Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
- RECEIVE
po £0 2
“CONTRACT & ease INTERNAL CO DINATION SHEET \
: ContractiLease Number:
wa RFOT . Tracking Number: K/lo-I+
‘Contictor/lessee Names .
. Grant Funded: YES,__ NO_3<
He), [1] GREATER THAN $50,000
30 §25,000 OR LESS —
2 oO GREATER THAN $254 900 fo
-: County Alforney Review -
‘Date:
ebony Atri X -
: aaa
Following. Okaloosa County approval:
4 Document has beein-teceived:
Contracts & Grants
Date:
“Contracts & Grants Manager .
REQUEST FOR QUALIFICATIONS
FOR DESIGN SERVICES
For A NEW OFFICE BUILDING
AT THE OKALOOSA COUNTY SHERIFF'S OFFICE LOCATED AT
50 2ND STREET, SHALIMAR, FL
RFQ # BCC 26-14
Caldwell
Company Name CRA DAG Bay Design Townes Associates SDF VBA Design DC Architects
Architects
Kelly Windes 82 85 74 74 84 81 81 85
Donald Turner 82 93 87 87 8&3 91 82 79
Jason Autrey 80 80 63 66 70 72 54 55
Elliot Kampert 95 98 82 91 91 87 55 67
John D. Peacok 87 96 73 90 80 82 67 69
Total 426 452 379 408 408 413 339 355
1) DAG 4) __ Townes
2) _CRA Architects 6) _ Bay Design
3) __JDF 7) _DC Architects
4) _Caldwell Associates (Tie) 8) __VBS Design
Prepared by: Jack Allen Date: 2/11/14
Init.
WATA Document B101" — 2007
Standard Form of Agreement Between Owner and Architect
AGREEMENT made as of the Tenth day of March in the year Two Thousand Fourteen
(in words, indicate day, month and year.)
BETWEEN the Architect’s client identified as the Owner: ADDITIONS AND DELETIONS:
. 5 The author of this document has
(Name, legal status, address and other information) added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to the
standard form text is available from
the author and should be reviewed. A
Okaloosa County Commission
1804 Lewis Turner Blvd, Suite 100
Fort Walton Beach, Florida 32547
850.651.7105 phone
850.651.7142 fax
and the Architect: vertical line in the left margin of this
(Name, legal status, address and other information) document indicates where the author
has added necessary information
DAG Architects Inc, and where the author has added to or
1223. Airport Road deleted from the original AIA text.
350'897.8152 pbone ‘This document has important legal
consequences, Consultation with an
attorney is encouraged with respect
to its completion or modification.
850.654.4276 fax
for the following Project:
(Name, location and detailed description)
Okaloosa County Sheriff's Office
50 2" Street
Shalimar, FL 32579
Okaloosa County, Florida
The Owner and Architect agree as follows.
Two story addition to the Okaloosa County Sheriffs Office administration complex. The
facility is located in Shalimar, Florida, and will be approximately 11,633 square fect.
AIA Document B101™ — 2007 (formerly B151™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No,5773739723_1 which expires on 01/1 §/2015, and is not for
resale,
User Notes: (1683049266)
Init,
TABLE OF ARTICLES
4 INITIAL INFORMATION
2 ARCHITECT’S RESPONSIBILITIES
3 SCOPE OF ARCHITECT'S BASIC SERVICES
4 ADDITIONAL SERVICES
5 OWNER’S RESPONSIBILITIES
6 COST OF THE WORK
7 COPYRIGHTS AND LICENSES
8 CLAIMS AND DISPUTES
9 TERMINATION OR SUSPENSION
10 MISCELLANEOUS PROVISIONS
1 COMPENSATION
12 SPECIAL TERMS AND CONDITIONS
13 SCOPE OF THE AGREEMENT
EXHIBIT A INITIAL INFORMATION
ARTICLE 1 INITIAL INFORMATION
§ 1.1 This Agreement is based on the Initial Information set forth in this Article | and in optional Exhibit A, Initial
Information:
(Complete Exhibit A, Initial Information, and incorporate it into the Agreement at Section 13.2, or state below Initial
Information such as details of the Project’s site and program, Owner’s contractors and consultants, Architect's
consultants, Owner's budget for the Cost of the Work, authorized representatives, anticipated procurement method
and other information relevant to the Project.)
See Exhibit A
§ 1.2 The Owner’s anticipated dates for commencement of construction and Substantial Completion of the Work are
set forth below:
‘1 Commencement of construction date:
TBD
2 Substantial Completion date:
TBD
§ 1.3 The Owner and Architect may rely on the Initial Information. Both parties, however, recognize that such
information may materially change and, in that event, the Owner and the Architect shall appropriately adjust the
schedule, the Architect’s services and the Architect’s compensation.
ARTICLE 2. ARCHITECT'S RESPONSIBILITIES
§ 2.1 The Architect shall provide the professional services as set forth in this Agreement.
AIA Document Bi01™ —- 2007 (formerly B161™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
reserved. WARNING: This AIA” Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and Is not for
resale.
User Notes: (1683049266)
2
Init.
§ 2.2 The Architect shall perform its services consistent with the professional skill and care ordinarily provided by
architects practicing in the same or similar locality under the same or similar circumstances. The Architect shall
perform its services as expeditiously as is consistent with such professional skill and care and the orderly progress of
the Project.
§ 2.3 The Architect shall identify a representative authorized to act on behalf of the Architect with respect to the
Project.
§ 2.4 Except with the Owner’s knowledge and consent, the Architect shall not engage in any activity, or accept any
employment, interest or contribution that would reasonably appear to compromise the Architect’s professional
judgment with respect to this Project.
§ 2.5 The Architect shall maintain the following insurance for the duration of this Agreement,
(dentify types and limits of insurance coverage, and other insurance requirements applicable to the Agreement, if
any.)
‘1 General Liability
$1,000,000 each occurrence, $2,000,000 aggregate
$1,000,000 umbrella
2 Automobile Liability
$1,000,000 combined single limit
3 Workers’ Compensation
$1,000,000
A Professional Liability
$2,000,000 per claim, $2,000,000 aggregate
ARTICLE 3. SCOPE OF ARCHITECT’S BASIC SERVICES
§ 3.1 The Architect’s Basic Services consist of those described in Article 3 and include usual and customary
structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Additional
Services,
§ 3.1.1 The Architect shall manage the Architect’s services, consult with the Owner, research applicable design
criteria, attend Project meetings, communicate with members of the Project team and report progress to the Owner.
§ 3.1.2 The Architect shall coordinate its services with those services provided by the Owner and the Owner’s
consultants. The Architect shall be entitled to rely on the accuracy and completeness of services and information
furnished by the Owner and the Owner’s consultants. The Architect shal! provide prompt written notice to the Owner
if the Architect becomes aware of any error, omission or inconsistency in such services or information.
§ 3.1.3 As soon as practicable after the date of this Agreement, the Architect shall submit for the Owner’s approval a
schedule for the performance of the Architect’s services. The schedule initially shall include anticipated dates for the
commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. The
schedule shall include allowances for periods of time required for the Owner’ s review, for the performance of the
Owner’s consultants, and for approval of submissions by authorities having jurisdiction over the Project. Once
approved by the Owner, time limits established by the schedule shall not, except for reasonable cause, be exceeded by
the Architect or Owner, With the Owner’s approval, the Architect shall adjust the schedule, if necessary, as the Project
proceeds until the commencement of construction.
§ 3.1.4 The Architect shall not be responsible for an Owner’s directive or substitution made without the Architects
approval.
AIA Document B101™ ~ 2007 (formerly B161™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and Internatlonal Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was praduced by AIA software at 10:18:01 on 03/26/2014 under Order No,$773739723_1 which expires on 01/15/2018, and Is not for
resale.
User Notes: (1683049266)
§ 3.1.5 The Architect shall, at appropriate times, contact the governmental authorities required to approve the
Construction Documents and the entities providing utility services to the Project. In designing the Project, the
Architect shall respond to applicable design requirements imposed by such governmental authorities and by such
entities providing utility services,
§ 3.1.6 The Architect shall assist the Owner in connection with the Owner’s responsibility for filing documents
required for the approval of governmental authorities having jurisdiction over the Project.
§ 3.2 SCHEMATIC DESIGN PHASE SERVICES
§ 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws,
codes, and regulations applicable to the Architect’s services.
§ 3.2.2 The Architect shall prepare a preliminary evaluation of the Owner’s program, schedule, budget for the Cost of
the Work, Project site, and the proposed procurement or delivery method and other Initial Information, each in terms
of the other, to ascertain the requirements of the Project. The Architect shall notify the Owner of (1) any
inconsistencies discovered in the information, and (2) other information or consulting services that may be reasonably
needed for the Project.
§ 3.2.3 The Architect shall! present its preliminary evaluation to the Owner and shall discuss with the Owner
alternative approaches to design and construction of the Project, including the feasibility of incorporating
environmentally responsible design approaches. The Architect shall reach an understanding with the Owner regarding
the requirements of the Project.
§ 3.2.4 Based on the Project’s requirements agreed upon with the Owner, the Architect shall prepare and present for
the Owner’s approval a preliminary design illustrating the scale and relationship of the Project components.
§ 3.2.5 Based on the Owner’s approval of the preliminary design, the Architect shall prepare Schematic Design
Documents for the Owner’s approval, The Schematic Design Documents shall consist of drawings and other
documents including a site plan, if appropriate, and preliminary building plans, sections and elevations; and may
include some combination of study models, perspective sketches, or digital modeling, Preliminary selections of. major
building systems and construction materials shall be noted on the drawings or described in writing.
§ 3.2.5.1 The Architect shall consider environmentally responsible design alternatives, such as material choices and
building orientation, together with other considerations based on program and aesthetics, in developing a design that is
consistent with the Owner’s program, schedule and budget for the Cost of the Work. The Owner may obtain other
environmentally responsible design services under Article 4.
§ 3.2.5.2 The Architect shall consider the value of alternative materials, building systems and equipment, together
with other considerations based on program and aesthetics, in developing a design for the Project that is consistent
with the Owner’s program, schedule and budget for the Cost of the Work.
(Paragraph deleted)
§ 3.2.7 The Architect shall submit the Schematic Design Documents to the Owner, and request the Owner’s approval.
§ 3.3 DESIGN DEVELOPMENT PHASE SERVICES
§ 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any
adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design
Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe
the development of the approved Schematic Design Documents and shall consist of drawings and other documents
including plans, sections, clevations, typical construction details, and diagrammatic layouts of building systems to fix
and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and
such other elements as may be appropriate. The Design Development Documents shall also include outline
specifications that identify major materials and systems and establish in general their quality levels.
AIA Document B101™ — 2007 (formerly B151™ ~ 1997}. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
Init. reserved. WARNING: This AIA” Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 4
this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
| the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/45/2015, and is not for
resale.
User Notes: (1683049266)
init.
§ 3.3.2 The Architect shall update the estimate of the Cost of the Work.
§ 3.3.3 The Architect shall submit the Design Development Documents to the Owner, advise the Owner of any
adjustments to the estimate of the Cost of the Work, and request the Owner’s approval.
§ 3.4CONSTRUCTION DOCUMENTS PHASE SERVICES
§ 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of
any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare
Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the
further development of the approved Design Development Documents and shall consist of Drawings and
Specifications setting forth in detail the quality levels of materials and systems and other requirements for the
construction of the Work. The Owner and Architect acknowledge that in order to construct the Work the Contractor
will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals,
which the Architect shall review in accordance with Section 3.6.4.
§ 3.4.2 The Architect shall incorporate into the Construction Documents the design requirements of governmental
authorities having jurisdiction over the Project.
§ 3.4.3 During the development of the Construction Documents, the Architect shall assist the Owner in the
development and preparation of (1) bidding and procurement information that describes the time, place and conditions
of bidding, including bidding or proposal forms; (2) the form of agreement between the Owner and Contractor; and (3)
the Conditions of the Contract for Construction (General, Supplementary and other Conditions), The Architect shall
also compile a project manual that includes the Conditions of the Contract for Construction and Specifications and
may include bidding requirements and sample forms.
(Paragraph deleted)
§ 3.4.5 The Architect shall submit the Construction Documents to the Owner, advise the Owner of any adjustments to
the estimate of the Cost of the Work, take any action required under Section 6.5, and request the Owner’s approval...
§ 3.5 BIDDING OR NEGOTIATION PHASE SERVICES
§ 3.5.1 GENERAL
As the construction delivery method will be construction management, the Architect shall assist the CM in
establishing a list of prospective subcontractors. Following the Owner’s approval of the Construction Documents, the
Architect shall assist the CM in (1) obtaining either competitive bids or negotiated proposals; (2) confirmin g
responsiveness of bids or proposals; (3) determining the successful bid or proposal, if any; and, (4) awarding and
preparing contracts for construction.
§ 3.5.2 COMPETITIVE BIDDING
§ 3.5.2.1 Bidding Documents shall consist of bidding requirements and proposed Contract Documents.
§ 3.5.2.2 The Architect shall assist the CM in bidding the Project by
1 procuring the reproduction of Bidding Documents for distribution to prospective bidders;
2 distributing the Bidding Documents to prospective bidders, requesting their return upon completion of
the bidding process, and maintaining a log of distribution and retrieval and of the amounts of deposits,
if any, received from and returned to prospective bidders;
organizing and conducting a pre-bid conference for prospective bidders;
4 preparing responses to questions from prospective bidders and providing clarifications and
interpretations of the Bidding Documents to all prospective bidders in the form of addenda; and
5 organizing and conducting the opening of the bids, and subsequently documenting and distributing the
bidding results, as directed by the Owner.
bo
§ 3.5.2.3 The Architect shall consider requests for substitutions, if the Bidding Documents permit substitutions, and
shall prepare and distribute addenda identifying approved substitutions to all prospective bidders.
AIA Document B101™ ~ 2007 {formerly B151™ — 1997}. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
reserved. WARNING: This AIA" Document is protected by U.S, Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penaities, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for
resale.
