Okaloosa County BOCC — September 16, 2014 — PFC6 Project Description & Capital Plan — reading text
Part 2 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 218-PFC6 Project Description _ Capital Plan.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
and recreational fliers
as part the Airport's operational mix. Eglin AFB is one of the busiest U.S.
Air Force bases in the country and serves aircraft ranging from low-speed
helicopters and fixed-wing aircraft to high performance jet fighters.
Controller eyes on the field and airspace contro! between Destin and Eglin
will dramatically enhance the safety at DTS and Eglin.
A Benefit Cost Analysis ("BCA") quantifying the benefits of establishing
the ATCT at Destin was completed in May of 2009 quantifying the delay
implications of continuing to operate Destin without a tower and accepting
delays occasioned by holding aircraft until receiving clearance from the
Eglin Tower. The calculated annual delay of Destin continuing to operate
without a tower, as proposed, was $2,077,616 annually in 2009 dollars,
including crew costs. As a result of the BCA, Destin was admitted into
FAA's Contract Tower Program in July of 2010.
An ATCT Siting Study was completed in 2012, subsequently; an
Environmental Assessment was completed and approved by the FAA in July
of 2013. The proposed ATCT is located 550-feet from the centerline of
Runway 14-32 and 3,600 feet from the existing approach end of Runway 14
at Eglin. The proposed tower height is 70' to 84.5'. The tower cab will be
accessed by stairs and an elevator located in the shaft of the tower. Due to
the limited height of the tower, it is assumed that a small base building will
be required to house necessary equipment and airport support functions. The
project includes a 3,400-feet roadway and site utilities necessary (i.e., water,
sanitary, etc.) to make the ATCT functional,
The project will be funded with $2 million in AIP funds under AIP Grant
No. 3-12-0020-017-2014, $1,250,000 in PFCs, and $1,486,682 in FDOT
funds and the balance from County funds.
6 of 10
12
13
14
Terminal Area Rehabilitations & Improvements Phase 1
PFC Level: $4.50 PFC Revenue: $26,250
Description: During the period FY2015 through FY2017, the County will
undertake a series of Terminal Area (terminal building, apron, parking and
access improvements) to repair, rehabilitate and preserve Terminal Area
infrastructure for VPS to ensure that these facilities are preserved as
functional elements of the VPS for the ensuing 20-year period.
The individual projects included within this Project 12 include the
following:
12-A Terminal Flooring Area Improvements (PFC Revenue $15,000)
Description: This project will install terrazzo flooring in the ticketing wing
and baggage claim wing of the Terminal Building to provide a long-term
flooring improvement to these public areas of the Terminal. This
improvement will eliminate the need for periodic flooring replacement
during the useful life of the Terminal Building.
12-B Terminal Lighting Improvements (PFC Revenue $11,250)
Description: This project will replace the incandescent lighting fixtures
within the public areas of the Terminal Building with new LED lighting
installations.
PFCs will fund the local share of the project not otherwise funded from AIP
and FDOT funds.
Parking Lighting Improvements
PFC Level: $4.50 PFC Revenue: $11,250
Description: This project will replace the incandescent lighting in the
Public Parking Lots of the Airport with new LED lighting installations.
PFCs will fund the local share of the project not otherwise funded from AIP
and FDOT funds.
Complete Expansion of Second Level Pier Concourse
PFC Level: $4.50 PFC Revenue: $500,000
Description: This project will complete the gate development at the end of
the second level of VPS's Pier Concourse. The project will complete the
balance of work which remained after the two-gate addition was added
under PFC Application No. 10-05-C-00-VPS and AIP Grant No, 3-12-0081-
023-2010. This project will add 5,500 square feet of space. The expansion
7 of 10
15
16
will include 2,000 square feet of holdroom space, 1,500 square feet of shell
space to be developed into passenger concession facilities, with the balance
of 2,000 square feet being public and mechanical space. The project will
include the installation of a passenger loading bridge with ground power,
passenger bag lift, and conditioned air. PFCs will cover $500,000 of the cost
‘of this project. The balance of $3.5 million will come from $30 million in
AIP entitlements and MAP discretionary funds and $500,000 in FDOT
funds.
