Okaloosa County BOCC — February 18, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 23 of 35. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 90-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
of retainage with respect to
pro-gress payments will be as stipulated in the
Agreement.
B. Review of Applications
i. ENGINEER will, within 10 days after
receipt of each Application for Payment, either
indicate in writing a recommendation of payment
and present the Application to OWNER or return the
Application to CONTRACTOR indicating in writing
ENGINEER’s reasons for refusing to recommend
payment. In the latter case, CONTRACTOR may
make the necessary corrections and resubmit the
Application.
2. | ENGINEER’s recommendation of any
payment requested in an Application for Payment
will constitute a representation by ENGINEER to
OWNER, based on ENGINEER’s observations on
the Site of the executed Work as an experienced and
qualified design professional and on ENGINEER's
review of the Application for Payment and the
accompanying data and schedules, that to the best of
ENGINEER’s knowledge, information and belief:
General Conditions
Page 00700-37
a. the Work has progressed to the point
indicated;
b. the quality of the Work is generally in
accordance with the Contract Documents
(subject to an evaluation of the Work as a
functioning whole prior to or upon Substantial
Completion, to the results of any subsequent
tests called for in the Contract Documents, to a
final determination of quantities and
classifications for Unit Price Work under
paragraph 9.08, and to any other qualifications
stated in the recommendation); and
c. the conditions precedent to
CONTRACTOR’s being entitled to such pay-
ment appear to have been fulfilled in so far as it
is ENGINEER’s responsibility to observe the
Work.
3. By recommending any such payment
ENGINEER will not thereby be deemed to have
represented that: (i) inspections made to check the
quality or the quantity of the Work as it has been
performed have been exhaustive, extended to every
aspect of the Work in progress, or involved detailed
inspections of the Work beyond the responsibilities
specifically assigned to ENGINEER in the Contract
Documents; or (ii) that there may not be other
matters or issues between the parties that might
entitle CONTRACTOR to be paid additionally by
OWNER or entitle OWNER to withhold payment to
CONTRACTOR.
4. Neither ENGINEER’s review of
CONTRACTOR’s Work for the purposes of
recommending payments nor ENGINEER’s
recommendation of any payment, including final
payment, will impose responsibility on ENGINEER
to supervise, direct, or control the Work or for the
means, methods, techniques, sequences, or
procedures of construction, or the safety precautions
and programs incident thereto, or for
CONTRACTOR’s failure to comply with Laws and
Regulations applicable to CONTRACTOR’s
performance of the Work. Additionally, said review
or recommendation will not impose responsibility on
ENGINEER to make any examination to ascertain
how or for what purposes CONTRACTOR has used
the moneys paid on account of the Contract Price, or
to determine that title to any of the Work, materials,
or equipment has passed to OWNER free and clear
of any. Liens.
SEE ALSO SUPLEMENTARY CONDITIONS
(SECTION 00800)
5. | ENGINEER may refuse to recommend
the whole or any part of any payment if, in
ENGINEER’s opinion, it would be incorrect to
make the representations to OWNER referred to in
paragraph 14,02.B.2. ENGINEER may also refuse
to recommend any such payment or, because of
subsequently discovered evidence or the results of
subsequent inspections or tests, revise or revoke any
such payment recommendation previously made, to
such extent as may be necessary in ENGINEER’s
opinion to protect OWNER from loss because:
a. the Work is defective, or completed
Work has been damaged, requiring correction or
replacement;
b. the Contract Price has been reduced by
Written Amendment or Change Orders;
c. OWNER has been required to correct
defective Work or complete Work in accordance
with paragraph 13.09; or
d. ENGINEER has actual knowledge of the
occurrence of any of the events enumerated in
paragraph 15.02.A.
C. Payment Becomes Due
1. Ten days after presentation of the
Application for Payment to OWNER with
ENGINEER’s recommendation, the amount recom-
mended will (subject to the provisions of paragraph
14.02.D) become due, and when due will be paid by
OWNER to CONTRACTOR.
D. Reduction in Payment
1. OWNER may refuse to make payment of
the full amount recommended by ENGINEER
because:
a. claims have been made against OWNER
on account of CONTRACTOR’s performance or
furnishing of the Work;
b. Liens have been filed in connection with
the Work, except where CONTRACTOR has
delivered a specific Bond satisfactory to OWN-
ER to secure the satisfaction and discharge of
such Liens;
c. there are other items entitling OWNER to
a set off against the amount recommended; or
d. OWNER has actual knowledge of the
occurrence of any of the events enumerated in
General Conditions
Page 00700-38
paragraphs 14.02.B.5.a through 14.02.B.5.c or
paragraph 15.02.A.
2. If OWNER refuses to make payment of
the full amount recommended by ENGINEER,
OWNER must give CONTRACTOR immediate
written notice (with a copy to ENGINEER) stating
the reasons for such action and promptly pay
CONTRACTOR any amount remaining after
deduction of the amount so withheld. OWNER shall
promptly pay CONTRACTOR the amount so
withheld, or any adjustment thereto agreed to by
OWNER and CONTRACTOR, when
CONTRACTOR corrects to OWNER’s satisfaction
the reasons for such action.
3. If it is subsequently determined that
OWNER’s refusal of payment was not justified, the
amount wrongfully withheld shall be treated as an
amount due as determined by paragraph 14.02.C.1.
14.03 CONTRACTOR’s Warranty of Title
A. CONTRACTOR warrants and guarantees that title
to all Work, materials, and equipment covered by any
Application for Payment, whether incorporated in the
Project or not, will pass to OWNER no later than the time
of payment free and clear of all Liens.