User Notes: (1683049266)
5
| (Paragraphs deleted)
§ 3.6 CONSTRUCTION PHASE SERVICES
§ 3.6.1 GENERAL
§ 3.6.1.1 The Architect shall provide administration of the Contract between the Owner and the Contractor as set forth
below and in AIA Document A201™—2007, General Conditions of the Contract for Construction. If the Owner and
Contractor modify AIA Document A201-2007, those modifications shall not affect the Architect’s services under this
Agreement unless the Owner and the Architect amend this Agreement.
§ 3.6.1.2 The Architect shall advise and consult with the Owner during the Construction Phase Services. The Architect
shall have authority to act on behalf of the Owner only to the extent provided in this Agreement. The Architect shall
not have control over, charge of, or responsibility for the construction means, methods, techniques, sequences or
procedures, or for safety precautions and programs in connection with the Work, nor shall the Architect be responsible
for the Contractor’s failure to perform the Work in accordance with the requirements of the Contract Documents. The
Architect shall be responsible for the Architect’s negligent acts or omissions, but shall not have control over or charge
of, and shall not be responsible for, acts or omissions of the Contractor or of any other persons or entities performing
portions of the Work.
§ 3.6.1.3 Subject to Section 4.3, the Architect’s responsibility to provide Construction Phase Services commences
with the award of the Contract for Construction and terminates on the date the Architect issues the final Certificate for
Payment,
§ 3.6.2 EVALUATIONS OF THE WORK
§ 3.6.21 The Architect shall visit the site at intervals appropriate to the stage of construction, or as otherwise required
in Section 4.3.3, to become generally familiar with the progress and quality of the portion of the Work completed, and
to determine, in general, if the Work observed is being performed in a manner indicating that the Work, when fully
completed, will be in accordance with the Contract Documents. However, the Architect shall not be required to make
exhaustive or continuous on-site inspections to check the quality or quantity of the Work. On the basis of the site visits,
the Architect shall keep the Owner reasonably informed about the progress and quality of the portion of the Work
completed, and report to the Owner (1) known deviations from the Contract Documents and from the most recent
construction schedule submitted by the Contractor, and (2) defects and deficiencies observed in the Work.
§ 3.6.2.2 The Architect has the authority to reject Work that does not conform to the Contract Documents, Whenever |
the Architect considers it necessary or advisable, the Architect shall have the authority to require inspection or testing
of the Work in accordance with the provisions of the Contract Documents, whether or not such Work is fabricated,
installed or completed. However, neither this authority of the Architect nor a decision made in good faith either to
exercise or not to exercise such authority shall give tise to a duty or responsibility of the Architect to the Contractor,
Subcontractors, material and equipment suppliers, their agents or employees or other persons or entities performing
portions of the Work,
§ 3.6.2.3 The Architect shall interpret and decide matters concerning performance under, and requirements of, the
Contract Documents on written request of either the Owner or Contractor. The Architect’ s response to such requests
shall be made in writing within any time limits agreed upon or otherwise with reasonable promptness,
§ 3.6.2.4 Interpretations and decisions of the Architect shall be consistent with the intent of and reasonably inferable
from the Contract Documents and shall be in writing or in the form of drawings. When making such interpretations
and decisions, the Architect shall endeavor to secure faithful performance by both Owner and Contractor, shall not
show partiality to either, and shall not be liable for results of interpretations or decisions rendered in good faith. The
AIA Document B101™ — 2007 {formerly B151™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
Init, reserved. WARNING: This AIA Document is protected by U.S, Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
! the jaw. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No,5773739723_1 which expires on 01/15/2015, and is not for
resale.
User Notes: (1683049266)
Architect’s decisions on matters relating to aesthetic effect shall be final if consistent with the intent expressed in the
Contract Documents.
§ 3.6.2.5 Unless the Owner and Contractor designate another person to serve as an Initial Decision Maker, as that term
is defined in AJA Document A201—2007, the Architect shall render initial decisions on Claims between the Owner and
Contractor as provided in the Contract Documents.
§ 3.6.3 CERTIFICATES FOR PAYMENT TO CONTRACTOR
§ 3.6.3.1 The Architect shall review and certify the amounts due the Contractor and shall issue certificates in such
amounts. The Architect’s certification for payment shall constitute a representation to the Owner, based on the
Architect’s evaluation of the Work as provided in Section 3.6.2 and on the data comprising the Contractor’s
Application for Payment, that, to the best of the Architect’s knowledge, information and belief, the Work has
progressed to the point indicated and that the quality of the Work is in accordance with the Contract Documents. The
foregoing representations are subject (1) to an evaluation of the Work for conformance with the Contract Documents
upon Substantial Completion, (2) to results of subsequent tests and inspections, (3) to correction of minor deviations
from the Contract Documents prior to completion, and (4) to specific qualifications expressed by the Architect.
§ 3.6.3.2 The issuance of a Certificate for Payment shall not be a representation that the Architect has (1) made
exhaustive or continuous on-site inspections to check the quality or quantity of the Work, (2) reviewed construction
means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from
Subcontractors and material suppliers and other data requested by the Owner to substantiate the Contractor’ s right to
payment, or (4) ascertained how or for what purpose the Contractor has used money previously paid on account of the
Contract Sum.
§ 3.6.3.3 The Architect shall maintain a record of the Applications and Certificates for Payment.
§ 3.6.4 SUBMITTALS
§ 3.6.4.1 The Architect shall review the Contractor’s submittal schedule and shall not unreasonably delay or withhold
approval. The Architect’s action in reviewing submittals shall be taken in accordance with the approved submittal
schedule or, in the absence of an approved submittal schedule, with reasonable promptness while allowing sufficient
time in the Architect’s professional judgment to permit adequate review.
§ 3.6.4.2 In accordance with the Architect-approved submittal schedule, the Architect shall review and approve or take
other appropriate action upon the Contractor’ s submittals such as Shop Drawings, Product Data and Samples, but only
for the limited purpose of checking for conformance with information given and the design concept expressed in the
Contract Documents. Review of such submittals is not for the purpose of determining the accuracy and completeness
of other information such as dimensions, quantities, and installation or performance of equipment or systems, which
are the Contractor’s responsibility. The Architect’s review shall not constitute approval of safety precautions or,
unless otherwise specifically stated by the Architect, of any construction means, methods, techniques, sequences or
procedures. The Architect’s approval of a specific item shall not indicate approval of an assembly of which the item is
a component.
§ 3.6.4.3 If the Contract Documents specifically require the Contractor to provide professional design services or
certifications by a design professional related to systems, materials or equipment, the Architect shall specify the
appropriate performance and design criteria that such services must satisfy. The Architect shall review Shop Drawings
and other submittals related to the Work designed or certified by the design professional retained by the Contractor
that bear such professional’s seal and signature when submitted to the Architect. The Architect shall be entitled to rely
upon the adequacy, accuracy and completeness of the services, certifications and approvals performed or provided by
such design professionals.
§ 3.6.4.4 Subject to the provisions of Section 4.3, the Architect shall review and respond to requests for information
about the Contract Documents. The Architect shall set forth in the Contract Documents the requirements for requests
for information. Requests for information shall include, at a minimum, a detailed written statement that indicates the
specific Drawings or Specifications in need of clarification and the nature of the clarification requested. The
Architect’s response to such requests shall be made in writing within any time limits agreed upon, or otherwise with
reasonable promptness. If appropriate, the Architect shall prepare and issue supplemental Drawings and
Specifications in response to requests for information.
AIA Document B101™ — 2007 {formerly B151™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
Init. reserved. WARNING: This AIA” Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
i the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for
resale,
User Notes: (1683049266)
Init.
§ 3.6.4.5 The Architect shall maintain a record of submittals and copies of submittals supplied by the Contractor in
accordance with the requirements of the Contract Documents.
§ 3.6.5 CHANGES IN THE WORK
§ 3.6.5.1 The Architect may authorize minor changes in the Work that are consistent with the intent of the Contract
Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time. Subject to the
provisions of Section 4.3, the Architect shall prepare Change Orders and Construction Change Directives for the
Owner’s approval and execution in accordance with the Contract Documents.
§ 3.6.5.2 The Architect shall maintain records relative to changes in the Work,
§ 3.6.6 PROJECT COMPLETION
§ 3.6.6.1 The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date
of final completion; issue Certificates of Substantial Completion; receive from the Contractor and forward to the
Owner, for the Owner’s review and records, written warranties and related documents required by the Contract
Documents and assembled by the Contractor; and issue a final Certificate for Payment based upon a final inspection
indicating the Work complies with the requirements of the Contract Documents.
§ 3.6.6.2 The Architect’s inspections shall be conducted with the Owner to check conformance of the Work with the
requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the
Contractor of Work to be completed or corrected.
§ 3.6.6.3 When the Work is found to be substantially complete, the Architect shall inform the Owner about the balance
of the Contract Sum remaining to be paid the Contractor, including the amount to be retained from the Contract Sum,
if any, for final completion or correction of the Work.
§ 3.6.6.4 The Architect shall forward to the Owner the following information received from the Contractor: (1)
consent of surety or sureties, if any, to reduction in or partial release of retainage or the making of final payment; (2)
affidavits, receipts, releases and waivers of liens or bonds indemnifying the Owner against liens; and (3) any other
documentation required of the Contractor under the Contract Documents.
§ 3.6.6.5 Upon request of the Owner, and prior to the expiration of one year from the date of Substantial Completion,
the Architect shall, without additional compensation, conduct a meeting with the Owner to review the facility
operations and performance.
ARTICLE 4 ADDITIONAL SERVICES
§ 4.1 Additional Services listed below are not included in Basic Services but may be required for the Project. The
Architect shall provide the listed Additional Services only if specifically designated in the table below as the
Architect’s responsibility, and the Owner shall compensate the Architect as provided in Section 11.2.
(Designate the Additional Services the Architect shall provide in the second column of the table below, In the third
column indicate whether the service description is located in Section 4.2 or in an attached exhibit. If in an exhibit,
identify the exhibit.)
Additional Services Responsibility Location of Service Description
(Architect, Owner | (Section 4.2 below or in an exhibit
or attached to this document and
Not Provided) identified below)
§ 44.1 Programming 9)
§ 41.2 Multipie preliminary designs NP
§ 41.3 Measured drawings NP
§ 41.4 Existing facilities surveys ()
§ 41.5 Site Evaluation and Planning (B203™_2007)_ | A
§ 41.6 Building information modeling NP
§ 417 Civil engineering A
§ 41.8 Landscape design NP
§ 41.9 Architectural Interior Design (B252™ 2007) | A
AIA Document B101™ - 2007 (formerly B151™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. AII tights
reserved. WARNING: This AIA” Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penaitles, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.6773739723_1 which expires on 04/15/2015, and is not for
resale.
User Notes: (1683049266)
8
Init.
§ 41410 Value Analysis (3204™_2007) NP
§ 41.11 Detailed cost estimating NP
§ 41.12 On-site project representation A
§ 41.13 Conformed construction documents A
§ 41.14 As-Designed Record drawings A
§ 4.1.15 As-Constructed Record drawings A
§ 4.1.16 Post occupancy evaluation NP
§ 41.17 Facility Support Services (B210™—2007) NP
§ 41.18 Tenant-related services NP
§ 4.1.19 Coordination of Owner’s consultants A
§ 4.1.20 Telecommunications/data design ie]
§ 4.1.21 Security Evaluation and Planning NP
(B206™_2007)
§ 41.22 | Commissioning (B211™—2007) NP
§ 4.1.23 — Extensive environmentally responsible design _[ NP
§ 4.1.24 LEED® Certification (B214™_2007) NP
§ 4.1.25 Fast-track design services NP
§ 4.1.26 Historic Preservation (B205™—2007) NP
§ 4.1.27 Furniture, Furnishings, and Equipment Design | O
(B253™™—2007)
§ 4.2 Insert a description of each Additional Service designated in Section 4.1 as the Architect’s responsibility, if not
further described in an exhibit attached to this document.
§ 4.3 Additional Services may be provided after execution of this Agreement, without invalidating the Agreement.
Except for services required due to the fault of the Architect, any Additional Services provided in accordance with this
Section 4.3 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment in the
Architect’s schedule.
§ 4.3.1 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner
with reasonable promptness and explain the facts and circumstances giving rise to the need, The Architect shall not
proceed to provide the following services until the Architect receives the Owner’s written authorization:
A
OND
Services necessitated by a change in the Initial Information, previous instructions or approvals given by
the Owner, or a material change in the Project including, but not limited to, size, quality, complexity,
the Owner's schedule or budget for Cost of the Work, or procurement or delivery method;
Services necessitated by the Owner’s request for extensive environmentally responsible design
alternatives, such as unique system designs, in-depth material research, energy modeling, or LEED®
certification;
Changing or editing previously prepared Instruments of Service necessitated by the enactment or
revision of codes, laws or regulations or official interpretations;
Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of
performance on the part of the Owner or the Owner’s consultants or contractors;
Preparing digital data for transmission to the Owner’s consultants and contractors, or to other Owner
authorized recipients;
Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner;
Preparation for, and attendance at, a public presentation, meeting or hearing;
Preparation for, and attendance at a dispute resolution proceeding or legal proceeding, except where the
Architect is party thereto;
Evaluation of the qualifications of bidders or persons providing proposals;
10 Consultation concerning replacement of Work resulting from fire or other cause during construction; or
11. Assistance to the Initial Decision Maker, if other than the Architect.
AIA Document B101™ — 2007 (formerly Bi61™ - 1997}. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
reserved. WARNING: This AIA” Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No,5773739723_1 which expires on 04/15/2018, and is not for
resale.
User Notes:
(1683049266)
Init.