Rehabilitate Fuel Farm Tanks & Pumps
PFC Level: $4.50 PFC Revenue: $45,000
Description: This project will recondition and rehabilitate the storage tanks
at the Airport's fuel farm. After sand blasting and cleaning the tanks and
pipes comprising the system, they will be recoated. The project will also
retrofit and rehabilitate the fuel farm pump system. PFCs will be used only
for the aviation fuel part of the fuel farm. PFCs will cover the local share of
the project cost matching $45,000 in FDOT. Ninety percent (90%), or
$810,000 of $900,000 of the total cost, will be funded from AIP funds.
Acquire Long Term Lease on Land Comprising NWFRA
PFC Level: $4.50 PFC Revenue: $6,956,880
Description: Okaloosa County ("County") proposes to obtain from the
United States Air Force ("USAF") a new, long-term, real property lease
("New Lease") for the Northwest Florida Regional Airport ("VPS" or
"NWFRA"). The preferred term would be 99 years, but at a minimum the
County proposes to acquire a lease of at least a 50-year term. At the same
time, the County proposes to acquire a new Joint Use Agreement ("JUA") of
like term duration which will not be part of this PFC project. The County's
current JUA with the USAF expires on February 27, 2031. The proposed
New Lease would replace the existing lease ("Existing Lease") which is an
operating lease which expires July 16, 2038. The Existing Lease, which was
originally a 25-year lease, was extended in July of this year to the new July
16, 2038 expiration date.
The County proposes to convert the New Lease into a "capitalized lease"
which would allow the County to make a one-time, up-front capitalized
lease payment to the USAF representing the fair market value of the
leasehold interest acquired or the net present value of the lease payments
over the term, whichever is less, in lieu of making annual operating lease
rental payments. Converting the County's leasehold to this capitalized lease
would allow the County to make this one-time, up-front payment for the
New Lease from Airport Improvement Program ("AIP") grant funds and
Passenger Facility Charges ("PFCs"). AIP funds are anticipated to come
from AIP discretionary funds designated for VPS under its current Military
8 of 10
17
Airports Program designation (Fiscal Years 2012 - 2016) and AIP
entitlements. Changing the County's leasehold from an operating to a capital
lease, as proposed, would reduce NWFRA's average annual operating cost
"(under its Existing Lease) by approximately $554,000 annually, or the
equivalent of $1.23 per enplaned passenger. Since the Existing Lease is an
operating lease, periodic annual rental payments are treated as operating
costs in the airline rates and charges calculation. Assuming the County
acquires a long-term, capitalized lease as its New Lease for the minimum
period of 50 years, the projected operating cost savings to the County and
the airlines over the 50-year term would be approximately $45 million.
Acquisition of the long-term, capitalized New Lease, as proposed, and the
acquisition of a new, long-term JUA of 50 years or more, would assure that
VPS has a long-term, adequate interest in land and also provide long-term
access to Eglin Flying facilities to allow for the continuous operation of the
Northwest Florida Regional Airport and to enable the County to finance
future airport development through the Airport Improvement Program
(satisfying applicable AIP Grant Assurances) and the issuance of general
airport revenue bonds ("GARBs"). The project cost of $8.5 million would be
funded by $3 million in MAP funds, $5 million in PFC pay-as-you-go and
capital funds, and $.5 million from FDOT. PFC revenue would cover pay-
as-you-go and bond capital and financing costs of $6,956,880.
Improvements to West Side Parking Apron
PFC Level: $4.50 PFC Revenue: $90,000
Description: This project involves the milling and removal of the surface of
the West Aircraft Parking Apron at the Airport's Pier Concourse's Lower
Level and replacing the asphalt with a concrete overlay of sufficient strength
to support the parking and taxiing of a diverse mix of larger aircraft
projected for VPS (i.e., larger regional jets of 90 seats or more and narrow
body mainline jets like the Boeing 717), PFCs will cover the local share of
this project with a like match from FDOT. Ninety percent (90%), or
$1,620,000 of the total cost of $1,800,000 will be funded from AIP funds.
