the coatings. This
quick reference is included for the contractor’s convenience, but is not
intended to supersede the technical specifications.
ELASTOMERIC SEALANT
A. Elastomeric Sealant shall be an NSF approved, one part polyurethane sealant. Product
shall be SIKAFLEX-1 as manufactured by SIKA Corporation.
SEAM SEALER & SURFACER
A. Seam sealer and surfacer shall be an NSF 61 approved solventless epoxy seam sealer
and shall be Tnemec 215 Surfacer. The seam sealer and surfacer shall be
recommended by the manufacturer of the interior paint system.
DEGREASING AGENT
A. A degreasing agent such as Great Lakes Extra Muscle Pre-Paint Cleaner or approved
equal shall be used for the pre-inspection washouts as required, if applicable to project.
MATERIAL SAFETY DATA SHEETS (MSDS)
A. An MSDS shall be posted at the job site for each chemical product on the job site
including, but not limited to, coatings, thinners, solvents, disinfecting agents, abrasives,
welding materials, and flexible sealant material.
B. AnMSDS for each chemical product on the job site shall also be submitted to the
ENGINEER prior to starting any work.
PART 3 - REPAIRING AND REPAINTING THE TANK
3.1 PRELIMINARIES
A. The CONTRACTOR shall notify the OWNER and the ENGINEER at least seven (7)
days before starting the Work at the site. The CONTRACTOR shall reconfirm the
commencement of Work with the OWNER and ENGINEER twenty-four (24) hours
prior to starting Work at the site.
B. The tank shall be drained during all cleaning, painting and curing of the coatings.
Repair & Paint 009870 - 10
Countryview & Bluewater Tanks (2014)
Job No. 41-459
C. All operations which would include closing valves, or starting, stopping, or removal
from service any equipment shall be done by the OWNER'S personnel upon request by
the CONTRACTOR.
D. The CONTRACTOR shall provide a representative who shall contact and distribute
notices to the surrounding properties in the vicinity of the project site. The purpose of
this notification procedure is to inform the neighbors and businesses of the ensuing
cleaning and painting operations and to establish a good working relationship with the
surrounding property owners and occupants whose property may be affected by the
cleaning and painting operations of the CONTRACTOR
E. Protection of Equipment and Cabinets
1. All electrical apparatus, telemetering and other equipment in or on the tank,
including all wiring, shall be protected from all damage and dust or other
deleterious material infiltration during the operations of the CONTRACTOR.
2. Any antennas on the roof of the tank shall also be protected from damage. The
operation of the equipment shall be continued during the repair, cleaning and
painting operations.
3. Any items damaged by the operations of the CONTRACTOR shall be replaced in
kind or acceptably repaired by the CONTRACTOR at no cost to the OWNER.
4. Before cleaning on any portion of the tank, all cabinets on the site shall be covered
to prevent the entry of blasting abrasive, dust or paint and so they can continue to
function as required.
5. Any cabinets which cannot be covered will be marked by the OWNER. The
covering shall be removed from the cabinets while the cabinets are cleaned,
painted, and the coating cures in accordance with the exterior painting section of
these specifications.
6. Any blasting, cleaning or paint debris inside these cabinets shall be removed by the
CONTRACTOR prior to completion of the Work.
F, Nameplates
1. The nameplates shall be carefully removed to prevent paint coverage. The
areas behind the nameplates shall be cleaned and painted in accordance with
section 3.05 of this specification.
Repair & Paint 009870 - 11
Countryview & Bluewater Tanks (2014) Job No. 41-459
The nameplates shall be protected from the application of paint on the exposed
surface.
Any paint on the nameplate shall be removed by solvent cleaning or other methods
which will not damage the surface of the nameplate.
_The nameplates shall be bolted back on the mounting brackets with stainless steel
stove bolts and nuts.
G. Conduit and Cables
1.
Cables, conduit, and conduit clamps shall be relocated as necessary to effect
proper surface preparation and coating.
The cables, conduit, and conduit clamps along or near ladders shall be repositioned
prior to the cleaning and painting being sure to provide a minimum clear spacing
of 3" between the cables or conduit and the ladder side rails so as not to interfere
with the climber.
H. Interior Rigging Openings
1.
Suitable threaded outlets shall be installed in the roof of the tank for the attachment
of paint rigging.
The threaded outlets shall be a Phoenix #132 heavy tank flange. The flanges shall
be welded on both the inside and outside of the tank with a continuous fillet weld.
Galvanized malleable iron pipe plugs shall be furnished and installed after the
completion of the painting. The threads on the plugs shall be covered with Teflon
tape prior to threading into the couplings.
The couplings shall be installed in sufficient number and placement so as to allow
complete and proper cleaning and painting of the shell and roof surfaces of the
tank.
I. Inter-coat Cleaning
1.
2.
Repair & Paint
Countryview & Bluewater Tanks (2014)
Residue or foreign matter on applied coatings to receive subsequent coats shall be
cleaned by pressure rinse.
Determination of the need for inter-coat cleaning shall be made by the ENGINEER
and OWNER. Inter-coat cleanliness shall be determined by wiping with clean
white rags, determination of pH, chlorides or other suitable test, depending on
circumstances. Pressure cleaning when required between coats of coating material
are the CONTRACTOR’S responsibility.
009870 - 12
Job No. 41-459
3.2. ELECTRICAL SYSTEM SAFETY
A. The CONTRACTOR shall at a minimum take the following safety measures to prevent
accidents due to electrical hazards:
1. Electric Service Deactivation:
a. The OWNER shall deactivate and lock out the electric service to the tank.
b. The CONTRACTOR shall verify the deactivated status of the electric service
to the tank prior to beginning each day's Work functions and throughout the
work day.
c. The verification of the electric service deactivation is the sole responsibility of
the CONTRACTOR and shall be accomplished without supervision from the
OWNER, ENGINEER, or other direct or indirect agents of the OWNER.
2. Electric Service Wiring
a. The CONTRACTOR shall be aware of the electric service wiring attached to
and located adjacent to the tank.
b. The OWNER shall relocate, deactivate, or provide necessary electric shock
hazard protective devices to prevent exposure of workers and/or equipment to
electric shock hazards.
c. The CONTRACTOR shall verify that there is sufficient electric shock hazard
protection for the workers and equipment prior to and throughout each
working period on the job.
d. The verification of the electric shock hazard protection is the sole
responsibility of the CONTRACTOR and shall be accomplished without
supervision from the OWNER, ENGINEER, or other direct or indirect agents
of the OWNER.
3.3 CONTAINMENT SYSTEM
A. The CONTRACTOR shall design and provide a containment system for the capture,
containment, collection, storage and disposal of the waste materials generated by the
work under this specification Section, to meet the requirements of SSPC Guide 6, Class
3 and this specification.
B. The Containment Enclosure shall be at minimum as follows:
Repair & Paint 009870 - 13
Countryview & Bluewater Tanks (2014) Job No. 41-459
Repair & Paint 009870 - 14
Countryview & Bluewater Tanks (2014)
1. A retractable enclosure to completely surround (around and under) the blasting,
priming and coating operations. The ground cannot be used as the bottom of the
enclosure unless completely covered with suitable containment material that
retains 100% of the residue.
2 Constructed of flexible materials such as containment screens (specifically
designed for this purpose). The floor may be containment screening or of rigid
materials such as overlapping plywood fastened in place.
Maintained free of tears, cuts or holes.
4. Have seams overlapped a minimum of 6" and fastened together at 12" centers or
fastened and overlapped in a manner that insures a tight seal which does not allow
openings between the screens in the containment.
With sides extending past the top of and enclose the roof of the tank.
6. With a top bonnet capable of containing dust, debris and coating materials being
removed.
7. Retractable or moveable in a carousel fashion such that:
a. Lowering shall require no more than 10 minutes
b. Raising shall require no more than 15 minutes.
iv)
ws
It is the CONTRACTOR’S responsibility to insure the feasibility and workability of the
containment system.
