Okaloosa County BOCC — February 18, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 14 of 35. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 90-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
indicated in the Contract Documents; or
4. is of an unusual nature, and differs materially from
conditions ordinarily encountered and generally recognized
as inherent in work of the character provided for in the
Contract Documents;
then CONTRACTOR shall, promptly after becoming aware
thereof and before further disturbing the subsurface or
physical conditions or performing any Work in connection
therewith (except in an emergency as required by paragraph
6.16.A), notify OWNER and ENGINEER in writing about
such condition. CONTRACTOR shali not further disturb
such condition or perform any Work in connection
therewith (except as aforesaid) until receipt of written order
to do so.
B. ENGINEER’s Review: After receipt of written
notice as required by paragraph 4.03.A, ENGINEER will
promptly review the pertinent condition, determine the
necessity of OWNER's obtaining additional exploration or
tests with respect thereto, and advise OWNER in writing
(with a copy to CONTRACTOR) of ENGINEER’s findings
and conclusions.
C. Possible Price and Times Adjustments
1. The Contract Price or the Contract
Times, or both, will be equitably adjusted to the
extent that the existence of such differing subsurface
or physical condition causes an increase or decrease
in CONTRACTOR’s cost of, or time required for,
performance of the Work; subject, however, to the
following:
a. such condition must meet any one or
more of the categories described in paragraph
4.03.A; and
General Conditions
Page 00700-12
EEEEEEIEIIETE Tc re
4.04
b. with respect to Work that is paid for on a
Unit Price Basis, any adjustment in Contract
Price will be subject to the provisions of para-
graphs 9.08 and 11.03.
2. | CONTRACTOR shall not be entitled to
any adjustment in the Contract Price or Contract
Times if:
a. CONTRACTOR knew of the existence
of such conditions at the time CONTRACTOR
made a final commitment to OWNER in respect
of Contract Price and Contract Times by the
submission of a Bid or becoming bound under a
negotiated contract; or
b. the existence of such condition could
reasonably have been discovered or revealed as a
result of any examination, investigation,
exploration, test, or study of the Site and
contiguous areas required by the Bidding
Requirements or Contract Documents to be
conducted by or for CONTRACTOR prior to
CONTRACTOR's making such final com-
mitment; or
c. CONTRACTOR failed to give the
written notice within the time and as required by
paragraph 4.03.A.
3. If OWNER and CONTRACTOR are
unable to agree on entitlement to or on the amount
or extent, if any, of any adjustment in the Contract
Price or Contract Times, or both, a Claim may be
made therefore as provided in paragraph 10.05.
However, OWNER, ENGINEER, and
ENGINEER’s Consultants shall not be liable to
CONTRACTOR for any claims, costs, losses, or
damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other
dispute resolution _ costs) sustained — by
CONTRACTOR on or in connection with any other
project or anticipated project.
Underground Facilities
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800)
A. Shown or Indicated: The information and data
shown or indicated in the Contract Documents with respect
to existing Underground Facilities at or contiguous to the
Site is based on information and data furnished to OWNER
or ENGINEER by the owners of such Underground
Facilities, including OWNER, or by others. Unless it is
otherwise expressly provided in the Supplementary
Conditions:
1. OWNER and ENGINEER shall not be
responsible for the accuracy or completeness of any
such information or data; and
2. the cost of all of the following will be
included in the Contract Price, and CONTRACTOR
shall have full responsibility for:
a. reviewing and checking all such
information and data,
b. locating all Underground Facilities
shown or indicated in the Contract Documents,
c. coordination of the Work with the
owners of such Underground Facilities,
including OWNER, during construction, and
d. the safety and protection of all such
Underground Facilities and repairing any
damage thereto resulting from the Work.
B. Not Shown or Indicated
1. If an Underground Facility is uncovered
or revealed at or contiguous to the Site which was
not shown or indicated, or not shown or indicated
with reasonable accuracy in the Contract
Documents, CONTRACTOR shall, promptly after
becoming aware thereof and before further
disturbing conditions affected thereby or performing
any Work in connection therewith (except in an
emergency as required by paragraph 6.16.A),
identify the owner of such Underground Facility and
give written notice to that owner and to OWNER
and ENGINEER. ENGINEER will promptly review
the Underground Facility and determine the extent,
if any, to which a change is required in the Contract
Documents to reflect and document the
consequences of the existence or location of the
Underground Facility. During such time,
CONTRACTOR shall be responsible for the safety
and protection of such Underground Facility.
2. IfENGINEER concludes that a change in
the Contract Documents is required, a Work Change
Directive or a Change Order will be issued to reflect
and document such consequences. An equitable
adjustment shall be made in the Contract Price of
Contract Times, or both, to the extent that they are
attributable to the existence or location of any
Underground Facility that was not shown or
indicated or not shown or indicated with reasonable
accuracy in the Contract Documents and that
CONTRACTOR did not know of and could not
reasonably have been expected to be aware of or to
have anticipated. If OWNER and CONTRACTOR
General Conditions
Page 00700-13
are unable to agree on entitlement to or on the
amount or extent, if any, of any such adjustment in
Contract Price or Contract Times, OWNER or
CONTRACTOR may make a Claim therefor as
provided in paragraph 10.05.