9 of 10
18
19
Rehabilitate Taxiways D-1 & D-2
PFC Level: $4.50 PFC Revenue: $135,000
Description: This project will rehabilitate Taxiway D-1, originally
constructed in the 1970s and widened in 2001, but not rehabilitated. It will
provide a 3" asphalt overlay on the full strength pavement and 2” overlay on
the shoulder, after milling and removing unsuitable pavement, and replace
taxiway lighting fixtures, cans, conduit and cable with LEDs. Taxiway D-1
is one of two airport taxiways connecting the VPS Terminal Apron to the
Eglin Flying Facilities. This project will also rehabilitate and improve
Taxiway D-2, the parallel taxiway to D-1 originally constructed as part of
the Terminal Development Program, in a like manner to Taxiway D-1. The
existing taxiway signs, foundations, conduit and cable of both taxiways will
also be replaced under this project. PFCs will fund the County's portion of
the local share of this project. Ninety percent (90%) or $2,430,000 of the
project cost of $2,7 million will be funded by AIP entitlements.
PFC Program Formulation and Administrative Costs
PFC Level: $4.50 PFC Revenue: $50,000
Description: This project will reimburse the County for the program
formulation expenses incurred to develop the proposed PFC program,
consult with the airlines, provide for public comment, prepare and file
Application No. 14-06-C-00-VPS and related attachments, and notify
airlines of collection requirements and annual administrative expenses
incurred to administer collection under the proposed Application, including
accounting, auditing and FAA and airline reporting expenses for the
proposed collection period plus the cost of preparing any amendments
required and application closeout documents. Project formulation expenses
are estimated to be $32,000, while the balance of $18,000 is the estimated
administrative expense over the collection and closeout period.
10 of 10
PFC APPLICATION NO. 14-06-C-00-VPS
PFC PROJECT CAPITAL PLAN
LOCAL FUNDING
PFC AIPIPEC PFC
PROJECT FISCAL ELIGIBLE FEDERAL FUNDS FDOT Pay-As- BOND
NUMBER DESCRIPTION YEAR | TOTAL COST % ENTITLEMENT | DISCRETIONARY| GA ENTITLEMENTS MAP. FUNDS GP FUNDS You-Go CAPITAL
REIMBURSEABLE PROJECTS: (1)
BOB SIKES AIRPORT:
1 Purchase 36 Acres of Land to Construct New Access System $ 829,000 $ 10,000 | $ 849,000
2 Rehabilitate & Widen Taxiway A $ 6,634,365 $ 3,603,845 | $ 487,853 $ 2,301,747 $ 180,920
3 Stormwater Master Plan $ 408,200 $ 178,383 $ 229,817
4 Stormwater Improvements $ 3,053,064 $ 810,441 $ 892,870 $ 133,608 | $ 1,216,052
5 North Apron Expansion $1,554,139 $ 1,554,139
TOTAL REIMBURSEABLE PROJECTS § 12,478,765 | $ -|$ “1S 4,692,669 | $ 487,863 | $ o[$ 3,284,617 | $ -|[$ 294,618] $ 3,819,008
F¥2043;
NWERA:
6 Construct Quick Response ARFF Bldg to Serve VPS 2013 | $ 3,048,762 |$ 2,743,526 |$ 2,743,526 $ -|$ 150,000 $ 155,236
Total FY2043 $ 3,048,762] $ 2,743,626] $ 2,743,626 | $ -|$ $ -1$ 150,000 | $ -[$ 156,236 | § -
FY2014:
NWFRA:
7 Replace Ramp Sweeper for VPS Air Side 2014 | $ 73,000 $ 73,000
& Replace Regional Boarding Ramps with Passenger Loading 2014 7$ 2,084,873] $ 1,876,387] $ 1,876,387 $ 104,243 $ 104,243
Bridges at Gates