§ 4.3.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Services, notify
the Owner with reasonable promptness, and explain the facts and circumstances giving rise to the need, If the Owner
subsequently determines that all or parts of those services are not required, the Owner shall give prompt written notice
to the Architect, and the Owner shall have no further obligation to compensate the Architect for those services:
4
2
ine
Reviewing a Contractor’s submittal out of sequence from the submittal schedule agreed to by the
Architect;
Responding to the Contractor’s requests for information that are not prepared in accordance with the
Contract Documents or where such information is available to the Contractor from a careful study and
comparison of the Contract Documents, field conditions, other Qwner-provided information,
Contractor-prepared coordination drawings, or prior Project correspondence or documentation;
Preparing Change Orders and Construction Change Directives that require evaluation of Contractor’s
proposals and supporting data, or the preparation or revision of Instruments of Service;
Evaluating an extensive number of Claims as the Initial Decision Maker;
Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to
Instruments of Service resulting therefrom; or
To the extent the Architect’s Basic Services are affected, providing Construction Phase Services 60
days after (1) the date of Substantial Completion of the Work or (2) the anticipated date of Substantial
Completion identified in Initial Information, whichever is earlier.
§ 4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional
Services. When the limits below are reached, the Architect shall notify the Owner:
A
2
3
4
TBD (_ )reviews of each Shop Drawing, Product Data item, sample and similar submittal of the
Contractor
TBD (_) visits to the site by the Architect over the duration of the Project during construction
( _) inspections for any portion of the Work to determine whether such portion of the Work is
substantially complete in accordance with the requirements of the Contract Documents
TBD (_) inspections for any portion ofthe Work to determine final completion
§ 4.3.4 Ifthe services covered by this Agreement have not been completed within Twenty Four (24 ) months of the
date of this Agreement, through no fault of the Architect, extension of the Architects services beyond that time shall
be compensated as Additional Services,
ARTICLE 5
OWNER’S RESPONSIBILITIES
§ 5.1 Unless otherwise provided for under this Agreement, the Owner shall provide information in a timely manner
regarding requirements for and limitations on the Project, including a written program which shall set forth the
Owner’s objectives, schedule, constraints and criteria, including space requirements and relationships, flexibility,
expandability, special equipment, systems and site requirements, Within 15 days after receipt of a written request from
the Architect, the Owner shall furnish the requested information as necessary and relevant for the Architect to
evaluate, give notice of or enforce lien rights.
§ 5.2 The Owner shall establish and periodically update the Owner’s budget for the Project, including (1) the budget
for the Cost of the Work as defined in Section 6.1; (2) the Owner’s other costs; and, (3) reasonable contingencies
related to all of these costs, If the Owner significantly increases or decreases the Owner’s budget for the Cost of the
Work, the Owner shall notify the Architect. The Owner and the Architect shall thereafter agree to a corresponding
change in the Project’s scope and quality.
§ 5.3 The Owner shall identify a representative authorized to act on the Owner’s behalf with respect to the Project. The
Owner shall render decisions and approve the Architects submittals in a timely manner in order to avoid unreasonable
delay in the orderly and sequential progress of the Architect’s services.
§ 5.4 The Owner shall furnish surveys to describe physical characteristics, legal limitations and utility locations for the
site of the Project, and a written legal description of the site. The surveys and legal information shall include, as
applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; designated wetlands;
adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and
contours of the site; locations, dimensions and necessary data with respect to existing buildings, other improvements
and trees; and information concerning available utility services and lines, both public and private, above and below
grade, including inverts and depths, All the information on the survey shall be referenced to a Project benchmark,
AIA Document B101™ — 2007 (formerly B161™ — 1997}. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects, All tights
reserved. WARNING: This AIA” Document is protected by U.S, Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may resuit in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for
resale.
User Notes:
(1683049266)
10
§ 5.5 The Owner shall furnish services of geotechnical engineers, which may include but are not limited to test
borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, seismic
evaluation, ground corrosion tests and resistivity tests, including necessary operations for anticipating subsoil
conditions, with written reports and appropriate recommendations.
§ 5.6 The Owner shall coordinate the services of its own consultants with those services provided by the Architect.
Upon the Architect’s request, the Owner shall furnish copies of the scope of services in the contracts between the
Owner and the Owner’s consultants. The Owner shall furnish the services of consultants other than those designated in
this Agreement, or authorize the Architect to furnish them as an Additional Service, when the Architect requests such
services and demonstrates that they are reasonably required by the scope of the Project. The Owner shall require that
its consultants maintain professional liability insurance as appropriate to the services provided.
§ 5.7 The Owner shall furnish tests, inspections and reports required by law or the Contract Documents, such as
structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials,
§ 5.8 The Owner shall furnish all legal, insurance and accounting services, including auditing services, that may be
reasonably necessary at any time for the Project to meet the Owner’s needs and interests.
§ 5.9 The Owner shall provide prompt written notice to the Architect if the Owner becomes aware of any fault or
defect in the Project, including errors, omissions or inconsistencies in the Architect’s Instruments of Service,
§ 5.10 Except as otherwise provided in this Agreement, or when direct communications have been specially
authorized, the Owner shall endeavor to communicate with the Contractor and the Architect’s consultants through the
Architect about matters arising out of or relating to the Contract Documents. The Owner shall promptly notify the
Architect of any direct communications that may affect the Architect’s services.
§ 5.11 Before executing the Contract for Construction, the Owner shall coordinate the Architect’s duties and
responsibilities set forth in the Contract for Construction with the Architect’s services set forth in this Agreement. The
Owner shall provide the Architect a copy of the executed agreement between the Owner and Contractor, including the
General Conditions of the Contract for Construction.
§ 5.12 The Owner shall provide the Architect access to the Project site prior to commencement of the Work and shall
obligate the Contractor to provide the Architect access to the Work wherever it is in preparation or progress.
ARTICLE 6 COST OF THE WORK
§ 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all
elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs,
overhead and profit. The Cost of the Work does not include the compensation of the Architect, the costs of the land,
rights-of-way, financing, contingencies for changes in the Work or other costs that are the responsibility of the Owner.
§ 6.2 The Owner’s budget for the Cost of the Work is provided in Initial Information, and may be adjusted throughout
the Project as required under Sections 5.2, 6.4 and 6.5. Evaluations of the Owner’s budget for the Cost of the Work, the
preliminary estimate of the Cost of the Work and updated estimates of the Cost of the Work prepared by the Architect,
represent the Architect’s judgment as a design professional. It is recognized, however, that neither the Architect nor
the Owner has control over the cost of Iabor, materials or equipment; the Contractor’s methods of determining bid
prices; or competitive bidding, market or negotiating conditions. Accordingly, the Architect cannot and does not
warrant or represent that bids or negotiated prices will not vary from the Owner’s budget for the Cost of the Work or
from any estimate of the Cost of the Work or evaluation prepared or agreed to by the Architect.
§ 6.3 In preparing estimates of the Cost of Work, the Architect shall be permitted to include contingencies for design,
bidding and price escalation; to determine what materials, equipment, component systems and types of construction
are to be included in the Contract Documents; to make reasonable adjustments in the program and scope of the Project;
and to include in the Contract Documents alternate bids as may be necessary to adjust the estimated Cost of the Work
to meet the Owner’s budget for the Cost of the Work. The Architect’s estimate of the Cost of the Work shall be based
on current area, volume or similar conceptual estimating techniques. If the Owner requests detailed cost estimating
services, the Architect shall provide such services as an Additional Service under Article 4.
AIA Document B101™ — 2007 {formerly B151™ - 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
init. reserved. WARNING: This AIA” Document is protected by U.S. Copyright Law and International Treatles. Unauthorized reproduction or distribution of 1
this AIA” Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
i the law, This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.8773739723_1 which expires on 01/15/2015, and is not for
resale.
User Notes: (1683049266)
Init.
§ 6.4 If the Bidding or Negotiation Phase has not commenced within 90 days after the Architect submits the
Construction Documents to the Owner, through no fault of the Architect, the Owner’s budget for the Cost of the Work
shall be adjusted to reflect changes in the general level of prices in the applicable construction market,
§ 6.5 Ifat any time the Architect’s estimate of the Cost of the Work exceeds the Owner’s budget for the Cost of the
Work, the Architect shall make appropriate recommendations to the Owner to adjust the Project’s size, quality or
budget for the Cost of the Work, and the Owner shall cooperate with the Architect in making such adjustments,
§ 6.6 Ifthe Owner’s budget for the Cost of the Work at the conclusion of the Construction Documents Phase Services
is exceeded by the lowest bona fide bid or negotiated proposal, the Owner shall
1
2
3
4
5
give written approval of an increase in the budget for the Cost of the Work;
authorize rebidding or renegotiating of the Project within a reasonable time;
terminate in accordance with Section 9.5;
in consultation with the Architect, revise the Project program, scope, or quality as required to reduce
the Cost of the Work; or
implement any other mutually acceptable alternative.
§ 6.7 If the Owner chooses to proceed under Section 6.6.4, the Architect, without additional compensation, shall
modify the Construction Documents as necessary to comply with the Owner’s budget for the Cost of the Work at the
conclusion of the Construction Documents Phase Services, or the budget as adjusted under Section 6.6.1. The
Architect’s modification of the Construction Documents shall be the limit of the Architect’s responsibility under this
Article 6.
ARTICLE 7
COPYRIGHTS AND LICENSES
§ 7.1 The Architect and the Owner warrant that in transmitting Instruments of Service, or any other information, the
transmitting party is the copyright owner of such information or has permission from the copyright owner to transmit
such information for its use on the Project. Ifthe Owner and Architect intend to transmit Instruments of Service or any
other information or documentation in digital form, they shall endeavor to establish necessary protocols governing
such transmissions,
§ 7.2 The Architect and the Architect’s consultants shall be deemed the authors and owners of their respective
Instruments of Service, including the Drawings and Specifications, and shall retain all common law, statutory and
other reserved rights, including copyrights. Submission or distribution of Instruments of Service to meet official
regulatory requirements or for similar purposes in connection with the Project is not to be construed as publication in
derogation of the reserved rights of the Architect and the Architect’s consultants.
§ 7.3 Upon execution of this Agreement, the Architect grants to the Owner a nonexclusive license to use the
Architect’s Instruments of Service solely and exclusively for purposes of constructing, using, maintaining, altering
and adding to the Project, provided that the Owner substantially performs its obligations, including prompt payment of
all sums when due, under this Agreement. The Architect shall obtain similar nonexclusive licenses from the
Architect’s consultants consistent with this Agreement. The license granted under this section permits the Owner to
authorize the Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers, as well as the
Owner’s consultants and separate contractors, to reproduce applicable portions of the Instruments of Service solely
and exclusively for use in performing services or construction for the Project. If the Architect rightfully terminates this
Agreement for cause as provided in Section 9.4, the license granted in this Section 7.3 shall terminate.
§ 7.3.1 In the event the Owner uses the Instruments of Service without retaining the author of the Instruments of
Service, the Owner releases the Architect and Architect’s consultant(s) from all claims and causes of action arising
from such uses. The Owner, to the extent permitted by Jaw, further agrees to indemnify and hold harmless the
Architect and its consultants from all costs and expenses, including the cost of defense, related to claims and causes of
action asserted by any third person or entity to the extent such costs and expenses arise from the Owner’s use of the
Instruments of Service under this Section 7.3.1. The terms of this Section 7.3.1 shall not apply ifthe Owner rightfully
terminates this Agreement for cause under Section 9.4,
§ 7.4 Except for the licenses granted in this Article 7, no other license or right shall be deemed granted or implied
under this Agreement, The Owner shall not assign, delegate, sublicense, pledge or otherwise transfer any license
AIA Document B101™ — 2007 (formerly B151™ ~ 1997), Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
reserved, WARNING: This AIA” Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of
@
this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for
resale,
User Notes:
(1683049266)
12
Init,
granted herein to another party without the prior written agreement of the Architect. Any unauthorized use of the
Instruments of Service shall be at the Owner’s sole risk and without liability to the Architect and the Architect’s
consultants,
ARTICLE 8 CLAIMS AND DISPUTES
§ 8.1 GENERAL
§ 8.1.1 The Owner and Architect shall commence all claims and causes of action, whether in contract, tort, or
otherwise, against the other arising out of or related to this Agreement in accordance with the requirements of the
method of binding dispute resolution selected in this Agreement within the period specified by applicable law, but in
any case not more than 10 years after the date of Substantial Completion of the Work. The Owner and Architect waive
all claims and causes of action not commenced in accordance with this Section 8.1.1.
§ 8.1.2 To the extent damages are covered by property insurance, the Owner and Architect waive all rights against
each other and against the contractors, consultants, agents and employees of the other for damages, except such rights
as they may have to the proceeds of such insurance as set forth in AIA Document A201-2007, General Conditions of
the Contract for Construction. The Owner or the Architect, as appropriate, shall require of the contractors, consultants,
agents and employees of any of them similar waivers in favor of the other parties enumerated herein.
§ 8.1.3 The Architect and Owner waive consequential damages for claims, disputes or other matters in question arising
out of or relating to this Agreement. This mutual waiver is applicable, without limitation, to all consequential damages
due to either party’s termination of this Agreement, except as specifically provided in Section 9.7.
§ 8.2 MEDIATION
§ 8.2.1 Any claim, dispute or other matter in question arising out of or related to this Agreement shall be subject to
mediation as a condition precedent to binding dispute resolution. If such matter relates to or is the subject of a lien
arising out of the Architect’s services, the Architect may proceed in accordance with applicable law to comply with the
lien notice or filing deadlines prior to resolution of the matter by mediation or by binding dispute resolution.
§ 8.2.2 The Owner and Architect shall endeavor to resolve claims, disputes and other matters in question between
them by mediation which, unless the parties mutually agree otherwise, shall be administered by the American
Arbitration Association in accordance with its Construction Industry Mediation Procedures in effect on the date of the
Agreement. A request for mediation shall be made in writing, delivered to the other party to the Agreement, and filed
with the person or entity administering the mediation. The request may be made concurrently with the filing of a
complaint or other appropriate demand for binding dispute resolution but, in such event, mediation shall proceed in
advance of binding dispute resolution proceedings, which shall be stayed pending mediation for a period of 60 days
from the date of filing, unless stayed for a longer period by agreement of the parties or court order. If an arbitration
proceeding is stayed pursuant to this section, the parties may nonetheless proceed to the selection of the arbitrator(s)
and agree upon a schedule for later proceedings.
