such as material choices and
building orientation, together with other considerations based on program and aesthetics, in developing a design that is
consistent with the Owner’s program, schedule and budget for the Cost of the Work. The Owner may obtain other
environmentally responsible design services under Article 4.
§ 3.2.5.2 The Architect shall consider the value of alternative materials, building systems and equipment, together
with other considerations based on program and aesthetics, in developing a design for the Project that is consistent
with the Owner’s program, schedule and budget for the Cost of the Work.
(Paragraph deleted)
§ 3.2.7 The Architect shall submit the Schematic Design Documents to the Owner, and request the Owner’s approval.
§ 3.3 DESIGN DEVELOPMENT PHASE SERVICES
§ 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any
adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design
Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe
the development of the approved Schematic Design Documents and shall consist of drawings and other documents
including plans, sections, clevations, typical construction details, and diagrammatic layouts of building systems to fix
and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and
such other elements as may be appropriate. The Design Development Documents shall also include outline
specifications that identify major materials and systems and establish in general their quality levels.
AIA Document B101™ — 2007 (formerly B151™ ~ 1997}. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
Init. reserved. WARNING: This AIA” Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 4
this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
| the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/45/2015, and is not for
resale.
User Notes: (1683049266)
init.
§ 3.3.2 The Architect shall update the estimate of the Cost of the Work.
§ 3.3.3 The Architect shall submit the Design Development Documents to the Owner, advise the Owner of any
adjustments to the estimate of the Cost of the Work, and request the Owner’s approval.
§ 3.4CONSTRUCTION DOCUMENTS PHASE SERVICES
§ 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of
any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare
Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the
further development of the approved Design Development Documents and shall consist of Drawings and
Specifications setting forth in detail the quality levels of materials and systems and other requirements for the
construction of the Work. The Owner and Architect acknowledge that in order to construct the Work the Contractor
will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals,
which the Architect shall review in accordance with Section 3.6.4.
§ 3.4.2 The Architect shall incorporate into the Construction Documents the design requirements of governmental
authorities having jurisdiction over the Project.
§ 3.4.3 During the development of the Construction Documents, the Architect shall assist the Owner in the
development and preparation of (1) bidding and procurement information that describes the time, place and conditions
of bidding, including bidding or proposal forms; (2) the form of agreement between the Owner and Contractor; and (3)
the Conditions of the Contract for Construction (General, Supplementary and other Conditions), The Architect shall
also compile a project manual that includes the Conditions of the Contract for Construction and Specifications and
may include bidding requirements and sample forms.
(Paragraph deleted)
§ 3.4.5 The Architect shall submit the Construction Documents to the Owner, advise the Owner of any adjustments to
the estimate of the Cost of the Work, take any action required under Section 6.5, and request the Owner’s approval...
§ 3.5 BIDDING OR NEGOTIATION PHASE SERVICES
§ 3.5.1 GENERAL
As the construction delivery method will be construction management, the Architect shall assist the CM in
establishing a list of prospective subcontractors. Following the Owner’s approval of the Construction Documents, the
Architect shall assist the CM in (1) obtaining either competitive bids or negotiated proposals; (2) confirmin g
responsiveness of bids or proposals; (3) determining the successful bid or proposal, if any; and, (4) awarding and
preparing contracts for construction.
§ 3.5.2 COMPETITIVE BIDDING
§ 3.5.2.1 Bidding Documents shall consist of bidding requirements and proposed Contract Documents.
§ 3.5.2.2 The Architect shall assist the CM in bidding the Project by
1 procuring the reproduction of Bidding Documents for distribution to prospective bidders;
2 distributing the Bidding Documents to prospective bidders, requesting their return upon completion of
the bidding process, and maintaining a log of distribution and retrieval and of the amounts of deposits,
if any, received from and returned to prospective bidders;
organizing and conducting a pre-bid conference for prospective bidders;
4 preparing responses to questions from prospective bidders and providing clarifications and
interpretations of the Bidding Documents to all prospective bidders in the form of addenda; and
5 organizing and conducting the opening of the bids, and subsequently documenting and distributing the
bidding results, as directed by the Owner.
bo
§ 3.5.2.3 The Architect shall consider requests for substitutions, if the Bidding Documents permit substitutions, and
shall prepare and distribute addenda identifying approved substitutions to all prospective bidders.
