Bid Tabulation for
DESTIN ‐ FORT WALTON BEACH AIRPORT
CHECKED BAGGAGE SCREENING PROJECT
OKALOOSA COUNTY AIRPORTS
Bid Opening: 4/29/2015, 2:00 PM
Cathey Construction and Pinnacle Construction Support
Engineer's Estimate Lord and Son Construction Inc.
Bid #: AP 37‐15 Development, LLC Group Inc.
Spec
Description UOM Quant. Unit Value Extended Value Unit Value Extended Value Unit Value Extended Value Unit Value Extended Value
Section
GENERAL CONDITIONS - BASE BID
100 Insurance and Bonds LS 1 $106,000.00 $106,000.00 $52,700 $52,700 $56,000 $56,000 $86,834 $86,834
General Conditions and Mobilization for Base Bid -
1000 LS 1 $265,000.00 $265,000.00 $161,200 $161,200 $145,000 $145,000 $580,592 $580,592
Special Notices thru Division 01
1000 Mobilization LS 1 $10,000.00 $10,000.00 $11,800 $11,800 $10,000 $10,000 $10,000 $10,000
1500 Temporary Facilities and Controls / Barricades LS 1 $25,000.00 $25,000.00 $32,300 $32,300 $3,000 $3,000 $67,340 $67,340
ALLOWANCES - BASE BID
Allowance No. 1: Unforeseen to Project Conditions:
Include a Lump-Sum allowance of $65,000 (sixty – five
thousand dollars), to be used as directed by Owner to
1210 LS 1 $65,000.00 $65,000.00 $65,000.00 $65,000.00 $65,000.00 $65,000.00 $65,000.00 $65,000.00
adjust conditions in the field for differing existing
conditions or TSA or tenant-requested changes during
the progress of the work.
Allowance No. 2: Testing and Inspection – Owner
Directed: Include a Lump Sum allowance of $15,000
(fifteen thousand dollars), to be used as directed by
Architect or Owner. Owner shall employ a testing
agency acceptable to the General Contractor; testing
1210 LS 1 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00
agency shall be named after Notice to Proceed. This
allowance does not include Contractor’s Quality
Control testing or Quality Assurance testing specified
under other technical specification sections (Division
02-Division 24).
BASE BID
Improvements, temporary structures, and incidental
renovations – complete to provide for construction of
DIV 02
all sitework and vertical construction elements (less LS 1 $444,000.00 $444,000.00 $446,500.00 $446,500.00 $423,582.00 $423,582.00 $472,893.00 $472,893.00
–10
Divisions listed below) for the NWF Regional Airport
Checked Baggage Screening Project.
Improvements, temporary structures, and incidental
renovations – complete to provide for construction of
DIV 22 - all Mechanical, Electrical, Plumbing, and Fire
LS 1 $219,000.00 $219,000.00 $180,500.00 $180,500.00 $168,000.00 $168,000.00 $199,175.00 $199,175.00
26 Protection Systems and related construction elements
(less Divisions 02-10 above) for the NWF Regional
Airport Checked Baggage Screening Project.
Improvements, temporary structures, and incidental
renovations – complete to provide for construction of
all Baggage Handling Equipment including all
coordination, installation, programming and system
DIV 34 LS 1 $2,608,471.00 $2,608,471.00 $2,537,100.00 $2,537,100.00 $2,630,000.00 $2,630,000.00 $2,393,492.00 $2,393,492.00
testing for a complete BHS system per TSA PGDS
Requirements (less Divisions 02-26 above) for the
NWF Regional Airport Checked Baggage Screening
Project.
TOTAL BASE BID = $3,757,471.00 $3,502,100.00 $3,515,582.00 $3,890,326.00
Engineer's Estimate Lord and Son Construction Inc. Cathey Construction and Pinnacle Construction Support
Development, LLC Group Inc.
Spec Extended Extended Extended
Description UOM Quant. Unit Value Unit Value Extended Value Unit Value Unit Value
Section Value Value Value
ALTERNATES
ALTERNATE No. 01: (Add-Lump Sum) To furnish
and install a new flat plate conveyor at the TC-1 line
within the baggage make up area as part of the new
1230 BHS system. The work shall include programming, LS 1 $165,000.00 $165,000.00 $139,200 $139,200 143,167.00 143,167.00 142,360.00 142,360.00
integration of the new flat plate, removal of the existing
flat plate, and all work required for a complete and
functioning system.
ALTERNATE No. 02: (Add-Lump Sum) To remove
and reinstall the new temporary flat plate conveyor at
the TC-2 line within the baggage make-up area, as part
of the new BHS system, after the temporary line is no
1230 LS 1 $70,000.00 $70,000.00 $75,400 $75,400 77,864.00 77,864.00 77,063.00 77,063.00
longer needed. The work shall include programming,
integration of the new flat plate, removal of the existing
flat plate at TC-2, and all work required for a complete
and functioning system.
ALTERNATE No. 03: (Add-Lump Sum) To furnish
and install two new in-line power faced-baggage-
diverters, that shall be networked with the entire BHS
1230 LS 1 $120,000.00 $120,000.00 $93,000 $93,000 95,590.00 95,590.00 95,052.00 95,052.00
system, including removal of the two existing diverters
between the ticket counter and the Baggage Screening
area (CBIS), if this alternate is accepted by the Owner.
Alternate No. 04: (Add-Lump Sum) To furnish and
provide Owner-Directed Baggage Handling System
software and integration Programming modifications
after Initial Owner and TSA Acceptance and
completion of the project. The Base Bid shall include
layout and programming of the entire baggage
handling system through the motor control panel to
achieve the sequence of operations and throughput
described in other sections of the specifications or
drawings.
This alternate shall provide for up to 60 (sixty) hours of
1230 software programming to be used within 3 months LS 1 $17,000.00 $17,000.00 $17,300 $17,300 18,027.00 18,027.00 17,600.00 17,600.00
following Final Acceptance of the BHS System;
Programming shall be, as directed and approved in
advance and shall be in writing by the Owner, for BHS-
programming-upgrades and modifications to the
baggage handling system. This alternate shall include
all costs, including travel costs, associated with
implementation of programming changes on site. All
programming costs not used during the first three
months following Final Acceptance of the BHS System
will be credited back to the Owner in the form of a
credit change order if this alternate is accepted by the
Owner.
TOTAL BASE Plus Alt 2 and 3 = $3,947,471.00 $3,670,500.00 $3,689,036.00 $4,062,441.00
I hereby certify the numbers contained within this Bid Tabulation are
accurate and complete.
29‐May‐15
Doug Hambrecht, P.E.
Michael Baker Jr., Inc