The CONTRACTOR shall ensure that no cleaning/blasting debris, overspray or
coating droplets escape to the atmosphere. The ground surrounding the tank shall be
protected from all debris and other materials generated in the cleaning operations.
The CONTRACTOR shall be responsible for all materials that are used and for any
apparatus used to contain debris, overspray, and coating droplets.
The CONTRACTOR shall perform his operations and work schedule in a manner as to
minimize leakage of the containment system. The containment system shall be
properly maintained and shall not deviate from the approved drawings, without the
ENGINEER’S approval.
If at any time during the execution of the work, the containment system fails to
function satisfactorily, the OWNER reserves the right to stop work and the
CONTRACTOR suspend all operations, except those required to minimize adverse
impact on the environment or property. Operations shall not resume until
modifications have been made to correct the cause of failure. Modifications shall be
approved by the ENGINEER. The OWNER further reserves the right to stop work or
to require additional or different enclosure methods, if the CONTRACTOR’S
operations create a nuisance beyond the tank site property line in the sole opinion of the
OWNER, the ENGINEER, the OWNER’S designated representative, any regulatory
agency, or neighbor.
Job No. 41-459
H. The containment system and all accompanying support brackets and rigging shall be
designed by a professional engineer and appropriately signed and sealed per applicable
rules and regulations. A professional engineer registered in the State of Florida shall
provide a statement that the containment system will not exceed the structural loading
capacity of the tank when fully erect.
I. The containment system utilized on the tank shall be designed not to impose excessive
loading on the tank, tower and tank appurtenances. Any damage done to the tank or
tower as a direct or indirect result of the enclosure system shall be repaired by the
CONTRACTOR at no additional cost to the OWNER. Neither the ENGINEER nor the
OWNER assume any responsibility for the structural ability of the tank and tower to
support the enclosure system.
J. All equipment shall be parked on ground covers free of cuts, tears or holes to prevent
contamination of pavement or soil and to protect area under and around equipment.
K. If tarps are used as part of the enclosure, the tarps shall be an impervious, solid, flame-
resistant material, reinforced with a fiber mesh and shall allow as much light as
possible to pass through the material.
L. The existing paint being removed from the tank may contain lead and chromium. The
CONTRACTOR shall bear all responsibility to assure that workers take proper safety
precautions when working in a lead and chromium abatement environment.
M. Dust Collectors - Air Filtration Units:
1. Furnish and use a dust collector(s) during all blasting work.
2. Units to be equal in filtration capacity to Eagle Industries dust collectors. Other
units may be approved as equal, but their substitution will be evaluated on
efficiency at 0.5 micron size and airflow movement.
Unit shall be 40,000 cfm minimum.
Furnish HEPA filters for dust collection.
Number of dust collectors shall be sufficient to supply a 50 ft/minute downward
draft at most areas. An average may be considered. Determination of actual
containment plan will be the deciding factor. Calculations of airflow shall be
included in the containment submittal.
6. CONTRACTOR shall use only new filters or filters that are certified clean.
N. All costs of providing the containment system (including air filtration) shall be
included by the CONTRACTOR in the Base Bid.
we w&
3.5 REPAIRING THE TANKS
Repair & Paint 009870 - 15
Countryview & Bluewater Tanks (2014) Job No. 41-459
A. Grout Repair
1.
The grout which is between the base plates and the concrete foundations shall be
tested by the CONTRACTOR under the observation of the ENGINEER by using a
sharp 16 oz. hammer.
Any missing or loosened portions of grout shall be replaced with a non-shrinking,
non-staining, high-strength structural grout material.
The final contour of the grout shall be vertical and flush with the edge of the base
plates, and shall not overlap outside the edge of the base plates.
After the grout has hardened sufficiently for the application of a curing compound,
a water-based curing compound shall be applied to the exposed grout surfaces.
After cleaning and painting, any separation between the base plates and the grout
greater than 1/32" and less than 5/32" shall be filled with elastomeric sealant.
B. Welding Repairs
1.
Repair & Paint
“Countryview & Bluewater Tanks (2014)
All welding repairs to the interior or exterior of the tank are to be made prior
to all painting operations.
No welding or flame cutting through the existing coating system shall be
permitted, unless adequate worker protection is provided in accordance with the
instructions in ANSI Z49.1, "Safety in Welding and Cutting."
Any resulting burrs, weld spatter, sharp edges, corners, or rough welds which
would cause difficulty in applying a holiday-free coating shall be ground smooth.
This grinding is considered incidental to the welding work and is to be included in
the Base Bid.
After grinding, these areas shall be cleaned to produce the profile recommended by
the manufacturer of the coating system.
Cleaning Areas To Be Welded
a. It shall be necessary to remove the coating prior to the welding of any new
items to the tank.
b. All areas that have been welded and/or ground smooth shall be cleaned prior
to painting to provide proper profile for the coating system.
c. Areas to be welded shall be welded prior to the final cleaning and painting of
surfaces within the heat-affected zone. The heat-affected zone includes the
opposite side of the plate or member being welded. Even if not specifically
009870 - 16
Job No. 41-459
mentioned as a part of the Work under this Agreement, those areas of paint or
coatings in the heat-affected zone of areas not specified to be painted shall be
cleaned and painted in accordance with the requirements listed in these
Detailed Technical Specifications.
C. Pit Filling
1. After an area of steel is abrasive blast cleaned, any pits, rough areas or seams
marked for pit filling or surfacing by the ENGINEER shall be filled with
solventless polyamide epoxy seam sealer of the type recommended by the supplier
of the interior paint system. The epoxy seam sealer shall be applied neatly and
smoothly to the steel surfaces and any rough areas of the seam sealer shall be
sanded smooth prior to the application of the coating system.
2. The CONTRACTOR shall include in his base bid two gallons of pit filler.
D. Seam/Seal Welding
1. All areas of apparent seam deterioration shall be abrasive blast cleaned, and any
seam corrosion or undercut marked by the Engineer shall be repaired by arc-
gouging and welding.
2. The number of linear feet of seam welding shall be paid for by the unit price as
listed in the Bid Proposal.
E. Handrail Addition (in base bid - both tanks)
Fabricate and install a handrail on the exterior of the access tube at the top of both
tanks as depicted in the detailed drawing in the Appendix. Depicted on side of access
tube, but final location (access tube or top of tank) to be determined by OWNER at
time of installation. An additional coat of zinc-rich primer shall be shop-applied to all
replacement parts.
G. Tank Vent (separate bid item - Bluewater Tank only)
Replace tank vent with 24" Pressure Vacuum Vent as manufactured by Newlin’s
Welding and Tank Maintenance (Montezuma, IN - Phone No. (765) 245-2741)
K. Roof Manway (separate bid item - both tanks)
Replace existing 24" roof manway with new 30" roof manway as manufactured by
Newlin’s Welding and Tank Maintenance (Montezuma, IN - Phone No. (765) 245-
Repair & Paint 009870 - 17
Countryview & Bluewater Tanks (2014) Job No. 41-459
2741). Details included in Appendix. An additional coat of zinc-rich primer shall be
shop-applied to all replacement parts.
L. Target (in base bid - both tanks)
Remove and dispose of existing target, brackets and any associated appurtenances and
seal all penetrations by welding, as applicable, before commencing blasting and
painting operations.
M. Existing Transducer and New Conduit (in base bid — both tanks)
Remove existing transducer and cable under supervision of OWNER’s SCADA
personnel. Install new rigid galvanized conduit from existing transducer tap to RTU
panel, routing down through dry riser. Transducer and cable to be re-installed at later
date by others. Details for conduit in Electrical Drawings in Appendix.
N. Countryview Tank Repairs (in base bid)
1. Replace dry riser entrance door hinges and weatherstrip around door to prevent
entrance by insects.
2. Replace screens on vent and dry riser vents.
O. Bluewater Tank Repairs (separate bid item)
Replace screened end of overflow pipe with weighted flapper and screen to meet FDEP
regulations.