AIA Document B101™ ~ 2007 {formerly B151™ — 1997}. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
reserved. WARNING: This AIA" Document is protected by U.S, Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penaities, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for
resale.
User Notes: (1683049266)
5
| (Paragraphs deleted)
§ 3.6 CONSTRUCTION PHASE SERVICES
§ 3.6.1 GENERAL
§ 3.6.1.1 The Architect shall provide administration of the Contract between the Owner and the Contractor as set forth
below and in AIA Document A201™—2007, General Conditions of the Contract for Construction. If the Owner and
Contractor modify AIA Document A201-2007, those modifications shall not affect the Architect’s services under this
Agreement unless the Owner and the Architect amend this Agreement.
§ 3.6.1.2 The Architect shall advise and consult with the Owner during the Construction Phase Services. The Architect
shall have authority to act on behalf of the Owner only to the extent provided in this Agreement. The Architect shall
not have control over, charge of, or responsibility for the construction means, methods, techniques, sequences or
procedures, or for safety precautions and programs in connection with the Work, nor shall the Architect be responsible
for the Contractor’s failure to perform the Work in accordance with the requirements of the Contract Documents. The
Architect shall be responsible for the Architect’s negligent acts or omissions, but shall not have control over or charge
of, and shall not be responsible for, acts or omissions of the Contractor or of any other persons or entities performing
portions of the Work.
§ 3.6.1.3 Subject to Section 4.3, the Architect’s responsibility to provide Construction Phase Services commences
with the award of the Contract for Construction and terminates on the date the Architect issues the final Certificate for
Payment,
§ 3.6.2 EVALUATIONS OF THE WORK
§ 3.6.21 The Architect shall visit the site at intervals appropriate to the stage of construction, or as otherwise required
in Section 4.3.3, to become generally familiar with the progress and quality of the portion of the Work completed, and
to determine, in general, if the Work observed is being performed in a manner indicating that the Work, when fully
completed, will be in accordance with the Contract Documents. However, the Architect shall not be required to make
exhaustive or continuous on-site inspections to check the quality or quantity of the Work. On the basis of the site visits,
the Architect shall keep the Owner reasonably informed about the progress and quality of the portion of the Work
completed, and report to the Owner (1) known deviations from the Contract Documents and from the most recent
construction schedule submitted by the Contractor, and (2) defects and deficiencies observed in the Work.
§ 3.6.2.2 The Architect has the authority to reject Work that does not conform to the Contract Documents, Whenever |
the Architect considers it necessary or advisable, the Architect shall have the authority to require inspection or testing
of the Work in accordance with the provisions of the Contract Documents, whether or not such Work is fabricated,
installed or completed. However, neither this authority of the Architect nor a decision made in good faith either to
exercise or not to exercise such authority shall give tise to a duty or responsibility of the Architect to the Contractor,
Subcontractors, material and equipment suppliers, their agents or employees or other persons or entities performing
portions of the Work,
§ 3.6.2.3 The Architect shall interpret and decide matters concerning performance under, and requirements of, the
Contract Documents on written request of either the Owner or Contractor. The Architect’ s response to such requests
shall be made in writing within any time limits agreed upon or otherwise with reasonable promptness,
§ 3.6.2.4 Interpretations and decisions of the Architect shall be consistent with the intent of and reasonably inferable
from the Contract Documents and shall be in writing or in the form of drawings. When making such interpretations
and decisions, the Architect shall endeavor to secure faithful performance by both Owner and Contractor, shall not
show partiality to either, and shall not be liable for results of interpretations or decisions rendered in good faith. The
AIA Document B101™ — 2007 {formerly B151™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
Init, reserved. WARNING: This AIA Document is protected by U.S, Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
! the jaw. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No,5773739723_1 which expires on 01/15/2015, and is not for
resale.
User Notes: (1683049266)
Architect’s decisions on matters relating to aesthetic effect shall be final if consistent with the intent expressed in the
Contract Documents.
§ 3.6.2.5 Unless the Owner and Contractor designate another person to serve as an Initial Decision Maker, as that term
is defined in AJA Document A201—2007, the Architect shall render initial decisions on Claims