§ 8.2.3 The parties shall share the mediator’s fee and any filing fees equally. The mediation shall be held in the place
where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall
be enforceable as settlement agreements in any court having jurisdiction thereof.
§ 8.2.4 If the parties do not resolve a dispute through mediation pursuant to this Section 8.2, the method of binding
dispute resolution shall be the following:
(Check the appropriate box. {f the Owner and Architect do not select a method of binding dispute resolution below, or
do not subsequently agree in writing to a binding dispute resolution method other than litigation, the dispute will be
resolved in a court of competent jurisdiction.)
[ ] Arbitration pursuant to Section 8.3 of this Agreement
[X ] Litigation in a court of competent jurisdiction
[ ] Other (Specify)
AIA Document B101™ - 2007 (formerly B181™ -— 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. Alt rights
reserved. WARNING: This AIA” Document is protected by U.S. Copyright Law and International! Treaties. Unauthorized reproduction or distribution of
this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and |s not for
resale,
User Notes: (1683049266)
13
| (Paragraphs deleted)
§ 8.3.4 CONSOLIDATION OR JOINDER
§ 8.3.4.1 Either party, at its sole discretion, may consolidate an arbitration conducted under this Agreement with any
other arbitration to which it is a party provided that (1) the arbitration agreement governing the other arbitration
permits consolidation; (2) the arbitrations to be consolidated substantially involve common questions of law or fact;
and (3) the arbitrations employ materially similar procedural rules and methods for selecting arbitrator(s).
§ 8.3.4.2 Either party, at its sole discretion, may include by joinder persons or entities substantially involved in a
common question of law or fact whose presence is required if complete relief is to be accorded in arbitration, provided
that the party sought to be joined consents in writing to such joinder. Consent to arbitration involving an additional
person or entity shall not constitute consent to arbitration of any claim, dispute or other matter in question not
described in the written consent,
§ 8.3.4.3 The Owner and Architect grant to any person or entity made a party to an arbitration conducted under this
Section 8.3, whether by joinder or consolidation, the same rights of joinder and consolidation as the Owner and
Architect under this Agreement.
ARTICLE 9 TERMINATION OR SUSPENSION
§ 9.1 Ifthe Owner fails to make payments to the Architect in accordance with this Agreement, such failure shall be
considered substantial nonperformance and cause for termination or, at the Architect’s option, cause for suspension of
performance of services under this Agreement, If the Architect elects to suspend services, the Architect shall give
seven days’ written notice to the Owner before suspending services. In the event of a suspension of services, the
Architect shall have no liability to the Owner for delay or damage caused the Owner because of such suspension of
services. Before resuming services, the Architect shall be paid all sums due prior to suspension and any expenses
incurred in the interruption and resumption of the Architect’s services. The Architect’s fees for the remaining services
and the time schedules shall be equitably adjusted.
§ 9.2 If the Owner suspends the Project, the Architect shall be compensated for services performed prior to notice of
such suspension. When the Project is resumed, the Architect shall be compensated for expenses incurred in the
interruption and resumption of the Architect’s services. The Architect’s fees for the remaining services and the time
schedules shall be equitably adjusted.
§ 9.3 If the Owner suspends the Project for more than 90 cumulative days for reasons other than the fault of the
Architect, the Architect may terminate this Agreement by giving not less than seven days’ written notice.
§ 9.4 Rither party may terminate this Agreement upon not less than seven days’ written notice should the other party
fail substantially to perform in accordance with the terms of this Agreement through no fault of the party initiating the
termination.
§ 9.5 The Owner may terminate this Agreement upon not less than seven days’ written notice to the Architect for the
Owner’s convenience and without cause.
§ 9.6 In the event of termination not the fault of the Architect, the Architect shall be compensated for services
performed prior to termination, together with Reimbursable Expenses then due and all Termination Expenses as
defined in Section 9.7.
AIA Document B101™ — 2007 (formerly B181™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treatles. Unauthorized reproduction or distribution of 14
this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
} the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.8773739723_1 which expires on 01/45/2015, and is not for
resale,
User Notes: (1683049266)
Init.
§ 9.7 Termination Expenses are in addition to compensation for the Architect’s services and include expenses directly
attributable to termination for which the Architect is not otherwise compensated, plus an amount for the Architect’s
anticipated profit on the value of the services not performed by the Architect.
§ 9.8 The Owner’s rights to use the Architect’s Instruments of Service in the event of a termination of this Agreement
are set forth in Article 7 and Section 11.9.
ARTICLE 10 MISCELLANEOUS PROVISIONS
§ 10.1 This Agreement shall be governed by the law of the place where the Project is located, except that if the parties
have selected arbitration as the method of binding dispute resolution, the Federal Arbitration Act shall govern Section
8.3.
§ 10.2 Terms in this Agreement shall have the same meaning as those in AIA Document A201-2007, General
Conditions of the Contract for Construction, ,
§ 10.3 The Owner and Architect, respectively, bind themselves, their agents, successors, assigns and legal
representatives to this Agreement. Neither the Owner nor the Architect shall assign this Agreement without the written
consent of the other, except that the Owner may assign this Agreement to a lender providing financing for the Project
if the lender agrees to assume the Owner’s rights and obligations under this Agreement.
§ 10.4 If the Owner requests the Architect to execute certificates, the proposed language of such certificates shall be
submitted to the Architect for review at least 14 days prior to the requested dates of execution. If the Owner requests
the Architect to execute consents reasonably required to facilitate assignment to a lender, the Architect shall execute
all such consents that are consistent with this Agreement, provided the proposed consent is submitted to the Architect
for review at least 14 days prior to execution. The Architect shall not be required to execute certificates or consents
that would require knowledge, services or responsibilities beyond the scope of this Agreement.
§ 10.5 Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of
a third party against either the Owner or Architect.
§ 10.6 Unless otherwise required in this Agreement, the Architect shall have no responsibility for the discovery,
presence, handling, removal or disposal of, or exposure of persons to, hazardous materials or toxic substances in any
form at the Project site.
§ 10.7 The Architect shall have the right to include photographic or artistic representations of the design of the Project
among the Architect’s promotional and professional materials. The Architect shall, be given reasonable access to the
completed Project to make such representations, However, the Architects materials shall not include the Owner’s
confidential or proprietary information if the Owner has previously advised the Architect in writing of the specific
information considered by the Owner to be confidential or proprietary. The Owner shall provide professional credit for
the Architect in the Owner’s promotional materials for the Project.
§ 10.8 If the Architect or Owner receives information specifically designated by the other party as "confidential" or
"business proprietary," the receiving party shal] keep such information strictly confidential and shall not disclose itto
any other person except to (1) its employees, (2) those who need to know the content of such information in order to
perform services or construction solely and exclusively for the Project, or (3) its consultants and contractors whose
contracts include similar restrictions on the use of confidential information.
ARTICLE 11 COMPENSATION
§ 11.1 For the Architect’s Basic Services described under Article 3, the Owner shall compensate the Architect as
follows:
(insert amount of, or basis for, compensation.)
$80,000
§ 11.2 For Additional Services designated in Section 4.1, the Owner shall compensate the Architect as follows:
(insert amount of, or basis for, compensation. If necessary, list specific services to which particular methods of
compensation apply.)
AIA Document B101™ - 2007 (formerly B161™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects, All rights
reserved. WARNING: This AIA” Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for
resale,
User Notes: (1683049266)
15
Init.
| Hourly, at hourly rates, or lump sum as mutually agreed upon by Architect and Owner
§ 11.3 For Additional Services that may arise during the course of the Project, including those under Section 4.3, the
Owner shali compensate the Architect as follows:
(Insert amount of, or basis for, compensation.)
| Hourly, at hourly rates, or lump sum as mutually agreed upon by Architect and Owner
§ 11.4 Compensation for Additional Services of the Architect’s consultants when not included in Section 11.2 or 11.3,
shall be the amount invoiced to the Architect plus Ten percent (10 %), or as otherwise stated below:
§ 11.5 Where compensation for Basic Services is based on a stipulated sum or percentage of the Cost of the Work, the
compensation for each phase of services shall be as follows:
Schematic Design Phase 12,000 = Dollars ( 15 %)
Design Development Phase 16,000 Dollars ( 20 %)
Construction Documents 36,000 Dollars ( 4S %)
Phase
Bidding or Negotiation Phase Dollars ( %)
Construction Phase 16,000 Dollars ( 20 %)
Total Basic Compensation $80,000 Dollars ( 100 %)
§ 11.6 When compensation is based on a percentage of the Cost of the Work and any portions of the Project are deleted
or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent services are
performed on those portions, in accordance with the schedule set forth in Section 11.5 based on (1) the lowest bona
fide bid or negotiated proposal, or (2) ifno such bid or proposal is received, the most recent estimate of the Cost of the
Work for such portions of the Project. The Architect shall be entitled to compensation in accordance with this
Agreement for all services performed whether or not the Construction Phase is commenced.
§ 11.7 The hourly billing rates for services of the Architect and the Architect’s consultants, if any, are set forth below.
The rates shall be adjusted in accordance with the Architect’s and Architect’s consultants’ normal review practices,
Of applicable, aitach an exhibit of hourly billing rates or insert them below.)
| See below
Employee or Category sos h
per hour
$150 per hour
$125 per hour
$100 per hour
$ 75 per hour
Principals
Associate Principals
Project Managers
Senior Architectural Staff
Architectural Staff
Administrative Staff
§ 11.8 COMPENSATION FOR REIMBURSABLE EXPENSES
$ 50 per hour
§ 11.8.1 Reimbursable Expenses are in addition to compensation for Basic and Additional Services and include
expenses incurred by the Architect and the Architect’s consultants directly related to the Project, as follows:
‘1 Transportation and authorized out-of-town travel and subsistence;
2 Long distance services, dedicated data and communication services, teleconferences, Project Web
sites, and extranets;
Postage, handling and delivery;
@ in bw
Fees paid for securing approval of authorities having jurisdiction over the Project;
Printing, reproductions, plots, standard form documents;
Expense of overtime work requiring higher than regular rates, if authorized in advance by the Owner;
AIA Document B101™ — 2007 {formerly Bi51™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects, All rights
reserved, WARNING: This AIA” Document is protected by U.S. Copyright Law and International Treatles. Unauthorized reproduction or distribution of
this AIA” Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2044 under Order No.5773739723_1 which expires on 01/15/2018, and is not for
resale,
User Notes:
(1683049266)
16
Init,
7 Renderings, models, mock-ups, professional photography, and presentation materials requested by the
Owner;
8 — Architect’s Consultant’s expense of professional liability insurance dedicated exclusively to this
Project, or the expense of additional insurance coverage or limits if the Owner requests such insurance
in excess of that normally carried by the Architect’s consultants;
All taxes levied on professional services and on reimbursable expenses;
10 Site office expenses; and
11 Other similar Project-related expenditures.
§ 11.8.2 For Reimbursable Expenses the compensation shal] be the expenses incurred by the Architect and the
Architect’s consultants plus Ten percent (10 %) of the expenses incurred.
§ 11.9 COMPENSATION FOR USE OF ARCHITECT'S INSTRUMENTS OF SERVICE
If the Owner terminates the Architect for its convenience under Section 9.5, or the Architect terminates this
Agreement under Section 9.3, the Owner shall pay a licensing fee as compensation for the Owner’s continued use of
the Architect’s Instruments of Service solely for purposes of completing, using and maintaining the Project as follows:
§ 11.10 PAYMENTS TO THE ARCHITECT
(Paragraph deleted)
§ 11.10.2 Unless otherwise agreed, payments for services shall be made monthly in proportion to services performed.
Payments are due and payable upon presentation of the Architect’s invoice. Amounts unpaid (__) days after the
invoice date shall bear interest at the rate entered below, or in the absence thereof at the legal rate prevailing from tine
to time at the principal place of business of the Architect.
(Insert rate of monthly or annual interest agreed upon.)
%
§ 11.10.3 The Owner shall not withhold amounts from the Architect’s compensation to impose a penalty or liquidated
damages on the Architect, or to offset sums requested by or paid to contractors for the cost of changes in the Work
unless the Architect agrees or has been found liable for the amounts in a binding dispute resolution proceeding.
§ 11.10.4 Records of Reimbursable Expenses, expenses pertaining to Additional Services, and services performed on
the basis of hourly rates shall be available to the Owner at mutually convenient times.
ARTICLE 12 SPECIAL TERMS AND CONDITIONS
Special terms and conditions that modify this Agreement are as follows:
ARTICLE 13 SCOPE OF THE AGREEMENT
§ 13.1 This Agreement represents the entire and integrated agreement between the Owner and the Architect and
supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be
amended only by written instrument signed by both Owner and Architect.
§ 13.2 This Agreement is comprised of the following documents listed below:
4 AIA Document B101™~2007, Standard Form Agreement Between Owner and Architect
2 ATA Document E201™—2007, Digital Data Protocol Exhibit, if completed, or the following:
3 Other documents:
(List other documents, if any, including Exhibit A, Initial Information, and additional scopes of service,
if any, forming part of the Agreement.)
AIA Document B101™ — 2007 (formerly B151™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of
this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for
resale,
User Notes: (1683049266)
17
Init.
| Exhibit A
(Signature) (Signature)
Charles W. Clary ITI, FAIA, Principa
(Printed name and title) (Printed name and title)
This Agreement entered into as of the day and year first written above.
OWNER ARCHITECT (ec
AIA Document B101™ — 2007 (formerly B161™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American institute of Architects. All rights
reserved. WARNING: This AIA” Documentis protected by U.S. Gopyright Law and International Treaties. Unauthorized reproduction or distribution of
this ALA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
the law. This document was produced by AIA software at 10:48:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for
resale,
User Notes: (1883049268)
18
Init.