P. Bluewater Tank Repairs (in base bid)
1. Repair door frame before blasting and painting
Seal conduit penetrations in dry pillar by welding plates as needed, reducing size
of penetrations to match conduit size.
Remove and grind smooth existing old ladder brackets.
4. Replace vent screens.
ive)
3.6 REPAINTING THE TANKS
A. General
1. All cleaning and painting shall be done in a workmanlike manner. Curing times
and ventilation requirements of the paint manufacturer shall be strictly enforced by
the CONTRACTOR.
Repair & Paint 009870 - 18
Countryview & Bluewater Tanks (2014) Job No. 41-459
The CONTRACTOR shall have sufficient Wet Film Thickness Gauges and a
calibrated Dry Film Thickness Gauge on the premises during all working hours
after any painting begins.
In addition to the minimum and maximum dry film requirements (See Appendix,
Table 1), all sags, runs, pinholes, craters, roller nap, and other irregularities which
would be detrimental to the life or appearance of the coating(s) shall be removed
and repaired at no additional cost to the OWNER.
Finish coats shall be uniform in color, hide and sheen (gloss) without streaks, laps,
runs, drips, sags or missed areas.
B. Painting Environment
1.
Repair & Paint
All temperature and humidity requirements of the paint manufacturer's published
product data shall be followed.
In addition, no painting shall be done when the relative humidity is greater than
80%, or the temperature of the steel is or is expected to be less than 5 degrees F
above the dew point temperature during application and until the coating has cured
to resist moisture in accordance with the manufacturer's published product data.
The CONTRACTOR shall have wet bulb-dry bulb measuring equipment and steel
temperature measuring equipment on the job at all times. Readings shall be
recorded at the beginning and end of each painting session and at no less than two
(2) hour intervals. Wind velocities during exterior painting shall be compatible for
the quality application of the exterior coatings. Measurements shall be recorded on
the Daily Coatings Report.
Minimum Temperature
a. Each component shall be maintained at a minimum of 75 degrees F prior to
mixing.
b. The mixed coatings shall also be maintained at a minimum of 65 degrees F
during application.
c. All costs associated with keeping the coating material at the minimum
specified temperature shall be included in the Base Bid.
Mixing of Coatings
a. Each component shall be thoroughly mixed on-site with a power agitator in
accordance with the manufacturer’s printed instructions to ensure no pigment
remains on the bottom of the container.
b. Anentire kit shall be mixed together to ensure proper ratios of components.
c. The container shall be large enough to hold all components to be mixed,
009870 - 19
Countryview & Bluewater Tanks (2014) Job No. 41-459
including thinner. The combined material shall be thoroughly mixed with a power
agitator that shall be driven by a 3/4" drill motor not exceeding 300 rpm and which
do not cause air entrainment to achieve a uniform consistency.
Adherence to proper induction times and re-coat schedule for the combined
coating material shall be in accordance with the manufacturer's published product
data. No coating shall be applied until the minimum induction time has been
reached.
6. Coatings Application
a.
Methods of application are at the discretion of the CONTRACTOR as long as the
materials are applied in accordance with the manufacturer's published data and the
end results are in compliance with these specifications (including all others
inferred by reference).
Brushes shall be: Purdy Corporation, Professional Quality, Black China Bristle
Series, or Wooster Brush Company Pro 10, Professional Quality, Black China,
sash and trim brushes, or approved equal.
Rollers shall be Purdy Corporation, Professional Quality, Lambskin rollers with
phenolic core, or Wooster Brush Company, Professional Quality, Resin/Coat
Rollers, or Premier Lint Free, Epoxy Bonded to Phenolic Core, Premier Richmond
Hill, NY, or approved equal.
Techniques shall be used which will not allow coating droplets to travel from the
base of the tank or escape from the containment apparatus.
Prior to the cleaning or coating of any surface, the CONTRACTOR shall present a
written plan for approval by the PROJECT REPRESENTATIVE and the
ENGINEER concerning how abrasive and/or paint damage to automobiles and
property will be handled, including a process for quick removal of the abrasive or
paint, and who will do the Work. This approval in no way shall relieve the
CONTRACTOR from the responsibility of settling claims for damage, but is
intended as an avenue to expedite and minimize said claims.
7. Coating Thickness
a. Dry film thicknesses (DFT) specified in the attached painting schedule (see
Appendix, Table 1), are dry mil thicknesses measured in accordance with Steel
Structures Painting Council SSPC-PA-2, Paint Application Specification No. 2,
“Measurement of Dry Paint Thickness with Magnetic Gauges.” Painting
Contractor shall apply additional coats as necessary to achieve the specified
minimum dry film thickness range per coat.
b. The thickness of each type paint is essential to the system's integrity (see
Repair & Paint
Countryview & Bluewater Tanks (2014)
Appendix, Table 1). The addition of mils in a succeeding coat of a different
generic type or formulation to make up for thin preceding coat(s) shall not be
allowed. Ifa thicker finish coat is needed to hide the underlying darker color on
the exterior of the tank, a thicker coat may be applied, but it shall not exceed the
009870 - 20
Job No. 41-459
maximum allowable thickness recommended by the coating manufacturer.
- c. Under no circumstances shall the dry film thickness of an individual coat or of the
total coating system exceed the coating manufacturer's maximum allowable
thickness limit.
f. Dry mil thickness greater than the coating manufacturer's maximum allowable
thickness shall be considered unacceptable and shall be removed by the
CONTRACTOR at no additional cost to the OWNER at the direction of the
ENGINEER and OWNER.
g. Some coatings may require additional coats applied to achieve the specified
thickness when applied by brush or roller. No additional compensation shall be
made for additional coats required to achieve the specified minimum thickness.
8. Surface Conditions
a. The surfaces to be painted shall be free from mud, oil, grease, dust, moisture,
salts, and other foreign material which would cause adhesion or other
problems in the finished product.
b. If field tests by the ENGINEER find questionable amounts of contamination
on the steel surfaces or painted surfaces to be top-coated, a representative of
the paint manufacturer may be called to examine the surfaces in question and
determine if the surfaces are in accordance with these Detailed Technical
Specifications and the manufacturer's published product data.
9. Painting Schedule
a. The tank should be entirely cleaned and primed prior to the start of the
intermediate painting to avoid damage to the topcoats from adjacent cleaning
operations.
b. The primer shall not be applied closer than 6" to the edge of a surface yet to
be cleaned.
c. Ifthe re-coat cycle of the primer prevents completing cleaning and priming of
the tank before applying the intermediate coat, then the CONTRACTOR shall
submit, in writing, a schedule for coating application which will avoid damage
to the intermediate and finish coats when applied close to uncleaned surfaces.
10. Piping
a. The CONTRACTOR shall be responsible for assuring that no foreign material
including, but not limited to paint, abrasive, rags, or tools enter the :
inlet/outlet, drain, or overflow piping during the prosecution of the Work.
b. Any material found in this piping at the time the tank is placed back into
service shall be removed at the expense of the CONTRACTOR. To aid in
preventing the entrance of foreign material, the CONTRACTOR shall drain
the pipe and either lower the protective cover to the top of the pipe, tack weld
a plate over the inlet/outlet pipe or place an expandable plug in the pipe.
Repair & Paint 009870 - 21
Countryview & Bluewater Tanks (2014) Job No. 41-459
c. Ifa plate is tack welded over the pipe, the plate shall completely cover the
pipe and shall not be removed until the interior and exterior painting is
complete. After the plate is removed the damaged areas of coating and weld
burrs shall be ground smooth and recoated in accordance with the applicable
paragraphs in these specifications.
d. Ifan expandable plug is inserted in the pipe, the plug shall be placed
approximately 18" down in the pipe to allow for proper coating of the
inlet/outlet pipe.
11. Air Dryer for Compressor
a. Use air dryers sufficient to remove 98% of the moisture from the compressed
air. Size the dryers based on total cfm using manufacturer supplied charts.
