READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 18, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 17 of 35. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 90-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Documents for the benefit of OWNER and
ENGINEER. Whenever any such agreement is with a
Subcontractor or Supplier who is listed as an additional
insured on the property insurance provided in paragraph
5.06, the agreement between the CONTRACTOR and the
Subcontractor or Supplier will contain provisions whereby
the Subcontractor or Supplier waives all rights against
OWNER, CONTRACTOR, ENGINEER, ENGINEER’s
Consultants, and all other individuals or entities identified in
the Supplementary Conditions to be listed as insureds or
additional insureds (and the officers, directors, partners,
employees, agents, and other consultants and subcontractors
of each and any of them) for all losses and damages caused
by, arising out of, relating to, or resulting from any of the
perils or causes of loss covered by such policies and any
other property insurance applicable to the Work. If the
insurers on any such policies require separate waiver forms
to be signed by any Subcontractor or Supplier,
CONTRACTOR will obtain the same.
6.07 Patent Fees and Royalties
General Conditions
Page 00700-21
A. CONTRACTOR shail pay ail license fees and
royalties and assume all costs incident to the use in the
performance of the Work or the incorporation in the Work
of any invention, design, process, product, or device which
is the subject of patent rights or copyrights held by others.
If a particular invention, design, process, product, or device
is specified in the Contract Documents for use in the
performance of the Work and if to the actual knowledge of
OWNER or ENGINEER its use is subject to patent rights or
copyrights calling for the payment of any license fee or
royalty to others, the existence of such rights shall be
disclosed by OWNER in the Contract Documents. To the
fullest extent permitted by Laws and Regulations,
CONTRACTOR shall indemnify and hold harmless
OWNER, ENGINEER, ENGINEER’s Consultants, and the
officers, directors, partners, employees or agents, and other
consultants of each and any of them from and against all
claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys,
and other professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to any
infringement of patent rights or copyrights incident to the
use in the performance of the Work or resulting from the
incorporation in the Work of any invention, design, process,
product, or device not specified in the Contract Documents.
6.08 Permits
A. Unless otherwise provided in the Supplementary
Conditions, CONTRACTOR shall obtain and pay for all
construction permits and licenses. OWNER shall assist
CONTRACTOR, when necessary, in obtaining such
permits and licenses. CONTRACTOR shall pay all
governmental charges and inspection fees necessary for the
prosecution of the Work which are applicable at the time of
opening of Bids, or, if there are no Bids, on the Effective
Date of the Agreement. CONTRACTOR shall pay all
charges of utility owners for connections to the Work, and
OWNER shall pay all charges of such utility owners for
capital costs related thereto, such as plant investment fees.
6.09 Laws and Regulations
A. CONTRACTOR shall give all notices and comply
with all Laws and Regulations applicable to the
performance of the Work. Except where otherwise
expressly required by applicable Laws and Regulations,
neither OWNER nor ENGINEER shall be responsible for
monitoring CONTRACTOR’s compliance with any Laws
or Regulations.
B. If CONTRACTOR performs any Work knowing
or having reason to know that it is contrary to Laws or
Regulations, CONTRACTOR shall bear all claims, costs,
losses, and damages (including but not limited to all fees
and charges of engineers, architects, attorneys, and. other
professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to such Work;
however, it shall not be CONTRACTOR’s primary
responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but
this shail not relieve CONTRACTOR of CONTRACTOR’s
obligations under paragraph 3.03.
C. Changes in Laws or Regulations not known at the
time of opening of Bids (or, on the Effective Date of the
Agreement if there were no Bids) having an effect on the
cost or time of performance of the Work may be the subject
of an adjustment in Contract Price or Contract Times. If
OWNER and CONTRACTOR are unable to agree on
entitlement to or on the amount or extent, if any, of any such
adjustment, a Claim may be made therefore as provided in
paragraph 10.05.
6.10 Taxes
A. CONTRACTOR shall pay all sales, consumer,
use, and other similar taxes required to be paid by
CONTRACTOR in accordance with the Laws and
Regulations of the place of the Project which are applicable
during the performance of the Work.
6.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas
1. CONTRACTOR shall confine
construction equipment, the storage of materials and
equipment, and the operations of workers to the Site
and other areas permitted by Laws and Regulations,
and shall not unreasonably encumber the Site and
other areas with construction equipment or other
materials or equipment. CONTRACTOR shall
assume full responsibility for any damage to any
such land or area, or to the owner or occupant
thereof, or of any adjacent land or areas resulting
from the performance of the Work.
2. Should any claim be made by any such
owner or occupant because of the performance of
the Work, CONTRACTOR shall promptly settle
with such other party by negotiation or otherwise
resolve the claim by arbitration or other dispute
resolution proceeding or at law.