4.05 Reference Points
A. OWNER shall provide engineering surveys to
establish reference points for construction which in
ENGINEER’s judgment are necessary to enable CON-
TRACTOR to proceed with the Work. CONTRACTOR
shall be responsible for laying out the Work, shall protect
and preserve the established reference points and property
monuments, and shall make no changes or relocations
without the prior written approval of OWNER.
CONTRACTOR shall report to ENGINEER whenever any
reference point or property monument is lost or destroyed or
requires relocation because of necessary changes in grades
or locations, and shall be responsible for the accurate
replacement or relocation of such reference points or
property monuments by professionally qualified personnel.
4.06 Hazardous Environmental Condition at Site
A. Reports and Drawings: Reference is made to the
Supplementary Conditions for the identification of those
reports and drawings relating to a Hazardous Environmental
Condition identified at the Site, if any, that have been
utilized by the ENGINEER in the preparation of: the
Contract Documents.
B. Limited Reliance by CONTRACTOR on Technical
Data Authorized) CONTRACTOR may rely upon the
general accuracy of the “technical data” contained in such
reports and drawings, but such reports and drawings are not
Contract Documents. Such “technical data” is identified in
the Supplementary Conditions. Except for such reliance on
such “technical data,” CONTRACTOR may not rely upon
or make any Claim against OWNER, ENGINEER or any of
ENGINEER’s Consultants with respect to:
1. the completeness of such reports and
drawings for CONTRACTOR’s purposes, including,
but not limited to, any aspects of the means,
methods, techniques, sequences and procedures of
construction to be employed by CONTRACTOR
and safety precautions and programs incident
thereto; or
2. other data, interpretations, opinions and
information contained in such reports or shown or
indicated in such drawings; or
3. any CONTRACTOR interpretation of or
conclusion drawn from any “technical data” or any
such other data, interpretations, opinions or
information.
C. CONTRACTOR shall not be responsible for any
Hazardous Environmental Condition uncovered or revealed
at the Site which was not shown or indicated in Drawings or
Specifications or identified in the Contract Documents to be
within the scope of the Work. CONTRACTOR shall be
responsible for a Hazardous Environmental Condition
created with any materials brought to the Site by
CONTRACTOR, Subcontractors, Suppliers, or anyone else
for whom CONTRACTOR is responsible.
D. If CONTRACTOR encounters a Hazardous
Environmental Condition or if CONTRACTOR or anyone
for whom CONTRACTOR is responsible creates a
Hazardous Environmental Condition, CONTRACTOR
shall immediately: (i) secure or otherwise isolate such
condition; (ii) stop all Work in connection with such
condition and in any area affected thereby (except in an
emergency as required by paragraph 6.16); and (iii) notify
OWNER and ENGINEER (and promptly thereafter confirm
such notice in writing). OWNER shall promptly consult
with ENGINEER concerning the necessity for OWNER to
retain a qualified expert to evaluate such condition or take
corrective action, if any.
E. CONTRACTOR shall not be required to resume
Work in connection with such condition or in any affected
area until after OWNER has obtained any required permits
related thereto and delivered to CONTRACTOR written
notice: (i) specifying that such condition and any affected
area is or has been rendered safe for the resumption of
Work; or (ii) specifying any special conditions under which
such Work may be resumed safely. If OWNER and
CONTRACTOR cannot agree as to entitlement to or on the
amount or extent, if any, of any adjustment in Contract Price
or Contract Times, or both, as a result of such Work stop-
page or such special conditions under which Work is agreed
to be resumed by CONTRACTOR, either party may make a
Claim therefor as provided in paragraph 10.05.
F. If after receipt of such written notice
CONTRACTOR does not agree to resume such Work
based on a reasonable belief it is unsafe, or does not agree
to resume such Work under such special conditions, then
OWNER may order the portion of the Work that is in the
area affected by such condition to be deleted from the
Work. If OWNER and CONTRACTOR cannot agree as to
entitlement to or on the amount or extent, if any, of an
adjustment in Contract Price or Contract Times as a result
of deleting such portion of the Work, then either party may
make a Claim therefor as provided in paragraph 10.05.
OWNER may have such deleted portion of the Work
performed by OWNER’s own forces or others in accor-
dance with Article 7.
G. To the fullest extent permitted by Laws and
Regulations, OWNER shall indemnify and hold harmless
CONTRACTOR, Subcontractors, ENGINEER,
ENGINEER’s Consultants and the officers, directors,
General Conditions
Page 00700-14
partners, employees, agents, other consultants, and
subcontractors of each and any of them from and against all
claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys,
and other professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to a
Hazardous Environmental Condition, provided that such
Hazardous Environmental Condition: (i) was not shown or
indicated in the Drawings or Specifications or identified in
the Contract Documents to be included within the scope of
the Work, and (ii) was not created by CONTRACTOR or
by anyone for whom CONTRACTOR is responsible.
Nothing in this paragraph 4.06.E shall obligate OWNER to
indemnify any individual or entity from and against the
consequences of that individual’s or entity’s own
negligence.
H. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless OWNER, ENGINEER, ENGINEER’s Consul-
tants, and the officers,