Upon request, supply charts to engineer for verification.
b. _ If the fan is not operable, cease all blasting until the dryer is replaced or
repaired.
c. Supply air dryer with an air draw-off valve to check air for dryness, oil
contamination and cleanliness on the outlet side of the air dryer.
d. For cleaning operations, draw clean air from the outlet side of the air dryer.
C. Preparation and Painting the Tank Wet Interior
1. Surfaces to be Cleaned and Painted:
All interior wet surfaces including the roof, manholes, roof vent flange access tube,
etc., shall be cleaned and painted in accordance with the requirements of this
section.
2. Cleaning Tank and Debris Removal
a. The OWNER will remove all water from the tank which will drain by gravity
through the drain line.
b. The CONTRACTOR shall remove all standing water, mud, and debris from
the tank prior to starting work
3. Surface Preparation
a. The interior surfaces mentioned above in Paragraph 3.05.B.1. shall be cleaned
to a degree of cleanliness equivalent to SSPC-SP10, Near-White Blast
Cleaning by a method approved by the ENGINEER and OWNER.
b. Before the formation of rust and after observation of the surface by the
ENGINEER, all cleaned surfaces shall be primed as specified. Prior to the
application of the finish coat, all seams, rough areas, deviations from smooth
surfaces, pits, bolt heads and nuts, remains of erection lugs and scars, and
comers shall be primed by brush (stripe coat at 2.0 - 4.0 mils) with the primer,
Repair & Paint 009870 - 22
Countryview & Bluewater Tanks (2014) Job No. 41-459
followed by the finish coat.
A sample area of minimum size 2’x 2’ will be cleaned to a degree of
cleanliness equivalent to SSPC-SP10, Near White Blast Cleaning as agreed by
the ENGINEER and CONTRACTOR. After agreement as to degree of
cleanliness, the sample area shall be clear coated and used as a template for
the remainder of the cleaning for this portion of the tank.
4. Seam Sealer
After cleaning, seam sealer is to be applied to the roof vent intersection, roof
manhole, tank manhole intersection, piping intersections, and the lap seams to
seal these intersections from moisture. It shall be applied in a workmanlike
manner, being beveled at approximately 45 degrees.
The cost of this seam sealing is to be included in the Base Bid.
At the CONTRACTOR'S option Filler (see section 2.05, above) and Surfacer
may be applied after the priming of the surface, providing no rust has formed
on any un-coated surfaces (such as crevices between plates).
5. Coating Application
a.
The approved coatings for the interior surfaces are intended to comply with
the requirements of AWWA D102-11 Inside Coating System No. 3 (ICS-3,
Modified) with the dry film thickness as specified in the coating schedule.
Acceptable manufacturers and products are shown in the coating schedule.
The CONTRACTOR must submit certifications indicating compliance with
the specifications.
Not later than eight hours and before the formation of rust, the cleaned
surfaces (SSPC-SP10) shall be primed with the specified primer applied at a
rate to achieve a 2.5 - 3.5 mils (min.) dry film thickness.
The primer coat shall be inspected and approved by the ENGINEER prior to
proceeding with the remaining coats.
After approval of the prime coat a finish coat shall be applied at a rate to
achieve 30.0 - 40.0 mils DFT. Roof beams, sharp edges and other difficult to
coat areas shall receive 40.0 — 50.0 mils DFT..
The total dry film thickness for the two (2) coat system shall be a minimum of
32.5 mils. All roof beams, sharp edges and other difficult to coat areas shall
have a minimum of 42.5 mils DFT.
Paint shall be applied strictly in accordance with the manufacturer's
recommendations.
6. Re-coat Cycle
a. The CONTRACTOR shall review the manufacturer's published product data
for maximum re-coat times for the interior coating system selected for use.
b. Ifthe maximum re-coat window is exceeded prior to application of the
Repair & Paint 009870 - 23
Countryview & Bluewater Tanks (2014) Job No. 41-459
succeeding coat, then the CONTRACTOR shall prepare the interior surfaces
in accordance with the manufacturer's published product data prior to the
application of the next coat.
The cost of this additional surface preparation shall be borne by the
CONTRACTOR with no additional cost to the OWNER.
The Contract Time shall not be increased as a result of this additional surface
preparation.
Curing
Each coat shall be properly cured before the application of any subsequent
coats.
The interior wet area coating shall be completely cured and the tank shall not
be filled with water until approved by the ENGINEER and OWNER.
The exterior dry coating on the opposite side of water bearing surfaces shall be
completely cured and the tank shall not be filled with water until approved by
the ENGINEER and OWNER.
Solvent rub tests, pencil hardness tests, or other industry recognized testing
procedures shall be used as recommended by the manufacturer.
The CONTRACTOR shall monitor the torus bottom plate temperature during
the interior coating curing to verify that minimum steel temperature
requirements are satisfied.
Ventilation
Forced ventilation shall be supplied to the interior of the tank for a continuous
period of at least 48 hours after the final coat has been applied.
Adequate ventilation of the tank bottom and other low lying areas of the tank
shall be provided by the CONTRACTOR as required for solvent release and
coating cure. This ventilation shall, at a minimum, be in accordance with
AWWA D102-06.
The CONTRACTOR shall furnish, install and operate the equipment that is
necessary to provide forced ventilation to aid curing.
If supplementary heating or dehumidification is required to effect curing, the
CONTRACTOR shall furnish, install, and operate the equipment to perform
the supplementary heating or dehumidification required at no additional cost.
9. Testing
Repair & Paint
Countryview & Bluewater Tanks (2014)
All interior wet coatings, including those above the high water level, shall be
checked with a wet sponge low voltage holiday detector.
Testing shall be done in accordance with Section B.9.3 of AWWA D102-06 in
the presence of the ENGINEER.
Any voids indicated shall be repaired by applying more of the finish coat of
paint by brush or roller. The repaired areas shall be retested after the
009870 - 24
Job No. 41-459
appropriate drying time.
d. The coating system must pass the holiday test regardless of the mil thickness
applied to the tank.
D. Preparation and Painting the Tank Exterior
1. Surfaces to be Painted
All exterior surfaces of the tank, including the bowl, tower, rods, turnbuckle
threads, bolts, nuts, pins, brackets, seams, corners, base, pedestals/pillars or legs,
manhole neck of the roof vent, etc., shall be cleaned and painted in accordance
with the paragraphs in this section.
2. Irregular Surfaces
a. Any burns, weld splatter, rough welds, weld overlap, bolts, sharp edges, or
comers of any areas disturbed or installed by the CONTRACTOR'S
operations which would cause difficulty in achieving a defect-free coating
shall be chipped and/or ground smooth.
b. Any pinholes or voids in exterior welds shall be filled with an epoxy seam
sealer. It is not the intent to have these irregular surfaces chipped and/or
ground flush. The objective of the chipping, grinding and/or seam sealing is
to eliminate irregular surfaces to provide a surface that is sufficiently smooth
for the application of a uniform thickness coating without voids. This
chipping, grinding and/or seam sealing is considered incidental to the exterior
painting and is to be included in the Base Bid.
3. Cleaning Tank and Debris Removal
a. The surfaces described in paragraph 3.05.D.1 shall be cleaned to a degree of
cleanliness equivalent to SSPC-SP6, Commercial Blast Cleaning by a method
approved by the ENGINEER and OWNER.
b. A sample area of minimum size 2’x 2’ will be cleaned to a degree of
cleanliness equivalent to SSPC-SP 6, Commercial Blast Cleaning as agreed by
the ENGINEER and CONTRACTOR. After agreement as to degree of
cleanliness, the sample area shall be clear coated and used as a template for
the remainder of the cleaning for this portion of the tank.
4. Coating Application
a. The approved coatings for the exterior surfaces are intended to comply with
the requirements of AWWA D102-11 Outside Coating System No. 4 (OCS-4,
Modified). Acceptable manufacturers and products are shown in the coating
schedule. The CONTRACTOR must submit certifications indicating
compliance with the specifications.