WATA Document B101" - 2007 Exhibit A
Initial Information
for the following PROJECT:
(Name and location or address)
Okaloosa County Sheriff's Office
50 2" Street
Shalimar, FL 32579
Okaloosa County, Florida
THE OWNER:
(Name, legal status and address)
Okaloosa County Commission
1804 Lewis Turner Blvd, Suite 100
Fort Walton Beach, Florida 32547
THE ARCHITECT:
(Name, legal status and address)
DAG Architects Inc.
1223 Airport Road
Destin, Florida 32541
This Agreement is based on the following information.
(Note the disposition for the following items by inserting the requested information or a
statement such as "not applicable," "
later by mutual agreement.")
ARTICLE A... PROJECT INFORMATION
§ A.1.1 The Owner’s program for the Project:
(identify documentation or state the mamner in which the program will be developed)
Program as determined by Owner; a two story addition to the Okaloosa County Sheriff's
office administration complex.
§ A,1.2 The Project’s physical characteristics:
(Identify or describe, if appropriate, size, location, dimensions, or other pertinent
information, such as geotechnical reports; site, boundary and topographic surveys; traffic
and utility studies; availability of public and private utilities and services; legal
description of the site; etc.)
A two story, approximately 11,633 s.f. addition to the Okaloosa County Sheriff's office
administration complex.
§ A.1.3 The Owner’s budget for the Cost of the Work, as defined in Section 6.1:
(Provide total, and if known, a line item break down.)
$1,000,000
§ A.1.4 The Owner’s other anticipated scheduling information, if any, not provided in
Section 1.2:
‘unknown at time of execution" or "to be determined
ADDITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may aiso
have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to the
standard form text is available from
the author and should be reviewed. A
vertical line in the left margin of this
document indicates where the author
has added necessary information
and where the author has added to or
deleted from the original AIA text.
This document has important legal
consequences. Consultation with an
attorney is encouraged with respect
to its completion or modification.
AIA Document B101™ ~ 2007 Exhibit A. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:
This AIA” Document is protected by U.S. Copyright Law and International Treaties, Unauthorized reproduction or distribution of this AIA” Document,
or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This
document was produced by AIA software at 12:41:40 on 03/10/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for resale.
User Notes:
(20183292 10)
Init.
| TBD
§ A.1.5 The Owner intends the following procurement or delivery method for the Project:
(dentify method such as competitive bid, negotiated contract, or construction management.)
Construction Manager
§ A.1.6 Other Project information:
(identify special characteristics or needs of the Project not provided elsewhere, such as environmentally responsible
design or historic preservation requirements.)
ARTICLE A2 PROJECT TEAM
§ A.2.1 The Owner identifies the following representative in accordance with Section 5.3:
(List name, address and other information.)
Donald L. Turner
5489 Old Bethel Road
Crestview, Florida 32536
Phone: (850) 689-5790
Fax: (850) 689-5630
§ A.2.2 The persons or entities, in addition to the Owner’s representative, who are required to review the Architect’s
submittals to the Owner are as follows:
(List name, address and other information.)
Major J D Peacock
50 2" Street
Shalimar Florida 32579
850.651.7410 Phone
850. 609.3048 Fax
§ A.2.3 The Owner will retain the following consultants and contractors:
(List discipline and, if known, identify them by name and address.)
| NA
§ A.2.4 The Architect identifies the following representative in accordance with Section 2.3:
(List name, address and other information.)
Charles W. Clary IH, FAIA
850.259.6695 cell
Patrick L, Ballasch, AIA
850.217.4970 cell
1223 Airport Road
Destin, Fl 32541
850.837.8152 office phone
850.654.4276 fax
§ A.2.5 The Architect will retain the consultants identified in Sections A.2.5.1 and A.2.5.2.
(List discipline and, if known, identify them by name, legal status, address and other information.)
§ A.2.5.1 Consultants retained under Basic Services:
1 Structural Engineer -
AIA Document B101 ™ - 2007 Exhibit A. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American institute of Architects. All rights reserved. WARNING:
This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document,
or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This
document was produced by AIA software at 12:41:40 on 03/10/2014 under Order No.6773739723_1 which expires on 01/15/2015, and is not for resale.
User Notes: (2018329210)
Init.
§ A.2.5.2 Consultants retained under Additional Services:
Craft & Webster Structural Engineers, Inc.
Roger A. Craft, PE
129 Highpoint Dr.
Guif Breeze, FL 32561
850.712.8290 phone
850.934.0083 fax
Mechanical Engineer
Watford Engineering, Inc.
David Watford, PE
4471 Clinton Street
Marianna, FL. 32446
850.526.3447 phone
850.526.3448 fax
Electrical Engineer
Humber-Garick Consulting Engineers
Chris Garick, PE
142 Eglin Parkway, SE
Fort Walton Beach, FL 32548-5545
850.243.6723 phone
850.664.5420 fax
| Choctaw Engineering
§ A.2.6 Other Initial Information on which the Agreement is based:
(Provide other Initial Information.)
| NA
AIA Document B101™ - 2007 Exhibit A. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American institute of Architects. All rights reserved. WARNING:
This AIA” Document is protected by U.S, Copyright Law and International Treatles. Unauthorized reproduction or distribution of this AIA” Document,
or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This
document was produced by AiA software at 12:41:40 on 03/10/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for resale,
User Notes:
(2018320210)
3
Certification of Document’s Authenticity
AlA® Document D401™ - 2003
I, Charles W. Clary III, FAIA, Principal, hereby certify, to the best of my knowledge, information and belief, that I
created the attached final document simultaneously with its associated Additions and Deletions Report and this
certification at 10:18:01 on 03/26/2014 under Order No. 5773739723_1 from AIA Contract Documents software and
that in preparing the attached final document I made no changes to the original text of AIA® Document B101™ —
2007, Standard Form of Agreement Between Owner and Architect, as published by the AIA in its software, other than
those additions Vy shown jn the associated Additions and Deletions Report.
Aik
[Firwymn
(Signed)
(Title) |
2/Uof/l4
(Dated 7 .
AIA Document D401™ — 2003. Copyright © 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is
protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may 1
result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA
software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires on 01/15/2015, and is not for resale,
User Notes: (1683049266)
Additions and Deletions Report for
AIA’ Document B101™ - 2007
This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has
added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the
original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text.
Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part
of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by
AIA software at 10:18:01 on 03/26/2014.
PAGE 1
AGREEMENT made as of the Tenth day of March in the year Two Thousand Fourteen
Okaloosa County Commission
1804 Lewis Turner Blvd, Suite 100
Fort Walton Beach, Florida 32547
850.651.7105 phone
850.651.7142 fax
DAG Architects Inc.
1223 Airport Road
Destin, Florida
850.837.8152 phone
850.654.4276 fax
(Name, location and detailed description)
Okaloosa County Sheriff's Office
50 2" Street
Shalimar, FL 32579
Okaloosa County, Florida
The Owner and Architect agree as follows.
Two story addition to the Okaloosa County Sheriff's Office administration complex. The facility is located in
Shalimar, Florida, and will be approximately 11,633 square feet.
PAGE 2
See Exhibit A
TBD
Additions and Deletions Report for AIA Document B101™ - 2007 (formerly B161™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American
Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized
reproduction or distribution of this ATA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the Jaw. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.§773739723_1 which expires
on 01/15/2015, and is not for resale,
User Notes: (1683049266)
TBD
PAGE 3
§ 2.5 The Architect shall maintain the > following i insurance for the dur ation of this A reement Hany of the
$1,000,000 each occurrence, $2,000,000 aggregate
$1,000,000 umbrella
$1,000,000 combined single limit
$1,000,000
$2,000,000 per claim, $2,000,000 aggregate
The Architest-shallassist-the-Owner-As the construction delivery method will be construction management, the
Architect shall assist the CM in establishing a list of prospective eentracters-subcontractors, Following the Owner’s
approval of the Construction Documents, the Architect shall assist the Ow#erCM in (1) obtaining either competitive
bids or negotiated proposals; (2) confirming responsiveness of bids or proposals; (3) determining the successful bid or
proposal, if any; and, (4) awarding and preparing contracts for construction.
§ 3.5.2.2 The Architect shall assist the QwaerCM in bidding the Project by
PAGE 6
Additions and Deletions Report for AIA Document B107™ - 2007 (formerly B151™ ~ 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American
Institute of Architects, All rights reserved. WARNING: This AlA° Document is protected by U.S. Copyright Law and International Treaties. Unauthorized
reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This document was produced by AIA software at 10:18:04 on 03/26/2014 under Order No. §773739723_1 which expires
‘an 01/15/2015, and is not for resale,
User Notes: (1883049266)
PAGE 8
§ 411 Programming €8202T™-26095 (9)
§ 4.1.2 Multiple preliminary designs NP
§ 4.1.3 Measured drawings NP
§ 4.14 Existing facilities surveys ia]
§ 41.5 Site Evaluation and Planning (B203™-2007) | A
§ 4.1.6 Building Infermeation-Modeling NP
{£202™ 2008)in formation modeling
§ 4.1.7 _ Civil engineering A
§ 4.1.8 Landscape design NP
§ 4.1.9 Architectural Interior Design (B252™~—2007) | A
§ 414.10 Value Analysis (B204™_2007) NP
§ 41.11 Detailed cost estimating NP
§ 4.1.12 On-site Project Representation A
£8207 2008)project representation
§ 4.1.13 | Conformed construction documents A
§ 4.1.14 _As-Designed Record drawings A
§ 4115 —As-Constructed Record drawings A
§ 4.1.16 Post occupancy evaluation NP
§ 4117 Facility Support Services (B210™_2007) NP
§ 41418 Tenant-related services NP
§ 4.1.19 Coordination of Owner’s consultants A
§ 41.20 Telecommunications/data design 0)
§ 4.1.21 Security Evaluation and Planning NP
(B206™—2007)
§ 4.1.22 Commissioning (B211™—2007) NP
§ 4.1.23 Extensive environmentally responsible design [| NP
§ 41.24 LEED® Certification NP
Ba44M_29123(8214T™_2007)
§ 41.25 Fast-track design services NP
§ 4.1.26 Historic Preservation (B205™—2007) NP
§ 4.1.27 Furniture, Furnishings, and Equipment Design | O
(B253™_2007)
PAGE 10
1 TBD (_ )reviews of each Shop Drawing, Product Data item, sample and similar submittal of the
Contractor
2 TBD (_) visits to the site by the Architect over the duration of the Project during construction
Additions and Deletions Report for AIA Document B101™ -- 2007 (formerly B161™ — 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American
institute of Architects. All rights reserved. WARNING: This AtA® Document is protected by U.S. Copyright Law and International Treaties, Unauthorized
reproduction or distribution of this AIA Document, or any portion of if, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No.5773739723_1 which expires
on 04/15/2015, and is not for resale,
User Notes: (1683049266)
4 TBD _(_) inspections for any portion of the Work to determine final completion
§ 4.3.4 Ifthe services covered by this Agreement have not been completed within Twenty Four _(24_ ) months of the
date of this Agreement, through no fault of the Architect, extension of the Architect’s services beyond that time shall
be compensated as Additional Services,
PAGE 13
[X_] Litigation in a court of competent jurisdiction
PAGE 14
the arbitration-shall
astitie the nstiut: FL 1 jtablo-or. Et hased +h. Lain —di
tte-the-t ea OHA
PAGE 15
$80,000
PAGE 16
Hourly, at hourly rates, or lump sum as mutually agreed upon_by Architect and Owner
Hourly, at hourly rates, or lump sum as mutually agreed upon by Architect and Owner
§ 11.4 Compensation for Additional Services of the Architect’s consultants when not included in Section 11.2 or 11.3,
shall be the amount invoiced to the Architect plus Ten_percent (10%), or as otherwise stated below:
Schematic Design Phase 12,000 pereent 15 %)
Dollars (
Design Development Phase 16,000 pereent 20 %) :
Dollars ( :
Construction Documents 36,000 percent 45 %)
Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and Internatlonal Treaties, Unauthorized
reproduction or distribution of this AIA” Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This document was produced by AIA software at 10:18:01 on 03/26/2014 under Order No,.5773739723_1 which expires
on 01/15/2015, and is net for resale.
|
j
Additions and Deletions Report for AIA Document B101™ - 2007 (formerly B151™ ~ 1997). Gopyright © 1974, 1978, 1987, 1997 and 2007 by The American
4
User Notes: (1683049266)
Phase Dollars (
Bidding or Negotiation Phase percent %)
Dollars (
Construction Phase 16,000 pereent 20 %)
Dollars _(
Total Basic Compensation one-hundred $80,000 percent 100 %)
Dollars _(
See below
Principals $175 per hour
Associate Principals $150 per hour
Project Managers $125 per hour
Senior Architectural Staff $100 per hour
Architectural Staff $ 75 per hour
Administrative Staff $_50 per hour
PAGE 17
§ 11.8.2 For Reimbursable Expenses the compensation shall be the expenses incurred by the Architect and the
Architect’s consultants plus Ten_percent ( 10__%) of the expenses incurred.
PAGE 18
Exhibit A
Charles W. Clary IIL, FATA, Principal
Additions and Deletions Report for AIA Document B101™ ~ 2007 {formerly B151™ - 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American
Institute of Architects. All rights reserved. WARNING: This AIA® Document is. protected by U.S. Copyright Law and International Treaties. Unauthorized 5
reproduction or distribution of this AIA” Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted fo the
maximum extent possible under the law. This document was produced by AIA software at 10:18:04 on 03/26/2014 under Order No.5773739723_1 which expires
on 01/15/2018, and is not for resale,
User Notes: (1683049266)
Additions and Deletions Report for
AIA Document B101™ — 2007 Exhibit A
This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has
added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the
original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text.
Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part
of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by
AIA software at 12:41:40 on 03/10/2014,
PAGE 1
Okaloosa County Sheriff's Office
50 2™ Street
Shalimar, FL_32579
Okaloosa County, Florida
Okaloosa County Commission
1804 Lewis Turner Blvd, Suite 100
Fort Walton Beach, Florida 32547
DAG Architects Inc.
1223 Airport Road
Destin, Florida 32541
Program as determined by Owner; a two story addition to the Okaloosa County Sheriff's office administration
complex.
A two story, approximately 11,633 s.f. addition to the Okaloosa County Sheriff's office administration complex.
$1,000,000
PAGE 2
TBD
Construction Manager
Donald L, Turner
Additions and Deletions Report for AIA Document Bi 04™ — 2007 Exhibit A. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of
Architects. All rights reserved. WARNING: This AIA’ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 4
reproduction or distribution of this AlA® Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This document was produced by AIA software at 12:41:40 on 03/10/2014 under Order No.5773739723_1 which expires
on 01/15/2015, and is not for resale,
User Notes: . (2018329210)
5489 Old Bethel Road
Crestview, Florida 32536
Phone: (850) 689-5790
Fax: (850) 689-5630
Major J D Peacock
50.2" Street
Shalimar Florida 32579
850.651.7410 Phone
850. 609.3048 Fax
Charles W. Clary 10, FATA
850.259.6695 cell
Patrick L. Ballasch, AIA
850.217.4970 cell
1223 Airport Road
Destin, Fl 32541
850.837.8152 office phone
850.654.4276 fax
PAGE 3
Craft & Webster Structural Engineers, Inc.
Roger A. Craft, PE
129 Highpoint Dr.
Gulf Breeze, FL_32561
850.712.8290 phone
850.934.0083 fax
Watford Engineering, Inc.
David Watford, PE
4471 Clinton Street
Marianna, FL_ 32446
850.526.3447 phone
850.526.3448 fax
Humber-Garick Consulting Engineers
Chris Garick, PE
142 Eglin Parkway, SE
Fort Walton Beach, FL_ 32548-5545
850.243.6723 phone
850.664.5420 fax
Additions and Detetions Report for AIA Document B101™ — 2007 Exhibit A. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American institute of
Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and international Treaties. Unauthorized
reproduction or distribution of this AIA” Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This document was produced by AIA software at 12:41:40 on 03/10/2014 under Order No.§773739723_1 which expires
‘on 01/15/2015, and is not for resale,
User Notes: (2018329210)
2
Choctaw Engineering
Additions and Deletions Report for AIA Document B101™ — 2007 Exhibit A. Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of
Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 3
reproduction or distribution of this AIA” Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This document was produced by AIA software at 12:41:40 on 03/10/2014 under Order No.5773739723_1 which expires
on 01/15/2015, and is not for resale.
User Notes: (2018329210)
Qualifications for Design Services for a
New Office Building
[- at the Okaloosa County Sheriff’s Office
located at 50 2nd Street, Shalimar, Florida
f° RFQ No. BCC 26-14
Presented to
L, Okaloosa County Board of County Commissioners
January 17, 2014
| DAG Architects Inc.
, €: 1223 Airport Road
[° | | cam, Destin, Florida 32541
, PRMOFTHEVER — 850) 837 8152
{ www.dagarchitects.com
DAG architects
AA-~C000745
41223 airport road
destin florida
32547
p 850.837.8152
f 850.654.4276
www.dagarchitects.com
January 17, 2014
Zan Fedorak
Okaloosa County Purchasing Department
602-C North Pearl Street
Crestview, FL 32536
Re: BCC 26-14 Qualifications for Design Services on a New Office Building at the
Okaloosa County Sheriff's Office Located at 50 2nd Street, Shalimar, FL
Dear Mr. Fedorak and Members of the Selection Committee:
On behalf of DAG Architects, we appreciate the opportunity to submit the enclosed statement
of qualifications for providing professional design services to Okaloosa County for a new
10,000 SF office building for the County Sheriff's Office. We have already been working
closely with the Sheriffs Office regarding their space needs, as part of the Shalimar Annex
design-build project. This project has been evolving over the past two years, as you look for
the most efficient and cost effective ways to consolidate County offices and provide space for
current functions and future expansion.
DAG Architects is based in Okaloosa County and has been operating here continuously for
33 years. We have designed numerous office buildings, public safety centers, and law
enforcement facilities similar in nature fo that proposed. We are already familiar with the site
and the needs of the Sheriff's Office, not only through our work exploring reuse of the
Shalimar Annex property, but also because we designed the renovations to the space they
currently occupy. Our staff is local, experienced and seasoned, with an average of 27 years
of professional work history to draw upon. We pride ourselves on our responsiveness, our
design abilities, and our track record of bringing in projects on budget and within their
schedules.
We have augmented our experience with several very well-qualified local consulting firms,
essentially the same team that has been working together on the Shalimar Annex project.
Choctaw Engineering will be civil engineers, Humber-Garick will provide electrical
engineering, Watford Engineering will be our mechanical engineer, and RAC Engineering will
be structural engineer. We have worked closely with ail of these firms on many other
projects, and are confident in their abilities to provide excellent solutions. Choctaw and
Humber-Garick are also Okaloosa County-based firms.
Project Team
| will lead the design team as overall Principal in Charge. | have been responsible for
conducting programming sessions and other meetings with many Okaloosa County
departments on space needs and planning for replacement facilities at the Shalimar Annex.
As a lifelong resident of Okaloosa County, a former Destin City Councilman and former State
Senator from this district, | am intimately familiar with the county facilities and the importance
played in our community by the Sheriffs Office. | have worked closely with Major J.D.
Peacock, head of administration, to quantify the space needs and adjacencies necessary
Okaloosa County
January 17, 2014
Page three
Location, Ability to Perform and Current Workload
Our Destin office on Airport Road will be the base for managing this project, and given our
current and projected project commitments, we can fully staff and shepherd this work from
start to finish.
Summary
We look forward to the possibility of continuing to work together with Okaloosa County. As
long-standing members and residents of Okaloosa County, we understand the critical
importance to our local economy of making sure our facilities are well-maintained and
reflective of our communities. We will be careful shepherds of county funds since many of us
are also local taxpayers. And providing work to local businesses and residents sends a
positive message to other businesses already in the area or considering relocating here.
| hope that the enclosed material will demonstrate fo you our abilities, our attention to detail,
and our commitment to excellence in design and client services. Thank you for your
consideration,
Charles W. Clary, III, FAIA
Principal
Table of Contents
Introduction to the Team
DAG Architects 1-1
Humber-Garick Consulting Engineers 1-2
Choctaw Engineering 1-3
Watford Engineering 1-4
RAC Engineering 1-4
| Key Personnel
Organization Chart 2-1
Team Resumes 2-2
Project Experience
Experience in Similar Projects 3-1
Selected Experience in Okaloosa County 3-7
Project Understanding
Project Understanding and Approach 4-1
Ability to Observe and Advise Whether Plans and Specifications
are Being Complied With 4.3
Familiarity with the Project Area 4-3
Other Information
Meeting Schedules 5-1
Meeting Budget Requirements 5-1
Current Workload 5-3
Forms
Conflict of Interest Disclosure Form 6-1
Drug-Free Workplace Certification 6-2
No Contact Clause 8-3
Indemnification and Hold Harmless 6-4
Local Preference Data Sheet 6-5
=
®
|
o
=
—_
io)
=
<
o
2
)
S
x2]
°o
—_
_—
=
Introduction to the Team
DAG Architects
Destin { |
Brief History. DAG was established in Okaloosa County in 1981
by Samuel W. Blimling, AIA, and Charles W. Clary, Ill, FAIA. Over the past 33
years, the firm has grown and undertaken a tremendous variety of projects in
Northwest Florida and throughout the southeast.
Nature of Services Offered. Services that we provide in-house include
architecture, visioning and programming, master planning, interior design,
graphic design, and construction phase services. We use state-of-the-art
computer hardware and software, including Building Information Modeling
systems, to produce our drawings and documents.
Awards and Honors. The firm's work has been recognized with numerous
design awards, and the principals and key professionals have been active in
community, state, and national affairs relating to architecture and construction.
In 2007, DAG Architects was awarded the Firm of the Year for the State of
Florida, This honor is given annually to one firm in the state, in recognition of
outstanding achievement in design, community service, education, and service
fo the profession.
Breakdown of Staff by Discipline
e Architects: 14 (11 licensed, 3 not yet licensed)
¢ Administrative: 2
LEED AP: 6
Equipment and Facilities
Our Destin office is approximately 5,000 SF, and we have an investment in
state-of-the-art computer hardware and software, plotters, scanners, color
printers and other reprographic equipment. We use these tools to improve
coordination and communication among the project consultants to minimize
errors and to improve turnaround times for revisions and integration, We use
programs such as Revit (a Building Information Modeling system) which allow
us to coordinate drawings, schedules, details, and building systems, and to
enhance the design decision-making process because documents are
developed in 3D.
Repeat Business
The means by which we measure our success is through the good will of our
repeat or continuing clients. Their opinions are the very best testament to our
work and serve as the barometer of the quality of the professional services we
provide to them. Over 80% of our current commissions are with clients we
have worked with in the past.
AIA FLORIDA
FIRM OF THE YEAR
2007
Representative Repeat Clients.
>< Okaloosa County:School District=94""
“projects ftom:1986 10-2003.
, Leon, County School District-47 projects:
~ fom 2000 te present
- School District of Escambia County-33
= ov projects from: 1999 sé
- Santa Rosa County.School
es from 2008 to.pre
Page 1-1
Introduction to the Team
Choctaw Engineering
Fort Walton Beach
Choctaw Engineering, Inc. has been doing business in the Fort Walton Beach
area for over 36 years. The company is locally owned and maintains a solid
background from its many years of work in the region. The company has
functioned as the City Engineer for the Cities of Valparaiso and Destin in the
past and as the Engineer for the Okaloosa County School Board. The Choctaw
Engineering, Inc. staff has an in-depth knowledge of local and state permitting
requirements and has good working relationships with both local and state
permitting personnel.
A full range of services are provided by Choctaw Engineering, Inc. to both
public and private clients. A sampling of the services we offer to our clients
includes Site Design, Water and Wastewater Design, Highway Design,
Stormwater Design, Construction Inspections, Project Management, Traffic
Studies, Utility Design, and Subdivisions. Our surveying services include
Boundary and Topographic Surveys, Hydrologic Surveys, Construction Staking,
and Platting.
Choctaw Engineering, Inc. uses the latest in computer design techniques with
AutoCAD 2009-based drafting applications, including Civil 3D and Land
Development Desktop, Our systems are readily available and adaptable to a
wide variety of systems, allowing us the flexibility of electronically exchanging
data with other professionals and municipalities.
Watford
. . Engineering, Inc.
Watford Engineering, Inc. K pupineering, Ine
Marianna tacts, Rarer?
Watford Engineering, a Florida mechanical consulting firm, is centrally based
out of Marianna, and has been providing engineering services to clients since
late 2007. David N. Watford, PE is a mechanical engineer and President of
Watford Engineering, Inc. His project experience includes a wide variety of
clients and project delivery methods. Mr. Watford's career in building
construction began in 1996 while working as a designer for a fire sprinkler
company. In 1997 he began a mechanical engineering career with Schmidt
Dell in Pensacola, FL where he eventually became Vice President and served
as head of the mechanical department from 2003 until he {eft to form Watford
Engineering, Inc.
Breakdown of Staff by Discipline
e Professional Engineer: 4
« Mechanical Designers: 2
e — Draftsman/Administrative: 1
Repeat Business. We currently hold continuing contracts with Jackson
County Schools and Bay District Schools. Our clients return to us time and
again for our experience and the service received during design and
construction.
O'Sullivan Creel Office Building, Fort Walton Beach
{Choctaw Engineering with Lord & Son, Humber-Garick,
and DAG)
Renovations of FAMU Sampson & Young Dormitories,
Tallahassee ( Watford Engineering with DAG)
Breakfast Point Medical Office Building, Panama City
Beach ( Watford Engineering with DAG)
Page 1-3
o
<
=
°
vd
o
a
~
a
<
Key Personnel
Introduction to the Team
The individuals who make up our project team are seasoned professionals, with many years of experience in the design of
office projects of a similar nature to that proposed for the County Sheriffs Offices. As you will see, most of our team
members are also residents of Okaloosa County.
Page 2-1
Key Personnel—Engineering
PHILIP M. HUMBER, PE Okaloosa County Resident
ELECTRICAL ENGINEER
Mr. Humber has been in the consulting engineering practice on the North Florida Gulf Coast since
1969. During this time he has provided engineering services continually all over the southeast. He is
personally familiar with local conditions and codes.
Phil oversaw a courtroom renovation in the Crestview Courthouse in the mid 1990's, and has been
involved in the electrical design of the Okaloosa County Courthouse Annex building from its original
design, through numerous additions and renovations, to the current day. Other judicial projects
include a courtroom renovation in Milton, a new 38,000 SF Courthouse Office Building and Parking
Garage in Pensacola, the Juvenile Justice Courthouse in Panama City, the Ordon-Orvis Building
renovation in Pensacola, the South Okaloosa Sheriff's Operations Center in Shalimar, and the Fort
Walton Beach Fire and Police Station. He is also working on programming and schematic design for
the new Santa Rosa County courthouse currently being planned.
In addition to his consulting engineer experience, Philip Humber worked for five years in electric utility
company power distribution design with Gulf Power. Major prime electrical projects designed by Mr.
Humber include two $1 million power substations at U.S. military installations in Panama. Industrial
projects include a sandblasting, drying and painting facility for the Panama Canal Commission. Also,
he designed and supervised a replacement of all campus primary power cabling and transformers at
Okaloosa Walton Community College, now Northwest Florida State College.
