PROJECT DESCRIPTIONS, PFC CHARGE AND PFC REVENUE
PFC
Project No.
Descriptions, PFC Charge and PFC Revenue
1
Purchase 35 Acres of Land to Construct New Access System at CEW
PFC Level: $4.50 PFC Revenue: $937,107
Description: This project would authorize the use of PFC revenue to pay
the bond capital and financing and interest cost on a 10-year loan used to
acquire thirty-five (35) acres of land between the airport and Interstate 90
upon which the County will construct a new access system for Bob Sikes
Airport and reimburse the County for certain pay-as-you-go expenses
related to the acquisition and financing for this project. A sketch showing
the preliminary alignment of the access is attached.
The specific features of the proposed access will include the following:
1. | Construct a new median cut and intersection with Highway 90 located
a minimum of 1,000 feet west of the Fairchild Road intersection.
2. Construct a new two-lane airport access and circulation roadway
approximately 1.0 miles in length from Highway 90 to John Givens
Road.
3. Improve the intersection geometrics with John Givens Road to
eliminate the slight offset.
The County, in conjunction with the Florida Department of Transportation,
has initiated conceptual design of this project and is now engaged in project
definition, preliminary alignment for the access, and an environmental
assessment.
Rehabilitate and Widen Taxiway A at CEW
PEC Level: $4.50 PFC Revenue: $150,920
Description: This project involves the rehabilitation of the pavement of
Taxiway A, the widening of the south end of the taxiway by 25 feet to
correct a runway/taxiway separation deficiency as well as widening of the
entire north half of the taxiway to accommodate larger aircraft planned to
utilize the airport. It also includes the rehabilitation of taxiway lighting and
the widening of a number of taxiway connectors to the runway. This project
will authorize the use of PFC pay-as-you-go revenue to pay for the AIP/PFC
eligible costs not otherwise funded from AIP funds under AIP Grant No. 3-
12-0014-022-2010 and FDOT funds,
1 of 10
Stormwater Master Plan for CEW
PFC Level: $4.50 PFC Revenue: $271,751
Description: This project involved a master plan study to inventory existing
and planned impervious surfaces at Bob Sikes Airport, inventory existing
airport facilities available for attenuating stormwater runoff, and the analysis
and planning design of additional facilities required to capture, transmit,
treat and attenuate stormwater from existing and planned impervious
surfaces of the airport. The end product of this planning effort is a
comprehensive Stormwater Management Plan for the airport necessary to
comply with the regulatory and permitting requirements of the Federal
Clean Water Act, FAA Regulations, and Okaloosa County and the
Northwest Florida Water Management District's ("NWFWMD") water
quality and environmental permitting requirements, PFCs will fund that
portion of the bond capital and financing and interest cost on a loan the
County incurred to fund the portion of this project not otherwise funded
from AIP Grant No, 3-12-0014-022-2010 and FDOT funds.
Stormwater Improvements at CEW
PFC Level: $4.50 PFC Revenue: $1,571,639
Description: This project involved the construction of improvements
recommended in Phase I of the Bob Sikes Airport Stormwater Management
Plan. These improvements, including piping, transmission lines, retention
and attenuation facilities, all required to capture, transport, treat and release
stormwater from existing airport impervious surfaces plus those additional
new impervious surfaces proposed to be constructed under the County's
umbrella project "Rehabilitate & Widen Taxiway A", Existing impervious
surfaces which would be serviced by these stormwater improvements
include the existing runway and taxiway system at the airport, existing
public and tenant aircraft aprons and aircraft parking areas. Additions to
impervious areas include the widened areas of Taxiway A, widened
connectors to Taxiway A, and the expansion of the North Apron. Eighty-one
percent (81%) of the stormwater improvements to be constructed under the
project are for AIP/PFC eligible aircraft operating and parking areas, either
existing or constructed as part of the overall umbrella project, Rehabilitate
and Widen Taxiway A. FAA funded only thirty-one percent (31%) of the
cost of these stormwater improvements under AIP Grant Agreement No. 3-
12-0014-022-2010. PFC pay-as-you-go and PFC Bond Capital funds were
used to permanently finance the balance of the AIP/PFC eligible elements of
the project. This PFC revenue will cover both pay-as-you-go and bond
capital and financing and interest costs for this project.
2 of 10
North Apron Expansion at CEW
PFC Level: $4.50 PFC Revenue: $1,837,717
Description: This project involved the construction of an expansion to the
north public use apron of Bob Sikes Airport. The expansion includes the
addition of both 15,000 SY and 14,000 SY asphalt aprons north of the
existing north apron. This apron expansion is shown in the currently
approved ALP and Master Plan Update for Bob Sikes Airport. This PFC
revenue will repay bond capital and financing and interest costs on a ten-
year loan borrowed for this project.
Construct Quick Response ARFF Building to Serve VPS
PFC Level; $4.50 PFC Revenue: $155,236
Description: This facility to serve the Northwest Florida Regional Airport
consists of an approximately 8,600 square foot Airport Rescue and Fire
Fighting (ARFF) station with three truck bays. This station will include
bunk rooms, kitchen, office/operations space, fitness room, support rooms,
and locker rooms. The site improvements include concrete truck access
drives into and out of the truck bays, a vehicular parking lot with markings
and signage, stormwater and utility improvements, and associated grading
and sodding. The facility will be staffed, equipped and operated by the
United States Air Force. PFC revenue will cover pay-as-you-go local share
costs not otherwise funded by AIP Grant No. 3-12-0081-025-2013.