Repair & Paint 009870 - 25
Countryview & Bluewater Tanks (2014) Job No. 41-459
Repair & Paint
Countryview & Bluewater Tanks (2014)
Not later than eight hours and before the formation of rust, the cleaned
surfaces (SSPC-SP6) shall be primed with the specified primer.
Should any area exist where the intersection of two (2) members does not
allow the complete cleaning of the intersection and the members cannot be
separated for cleaning (such as anchor bolt washers, clevises, turnbuckles,
etc.), these intersections shall be post-primed with an aluminum platelet
pigmented material suitable for marginally cleaned surfaces. The material
shall be Tnemec 1 Omnithane, or other material approved in writing by the
ENGINEER and recommended by the manufacturer of the exterior paint
system.
Following the prime coat application, the exterior surfaces shall receive two
intermediate coats and a finish coat of paint. The colors for the intermediate
coats shall be slightly darker than that chosen for the finish coat, being dark
enough and different enough from one another to visually assure application
and coverage of each subsequent coat, yet light enough to allow proper hiding
of the intermediate coats of paint.
Recoat Cycle
The CONTRACTOR shall review the manufacturer's published product data
for maximum recoat times for the interior coating system selected for use.
If the maximum recoat window is exceeded prior to application of the
succeeding coat, then the CONTRACTOR shall prepare the interior surfaces
in accordance with the manufacturer's published product data prior to the
application of the next coat.
The cost of this additional surface preparation shall be borne by the
CONTRACTOR with no additional cost to the OWNER.
The Contract Time shall not be increased as a result of this additional surface
preparation.
Curing
Each coat shall be properly cured before the application of any subsequent
coats.
The interior wet area coating shall be completely cured and the tank shall not
be filled with water until approved by the ENGINEER and OWNER.
The exterior dry coating on the opposite side of water bearing surfaces shall be
completely cured and the tank shall not be filled with water until approved by
the ENGINEER and OWNER.
Solvent rub tests, pencil hardness tests, or other industry recognized testing
procedures shall be used as recommended by the manufacturer.
The CONTRACTOR shall monitor the torus bottom plate temperature during
the interior coating curing to verify that minimum steel temperature
requirements are satisfied.
009870 - 26
Job No. 41-459
E. Logos
1. Countryview Tank - The Tank CONTRACTOR shall paint the Okaloosa County
logo on the broadside of the tank. The logo shall be painted using colors to match
the logo (See Appendix for representative detail). Final color selections are on file
at Tnemec. Orientation of the Logo on the tank to be determined by the OWNER.
Diameter of the logo shall be minimum of 20’.
2. Bluewater Tank - The Tank CONTRACTOR shall replace the existing “sailboat”
logo to match as is. Artwork for the logo is not available.
Tank logo paint shall be same as final top coat required by the exterior coating system
F. Safety Climbing Devices
1. The tubular notched galvanized rigid rail safety-climbing devices shall be
removed prior to the cleaning and painting of the ladders.
2. All paint on the device, both existing paint and any paint spilled on the device by
the CONTRACTOR, shall be removed by wiping the device with the proper
solvent.
3. Any rust which has developed on the safety rails shall be removed by power tool
cleaning with Scotch-Brite abrasive discs, then these areas shall be coated with one
coat (2.0 to 3.0 mils thick) of an aluminum platelet pigmented single component
Polyurethane mastic such as Tnemec 530 Omnithane.
4. Any necessary temporary protective devices for compliance with Federal OSHA
requirements, all state and local safety regulations, and safe working practices shall
be furnished and maintained by the CONTRACTOR.
5. After the curing of the ladder paint, the tubular notched galvanized rigid rail safe-
climbing device shall be reinstalled in a secure manner as recommended by the
manufacturer of the climbing device.
6. Any fasteners damaged by the removal and replacement of the device shall be
replaced by the CONTRACTOR at no cost to the owner.
3.7 INSPECTION AND TESTING
A. Testing Coatings
1. Ifadispute arises concerning the quality or quantity of the applied coatings;
adhesion tests, Tooke gage inspection, or some other form of destructive testing
may be employed.
Repair & Paint 009870 - 27
Countryview & Bluewater Tanks (2014) Job No. 41-459
2.
If such tests are employed, the OWNER will pay for these tests and the
CONTRACTOR shall repair the damaged coating at no additional costs to the
OWNER regardless of the outcome of the tests.
B. Observation
1.
All Work shall be accessible to the ENGINEER using the CONTRACTOR'S
rigging and equipment. If assistance is required for the ENGINEER to safely
inspect the work, the CONTRACTOR shall assist the ENGINEER. The cost of
labor and equipment to assist the ENGINEER shall be included in the Base Bid
contract amount.
C. Hold Points for Required Inspections
The CONTRACTOR shall give the ENGINEER at least 24 hours notice (48 hours if
inspection required on weekend) before each of the following stages in the Work is
completed:
WC HSNAWRWN
any repairs and prior to preparation
interior blast (frequency to be determined)
installation of prime coat
installation of stripe coat
exterior blast
exterior prime coat
exterior stripe coat
exterior 1* intermediate
exterior 2" intermediate
Failure to notify ENGINEER as specified may result in removal of any installed
coating or re-work of surface preparation that has occurred since last hold point.
Removal or re-work shall be at the sole discretion of the OWNER and ENGINEER and
shall be at no additional cost to OWNER.
3.8 DISINFECTION OF THE TANK AND PIPING
A. Cleaning
1.
3.
Repair & Paint
Countryview & Bluewater Tanks (2014)
After curing and prior to disinfecting, the CONTRACTOR shall wash the tank
interior with potable water to remove all loose paint overspray, dirt, etc.
All equipment, including brooms, brushes, spray equipment, and worker's boots,
shall be disinfected before they are used to clean the water storage facility.
The CONTRACTOR shall supply an adequate volume of water (20 gpm
009870 - 28
Job No. 41-459
4.
minimum) with sufficient pressure (60 psi minimum at the nozzle) to wash
thoroughly all the interior wet surfaces, including those surfaces above the high
water level.
The spent water shall be removed from the tank before filling the tank.
B. Disinfection
1.
It is the CONTRACTOR'S responsibility to flush and disinfect the tank until two
(2) consecutive satisfactory water samples are reported from the OWNER'S
laboratory.
Method 2 (Section 4.3) of AWWA C652 shall be used for disinfection (spray
method). Material used for disinfection shall be HTH only.
The OWNER shall take and send in the samples to the laboratory, but shall assume
no responsibility for the sampling technique or the care of the samples.
The stored tank water shall comply with current state and USEPA standards for
organic, inorganic, and biological contaminants as influenced by the operations of
the CONTRACTOR.
3.9 Cleaning and Painting Concrete
A. Preparation
1. The CONTRACTOR shall dig down beside each foundation to expose
approximately 4" more of the concrete than is normally exposed (at least 10" from
the top of concrete).
2. Prior to any digging, the CONTRACTOR shall contact the utility hot line to have
all utilities marked on the site.
3. All concrete areas thus exposed (from the ground to the base plates) shall be
cleaned by brush-off blast cleaning to remove any existing coatings and other
contaminants. This entails lightly abrading the concrete surface without entirely
removing the surface concrete.
4. The aggregate shal] not be exposed by the blasting operations.
5. All efflorescence and laitance shall be removed from the surface.
6. The cleaning operation shall be performed to open subsurface holes and voids and
to produce a profile for the proper adherence of the specified coating system
(equivalent to 40-60 grit sand paper).
Repair & Paint 009870 - 29
Countryview & Bluewater Tanks (2014) Job No. 41-459
7. Bug holes, voids, pinholes, honeycombs and any other concrete imperfections shall
be patched, repaired or filled with 100% volume solids epoxy repair material prior
to coating application.
B. Coating Application
1. All cleaned concrete areas shall be given a two (2) coat roller applied coating.
2. Each coat shall be applied at a rate to achieve a 4.0 - 6.0 mil dry film thickness.
The total dry film thickness shall be 10.0 mils.
