Okaloosa County BOCC — February 18, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 18 of 35. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 90-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
accordance with the
acceptable schedule of Shop Drawings and Sample
submittals. All submittals will be identified as ENGINEER
may require and in the number of copies specified in the
General Requirements. The data shown on the Shop
Drawings will be complete with respect to quantities,
dimensions, specified performance and design criteria,
materials, and similar data to show ENGINEER the
services, materials, and equipment CONTRACTOR
proposes to provide and to enable ENGINEER to review
the information for the limited purposes required by
paragraph 6.17.E.
B. CONTRACTOR shall also submit Samples to
ENGINEER for review and approval in accordance with the
acceptable schedule of Shop Drawings and Sample
submittals. Each Sample will be identified clearly as to
material, Supplier, pertinent data such as catalog numbers,
and the use for which intended and otherwise as
ENGINEER may require to enable ENGINEER to review
the submittal for the limited purposes required by paragraph
6.17.E. The numbers of each Sample to be submitted will
be as specified in the Specifications.
C. Where a Shop Drawing or Sample is required by
the Contract Documents or the schedule of Shop Drawings
and Sample submittals acceptable to ENGINEER as
required by paragraph 2.07, any related Work performed
prior to ENGINEER’s review and approval of the pertinent
submittal will be at the sole expense and responsibility of
CONTRACTOR.
D. Submittal Procedures
I. Before submitting each Shop Drawing or
Sample, CONTRACTOR shall have determined and
verified:
a. all field measurements, quantities,
dimensions, specified performance criteria,
installation requirements, materials, catalog
numbers, and similar information with respect
thereto;
b. all materials with respect to intended use,
fabrication, shipping, handling, storage,
assembly, and installation pertaining to the
performance of the Work;
c. all information relative to means,
methods, techniques, sequences, and procedures
of construction and safety precautions and
programs incident thereto; and
d. CONTRACTOR - shall also have
reviewed and coordinated each Shop Drawing or
Sample with other Shop Drawings and Samples
and with the requirements of the Work and the
Contract Documents.
2. Each submittal shall bear a stamp or
specific written indication that CONTRACTOR has
satisfied CONTRACTOR’s obligations under the
Contract Documents with respect _— to
CONTRACTOR’s review and approval of that
submittal.
3. At the time of each submittal, CON-
TRACTOR shall give ENGINEER specific written
notice of such variations, if any, that the Shop
Drawing or Sample submitted may have from the
requirements of the Contract Documents, such
notice to be in a written communication separate
from the submittal; and, in addition, shall cause a
specific notation to be made on each Shop Drawing
and Sample submitted to ENGINEER for review
and approval of each such variation.
E. ENGINEER’s Review
1. ENGINEER will timely review and
approve Shop Drawings and Samples in accordance
with the schedule of Shop Drawings and Sample
submittals acceptable to ENGINEER.
ENGINEER’s review and approval will be only to
determine if the items covered by the submittals will,
after installation or incorporation in the Work, con-
form to the information given in the Contract Docu-
ments and be compatible with the design concept of
the completed Project as a functioning whole as
indicated by the Contract Documents.
2. | ENGINEER’s review and approval will
not extend to means, methods, techniques,
sequences, or procedures of construction (except
General Conditions
Page 00700-24
where a particular means, method, technique,
sequence, oF procedure of construction is
specifically and expressly called for by the Contract
Documents) or to safety precautions or programs
incident thereto. The review and approval of a
separate item as such will not indicate approval of
the assembly in which the item functions.
3. | ENGINEER’s review and approval of
Shop Drawings or Samples shall not relieve CON-
TRACTOR from responsibility for any variation
from the requirements of the Contract Documents
unless CONTRACTOR has in writing called
ENGINEER’s attention to each such variation at the
time of each submittal as required by paragraph
6.17.D3 and ENGINEER has given written
approval of each such variation by specific written
notation thereof incorporated in or accompanying
the Shop Drawing or Sample approval; nor will any
approval by ENGINEER relieve CONTRACTOR
from responsibility for complying with the require-
ments of paragraph 6.17.D.1.
F. Resubmittal Procedures
1. CONTRACTOR shall make corrections
required by ENGINEER and shall return the
required number of corrected copies of Shop
Drawings and submit as required new Samples for
review and approval. CONTRACTOR shail direct
specific attention in writing to revisions other than
the corrections called for by ENGINEER on
previous submittals.
6.18 Continuing the Work
A. CONTRACTOR shall carry on the Work and
adhere to the progress schedule during all disputes or
disagreements with OWNER. No Work shall be delayed or
postponed pending resolution of any disputes or
disagreements, except as permitted by paragraph 15.04 or as
OWNER and CONTRACTOR may otherwise agree in
writing.
6.19 CONTRACTOR’s General Warranty and
Guarantee
A. CONTRACTOR warrants and guarantees to
OWNER, ENGINEER, and ENGINEER’s Consultants that
all Work will be in accordance with the Contract
Documents and will not be defective. CONTRACTOR’s
warranty and guarantee hereunder excludes defects or
damage caused by:
1. abuse, modification, or improper main-
tenance or operation by persons other than CON-
TRACTOR, Subcontractors, Suppliers, or any other
individual or entity for whom CONTRACTOR is
responsible; or
2. normal wear and tear under normal
usage.
