READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 18, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 28 of 35. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 90-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Contractor shall remedy the deficiencies in the work, and send a second
written notice of substantial completion to the Engineer.
(3) Engineer will reinspect the work.
Repair & Paint :
Countryview & Bluewater Tanks (2014) 01700-1 Job No. 41-459
Dz. When Engineer finds that the work is substantially complete, he will:
(1) Prepare and deliver to Owner a tentative letter of Substantial Completion
with a tentative list of items to be completed or corrected before final
payment.
(2) After consideration of any objections made by the Owner as provided in
General, Supplemental and Special Conditions, and when Engineer
considers the work substantially complete, he will execute and deliver to
the Owner and the Contractor a definite Letter of Substantial Completion
with a revised tentative list of items to be completed or corrected.
13 FINAL INSPECTION
A. When Contractor considers the work is complete, he shall submit written
certification that:
(1) Contract Documents have been reviewed.
(2) Work has been inspected for compliance with Contract Documents.
(3) Work has been completed in accordance with Contract Documents.
(4) Equipment and systems have been tested in the presence of the Owner's
representative and are operational.
(5) | Work is completed and ready for final inspection.
B. Engineer will make an inspection to verify the status of completion with
reasonable promptness after receipt of such certification. .
C. Should Engineer consider that the work is incomplete or defective:
(1) Engineer will promptly notify the Contractor in writing, listing the
incomplete or defective work.
(2) Contractor shall take immediate steps to remedy the stated deficiencies,
and send a second written certification to Engineer that the work is
complete.
(3) Engineer will reinspect the work.
D. When the Engineer finds that the work is acceptable under the Contract
Documents, he shall request the Contractor to make closeout submittals and begin
project Advertisement of Completion.
Repair & Paint
Countryview & Bluewater Tanks (2014) 01700-2 Job No. 41-459
14 | REINSPECTION FEES
A.
Should the Engineer perform reinspections due to failure of the work to comply
with the claims of status of completion made by the Contractor:
(1) | Owner will compensate Engineer for such additional services.
(2) | Owner will deduct the amount of such compensation from the final
payment to the Contractor.
1.5 = CONTRACTOR'S CLOSEOUT SUBMITTALS TO ENGINEER
A.
B.
Repair & Paint
Section 01720: Project Record Documents
Warranties and Bonds as required, including a letter from the Surety Company
giving consent of final payment and assuring the Owner that the Performance and
Payment Bonds will remain in effect for at least one (1) year from the date final
payment to the Contractor becomes due.
Spare Parts and Maintenance Materials as required.
Release of Liens - A certified letter from the Contractor to release and discharge
the Owner, its officers, agents and employees of and from all liabilities,
obligations, and claims under or arising out of said contract.
Completed Operations Insurance -Contractor shall provide a signed statement
agreeing to continue Commercial General Liability including Completed
Operations and Product Liability coverage for two years following acceptance of
project. Contractor will attach a Certificate of Insurance as evidence of such
insurance and will provide Certificates in the future until the two-year period
expires.
Contractor's Advertisement of Completion - The Contractor immediately after
being notified by the Engineer that all other requirements of his contract have
been completed shall give notice of said completion by an advertisement for a
period of 4 successive weeks in the Northwest Florida Daily News. Proof of
publication of said notice shall be made by the Contractor to the Owner, by
affidavit of the publisher and a printed copy of the published notice.
Countryview & Bluewater Tanks (2014) 01700-3 Job No. 41-459
1.6 FINAL ADJUSTMENT OF ACCOUNTS
A. Submit a final settlement of accounting to Engineer.
B. Statement shall reflect all adjustments to the Contract Sum:
(1) The Original Contract Sum.
(2) Additions and deductions resulting from:
(a) Previous Change Orders
(b) Unit Prices
(c) Deductions for uncorrected work
(d) Penalties and Bonuses
(e) Deductions for liquidated damages
(f) Deductions for reinspection payments
(g) Other adjustments
(3) Total Contract Sum, as adjusted.
(4) Previous Payments
(5) Sum remaining due
C. Engineer will prepare a final change order, reflecting approval adjustments to the
Contract Sum which were not previously made by Change Orders.
1.7. FINAL APPLICATION FOR PAYMENT
Contractor shall submit the final Application for Payment in accordance with procedures
and requirements stated in the Conditions of the Contract. Included in the Final
Application For Payment shall be the affidavit of the Advertisement For Completion,
Release of Liens, Proof of Completed Operations Insurance and Assurance Letter from
Surety Company as outlined in Section 1.5 (A-F) above.
Repair & Paint
Countryview & Bluewater Tanks (2014) 01700-4 Job No. 41-459
ADVERTISEMENT OF COMPLETION
(Contractor)
(Address)
give notice of completion of |
(Project)
and sets as the date of final settlement. All persons and firms
should file all claims for payment to the below address prior to the settlement date:
Okaloosa Board of County Commissioners, (Owner)
c/o Polyengineering, Inc.