C. Backfill
After the coatings have cured and been approved by the ENGINEER, the concrete
structures are to be backfilled to the original grade.
3.10 GUARANTEE AND ANNIVERSARY INSPECTION
A. All Work shall be guaranteed for five years after the date of substantial completion.
This guarantee shall be provided for in the CONTRACTOR'S Performance Bond and
as described in Section 00624, Warranty Attachment.
B. The coatings manufacturer shall provide a 15 year warranty for the exterior coating
system. The warranty shall cover the following:
Color Retention
Gloss Retention
Chalking
Checking.
Blistering
Cracking
Delamination
The Contractor shall prepare and field apply the complete specified coating system to a
minimum of (6) panels (to be supplied by Tnemec — size 3” X 6” or larger) of each
exterior finish color identified in the warranty. The (6) field applied sample panels of
each finish color shall be air dried for a minimum of (7) days and shipped to Tnemec
Company prior to final acceptance of the Work. The panels will be checked for
verification of color accuracy and stored as the Original project Color Standards for the
duration of the Warranty Coverage. Upon completion of the work, Tnemec Company
shall forward the signed Warranty document along with two (2) panels of each finish
color to the Owner for retention by the Owner and shall return two (2) panels of each
finish color to the painting contractor
Repair & Paint 009870 - 30
Countryview & Bluewater Tanks (2014) Job No. 41-459
’
C. The Owner will notify the Contractor at least 30 days prior to each anniversary date
throughout the five year warranty period and shall establish a date for each
inspection. The tank will be drained, at Owner’s discretion, and the Owner's
representative and the Contractor shall thoroughly inspect all surfaces both inside and
out. Any defects in the coating system shall be repaired by the Contractor at no
additional cost to the Owner. Should a failure occur to 25% of the painted surface,
either interior or exterior, the entire surface shall be cleaned and painted in
accordance with these specifications.
D. The CONTRACTOR shall have at least one gallon of each final coating at the time of
the inspection along with power cleaning tools and "Scotch-Brite" abrasive disks for
spot cleaning.
E. To return the tank into service more quickly, the CONTRACTOR shall also have two
cases of Tnemec FC22 Touch-Up Kits (with appropriate compression gun) to touch
up the interior wet surfaces. Spot repairs shall be made by the CONTRACTOR
before returning the tank back into service. Repairs requiring extensive Work and
rigging may be delayed until a time mutually agreeable to the OWNER and
CONTRACTOR.
F.. It is the CONTRACTOR'S responsibility to disinfect the tank in accordance with
AWWA C652-92 until two (2) consecutive satisfactory water samples are reported
from the OWNER'S selected laboratory. All costs associated with the Anniversary
Inspections, including disinfection if required, shall be included in the Base Bid price.
3.11 RESTORATION OF GROUNDS
A. Clean-up
1. The job site shall be kept in a clean and safe condition at all times. Hazards or
nuisances shall be protected at all times.
2. Upon completion of the Work, the job site and all nearby sites impacted by the
Work activities shall be left clean of all debris, cleaning residue, or any other
items resulting from the operations of the CONTRACTOR.
3. The cost of any cleanup which must be done by the OWNER shall be deducted
from funds due the CONTRACTOR. Double layers of plastic sheeting (each at
least 6 mil thick) shall be placed under any compressors, paint pumps, mixers,
welding machines, etc., to prevent oils, solvents, organic compounds, or other
contaminants from leaching into the soil. Any oils, solvents, organic compounds,
or contaminants spilled on the site during the process of the Work shall be
immediately removed and cleaned up by the CONTRACTOR
B The CONTRACTOR shall grade and level the site upon completion of all work and
Repair & Paint 009870 - 31
Countryview & Bluewater Tanks (2014) Job No. 41-459
grass the site with rye or other type grass that will provide cover to all disturbed
areas. This work shall be completed at no extra pay to the CONTRACTOR.
3.12 REPORTS
A. The CONTRACTOR shall complete the reports included at the end of this section for
this project. The report shall be completed daily and sent to the Owner and Engineer
for their review and records.
B. No progress payments will be authorized for payment until acceptable completed
reports are properly submitted.
3.13 PRODUCT PERFORMANCE CRITERIA
Provide the following product information and manufacturers published performance
data should coatings or coating system be submitted in lieu of the standard of quality
established in the project documents. Should the data not be available in a published
format, or if the duration of the test does not meet the specified requirement, please
respond in the appropriate space with NT (Not Tested).
A. Interior and Exterior Primer
—
Generic Type:
2. Special Qualifications:
w
Solids By Volume:
4. Zinc Content:
5. Test Criteria:
Organic Zinc Rich Urethane Primer
Certified in accordance with ANSI/NSF STD 61 for
contact with potable water in tanks of 1,000 gallons
capacity or greater.
63%
83% by weight
Test Criteria Test Duration Proposed Product Test Results
ASTMB 117 50,000 hours Rust @ Soribe:
Salt Spray (Fog) (Scribed Panel) Blisters: ,
Rust @ Scribe:
ASTM G 85 15,000 Hours Plane Rust:
Prohesion Bli ;
isters:
ASTM D 4585 Rusting:
Humidity 4,000 hours Blistering:
Repair & Paint 009870 - 32
Job No. 41-459
Countryview & Bluewater Tanks (2014)
ASTM 4541 Average of Three
Adhesion Tests Report PSI
ASTM G8
Cathodic 30 Days Exposure
Disbondment
Immersion Service 7 years — No
(Potable Water) Failure
B. Exterior 1" Intermediate Coat
1. | Generic Type: Polyamidoamine Epoxy
. Solids By Volume: 67%
3. Special Qualifications: Certified in accordance with ANSI/NSF STD 61 for
contact with potable water in tanks of 1,000 gallons
capacity or greater.
4. Test Criteria:
Test Criteria Test Duration Proposed Product Test
Results
ASTM B 117 10,000 hours Rust @ Sone
Salt Spray (Fog) (Scribed Panel) Blisters:
Rust @ Scribe:
ASTM G 85 5,000 Hours Plane Rust:
Prohesion .
Blisters:
ASTM D 4585 Rusting:
Humidity 10,000 hours Blistering:
ASTM 4541 Average of Three
Adhesion Tests Report PSI
ASTM D 4060 CS-17 Wheel Report mg loss / Average of
Abrasion 1,000 Gram Load three tests
1,000 Cycles
Immersion Service > Years Rusting:
(Potable Water) Blistering
Repair & Paint 009870 - 33
Job No. 41-459
Countryview & Bluewater Tanks (2014)
C. Exterior 2" Intermediate Coat
1.
2.
3.
Repair & Paint
Countryview & Bluewater Tanks (2014)
Generic Type:
Solids By Volume:
Test Criteria:
Aliphatic Acrylic Urethane.
71%
Test Criteria
Test Duration
Proposed Product Test Results
ASTM B 117 9,000 hours Rust @ Sone
Salt Spray (Fog) (Scribed Panel) Blisters: .
Rust @ Scribe:
ASTM G 85 10,000 Hours Plane Rust:
Prohesion Blisters:
ASTM D 4585 Rusting:
Humidity 4,000 hours Blistering:
ASTM 4541 Average of Three
Adhesion Tests Report PSI
ASTM D 4060 CS-17 Wheel Report mg loss / Average of
Abrasion 1,000 Gram Load three tests
1,000 Cycles
ASTM D 522 Method B
Flexibility Cylindrical Mandrel
ASTM D 4141, _
Method C 500 MJ/m2 Giess Reenton
(EMMAQUA) rUnange.
se Moact Direct Impact Report in/Ibs:
009870 - 34
Job No. 41-459
D. Exterior Finish Coat
Repair & Paint
Countryview & Bluewater Tanks (2014)
1.
3.
Generic Type:
Solids By Volume:
Test Criteria:
Fluoropolymer Urethane.
