READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — April 15, 2014 — AVCON Task Order #3 — reading text
Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 79-AVCON Task Order _3.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
$116]
‘vironmental concem: Ce) 9] x of $0) a So] ol 2)
‘pacts 4 $600] 0] $4.00] te] $1,020] a Sal | $6140] S107
Hineation a so a $720 a 30] a Sol @ s720| $120
{on tater fom the U.S. ACOE a 30 a 3960] a $390] 2 S90 16 $1440) ES)
ate wetland impacts 4 $600 ao} $9.600] ait $1,580 a Sol 103 $11,760 $108
lion and map of rare and andangerad species @ 30) of $4,800] ii 3715 3 $22 Ey $5,740] $103
from U.S. Fish and Wife Services a 30 g $060] 4 $260) 2 $20] rr $1.30] Eg)
{from state department of natural resources al $0} 5 ‘$90 2 $19] z E 12] 31,189] $98)
Ble fara and endangered species mnpacts @ 30) 23, $2,760] a $520] 2 390] ES) $3,370] S102
ton af archaeological indings and histone siles| @ 30) a 3960] 2 3150 2 $00 rH $1,180 $08
‘From the Stale Historical Preservation Society | 30 ‘i a) f) 30] 2 ET a $570 395]
torical site impacts | 30 a $060 4 $200 Q 30) 12] $1,229| $102
mentaliog good sof condivons | Ey) 6 $720 4 $260] 2 590] 12 1.070 309
industrial park a 30 4 ‘S90| Fl $130 a $0] 4] seval S102
{e estimate of clearing, grubbing, and grading 2 3300] a 3960 4 $260] o so “4 $1.520| $109]
‘iifying location of 300 fl x S00 fl buiding pad 2 $300] 4 Er 4 $260] 9 ES) ‘0 31,040] $104
Total Sie Developabiliy Service: tel $2,400 aor] $36,840] Tor] ___ $6,885 13 $253] 443) $46,660| $108)
Subconsuitant services
"TT. Recordable boundary survey 316,000
412, Wetland Delingalion $10,000
17a, Wiclifa assessment $10,000
19b, Geotschnieal study 30,000
20, Topographic survey $26,000
Total Sukconaultant Servic $74,000
Total for Site Ouvalopability Services: $117,660
Total Zoning Service: of so] Al 3720 of so] Q) ‘sof q $720] $120],
“nly stating access will ba upgraded g 39 8 4 $260] d sq 10] soo Ey]
Jule to make access road improvements a 30 2a 1e|__S1,040] Ql a i) $3,920 $36]
<dusirial park boundaries @ sa 2a 2A] __ $1,560] a 30) Fr 34.460 Es)
ule 19 provide rail to the site | Ey 40 zal $1,560] f) 30] a $6,260 Ex)
tension are under canirol | 30] 15] a 3300] a $360) EY) 32.670 Es)
Total Transportation Services: a 30 ‘ro $13,200 7a]__ $4,820] a $360] i $18,370 336
EXHIBIT C - FEE DERIVATION
McCALLUM SWEENEY SITE CERTIFICATION
PHASE IIl
CRESTVIEW, FLORIDA
‘an to exlend three-phase power to site nth exhibit 2 $300] a 5980] a $390 Q 3 18 31.650] $103
aiway are under control for thras-shase power | so| 4 $400 2 Sa) 2 sag] 5 3570) $95
an to extend natural gas (0 the site will exhibit 2 $300 tol $1,200] 4 $260] a si rn $1.760| $110
away are under contrat for natural gas extension q 30] 4 3480] a So 2 Sag] gl 3970 $05)
‘an lo extend water inirastruclure wo the sila 2 $200 zal” $2,600] 12 $740] a si 3a] $3,560] __ $104
Poway are under control for water infraswructura @ $0] é $720] a $6] 2 300) a ge10{ S01
ian to extend stormwater ireatment lo sits 2 $300] ‘el $5.520] aul $1,560} a so) R $7,380] $103
ian w ontond wastewater reaiment o site 2 $300] 20[ $2,400 ‘ef $1,040] Q si] 3a 33,740) S08
fway ate under cantrol for wastewater extansion 2 3300] a 3720] Q 50] 2 Em rm Si1tof S14)
and existing wastewater treaiment facil 4 150 Q 30 q ES) a 30) i} = $160} so]
tend communications fo the ste with exhibit a so te] $1,920] a $520) @ Ei 2A S2.ad0{ $102]
kway ars under contol for communications extension a 30 8 3720] o so 4 Sieg iT) 3900 En)
Total Uttitias Sorvicas: Tal $7,350] 150] $13,000 EE) 12] 3540 Bg 325,040[ $102]
1g access roads, easaments, ulllias. ele, of _si.asa so] 87.080) ao] s2.sco] Q sol 108) Sitoao] $102
that adrass building type, landscaping, et af 31.209] 40[ $4.80) q 3a 4 S133 Ey $e.1a0[ $119)
Total Other Requirements: FL __ $2,550 ‘so[__ $11,880) 40] ___ $2,500] 4 $180] 760 si72t0 $108
Allowance for 3-D BIM renderings: $6,000
Total Approximate Phasa Iti Professtonal Services Cost: $186,000]
‘Approximate Arporl Responsibility (25.2%). $46,620
Approximate Remaining Responsibiity (74.8%): $198,380
ropasal ara based on the requirements established in the leller from McGahum Sweeney Gonsullng la ihe Economic Davelopment Coundil af Okaloosa Gaunty on Saptamber 9, 2013
nifeant adversa environmental issues are identified inthe Phase | Environmental Assessment.
‘enti 96 03-IN-23-1000-0001-0000 anc 02-3N-23-0000+-0005-0000 in Gulf Power Phase II Cerilfcation Parcals Exhibe 8. totalling 119.43 acres.
»ximately 30.19 actes and off-airport parcols reprasant a total of 89.2 acras, The or-aifporl area represents sppraximately 26.2% of the overall cariicalion ares.
Exhibit B - Geographic Planning Limits
Park Certification
Total 119.43 acres
Exhibit B - Geographic Planning Limits
02-3N-23-0000-0009-0000 and
02-3N-23-0000-0009-0010
Approximately 30.13 acres
Exhibit B - Geographic Planning Limits
03-3N-23-0000-0001-0000*
Approximately 67.37 acres
03-3N-23-0000-0001-0000
Approximately 21.93 acres
There are 89.3 acres highlighted above.
*A portion of Parcel 03-3N-23-0000-0001-0000 has been excluded.
