READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — April 15, 2014 — AVCON Task Order #3 — reading text

Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 79-AVCON Task Order _3.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

$116] ‘vironmental concem: Ce) 9] x of $0) a So] ol 2) ‘pacts 4 $600] 0] $4.00] te] $1,020] a Sal | $6140] S107 Hineation a so a $720 a 30] a Sol @ s720| $120 {on tater fom the U.S. ACOE a 30 a 3960] a $390] 2 S90 16 $1440) ES) ate wetland impacts 4 $600 ao} $9.600] ait $1,580 a Sol 103 $11,760 $108 lion and map of rare and andangerad species @ 30) of $4,800] ii 3715 3 $22 Ey $5,740] $103 from U.S. Fish and Wife Services a 30 g $060] 4 $260) 2 $20] rr $1.30] Eg) {from state department of natural resources al $0} 5 ‘$90 2 $19] z E 12] 31,189] $98) Ble fara and endangered species mnpacts @ 30) 23, $2,760] a $520] 2 390] ES) $3,370] S102 ton af archaeological indings and histone siles| @ 30) a 3960] 2 3150 2 $00 rH $1,180 $08 ‘From the Stale Historical Preservation Society | 30 ‘i a) f) 30] 2 ET a $570 395] torical site impacts | 30 a $060 4 $200 Q 30) 12] $1,229| $102 mentaliog good sof condivons | Ey) 6 $720 4 $260] 2 590] 12 1.070 309 industrial park a 30 4 ‘S90| Fl $130 a $0] 4] seval S102 {e estimate of clearing, grubbing, and grading 2 3300] a 3960 4 $260] o so “4 $1.520| $109] ‘iifying location of 300 fl x S00 fl buiding pad 2 $300] 4 Er 4 $260] 9 ES) ‘0 31,040] $104 Total Sie Developabiliy Service: tel $2,400 aor] $36,840] Tor] ___ $6,885 13 $253] 443) $46,660| $108) Subconsuitant services "TT. Recordable boundary survey 316,000 412, Wetland Delingalion $10,000 17a, Wiclifa assessment $10,000 19b, Geotschnieal study 30,000 20, Topographic survey $26,000 Total Sukconaultant Servic $74,000 Total for Site Ouvalopability Services: $117,660 Total Zoning Service: of so] Al 3720 of so] Q) ‘sof q $720] $120], “nly stating access will ba upgraded g 39 8 4 $260] d sq 10] soo Ey] Jule to make access road improvements a 30 2a 1e|__S1,040] Ql a i) $3,920 $36] <dusirial park boundaries @ sa 2a 2A] __ $1,560] a 30) Fr 34.460 Es) ule 19 provide rail to the site | Ey 40 zal $1,560] f) 30] a $6,260 Ex) tension are under canirol | 30] 15] a 3300] a $360) EY) 32.670 Es) Total Transportation Services: a 30 ‘ro $13,200 7a]__ $4,820] a $360] i $18,370 336 EXHIBIT C - FEE DERIVATION McCALLUM SWEENEY SITE CERTIFICATION PHASE IIl CRESTVIEW, FLORIDA ‘an to exlend three-phase power to site nth exhibit 2 $300] a 5980] a $390 Q 3 18 31.650] $103 aiway are under control for thras-shase power | so| 4 $400 2 Sa) 2 sag] 5 3570) $95 an to extend natural gas (0 the site will exhibit 2 $300 tol $1,200] 4 $260] a si rn $1.760| $110 away are under contrat for natural gas extension q 30] 4 3480] a So 2 Sag] gl 3970 $05) ‘an lo extend water inirastruclure wo the sila 2 $200 zal” $2,600] 12 $740] a si 3a] $3,560] __ $104 Poway are under control for water infraswructura @ $0] é $720] a $6] 2 300) a ge10{ S01 ian to extend stormwater ireatment lo sits 2 $300] ‘el $5.520] aul $1,560} a so) R $7,380] $103 ian w ontond wastewater reaiment o site 2 $300] 20[ $2,400 ‘ef $1,040] Q si] 3a 33,740) S08 fway ate under cantrol for wastewater extansion 2 3300] a 3720] Q 50] 2 Em rm Si1tof S14) and existing wastewater treaiment facil 4 150 Q 30 q ES) a 30) i} = $160} so] tend communications fo the ste with exhibit a so te] $1,920] a $520) @ Ei 2A S2.ad0{ $102] kway ars under contol for communications extension a 30 8 3720] o so 4 Sieg iT) 3900 En) Total Uttitias Sorvicas: Tal $7,350] 150] $13,000 EE) 12] 3540 Bg 325,040[ $102] 1g access roads, easaments, ulllias. ele, of _si.asa so] 87.080) ao] s2.sco] Q sol 108) Sitoao] $102 that adrass building type, landscaping, et af 31.209] 40[ $4.80) q 3a 4 S133 Ey $e.1a0[ $119) Total Other Requirements: FL __ $2,550 ‘so[__ $11,880) 40] ___ $2,500] 4 $180] 760 si72t0 $108 Allowance for 3-D BIM renderings: $6,000 Total Approximate Phasa Iti Professtonal Services Cost: $186,000] ‘Approximate Arporl Responsibility (25.2%). $46,620 Approximate Remaining Responsibiity (74.8%): $198,380 ropasal ara based on the requirements established in the leller from McGahum Sweeney Gonsullng la ihe Economic Davelopment Coundil af Okaloosa Gaunty on Saptamber 9, 2013 nifeant adversa environmental issues are identified inthe Phase | Environmental Assessment. ‘enti 96 03-IN-23-1000-0001-0000 anc 02-3N-23-0000+-0005-0000 in Gulf Power Phase II Cerilfcation Parcals Exhibe 8. totalling 119.43 acres. »ximately 30.19 actes and off-airport parcols reprasant a total of 89.2 acras, The or-aifporl area represents sppraximately 26.2% of the overall cariicalion ares. Exhibit B - Geographic Planning Limits Park Certification Total 119.43 acres Exhibit B - Geographic Planning Limits 02-3N-23-0000-0009-0000 and 02-3N-23-0000-0009-0010 Approximately 30.13 acres Exhibit B - Geographic Planning Limits 03-3N-23-0000-0001-0000* Approximately 67.37 acres 03-3N-23-0000-0001-0000 Approximately 21.93 acres There are 89.3 acres highlighted above. *A portion of Parcel 03-3N-23-0000-0001-0000 has been excluded.

Download this text file with its original spacing ↓