Acquire Ramp Sweeper for VPS Air Side
PFC Level: $4.50 PFC Revenue: $73,000
Description: This project involved the acquisition of a 63-horsepower, 50-
inch rotary ramp sweeper and vacuum to use to clear dirt, debris and foreign
objects from the aprons and taxiways of VPS. This sweeper will replace a
Tenant Ramp Sweeper which was purchased in 2001 and is 12 years old and
in need of replacement. PFC revenue will fund the County's entire cost of
this project.
3 of 10
Replace Regional Boarding Ramps with Passenger Loading Bridges at
Gates A-1 and A-2 and Install Bag Lifts for Passenger Loading Bridges
at VPS Gates A-1, A-2, B-2 and B-3
PFC Level: $4.50 PFC Revenue: $104,243
Description: This project will replace the Regional Boarding Ramps
("RBRs") as manufactured by Infra-Structures/East Island Aviation at Gates
A-1| and A-2, which had to be removed from these gates because of safety
concerns and the inability of the County to effectuate structural repairs, with
new apron drive Passenger Loading Bridges ("PLBs"). Included in this
project will be the re-placement of the existing 400hz/48VDC ground power
units and the pre-conditioned air units onto the new Passenger Loading
Bridges. The new bridge structure will consist of a ramped fixed tunnel, a
rotating rotunda, telescoping bridge tunnel section, a cab with full controls
for moving the bridge into position, vertical and horizontal drive system,
baggage lift system, and a re-marking of the apron for the new parking
positions associated with revised docking procedures which are designed to
accommodate a larger mix of aircraft at these positions. These positions will
be able to accommodate regional jets, narrow body jets, and a small
percentage of turboprop aircraft.
This project will also install hydraulic bag lifts on the passenger loading
bridges at A-1 and A-2 on the ground level and Gates B-2 and B-3 on the
second level of the Airport's pier concourse. These bag lifts are now integral
parts of passenger loading bridges ("PLBs"), but were not so when these
bridges were installed in 2004. (Recently installed PLBs on Gates 5 and 6
have the lifts.)
PFCs will cover that portion of the project cost not otherwise funded by AIP
grant funds under AIP Grant No. 3-12-0081-026-2014 and FDOT funds.
Construct Cell Phone Waiting Area on Access Roadway at VPS
PFC Level: $4.50 PFC Revenue: $125,000
Description: This Cell Phone Waiting Area ("CWA") project will consist of
the design and reconstruction of an approximately 40-space parking area in
an existing area of the West Credit Card Parking Lot at VPS as a cell phone
waiting area for vehicles picking up passengers at the Airport. Only
AIP/PFC eligible portions of the project are included for PFC approval.
(WiFi and FIDs equipment will not be included as part of the project.)
Project work will include the following construction items required to
modify the existing parking lot for the proposed cell phone waiting area:
1. A new concrete island along the southern limits of the CWA to
delineate the CWA from the Credit Card Parking Lot.
4 of 10
10
2. Removal of existing concrete curb, concrete sidewalk, and
landscaping to accommodate the new one-way entry and exit drives.
3. Removal of existing concrete island in the southwest corner of the
proposed CWA.
4. Removal of approximately 48 feet (24 feet for entry and 24 feet for
exit) of the existing covered walkway.
5. Pavement remarking of the CWA and affected portion of the West
Credit Card Parking Lot.
6. Placement of new asphalt one-way entry and exit drives and concrete
curbs.
7. Installation of vehicular signage.
This project is being entirely funded from pay-as-you-go PFCs.
Construct Security Checkpoint Exit Lane Control System at VPS
PFC Level: $4.50 PFC Revenue: $337,500
Description: Due to changes in TSA rules, Northwest Florida Regional
Airport has identified a need to develop a technology solution to monitor the
Exit Lane located at the security check point in its Terminal Building.
Currently the Exit Lane where arriving passengers exit at the security check
point at the first level of the terminal is manned by a TSA officer to prevent
unauthorized entry to the sterile area of the concourse facility. TSA has
notified the County that it will no longer staff this exit. Although there has
been a temporary suspension of TSA's removal of staffing at the exit, a
technology solution to monitor the exit is necessary.
The proposed Exit Lane reconfiguration and improvements will include
modifications to the current exit area to include set of doors and electronic
detection devices. The system will monitor the exit flow and any reverse
movement will be detected and alarmed. Upon detection of reverse flow,
alarms will be initiated and upstream doors will be locked to prevent
persons from re-entering into the sterile area.
These TSA Exit Lane modifications and improvements will include glass
dividing walls/barricades, CCTV cameras, motion sensing equipment and
sliding glass doors.
The design and installation of the system are subject to TSA approval. The
project will be funded fifty percent (50%) from pay-as-you-go PFCs and
fifty percent (50%) from FDOT funds.
5 of 10
1]
Construct and Equip Air Traffic Control Tower at DTW
PFC Level: $4.50 PFC Revenue: $1,250,000
Description: Destin Airport's proximity to Northwest Florida Regional
Airport/Eglin Air Force Base's, its increasing air traffic, and a diversified
aircraft performance fleet mix has prompted Okaloosa County to propose
the construction of a Visual Flight Rules (less than five (5) miles) Air
Traffic Control Tower ("ATCT") at the Airport and to seek participation in
the FAA Contract Tower Program. Destin Airport is a general aviation
airport serving a wide range of aircraft business jets, military aircraft, all
banner-towing airplanes, parasails, sightseeing flights,