B. CONTRACTOR’s obligation to perform and
complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will
constitute an acceptance of Work that is not in accordance
with the Contract Documents or 4 release of
CONTRACTOR’ obligation to perform the Work in
accordance with the Contract Documents: '
1. observations by ENGINEER;
2. recommendation by ENGINEER or
payment by OWNER of any progress or final
payment;
3. the issuance of a certificate of Substantial
Completion by ENGINEER or any payment related
thereto by OWNER;
4. _ use or occupancy of the Work or any part
thereof by OWNER;
5. any acceptance by OWNER or any
failure to do so;
6. any review and approval of a Shop Draw-
ing or Sample submittal or the issuance of a notice
of acceptability by ENGINEER;
7. any inspection, test, or approval by
others; or
8. any correction of defective Work by
OWNER.
6.20 Indemnification
A. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless OWNER, ENGINEER, ENGINEER’s Consul-
tants, and the officers, directors, partners, employees,
agents, and other consultants and subcontractors of each and
any of them from and against all claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
arising out of or relating to the performance of the Work,
provided that any such claim, cost, loss, or damage:
1. _ is attributable to bodily injury, sickness,
disease, or death, or to injury to or destruction of
tangible property (other than the Work itself),
including the loss of use resulting therefrom; and
General Conditions
Page 00700-25
—E—————————
2. is caused in whole or in part by any negli-
gent act or omission of CONTRACTOR, any Sub-
contractor, any Supplier, or any individual or entity
directly or indirectly employed by any of them to
perform any of the Work or anyone for whose acts
-any of them may be liable, regardless of whether or
not caused in part by any negligence or omission of
an individual or entity indemnified hereunder or
whether liability is imposed upon such indemnified
party by Laws and Regulations regardless of the
negligence of any such individual or entity.
B. In any and all claims against OWNER or ENGI-
NEER or any of their respective Consultants, agents,
officers, directors, partners, or employees by any employee
(or the survivor or personal representative of such
employee) of CONTRACTOR, any Subcontractor, any
Supplier, or any individual or entity directly or indirectly
employed by any of them to perform any of the Work, or
anyone for whose acts any of them may be liable, the
indemnification obligation under paragraph 6.20.A shall not
be limited in any way by any limitation on the amount or
type of damages, compensation, or benefits payable by or
for CONTRACTOR or any such Subcontractor, Supplier,
or other individual or entity under workers’ compensation
acts, disability benefit acts, or other employee benefit acts.
C. The indemnification obligations of CONTRAC-
TOR under paragraph 6.20.A shall not extend to the
liability of ENGINEER and ENGINEER’s Consultants or
to the officers, directors, partners, employees, agents, and
other consultants and subcontractors of each and any of
them arising out of:
1. the preparation or approval of, or the
failure to prepare or approve, maps, Drawings,
opinions, reports, surveys, Change Orders, designs,
or Specifications; or
2. giving directions or instructions, or
failing to give them, if that is the primary cause of
the injury or damage.
ARTICLE 7 - OTHER WORK
7.01 Related Work at Site
A. OWNER may perform other work related to the
Project at the Site by OWNER’s employees, or let other
direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the
Contract Documents, then:
1. written notice thereof will be given to
CONTRACTOR prior to Starting any such other
work; and
2. if OWNER and CONTRACTOR are
unable to agree on entitlement to or on the amount
or extent, if any, of any adjustment in the Contract
Price or Contract Times that should be allowed as a
result of such other work, a Claim may be made
therefore as provided in paragraph 10.05.
B. CONTRACTOR shall afford each other contractor
who is a party to such a direct contract and each utility
owner (and OWNER, if OWNER is performing the other
work with OWNER’s employees) proper and safe access to
the Site and a reasonable opportunity for the introduction
and storage of materials and equipment and the execution of
such other work and shall properly coordinate the Work
with theirs. Unless otherwise provided in the Contract
Documents, CONTRACTOR shall do ail cutting, fitting,
and patching of the Work that may be required to properly
connect or otherwise make its several parts come together
and properly integrate with such other work. CON-
TRACTOR shall not endanger any work of others by
cutting, excavating, or otherwise altering their work and will
only cut or alter their work with the written consent of
ENGINEER and the others whose work will be affected.
The duties and responsibilities of CONTRACTOR under
this paragraph are for the benefit of such utility owners and
other contractors to the extent that there are comparable
provisions for the benefit of CONTRACTOR in said direct
contracts between OWNER and such utility owners and
other contractors.
C. If the proper execution or results of any part of
CONTRACTOR’s Work depends upon work performed by
others under this Article 7, CONTRACTOR shall inspect
such other work and promptly report to ENGINEER in
writing any delays, defects, or deficiencies in such other
work that render it unavailable or unsuitable for the proper
execution and results of CONTRACTOR’s Work.
CONTRACTOR’s failure to so report will constitute an
acceptance of such other work as fit and proper for
integration with CONTRACTOR’s Work except for latent
defects and deficiencies in such other work.
7.02 Coordination
A. If OWNER intends to