P. O. Box 841
Shalimar, FL 32579
By: (Name)
(Title)
Leg: (Publication Dates)
Repair & Paint
Countryview & Bluewater Tanks (2014) 01700-5 Job No. 41-459
CONTRACTOR'S RELEASE OF LIENS
STATE OF:
COUNTY OF:
Before me, the undersigned Notary Public in and for the said County and State personally
appeared , representing the Contractor, , who being duly
sworn according to law deposes and says that all labor, materials, and outstanding claims and
indebtedness of whatever nature arising out of the performance of the Contract with Board of
County Commissioners, Okaloosa County, FL, the Owner, for
Contract No. have been paid in full and that for the final payment in the amount of
$ , the Contractor releases and discharges the Owner and his authorized
representatives from any liens or claims of any nature because of or arising from this contract
and/or its performance, which it has had, has or may have in the future.
By:
Sworn to and subscribed
before me this day of
(Notary Public)
My Commission expires
Repair & Paint
Countryview & Biuewater Tanks (2014) 01700-6 Job No. 41-459
[Date]
Polyengineering, Inc
PO Box 841
Shalimar, FL 32579
Reference: [Project Name]
Dear [Engineer] ,
As required in the contract specifications, upon expiration of our current Certificate of Insurance,
an additional copy will forwarded to you for your records.
[Contractors Name] will maintain our insurance coverage in excess of two (2) years from
completion.
If you have questions or require additional information, please do not hesitate to call.
END OF SECTION 01700
Repair & Paint
Countryview & Bluewater Tanks (2014) 01700-7 Job No. 41-459
SECTION 01711
CLEANUP
1.1 GENERAL
This section covers the general cleaning which the Contractor shall be required to
perform both during construction and before final acceptance of the project unless
otherwise shown on the Drawings or specified elsewhere in these Specifications.
1.2 HAZARD CONTROL
A. The Contractor shal] prevent accumulation of wastes which create hazardous
conditions.
B. Burning or burying rubbish and waste materials on the site shall not be allowed.
C. Disposal of volatile wastes into sanitary or storm sewers shall not be allowed.
1.3. DISPOSAL OF SURPLUS MATERIALS
A. Unless otherwise shown on the Drawings, specified or directed, the Contractor
shall dispose of all surplus excavated materials and equipment from demolition,
legally off the site, and shall provide his own suitable, off-site spoil area, or on a
site designated by the Owner.
14 FINAL CLEANING
The Contractor shall:
A. Remove from the site all plant, material, tools and equipment belonging to him,
and leave the site with an appearance acceptable to the Engineer.
B. The Contractor shall thoroughly clean all equipment materials installed by him
and shall deliver over such materials and equipment in a bright, clean, polished
and new-appearing condition.
C. Restoration of Landscape Damage. Any landscape feature scarred or damaged by
the Contractor's equipment or operations shall be restored as nearly as possible to
its original condition at the Contractor's expense. The Engineer will decide what
method of restoration shall be used.
Repair & Paint
Countryview & Bluewater Tanks (2014) 01711-1 Job No. 41-459
Dz. Post-Construction Cleanup or Obliteration. The Contractor shall obliterate all
signs of temporary construction facilities such as haul roads, work areas,
structures, stockpiles of excess or waste materials, or any other vestiges of
construction, as directed by the Engineer.
END OF SECTION 01711
Repair & Paint
Countryview & Bluewater Tanks (2014) 01711-2 Job No. 41-459
SECTION 01740
WARRANTIES AND BONDS
PART 1 - GENERAL
1.1 PROJECT MAINTENANCE AND WARRANTY
A. Maintain and keep in good repair the improvements covered by these Drawings
and Specifications during the life of the Contract.
B. Indemnify the Owner against any repairs which may become necessary to any part
of the work performed and to items of equipment and systems procured for or
furnished under this Contract, arising from defective workmanship or materials
used therein, for a period of five (5) years after acceptance from the final date of
final resolution of the Owner accepting work.
C. The Contractor shall not be obligated to make replacements which become
necessary because of ordinary wear and tear, or as a result of improper operation
or maintenance, or as a result of improper work or damage by another Contractor
or the Owner, or to perform any work which is normally performed by a
maintenance crew during operation.
In the event of multiple failures of major consequences prior to the expiration of
the five-year warranty described above, the affected unit shall be disassembled,
inspected, and modified or replaced as necessary to prevent further occurrences.
All related components which may have been damaged or rendered non-
serviceable as a consequence of the failure shall be replaced. As used herein,
multiple failures shall be interpreted to mean two (2) or more successive failures
of the same kind in the same item or failures of the same kind in two (2) or more
items. Major failures may include, but are not limited to, cracked or broken
housings, piping, or vessels, excessive deflections, bent or broken shafts, broken
or chipped gear teeth, premature bearing failure, excessive wear, or excessive
leakage around seals. Failures which are directly and clearly traceable to operator
abuse, such as operations in conflict with published operating procedures, or
improper maintenance, such as substitution of unauthorized replacement parts, use
of incorrect lubricants or chemicals, flagrant over- or under-lubrication, and using
maintenance procedures not conforming with published maintenance instructions,
shall be exempted from the scope of the one-year warranty. Should multiple
failures occur in a given time, all products of the same size and type shall be
disassembled, inspected, modified or replaced, as necessary and rewarranted for
one year.
E. The Contractor shall, at his own expense, furnish all labor, materials, tools and
Repair & Paint
Countryview & Bluewater Tanks (2014) 01740-1 Job No. 41-459
mH HH HEHE eH H EE lUEmElUMDlUlU EelCU Eel eelCeeelCUmeeee CU
0
equipment required and shall make such repairs and removals or shall perform
such work or reconstruction as may be made necessary by any structural or
functional defect or failure resulting from neglect, faulty workmanship or