14.04 Substantial Completion
A. When CONTRACTOR considers the entire Work
ready for its intended use CONTRACTOR shall notify
OWNER and ENGINEER in writing that the entire Work is
substantially complete (except for items specifically listed
by CONTRACTOR as incomplete) and request that
ENGINEER issue a certificate of Substantial Completion.
Promptly thereafter, OWNER, CONTRACTOR, and
ENGINEER shall make an inspection of the Work to
determine the status of completion. If ENGINEER does not
consider the Work substantially complete, ENGINEER will
notify CONTRACTOR in writing giving the reasons
therefore. If ENGINEER considers the Work substantially
complete, ENGINEER will prepare and deliver to OWNER
a tentative certificate of Substantial Completion which shall
fix the date of Substantial Completion. There shall be
attached to the certificate a tentative list of items to be
completed or corrected before final payment. OWNER
shall have seven days after receipt of the tentative certificate
during which to make written objection to ENGINEER as
to any provisions of the certificate or attached list. If, after
considering such objections, ENGINEER concludes that the
Work is not substantially complete, ENGINEER will within
14 days after submission of the tentative certificate to
OWNER notify CONTRACTOR in writing, stating the
reasons therefore. If, after consideration of OWNER’s
objections, ENGINEER considers the Work substantially
complete, ENGINEER will within said 14 days execute and
deliver to OWNER and CONTRACTOR a definitive
certificate of Substantial Completion (with a revised
tentative list of items to be completed or corrected)
reflecting such changes from the tentative certificate as
ENGINEER believes justified after consideration of any
objections from OWNER. At the time of delivery of the
tentative certificate of Substantial Completion ENGINEER
will deliver to OWNER and CONTRACTOR a written
recommendation as to division of responsibilities pending
final payment between OWNER and CONTRACTOR with
respect to security, operation, safety, and protection of the
Work, maintenance, heat, utilities, insurance, and warranties
and guarantees. Unless OWNER and CONTRACTOR
agree otherwise in writing and so inform ENGINEER in
writing prior to ENGINEER’s issuing the definitive
certificate of Substantial Completion, ENGINEER’s
aforesaid recommendation will be binding on OWNER and
CONTRACTOR until final payment.
B. OWNER shall have the right to exclude
CONTRACTOR from the Site after the date of Substantial
Completion, but OWNER shall allow CONTRACTOR
reasonable access to complete or correct items on the
tentative list.
14.05 Partial Utilization
A. Use by OWNER at OWNER’s option of any
substantially completed part of the Work which has
specifically been identified in the Contract Documents, or
which OWNER, ENGINEER, and CONTRACTOR agree
constitutes a separately functioning and usable part of the
Work that can be used by OWNER for its intended purpose
without significant interference with CONTRACTOR’s
performance of the remainder of the Work, may be
accomplished prior to Substantial Completion of all the
Work subject to the following conditions.
1. OWNER at any time may request CON-
TRACTOR in writing to permit OWNER to use any
such part of the Work which OWNER believes to be
ready for its intended use and substantially complete.
If CONTRACTOR agrees that such part of the
Work is substantially complete, CONTRACTOR
will certify to OWNER and ENGINEER that such
part of the Work is substantially complete and
request ENGINEER to issue a certificate of
Substantial Completion for that part of the Work.
CONTRACTOR at any time may notify OWNER
and ENGINEER in writing that CONTRACTOR
considers any such part of the Work ready for its
intended use and substantially complete and request
ENGINEER to issue a certificate of Substantial
Completion for that part of the Work. Within a
reasonable time after either such request, OWNER,
CONTRACTOR, and ENGINEER shall make an
inspection of that part of the Work to determine its
status of completion. If ENGINEER does not
General Conditions
Page 00700-39
consider that part of the Work to be substantially
complete, ENGINEER will notify OWNER and
CONTRACTOR in writing giving the reasons
therefore. If ENGINEER considers that part of the
Work to be substantially complete, the provisions of
paragraph 14.04 will apply with respect to
certification of Substantial Completion of that part
of the Work and the division of responsibility in
respect thereof and access thereto.
SEE SUPLEMENTARY CONDITIONS (SECTION
00800)
14.06 Final Inspection
A. Upon written notice from CONTRACTOR that
the entire Work or an agreed portion thereof is complete,
ENGINEER will promptly make a final inspection with
OWNER and CONTRACTOR and will notify CON-
TRACTOR in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective.
CONTRACTOR shall immediately take such measures as
are necessary to complete such Work or remedy such
deficiencies.
14.07 Final Payment
A. Application for Payment
1. After CONTRACTOR has, in the
opinion of ENGINEER, satisfactorily completed all
corrections identified during the final inspection and
has delivered, in accordance with the Contract
Documents, all maintenance and operating
instructions, schedules, guarantees, | Bonds,
certificates or other evidence of insurance
certificates of inspection, marked-up record
documents (as provided in paragraph 6.12), and
other documents, CONTRACTOR may make
application for final payment following the
procedure for progress payments.
2. The final Application for Payment shall
be accompanied (except as previously delivered) by:
(i) all documentation called for in the Contract
Documents, including but not limited to the
evidence of insurance required by subparagraph
5.04.B.7; (ii) consent of the surety, if any, to final
payment; and (iii) complete and legally effective
releases or waivers (satisfactory to OWNER) of all
Lien rights arising out of or Liens filed in