He has been the engineer of record on a wide variety of projects including multi-family housing,
dormitories, schools, fire arts centers, media centers, health care facilities, police and fire stations,
commercial, and industrial buildings. His experience includes electrical consulting to architects as
well as total project management of prime electrical projects. Philip Humber brings a wealth of
design experience, honesty, leadership and a demand for quality to all of Humber-Garick projects
and is an invaluable asset to any project team.
DAVID WATFORD, PE, LEED AP
MECHANICAL ENGINEER
David Watford has over 14 years of experience designing commercial, religious, institutional, and
educational projects. David has extensive experience with geothermal, hybrid geothermal, central
plant chilled water/hot water, and unitary HVAC systems. His experience also includes life cycle cost
analysis and preliminary cost estimates for planning. David has been project management
experience for MEP projects ranging from two classroom additions to new facilities exceeding
180,000 sf. He has been the prime design professional for mechanical renovations up to $3M
construction value. He regularly performs studies and reports to evaluate existing facilities and make
tecommendations for indoor air quality, energy efficiency upgrades, and equipment replacements.
Prior to forming Watford Engineering in 2007, David was a mechanical engineer with Schmidt Dell
Associates in Pensacola.
Representative Projects Include Jackson County Courthouse, Jackson County, FL—Reiccated
rooftop mechanical equipment and reconfigured the roof drainage system for a new metal roof
system (2010-2011). Escambia County Juvenile Justice Center, Escambia County, FL— Project
included courtrooms and office spaces for the state attorneys and public defenders, holding areas for
prisoners, and other public spaces. The mechanical system included 4 pipe chilled water/hot water
VAV systems, plumbing, and renovation to fire protection. The mechanical systems were tied into
the county's central energy plan. (2004-2006) Santa Rosa County Administration Complex,
Santa Rosa County, FL—Designs for this complex included commercial rooftop systems with
variable volume terminal units and electric reheat. Fire protection design and plumbing design were
also included. (1997-2001) Pensacola City Hall Hurricane Hardening and Renovation, City of
Pensacola—A new central energy plant was designed, piping revised, and several air handling units
and VAV terminal units replaced to update the City Hall's systems for better performance during
hurricane events. (2004-2006)
Education
Bachelor of Science in Electrical Engineering,
Mississippi State University, 1963
Professional Registrations
Engineer: Florida #13870; Alabama #9449
Mississippi #9643; Georgia #7190
Total Years Experience
44
Education
Bachelor of Science in Mechanical Engineering,
Florida State University, 1996
Professional Registrations
Engineer: Florida #58208
Alabama #26142
Mississippi #18409
Georgia #PE035507
LEED Accredited Professional
Professional Affiliations
American Soctety for Heating, Refrigerating and
Air-Conditioning Engineers
American Society of Professional Engineers
American Society of Mechanical Engineers
Total Years Experience
16
Page 2-3
Project Experience
Experience in Similar Projects
Shalimar Sheriff's Office (DAG &HGCE)
Shalimar, Florida
Renovation of the existing 27,000 SF Keltec Electronics Plant into offices for the Okaloosa County Sheriff's Office. Humber-Garick was
responsible for electrical, telecom, emergency power, fire alarm and security design including a total building generator.
Okaloosa County Shalimar Courthouse Annex
(DAG, HGCE, WEI)
Shalimar, Florida
This same project team has been working with Okaloosa
County over the past two years as we evaluated the
options for renovating the Shalimar Annex to consolidate
County officers and conducted programming and space
requirement meetings with County departments,
including the Sheriff's Office.
STORVOPTION“W- PIRSTILOORCONCEM
‘OkALOCRA COUNTY SILALIAR ARIS.
Page 3-1
Experience in Similar Projects
Florida Department of Law Enforcement
Renovation (DAG)
Pensacola, Florida
An historical 1920 school building was renovated
into a high technology crime laboratory for the
R) Florida Department of Law Enforcement. The
| 42,000 SF facility includes photo laboratories,
ballistics and forensic laboratories, a soundproof
shooting range, incoming evidence lab with
motion detectors and burglar bars in the air
j ducts. A vehicle investigation area was also
included. Workspaces for 10 different state and
local law enforcement departments were
a) designed, while conforming to local historical
ia preservation requirements.
Bay County Courthouse Addition (DAG)
Panama City, Florida
DAG Architects is part of a joint venture responsible for the design of a new addition to the Bay County Courthouse, which serves the 14th
Judicial Circuit. The 60,000 SF addition will include 6 courtrooms and 7 judges’ chambers and hearing rooms, public spaces and court
support spaces, all built over a secure parking and mechanical level. An elevated, enclosed and environmentally controlled connection
will link the addition to the existing courthouse and to the sally port. Full size mockups of the courtrooms were constructed so each judge
could specify any desired modifications before the construction documents are finalized,
Page 3-3
Experience in Similar Projects
Adaptive Re-Use of the Molino School into County Offices
and a Community Center (DAG)
Molino, Florida
This circa 1939 elementary school underwent an adaptive re-use
renovation to convert it into a Community Center, Library and
Museum. The 16,000 SF building’s mechanical, electrical, and
plumbing systems were completed redone, upgrading the facility to
meet ADA codes, While renovating to accommodate the new
programs, building elements were carefully selected to be
consistent with the historic nature of the structure. Throughout the
design process, DAG team members met with key city departments
and many user groups, and attended monthly meetings of the
historical society to become more attuned to the meaningful place
the Molino School has held in the community throughout its history.
Other Escambia County public offices became interested in
consolidating fo this central location, and new complementary
offices for the County Tax Collector and Property Appraiser were
constructed on the Molino campus. This bullding received a rating
of Two Green Globes for sustainability, the equivalent of LEED
Silver.
Jackson County Courthouse Renovations (WEI)
Marianna, Florida
Watford Engineering, Inc provided mechanical and
plumbing engineering services for the exterior Houston County Courthouse (HGCE)
renovations of the Jackson County Courthouse. The Dothan, Alabama
project includes the addition of a sloped roof over
approximately 2/3 of the existing flat roof along with other
aesthetic alterations to the building. The plans call for
mechanical equipment mounted to the old flat roof to be
relocated or replaced. The flue system for the gas boiler
located in the basement was reconfigured as well. Roof
drains were relocated to the flat portion of the roof to
remain.
Electrical design for 80,000 sq ft renovation including power distribution
systems, interior lighting, site lighting, lighting controls and fire alarm.
Houston County Courthouse is listed as a historical building on the Historic
Chattahoochee Commission. (Design by HGCE Principal as employee of
Family Design Firm).
Page 3-5
Selected Experience in Okaloosa County
Beasley Park (DAG)
Okaloosa Island, Florida
Designed for Okaloosa County, this beachfront recreational
facility is used by local residents as well as tourists. The site, on
the southern side of a barrier island, is exposed to corrosive salt
spray, torrential rain storms, intense sun, and potential hurricane-
force winds, Construction of the pavilion also had to be carried
out under strict Florida DNR guidelines to protect the sensitive
dune system.
Fort Walton Beach Recreational Complex
(HGCE)
Fort Walton Beach, FL
Provide design and construction documents for
new 30,000 sq ft gymnasium and multi-function
building and the complete site fo include
approximately five baseball fields, five softball
fields, a mile walking sidewalk track, and
associated parking. The electrical design
includes power, lighting, site lighting
telecommunications/data, audio visual and fire
alarm systems.
Okaloosa County Department of Health (DAG)
Fort Walton Beach, Florida
This 24,000 SF office building for the County's Health
Department included an in-house computer network and central
computer room with clean-room environmental equipment. DAG
designed the new building, made renovations to the older
buildings, and later worked on the design and expansion of the
third floor. The firm also designed the Okaloosa County Medical
Examiner's building.
Selected Experience in Okaloosa County
O’Sullivan Creel Office Building
(DAG, HGCE, and Choctaw)
Fort Walton Beach, Florida
This 30,000 SF office building for a local CPA
firm features a brick and stucco exterior and a
barrel-vault roof. The design is slightly more
contemporary in feeling than the building DAG
designed for the Destin branch of the same firm.
The first floor will be leased to a tenant, with the
owner occupying the top two levels. Preserving
the existing trees on the site was a priority for the
owner,
Destin Library (DAG and HGCE)
Destin, Florida
The City of Destin challenged DAG Architects to design
a new library that would fit comfortably in a heavily
wooded site filled with live oaks and reflect the fishing
and boating heritage of the city. The resulting 13,500 SF
facility addressed these issues while providing a
comfortable, state-of-the-art structure where one can
enjoy the site as well as the many features of the
building. The project has received design awards on
both the local and state level.
Page 3-9
Project Understanding
Project Understanding and Approach
Project Understanding and Approach
Our team has been working closely with Okaloosa County and the
Sheriff's Office for more a year, as part of an effort to consolidate
County operations and save money currently being expended in
office lease costs.. Through our role as design lead on the Lord &
Son design-build team hired to renovate the Shalimar Courthouse -
Annex building, we held numerous meetings with all of the affected :
departments, including the Sheriff's Office, to determine their
current and projected space needs.
Charlie Clary conducted in-depth interviews with each user
agency, and has spent a significant amount of time with Major J.D.
Peacock discussing the unique needs of the Sheriffs Office and its
investigative division in particular. Preliminary studies showed that
it would be more economical to provide a two story metal building
on the current site of the Sheriffs Office, rather than adding space
for them at the rebuilt Annex Building. In addition to providing
expansion space at a lower cost, this alternative addresses the
Department's desire to have special private parking and entrances
for the Investigative Division, as well as offering the benefit of
consolidating the department's activities into a single location.
Schematic plans were developed to identify how the site could be
organized to maintain access between the new building and the
existing structure, so that the two can work as one. As stated in
the RFQ, the building that we discussed would be two stories, with
approximately 10,000 SF, and will meet all applicable local, state
and federal laws, building codes, and ADA requirements.
Compliance with Plans / Familiarity with Project Area
Ability to Observe and Advise Whether Plans and Specifications are Being
Complied With
Having a well prepared and coordinated set of plans and specifications is no
guarantee that the project will be constructed according to those plans. Therefore it
is paramount that the design and construction team work together to develop a
system of checks to ensure that the plans are interpreted correctly and that
modifications and changes are followed through in detail. We have already
developed a quality contro! system that has been demonstrated successfully on a
number of completed projects.
Part of this system is the implementation of plan reviews throughout the project
beginning in the schematic design phase all of the way through the permit set.
These plan reviews are performed by a group comprised of members of the
design, engineering, estimating, and construction teams.
Once the project is designed and permitted, we continue the check system
through regularly scheduled project meetings where we remain proactive in
searching out any potential issues with drawing interpretation and construction
implementation. These meetings always include members of the design team as
well as subcontractors and of course the owner's representatives. In these
meetings we monitor the schedule, review the budget, and discuss opportunities
for project enhancement, and methods to ensure that the project remains on track.
The nature of building construction can present unforeseen challenges which
require solutions, and input from all parties is sought when developing quick and
responsive solutions to problems should they arise. Since our team is local,
discussions can easily be managed whenever convenient for the County.
Familiarity with the Project Area
Our firms are not only professionally-based in Okaloosa County, but our team—our
people and our families—have grown up in this area, and our lives are intertwined
with yours. We have watched Okaloosa County grow and expand, and have been
involved in this growth for over 60 years.
Our team members worked on the current Sheriff's Office building when it was
converted from an industrial building back in the 1990's, and we are all intimately
familiar with the project area, the departments and individuals involved, and the
County administration.
Page 4-3
c
5°
=
oe
=
Soe
°o
—
=
ho
cc)
=
~~
©
Meeting Schedules and Budgets
Scheduling
We understand that providing Professional Services for the addition to the
Sheriff's Office in Shalimar requires a total commitment to meeting the budget
and delivering documents within the schedule. Because of our success in doing
this, our team has been a repeat provider of architectural services to many public
clients and jurisdictions, including Escambia County, Okaloosa County, the City of Destin, the
City of Pensacola, and others.
We will establish the anticipated schedule and explore alternative approaches that
can expedite the design and construction processes without increasing cost or
sacrificing quality. This is a collaborative process and we will explore a number of
options with the County.
During every phase, we plan carefully to meet scheduled deadlines and project
milestones. The project manager will keep a master schedule, and all parties
involved (architects, engineers, and owner representatives) will have a responsibility |'» =/hAG) did a tremendous jeb.in®
to get decisions made in a timely manner so the process doesn’t get delayed. If the ensuring the project was completed
project becomes delayed during design phases, we have deep personnel resources : within budget and ‘within.th 6!
to assist the core team in producing the drawings on time. ‘antiipated firieline .
Examples of Team’s Ability to Meet Tight Schedules Boece
Kira Kirby,
Vernon High School Construction Documents were produced in 8 weeks City of DeFuniak Springs
Pea Ridge Elementary School Construction Documents were completed in 120 : =
days
e Woodlawn Beach Middle School Construction Documents were completed in
120 days
e Milton High School Athletic Improvements Construction Documents were
completed in 120 days
Roulhac Middle Schoo! Construction Documents were produced in 8 weeks
Pace High Schoo! Media Center Construction Documents were completed in
120 days
Meeting Budgets
Our extensive local experience and in-house cost estimating capabilities allow us to
help determine a realistic and achievable budget from the outset of the project.
Then, after each phase of the work is complete, we prepare an estimate of the
probable cost. If it looks like the budget will be exceeded, we work closely with the
client to resolve the problem. We can either prepare a menu of cost-saving items to
consider removing, or we can prepare phasing plans and structure the work so that
desired items can be included in the future as additional funding becomes available.