3. To the fullest extent permitted by Laws
and Regulations, CONTRACTOR shall indemnify
and hold harmless OWNER, ENGINEER,
ENGINEER’s Consultant, and the officers,
directors, partners, employees, agents, and other
consultants of each and any of them from and
against all claims, costs, losses, and damages
(including but not limited to all fees and charges of
engineers, architects, attorneys, and other
professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to
General Conditions
Page 00700-22
any claim or action, legal or equitable, brought by
any such owner or occupant against OWNER,
ENGINEER, or any other party indemnified
hereunder to the extent caused by or based upon
CONTRACTOR's performance of the Work.
B. Removal of Debris During Performance of the
Work: During the progress of the Work CONTRACTOR
shall keep the Site and other areas free from accumulations
of waste materials, rubbish, and other debris. Removal and
disposal of such waste materials, rubbish, and other debris
shall conform to applicable Laws and Regulations.
C. Cleaning: Prior to Substantial Completion of the
Work CONTRACTOR shall clean the Site and make it
ready for utilization by OWNER. At the completion of the
Work CONTRACTOR shall remove from the Site all tools,
appliances, construction equipment and machinery, and
surplus materials and shall restore to original condition all
property not designated for alteration by the Contract
Documents.
D. Loading Structures: CONTRACTOR shall not
load nor permit any part of any structure to be loaded in any
manner that will endanger the structure, nor shall
CONTRACTOR subject any part of the Work or adjacent
property to stresses or pressures that will endanger it.
6.12 Record Documents
A. CONTRACTOR shall maintain in a safe place at
the Site one record copy of all Drawings, Specifications,
Addenda, Written Amendments, Change Orders, Work
Change Directives, Field Orders, and written interpretations
and clarifications in good order and annotated to show
changes made during construction. These record
documents together with all approved Samples and a
counterpart of all approved Shop Drawings will be available
to ENGINEER for reference. Upon completion of the
Work, these record documents, Samples, and Shop
Drawings will be delivered to ENGINEER for OWNER.
6.13. Safety and Protection
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
A. CONTRACTOR shall be solely responsible for
initiating, maintaining and supervising all safety precautions
and programs in connection with the Work.
CONTRACTOR shall take all necessary precautions for the
safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be
affected by the Work;
2. all the Work and materials and equip-
ment to be incorporated therein, whether in storage
on or off the Site; and
3. other property at the Site or adjacent
thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and
Underground Facilities not designated for removal,
relocation, or replacement in the course of
construction.
B. CONTRACTOR shall comply with all applicable
Laws and Regulations relating to the safety of persons or
property, or to the protection of persons or property from
damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection.
CONTRACTOR shall notify owners of adjacent property
and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall
cooperate with them in the protection, removal, relocation,
and replacement of their property. All damage, injury, or
loss to any property referred to in paragraph 6.13.A.2 or
6.13.A.3 caused, directly or indirectly, in whole or in part,
by CONTRACTOR, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by
any of them to perform any of the Work, or anyone for
whose acts any of them may be liable, shall be remedied by
CONTRACTOR (except damage or loss attributable to the
fault of Drawings or Specifications or to the acts or
omissions of OWNER or ENGINEER or ENGINEER’s
Consultant, or anyone employed by any of them, or anyone
for whose acts any of them may be liable, and not
attributable, directly or indirectly, in whole or in part, to the
fault or negligence of CONTRACTOR or = any
Subcontractor, Supplier, or other individual or entity
directly or indirectly employed by any of them).
CONTRACTOR?’s duties and responsibilities for safety and
for protection of the Work shall continue until such time as
all the Work is completed and ENGINEER has issued a
notice to OWNER and CONTRACTOR in accordance with
paragraph 14.07.B that the Work is acceptable (except as
otherwise expressly provided in connection with Substantial
Completion).
6.14 Safety Representative
A. CONTRACTOR shall designate a qualified and
experienced safety representative at the Site whose duties
and responsibilities shall be the prevention of accidents and
the maintaining and supervising of safety precautions and
programs.
6.15 Hazard Communication Programs
A. CONTRACTOR shall be responsible for coordi-
nating any exchange of material safety data sheets or other
hazard communication information required to be made
General Conditions
Page 00700-23
available to or exchanged between or among employers at
the Site in accordance with Laws or Regulations.
6.16 Emergencies
A. In emergencies affecting the safety or protection of
persons or the Work or property at the Site or adjacent
thereto, CONTRACTOR is obligated to act to prevent
threatened damage, injury, or loss. CONTRACTOR shall
give ENGINEER prompt written notice if CONTRACTOR
believes that any significant changes in the Work or
variations from the Contract Documents have been caused
thereby or are required as a result thereof. If ENGINEER
determines that a change in the Contract Documents is
required because of the action taken by CONTRACTOR in
response to such an emergency, a Work Change Directive
or Change Order will be issued.
6.17 Shop Drawings and Samples
A. CONTRACTOR shall submit Shop Drawings to
ENGINEER for review and approval in