60%
Test Criteria
Test Duration
Proposed Product Test Results
ASTMB 117 10,000 hours Rust @ Senibe:
Salt Spray (Fog) (Scribed Panel) Blisters:
ASTM D 4585 Rusting:
Humidity 3,000 hours Blistering:
ASTM 4541 Average of Three
Adhesion Tests Report PSI
CS-17 Wheel
atin A000 1,000 Gram Load Report mg loss ! Average of three
1,000 Cycles
ASTM D 522 Method A
Flexibility Cylindrical Mandrel
1,500 MJ/m2* Gloss Retention:
ASTM D 4141, UV Exposure Color Change:
Method C
(EMMAQUA) 3,500 MJ/m2* Gloss Retention:
UV Exposure Color Change:
ASTM D 2794 . . ;
Impact Direct Impact Report in/Ibs:
ASTM D 4587 16,000 hours % Ciess Griention:
QUV Exposure Olor \nange:
Cycle 4: 8 hours UV - ° .
4 hours condensation 25,000 hours % Gloss Retention:
Color Change:
ASTM D 5031 5.§00 hours % Gloss Retention:
Weatherometer ° Color Change:
Report: Color Retention
AAMA 2604-98 5 Years 45 Degrees Gloss Retention
South Florida
Chalking
Film Erosion
* Values must be presented in UV Exposure and not Global Exposure. Submitting Manufacturer
shall provide a certified copy of the EMMAQUA test Report.
009870 - 35
Job No. 41-459
E. Interior Finish Coat
1. Generic Type: Modified Polyamine Epoxy
2. Solids By Volume: 100%
3. Test Criteria:
Test Criteria Test Duration Proposed Product Test Results
}
ASTM D 4585 Rusting:
Humidity 4,000 hours Blistering:
ASTM 4541 Average of Three
Adhesion Tests Report PSI
CS-17 Wheel
aaa fen 1,000 Gram Load Report mg loss : Average of three
1,000 Cycles
Immersion
ASTM D 870 Potable Water 2 Years
Rusting:
Immersion 140F DI Water Blistering:
ASTM D 870 2,000 Hours Cracking:
Delamination:
Edge Retention .
MIL-PRF 23236 Report Edge Retention:
Tensile :
Strength/Elongation Tensile Strength:
ASTM D 638
Moisture Vapor
oo. Perms:
Transmission Metric Perms:
ASTM D 1653 :
Repair & Paint 009870 - 36
Countryview & Bluewater Tanks (2014) Job No. 41-459
PRE-JOB CONFERENCE
Project, Location
Meeting Place Date Time
Owner. General Contractor
Owner Representative
Engineer Representative
Paint Contractor Representative
Paint Manufacturer Representative
All parties have read and understand specifications?
Coating System
Surface Preparation
Preparation Sample
Anchor Pattern
Shop Primer
Mils Dry Film
Required Field Prep.
Field Touch-Up Primer
Mils Dry Film
Dry or Cure Time
Ist Finish Coat
Mils Dry Film
Recoat Time
2nd Finish Coat
Mils Dry Film
Recoat Time
3rd Finish Coat
Mils Dry Film
System Min. Dry Film
Repair & Paint 009870 - 37
Countryview & Bluewater Tanks (2014) Job No. 41-459
DAILY COATING REPORTS
Project Location Date
Contractor Foreman. Surface Prep
Date Time Air Temp degrees F
Profile: Spec ; Obtained ; Quality ; Time Completed
Primer: Spec ; Used. : Air Temp___degrees F; Surface degrees F
Dew Point degrees F Dry Film: Spec mils; Obtained mils
Paint Spec ; Item Used : Dry Time before Recoat
Cure Time Allowed Dry Film: Spec mils; Obtained mils
Relative Humidity percent; Time Completed
Surface Temp. degrees F; Wind Speed mph; Wind Direction ; Time
Repair & Paint 009870 - 38
Countryview & Bluewater Tanks (2014) Job No. 41-459
6£ - 0L8600
(p10Z) SyuR] Joreman|g 7% MalAdnUNOD
qureg 7 Iedoy
6St- 1h ON 90f
04860 NOLLOUS JO CNA
‘sued juoursoejdas Joyjo pue ssoppey Jusuaoejder oy} 0} porjdde-doys aq jyeys sound you-ouIz Jo ye09 [eUONIppe UY ,
"UOLEPUSWIWIODOI USYLIM S JOINJOV|NULU POSOXO JOU [[YS S}BOO [ENPIAIPUI JO} SOSSOUYOIYY [IAL ,
‘ouy ‘AueduioD souisuy, Aq ponjoeynueui se ore sjonpord |TV ,
Seale JBOS O} YNOYJIp JoyJo pue sospo dieys ‘surwaq Joos Joy ssouyory], WL AIC [BIOL ,
Surry Axodo Jo s]Iw Q'9S — O'Op PAT990I [TBUS SEOrE 1209 0} YNOYJIP 1oyJO pue so8po dieys ‘sures Joo! JoLayUT [TV |
“SSOBJ.INS JOLIOJUL UO ]BOD YSTUIJ 94) 0} JOLId pue soovyjins
JO]18}X9 UO JeOd aBIPSULISIU! ISI SUIALSOEI 0} JOLId “ojo ‘soSpo ‘sloppe] ‘sures pjom [[e 0} ysnq Aq patjdde aq [jeys Axoda jo ye0o oduyjs V |
91919-ONAU
QS S9LI9g 91Q-ONAU
OO! 09-0'r 9¢1 SdLag
dLIOWIOISeLY 09-0’
oTADY SSWIO sep dpAIOY L-OdSS 9}0190U02)
auljoxody ouT'Z7-O.1pPAH
7ZOA SALAS OZH-16 S911
(S°ZS - ST) 0'0r - O'0E CEST
CU STE zAxody splfog %00I JOWLIg YORY-Iu1Z (UOISIOUTWT) O1-OdSS ¢-SOl
snd XOg-210g dUTZ-O.1PAL]
UO[JOIPAH OL sauieg PIS!YS-eInpuy ¢/01 SSZI - OVIN O7ZH-16 Solas
S91 - 0°01 Of - 07 0'€- 07 0'S-0'€ SE-ST (PaIpoW))
sueYoip) JsWAjodoJony.y oueyjamAjog Akxodq JOU YORY-OUIZ 9-0dSS ¢-SDO
< XXN- /onpoig ponpolg ponpold ponpoig daig s9Rj.nsg wayshs
(LA - s[ru) (LA - stun) (LAG - sift) (LAC - s[rat) (LAC > sya) suyeod
Wa3shS [B10], jew] C# SeIPSULIOIU] 1# SIRIPOULiojUy] gould
anpayrs ssuljzeoD - | ATAVL
as
a
Z|
Ss
re
cy
<
as =
7
wore , | %
Se aaa @
JIEMoli ? % ;
NETTIE VE f
= " F » iia iii eo 8 Ga
© 3 ~
3 6) 4 ‘<
3 s ‘e) Do,
A & ge hy,
Ww = if
n >
=
S fa)
a
" , ;
aAY BOUbeyy %. Zp &
io) y ‘3
Ye “Ga, z
‘ey o, 3
_ on oY a % Gy, 3
wish 3 Zip % i o
7 B $ yy Y 2%
73) 3 ad ka 5
2 ~ tS Py eorpud z
3 B € ¢ ond Fa
re x > % yi S
% im = © ty 2
J oO wo by. i
2 re 5 %
> g % %
3 3) = ty t
8 5 %, 2 me
s Se we ‘) sayenes
< cS ww on
nd > REN
Pal Jeyy-i8D a
L Ae
Ks 3 we
e \) Ye
3 2 % oa
D : hy,
4) & *
3 j y
3 : vezi cs) %
DY JEN IED AN 2 2 chy
oy % s x)
2 oO CPS,
3 LC o s.
& 7) P, & : "any, ° .
