READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 21, 2014 — Okaloosa Admin Building - GMP Proposal - 9-16-2014 — reading text
Part 1 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 77-Okaloosa Admin Building - GMP Proposal - 9-16-2014.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Okaloosa County Administration Building Preliminary Schedule Lord and Son - Preliminary 08-Sep-14 16:58
Activity ID Activity Name Original Start Finish Total Float r 3, 2014 Qtr 4, 2014 Qtr 1, 2015 Qtr 2, 2015 Qtr 3, 2015 5
Duration
A S O N D J F M A M J Jul A S ct
Okaloosa County
C Administration Building Preliminary Schedule 295 01-Aug-14 01-Oct-15 0
Milestone S
Schedule 427 01-Aug-14 01-Oct-15 0
M1000 Site Ready for Construction 0 01-Aug-14 47 Site Ready for Construction
M1010 Start Vertical Construction Building A 0 17-Oct-14 350 Start Vertical Construction Building A
M1100 Steel Erection 92 17-Oct-14 16-Jan-15 48 Erection 16-Jan-15
M1030 Start Roughin Building A 0 13-Dec-14 293 Start Roughin Building A
M1020 Start Vertical Construction Building B 0 25-Dec-14 281 Start Vertical Construction Building B
M1040 Start Roughin Building B 0 27-Jan-15 248 Start Roughin Building B
M1050 Dried In - Building A 0 07-Feb-15 237 Dried In - Building A
M1060 Dried In - Building B 0 25-Feb-15 219 Dried In - Building B
M1070 Moving Air - Building A/B 0 09-Jun-15 115 Moving Air - Bu
M1080 Substantial Complete - Building A - 1st & 2nd Floor 0 14-Aug-15* 0 Subst
M1110 Substantial Complete - Building A - 3rd Floor 0 01-Sep-15* 0 Sub
M1120 Substantial Complete - Building B 0 01-Oct-15* 0
Submittals/Procurement
Submittals/P 1 15-Oct-14 16-Oct-14 32 16-Oct-14, Submittals/Procurement
P1000 Deliver Steel 1 15-Oct-14 16-Oct-14 32ver Steel 16-Oct-14
Site Work 241 01-Aug-14 16-Jul-15 54 16-Jul-15,
Preparation 21 01-Aug-14 29-Aug-14 224 29-Aug-14, Preparation
S1000 Fill and Compact Site 6 01-Aug-14 08-Aug-14 57 08-Aug-14
S1020 Rough-in U/G Drainage 10 01-Aug-14 14-Aug-14 235 14-Aug-14
S1030 Run Firemain to Building 5 01-Aug-14 07-Aug-14 240 07-Aug-14
S1010 Place Building Pad 15 11-Aug-14 29-Aug-14 57 29-Aug-14
Finishing 53 30-Apr-15 16-Jul-15 54 16-Jul-15,
S2000 Rough Grade Settling Ponds 5 30-Apr-15 07-May-15 57 Rough Grade Settling Ponds 07-May-15
S2160 Install Ground Rods/Tie In to Building 5 30-Apr-15 07-May-15 97 stall Ground Rods/Tie In to Building 07-May-15
S2010 Build Shadow box Enclosure 5 05-May-15 12-May-15 54 Build Shadow box Enclosure 12-May-15
S2020 Build Storm Structures 10 07-May-15 21-May-15 57 Build Storm Structures 21-May-15
S2070 Rough-in Irrigation Sprinklers 5 07-May-15 14-May-15 62 Rough-in Irrigation Sprinklers 14-May-15
S2030 Grade/Compact Parking Areas/Drives 5 12-May-15 19-May-15 54Grade/Compact Parking Areas/Drives 19-May-15
S2040 Rock and Roll Parking Areas/Drives 5 19-May-15 27-May-15 54 Rock and Roll Parking Areas/Drives 27-May-15
S2050 Place Curbs 5 27-May-15 03-Jun-15 54 Place Curbs 03-Jun-15
Remaining Level of Effort Milestone Page 1 of 6
Actual Level of Effort Summary
