Bid Tabulation from Consultant — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Bid Tabulation for
DESTIN ‐ FORT WALTON BEACH AIRPORT
CHECKED BAGGAGE SCREENING PROJECT
OKALOOSA COUNTY AIRPORTS
Bid Opening: 4/29/2015, 2:00 PM
Cathey Construction and Pinnacle Construction Support
Engineer's Estimate Lord and Son Construction Inc.
Bid #: AP 37‐15 Development, LLC Group Inc.
Spec
Description UOM Quant. Unit Value Extended Value Unit Value Extended Value Unit Value Extended Value Unit Value Extended Value
Section
GENERAL CONDITIONS - BASE BID
100 Insurance and Bonds LS 1 $106,000.00 $106,000.00 $52,700 $52,700 $56,000 $56,000 $86,834 $86,834
General Conditions and Mobilization for Base Bid -
1000 LS 1 $265,000.00 $265,000.00 $161,200 $161,200 $145,000 $145,000 $580,592 $580,592
Special Notices thru Division 01
1000 Mobilization LS 1 $10,000.00 $10,000.00 $11,800 $11,800 $10,000 $10,000 $10,000 $10,000
1500 Temporary Facilities and Controls / Barricades LS 1 $25,000.00 $25,000.00 $32,300 $32,300 $3,000 $3,000 $67,340 $67,340
ALLOWANCES - BASE BID
Allowance No. 1: Unforeseen to Project Conditions:
Include a Lump-Sum allowance of $65,000 (sixty – five
thousand dollars), to be used as directed by Owner to
1210 LS 1 $65,000.00 $65,000.00 $65,000.00 $65,000.00 $65,000.00 $65,000.00 $65,000.00 $65,000.00
adjust conditions in the field for differing existing
conditions or TSA or tenant-requested changes during
the progress of the work.
Allowance No. 2: Testing and Inspection – Owner
Directed: Include a Lump Sum allowance of $15,000
(fifteen thousand dollars), to be used as directed by
Architect or Owner. Owner shall employ a testing
agency acceptable to the General Contractor; testing
1210 LS 1 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00
agency shall be named after Notice to Proceed. This
allowance does not include Contractor’s Quality
Control testing or Quality Assurance testing specified
under other technical specification sections (Division
02-Division 24).
BASE BID
Improvements, temporary structures, and incidental
renovations – complete to provide for construction of
DIV 02
all sitework and