FE > u7 abpry °y “ng Murrey)
Ss Q ¥
s 8 Mey &
= 8 ey s
i} ty Aa
» ~4
= 5 g
Y
a & 265. g ajerAy
< ey <
c » Mey =
Ss ¢ Y
wt
3
a e §
= .
6 | a 9
2 ie A 1D Ney wate é 7
a a at a
Bi S fs)
oO 4 ID puns §
= P
3 iy
Pa S
- $n e
e e 64 ~
a 7 {
PY sbuey i) a :
Py oBuey Py ebuey py abuey
| pores s
|
z * ae g
: > c : mi
3 = Ss & 3
o F » S$ & g
> wo > 5 rs
ef 5 6 f &
a oO Oo oc.
a > («)
z ? OS AXE
% & NM “ue
Y
Terrace Or
© ax PI
Green Cak Dr
Water Oak La
ie
S ad
o oO
S 4
& ——
2 a
4 =
L4 a
a
8
fe
. ASS
‘ ev we
30 qangale Or
‘J ieidey
se ot
as ye"
re) &
Stine
JG e683
Morthvisw Pare Or
PY Lodxg
weg Or
4
hs
Skyline q
Kipling Or
Kea
Clyde
Reese Pond
ang Prix Or
Gre
‘
¢
Peggy Cr
spree Or
Nes
of
o re.
a ge or
5 pr Le
&,
&
“A
ry
oY
ao” -
ys? a yi
Pas
Pant
et Pa
wh? S
x
gor 2 & a?
.
ei
a o
th ue ee
Py Oe
3 ye
Es) is N
“ 6 2 6 ts
= ~ te ~
a : a] ~ =
oH) bY 5 he o a
—} Cc is bed =
e& & @ 8S g 3
a6 g@ = & ;
Go 2
10 SaAquoN
‘Queue
iQ] Bll yy
Cherstegher Dr
Wesheevs Dr
ywand Dr
an Cr
ste
Shear River OF
Top Flight OF
&,
wy,
my oS
Savannah Lo
AO BNEIS 35 B14
Rea epeny
PY Bscwsaj)
2 8
a >
= =
=
a £ <
EE 3
& 2 wm
OQ DAD
caidot DF ger Cir
5 s x «&
~ oa F sz)
- & Ro fas
8 2 5 6
g 5 ec
2 t+ Oo &
5 6
Ww of
s
ane
Btyd
(a oe
ot
Presscott 51
Prane St &
Boulder St
Peoria Blvd
Ss
on =
Rs
Wid arse
ask
OSBury
ater, Storage ranks
Y,
Northview ra
Antic RS
southern Mid-Cot
va
“TANK RESIGN: "ROE,;OOG GanLe SPL
Wir VERTICAL CENTER MUTED RISER
be Lo ES QaMeTeR
DUAL ORETEY
Lahr
$00 ELE ae
¥ _ ne es carers
: N TKe S08
if (ee LETTERS FLOW WIR BET
| MATH ANT: VORTEX
Teed BAY WHEL
3 COUNTY
ae . ee DRY WELL LADOER
rr : Bin Sear eee
48
Sa
8
joe cue te
Y —marremn ne tectiems rm
Soar es
SS
==
12 UPPER WLEY
Cee one
EYFANSON JOWT
mee age manrorg |
ot veer pint
(STEEN ee
SEEED wim
4 sek wer RR
t se ruTED
c SER
eetreeR, .
; i eet SER, Sa —
1
nie
4 i
BAG MSEE Maen -
TANI LO POAT
e he BS MAR DOSE
TH Sat we eee a
SSUER SSS
ELEVATION
aos,
TSN
(eRe Mane:
etnias Nel uate:
Pe
fe UTE LEM,
Tai ACCESS LaBDE
WOH GARETT) DE MCE
sen Ye PLETE
EE Mane
“BANTER S SHG
Lets VEINS WHT Som EERS
BG MIG UPeEe
~- PLATFORM
DORR WITH SEPSET
“BIgrOROS as Neen eseny
| REST PLATEGRMS To BE
! POF seT An HECESSARY
i Lappars. Uo Has
hos VENTS WITH GORE ENE
/
: Sie We
\ [BLED
ey
ea igs SD
EVATION
(ANE SHALL BE OESIGNED 4S PER ALMA 0-100
2. Nd LOD 180 set
J. SOM BEARING SHALL MOT EXCEED 2B O0 poe Yt BTS VAUE FoR
4 AL COREE StL OF 9000S OAD 5 CYNON. i BLazone anne? OnE
ae RLY
5. SFE. ATE Ae, STAUCTURAL A, ABA — HE BILLET INT. sabe) { e-Sie natch
Meme a i
SHOP DRAWINGS REQ'D FOR STEEL & FORMDATION DESIGH BY TANK HG.
7 (OUOATIONS [ap macine aokTs FumalSHED By am. (8) SEMEN § i “We
LOCATION, GF BARS ARE Por IOED ACTORS CONVENIENCE ONLY. FIWAL, i
ROVIOED © SUBXUFTEO OY T FOR APERGYAL,
Ks. COT
SE UBDERCUT UMLISS APPROVED, (0) RATTEN Bons
ARSGRRE GAME 3-VE"HIH DIAL
SRS TE SE RANGE Waren
Ve eee va
HOSE conic Ton
Nene: WED BRNCARTS|
Fic PROTECT: Man
FOQUNDATI: PLAN
110"
ko pereonee
COMPACTED BAcKFIL
Ag MER Se
S ety
CP RHULAR FLL,
REPORT
agra a fr ty comin Sout Hse
i aes
Hei Maret Ag by eu rs Surrorr aus,
"
aren cost Ai COHPACTION OF Ale MMTEAIASS Seat RE PRDHIGED 45 8FQ°D cr uP"
I ek A SOS va" Tein 6 St ae race ey, BLOW -UP" oo seme AS BUILT RISER FOUNDATION ELEVATION
SCEPC CHEE. ETC y Sint Be FORMISND BFE STI SECTION “aoa
° : = -
Seoation romans 3 Soames NTS < sf
mt Se a ae.
AEVISION - DATE ~ T seas ‘5 SHOWN TANK ELEVATIONS AND FOUNDATION: seas at cu ‘SHEET
oN Sas 8s ] PROFECT NUMBER POLYENGINEERING 300,500" Gai LON ELEVATED WATER 4
— [BFE “nove oe | CONSULTING ERGINEERS
T_OWAWN BY MIKE D Areaoven mY EL ef 308 HUMBER 5
BILL OF MATERIALS
ITEM | REG DESCRIPTION MATERIAL
A 2 | PLATE 5*x2"x1/2" A36
= 12 290m By Penden
ms,
“= NEW HANDRAIL
B {1 | Op $/4"@ x12" AS6 ACCESS TUBE ~ TOP WEW
ant with Polzengineerng
EXIST. TOP ACCESS TUBE
48” DA, x 0.5” WALL
(MAT. A283C) ae oo
FOR
ACCESS TUBE
COUNTRYVIEW & BLUEWATER
TANKS
OKALOOSA COUNTY. FLORIDA
12" 1 NEW HANDRAIL BRACKET
NEW BRACKET & HANDRAIL
|
+"
A
a INSTALLATION DETAIL
Posr Orrer Box 841
POLYENGINEERING OF FLORIDA, INC.
AncHTECTUme ENGINEERING Soumons
A
TOP VIEW
459 Repair ong Point Countrwiew ond BW Tanks (2014)\Specs\occess safely brocket deg {Loyoutt] Last Printed: November 27, 2013
%
oN “Tt i ae 1/8” BEVEL
|
to , A L . 1
FRONT VIEW SECTION A-A
Treat te
RACKET DETAIL
‘Sear we
or 1
Polyengineering, Inc. ~ X:\FloridaDota\wASIER PROJECT FOLDER\(41) Dkoio:
z
3
OKALOOSA COUNTY SAND DOLLAR LOGO
POLYENGINEERING, Inc.
Project No. 41-459
Paint and Repair Countryview and Bluewater Water Tanks