Actual Work
Remaining Work
© Oracle Corporation
Critical Remaining Work
Okaloosa County Administration Building Preliminary Schedule Lord and Son - Preliminary 08-Sep-14 16:58
Activity ID Activity Name Original Start Finish Total Float r 3, 2014 Qtr 4, 2014 Qtr 1, 2015 Qtr 2, 2015 Qtr 3, 2015 5
Duration
A S O N D J F M A M J Jul A S ct
S2080 Place Asphalt 5 27-May-15 03-Jun-15 79 Place Asphalt 03-Jun-15
S2060 F/P Sidewalks 10 03-Jun-15 17-Jun-15 54 F/P Sidewalks 17-Jun-15
S2100 Trim Out Drainage/Tie In Gutters 5 03-Jun-15 10-Jun-15 69 Trim Out Drainage/Tie In Gutters 10-Jun-15
S2150 Stripe / Place Signage at Parking Areas/Drives 5 03-Jun-15 10-Jun-15 79 / Place Signage at Parking Areas/Drives 10-Jun-15
S2090 Fine Grade Landscaped Areas 10 17-Jun-15 01-Jul-15 54 Fine Grade Landscaped Areas 01-Jul-15
S2110 Plant Trees/Bedding Areas 5 01-Jul-15 09-Jul-15 54 Plant Trees/Bedding Areas 09-Jul-15
S2130 Trim Out / Test Sprinklers 5 01-Jul-15 09-Jul-15 54 Trim Out / Test Sprinklers 09-Jul-15
S2140 Place Planters 5 01-Jul-15 09-Jul-15 54 Place Planters 09-Jul-15
S2120 Sod Grass Areas 5 09-Jul-15 16-Jul-15 54 Sod Grass Areas 16-Jul-15
Structure and
an Shell 182 02-Sep-14 21-May-15 92 21-May-15, Struct
Building A (Multi-Floor)
( 182 02-Sep-14 21-May-15 92 21-May-15, Buildin
SH1000 F/R/P Spread / Continuous Footings 15 02-Sep-14 22-Sep-14 57 gs 22-Sep-14
SH1010 F/R/P Elevator Pit 5 02-Sep-14 08-Sep-14 244 Pit 08-Sep-14
SH1020 F/R/P Stair Tower / RR Towers 10 02-Sep-14 15-Sep-14 244 rs 15-Sep-14
SH1060 Build CMU Towers 20 16-Sep-14 14-Oct-14 244wers 14-Oct-14
SH1070 Erect Structural Steel CL A to D 10 16-Oct-14 30-Oct-14 32 L A to D 30-Oct-14
SH1180 Erect Structural Steel CL D to G 15 30-Oct-14 20-Nov-14 32 CL D to G 20-Nov-14
SH1200 Rough-in U/G MEP 10 13-Nov-14 28-Nov-14 59 -in U/G MEP 28-Nov-14
SH1100 F/P 2nd Floor Concrete Deck CL A to D 5 20-Nov-14 28-Nov-14 38eck CL A to D 28-Nov-14
SH2240 Hang Third Floor Joist CL D to G 5 20-Nov-14 28-Nov-14 32oist CL D to G 28-Nov-14
SH1110 F/P 3rd Floor Concrete Deck CL A to D 5 28-Nov-14 05-Dec-14 38Deck CL A to D 05-Dec-14
SH1220 F/P SOG 10 28-Nov-14 12-Dec-14 59 F/P SOG 12-Dec-14
SH2260 Deck Second Floor CL D to G 3 28-Nov-14 03-Dec-14 32Floor CL D to G 03-Dec-14
SH2230 Deck Third Floor CL D to G 3 03-Dec-14 08-Dec-14 32 Floor CL D to G 08-Dec-14
SH2130 Frame Exterior Walls 20 05-Dec-14 06-Jan-15 38 e Exterior Walls 06-Jan-15
SH2250 F/P 2nd Floor Lt.Wgt. Concrete Deck CL D to G 5 08-Dec-14 15-Dec-14 110 Deck CL D to G 15-Dec-14
SH2220 F/P 3rd Floor Lt.Wgt. Concrete Deck CL D to G 5 09-Dec-14 16-Dec-14 32 Deck CL D to G 16-Dec-14
SH1170 Frame Roof 10 16-Dec-14 31-Dec-14 32 Frame Roof 31-Dec-14
SH1160 Deck Roof 5 31-Dec-14 08-Jan-15 56 Deck Roof 08-Jan-15
SH1270 Lay Up Brick Veneer 80 06-Jan-15 30-Apr-15 54Lay Up Brick Veneer 30-Apr-15
SH1150 Install Roofing System 20 08-Jan-15 06-Feb-15 150 stall Roofing System 06-Feb-15
Remaining Level of Effort Milestone Page 2 of 6
Actual Level of Effort Summary
Actual Work
Remaining Work