Page 5-1
Current Workload
DAG Architects:
Design and Production: Shalimar Courthouse Replacement; Mosley High School Building 1 Renovation; WaterColor Beach
Club Improvements; Excel Safe Room; Renovations to 4 Leon County Schools
Construction: Quincy National Guard Armory Renovations; Bexar Street Police Station; Rosemary Beach Owners Club; Leon
County Schools Bus Maintenance Facility; FAMU 800-Bed Dormitory; Bay County Courthouse; North Bay Haven Charter
Academy; University Academy Charter School; Legion Field Community Center; Chumuckla Elementary School Kitchen,
Cafeteria, Music & Art; Northview High School PE Facility; Walton County TDC Renovations; Milton High School Science
Lab
Humber-Garick Consulting Engineers:
Design and Production: Market Shops @ Sandestin; Beachside Community Church; Dixie RV; Bay Co Schools Bus
Communications; TYAD UPS - Revisions; Somerby at Santa Rosa; NSA-PC-Fitness Center; ECIP-TYAD; NWFSC Bldg Q-3
~ Machine Lab; Port of PC - Warehouse 2W; Cedar Grove Bldg 7 Revision; Port of PC ~ Site Electrical
Construction: Ernest Ward MS; North Bay Haven Charter Academy; Quincy NGA; Adelphi Switchgear; Pier Park - Miracle
Strip; NWFSC Sign; Vernon ES New Bldg; Port of PC - Reefer Containers; Rosemary Beach Owners Club; FWB Recreation
Center; University Academy; L3 Admin Bldg; ECIP — PR (Ft. Buchanan); ECIP - Aberdeen Ltg Upgrades; ECIP - Ft.
Jackson Ltg Upgrades; Dothan Downtown Library; Dothan Westgate Library; Fort Buchanan Metering; Club Intrawest
Watford Engineering, Inc.:
Design and Production: Lynn Haven Medical Office Bldg; PCB Police Department and Public Works; NWFSC Machine
Shop; NWFSC Public Safety; Springfield ES Bldg 9; Mosley HS Renovations
Construction: Patronis & Rutherford Air Cooled Chiller Replacements; Chipley HS Gym Lobby Addition; Ozark Boys & Girls
Club; L3 Admin Bldg; Jackson County Vehicle Maintenance Bldg
Choctaw Engineering:
Design and Production: Ocean City Subdivision; Diamond Lakes Drainage Study; Taco Bell - Niceville, Fl; Kingdom Hall
Addition - Crestview; Landmark Center, FRE Medical Office Building - Niceville; David Street Apartments; White Point Retail
Center; Gulf Coast Boat Center Storage Facility
RAC Engineering:
Design and Production: Marine Corp Headquarters Emergency Power Building, New Orleans, LA ; Rex
Theater Renovation, Pensacola, FL; Office Building 701 South Palafox, Pensacola, FL; Hampton Inn, Austin, TX; Four
story mixed use building, Pensacola, FL
Construction: L-3 Communications Admin Bldg, Crestview, FL; Tepper Aviation Office, Crestview, FL; St Marks UMC
Classroom Addition, Crestview, FL; Maritime Place 4 story Office Building. Pensacola, FL
: qin uve
i ot
Page 5-3
Forms
CONFLICT OF INTEREST DISCLOSURE FORM
For purposes of determining any possible conflict of interest, all proposers, must disclose
if any Okaloosa Board of County Commissioner, employee(s), elected officials(s), or if
any of its agencles is also an owner, corporate officer, agency, employee, eic., of their
business.
Indicate either "yes" (a county employee, elected official, or agency Is also associated
with your business}, or “no”. If yes, give person(s) name(s) and position(s) with your
business.
YES, no__*
NAME(S) POSITION(S)
FIRM NAME: DAG Architects Inc,
BY {PRINTED}: sag Spent /
BY (SIGNATURE): al f Mahe
THLE: Principat /
ADDRESS: 1223 Airport Road
Destin, Florida 32544
PHONE NO. 850/837-8152
E-MAIL colary@dagarchitects.com
Page 15
Page 6-1
Forms
NO CONTACT CLAUSE
The Board has established a solicitation sllence policy (No Contact Clause) that prohibits oral
and written communication regarding all format solicitations for goods and services (formal bids,
Request for Proposals, Requests for Quatifications) issued by the Board through the County
Purchasing Department.
The period commences when the procurement document Is received and terminates when the
Board approves an award,
When the solicitation silence period is In effect, no oral or written communication is allowed
tegarding the solicitation between prospective bidders/proposers and members of the Board,
the County Administrator or members of the Board Approved Review Committee. All questions
or requests for information regarding the solicitation must be directed to the designated
Purchasing Representative listed in the solicitation.
Any information thought to affect the committee or staff recommendation submitted after bids
are due, should be directed! to the Purchasing Director or his appointed representative. It shall
be the Purchasing Director's decision whether to consider this information In the decision
process.
Any violatlon is policy sl tk i ii roposer iderati urin
the selection process,
All proposers ie? comply with this policy by signing the following statement and
includi Yl Ir sunpryittC, ee
y Atte Mo representing __DAG Architects inc.
Signature Company Name
On this 3 _ day of January 2014 hereby agree to abide by the County's “No Contact
Clause” and understand violation of this policy shall result In disqualification of my
proposal/submittal,
Page 17
Page 6-3
Forms
LOCAL PREFERENCE DATA SHEET
Okaloosa County grants a preference to In-county bidders only when bids are recelved from
firms located in states, municipalities or other political subdivisions which offer preference to
bidders located in such polltical subdivisions, The amount of preference given to local bidders
will be the same as that given by the state, county, municipality or other political subdivisions in
which the out-of-county bidder Is located. If the political subdlivision in which a bidder is located
offers preference to Its local firms, that bidder must plainly state the extent of such preference
to include the amount and type preference offered. Any bidder failing to indicate such
preference will be removed from the County bid list and any and all bids from that firm will be
rejected.
Does the state, county, municipality or political subdivision in which your firm Is located offer a
preference to their local bidders? If "YES," list below the extent of such preference. (If your firm Is
located in Okaloosa County, you will check "YES"-reciprocal only.)
Yes _X + reciprocal only NO
If yes, you must identify how you. confirmed this information or who you spoke with within your
area of business location below:
DAG Arcitets ne [ Vie =
Bidders Company Name Authorized Signature — mops
Charles W. Clary, Ill, FAIA
Printed Name
January 3, 2044
Date
Page 19
Page 6-5
CONFLICT OF INTEREST DISCLOSURE FORM
For purposes of determining any possible conflict of interest, all proposers, must disclose
if any Okaloosa Board of County Commissioner, employee(s), elected officials(s), or if
any of its agencies is also an owner, corporate officer, agency, employee, etc., of their
business.
Indicate either “yes” (a county employee, elected official, or agency is also associated
with your business), or “no”. If yes, give person(s} name(s) and position(s) with your
business.
YES. No__*
NAME(S) POSITION(S)
FIRM NAME: DAG Architects Inc.
BY (PRINTED): PrtiegW. Clan /
BY (SIGNATURE): CL Mints Me
TITLE: Principal
ADDRESS: 1223 Airport Road
Destin, Florida 32541
PHONE NO. 850/837-8152
E-MAIL cclary@dagarchitects.com
Page 15
DRUG-FREE WORKPLACE CERTIFICATION
THE BELOW SIGNED PROPOER CERTIFIES that it has implemented a drug-free workplace program.
in order to have a drug-free workplace program, a business shall:
1,
Publish a statement notifying employees that the unlawful manufacture, distribution,
dispensing, possession, or use of a controlled substance is prohibited in the workplace
and specifying the actions that will be taken against employees for violations of such
prohibition.
Inform employees about the dangers of drug abuse in the workplace, the business's
policy of maintaining a drug-free workplace, any available drug counseling,
rehabilitation and employee assistance programs, and the penalties that may be
imposed upon employees for drug abuse violations.
Give each employee engaged in providing the commodities or contractual services that
are under quote a copy of the statement specified in subsection 1.
In the statement specified in subsection 1, notify the employees that, as a condition of
working on the commodities or contractual services that are under quote, the employee
will abide by the terms of the statement and will notify the employer of any conviction of,
or plea of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled
substance law of the United States or any state, for a violation occurring in the workplace
no later than five (5) days after such conviction.
Impose a sanction on, or require the satisfactory participation in, drug abuse assistance
or rehabilitation program if such is available in employee’s community, by any employee
who is convicted.
Make a good faith effort to continue to maintain a drug-free workplace through
implementation of this section.
As the person authorized to sign this statement, | certify that this firm complies fully with the
above requirements.
January 3, 2014
DATE: SIGNATURE:
COMPANY: DAG Architects Inc. NAME: _ Charles W. Clary, II], FAIA
, (Typed or Printed)
ADDRESS: 1223 Airport Road
TITLE: Principal
Destin, FL 32541
EMAIL: _ °laty@dagarchitects.com
PHONE NO.: 850/837-8152
Page 16
NO CONTACT CLAUSE
The Board has established a solicitation silence policy (No Contact Clause) that prohibits oral
and written communication regarding ail formal solicitations for goods and services (formal bids,
Request for Proposals, Requests for Qualifications) issued by the Board through the County
Purchasing Department.
The period commences when the procurement document is received and terminates when the
Board approves an award.
When the solicitation silence period is in effect, no oral or written communication is allowed
regarding the solicitation between prospective bidders/proposers and members of the Board,
the County Administrator or members of the Board Approved Review Committee. All questions
or requests for information regarding the solicitation must be directed to the designated
Purchasing Representative listed in the solicitation.
Any information thought to affect the committee or staff recommendation submitted after bids
are due, should be directed to the Purchasing Director or his appointed representative. It shall
be the Purchasing Director's decision whether to consider this information in the decision
process,
Any violation of this policy shall be grounds to disqualify the proposer from consideration during
the selection process.
All proposers must esto comply with this policy by signing the following statement and
including it With theft suBrAittal, en
\ Le the Me representing _DAG Architects Inc.
Signature Company Name
On this__3 day of January 2014 hereby agree to abide by the County's “No Contact
Clause” and understand violation of this policy shall result in disqualification of my
proposal/submittal.
Page 17
INDEMNIFICATION AND HOLD HARMLESS
To the fullest extent permitted by law, CONTRACTOR shall indemnify and hold harmless
COUNTY, its officers and employees from liabilities, damages, losses, and costs including
but not limited to reasonable attorney fees, to the extent caused by the negligence,
recklessness, or intentional wrongful conduct of the CONTRACTOR and other persons
employed or utilized by the CONTRACTOR in the performance of this Agreement.
DAG Architects Inc.
Proposer's Company Name
1223 Airport Road, Destin, FL 32541
Physical Address
same
Mailing Address
850/837-8152
Phone Number
850/259-6695
Cellular Number
January 3, 2014
Ve
Authorized Signature — Manual
Charles W. Clary, Ill, FAIA
Authorized Signature - Typed
Principal
Title
850/654-4276
FAX Number
850/259-6695
DATE
After-Hours Number(s}
Page 18
LOCAL PREFERENCE DATA SHEET
Okaloosa County grants a preference to in-county bidders only when bids are received from
firms located in states, municipalities or other political subdivisions which offer preference to
bidders located in such political subdivisions. The amount of preference given to local bidders
will be the same as that given by the state, county, municipality or other political subdivisions in
which the out-of-county bidder is located. If the political subdivision in which a bidder is located
offers a preference to its local firms, that bidder must plainly state the extent of such preference
to include the amount and type preference offered. Any bidder failing to indicate such
preference will be removed from the County bid list and any and all bids from that firm will be
rejected.
Does the state, county, municipality or political subdivision in which your firm is located offer a
preference to their local bidders? If “YES,” list below the extent of such preference. (If your firm is
located in Okaloosa County, you will check "YES"-reciprocal only.)
yes __X- reciprocal only NO
if yes, you must identify how you confirmed this information or who you spoke with within your
area of business location below:
Daf} fp
DAG Architects Inc. ([ ie =
Bidder’s Company Name Authorized Signature — Nope
Charles W. Clary, Ill, FAIA
Printed Name
January 3, 2014
Date
Page 19
REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ON A
NEW OFFICE BUILDING
AT THE OKALOOSA COUNTY SHERIFF'S OFFICE LOCATED AT
50 2ND STREET, SHALIMAR, FL
Te of County Commissioners I<
RFQ #: BCC 26-14
RFQ DUE: JANUARY 17, 2014 @ 4:00 P.M.
NOTICE TO PROPOSERS
REQUEST FOR QUALIFICATIONS
FOR DESIGN SERVICES
FOR A NEW OFFICE BUILDING
AT THE OKALOOSA COUNTY SHERIFF'S OFFICE LOCATED AT
50 2ND STREET, SHALIMAR, FL
The Okaloosa County Board of County Commissioners under the provisions of Section 287.055,
Florida Statutes and county policy, request qualifications from professional firms to provide Design
Services for a new Office Building at the Okaloosa County Sheriff's Office located at 50 2" Street,
Shalimar, FL.
It is the intent of the Board to enter into contract negotiations with a firm to accomplish the
stated objective. Firms desiring consideration should provide an original and five (5) copies of
their statement of qualifications. Guidelines detailing form and content requirements for the
statement of qualification are available by contacting Zan Fedorak, Purchasing Services
Manager, 602-C North Pearl St., Crestview, FL 32536 or 850-689-5960.
Proposals must be delivered to the Okaloosa County Purchasing Department at the address
below no later than 4:00 p.m., (CST), January 17, 2014 in order to be considered. All proposals
must be in sealed envelopes reflecting on the outside thereof “Design Services Qualifications for
a new Office Building at the Okaloosa County Sheriff's Office located at 50 2"4 Street, Shalimar, FL.
Due at 4:00 p.m., (CST), on January 17, 2014.”
All proposals should be addressed as follows:
Okaloosa County Purchasing Department
Zan Fecorak
602-C North Pearl St.
Crestview, FL 32534
Richard Brannon Date
Purchasing Director
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY
Don Amunds
Chairman
Page 2
INTRODUCTION/SCOPE OF WORK — The Okaloosa County Board of County Commissioners is
soliciting Statements of Qualifications from interested firms detailing their technical and financial
qualifications to design a new office building at the Okaloosa County Sheriff's Office located at
50 2"4 Street, Shalimar, FL.
The scope of work shall include the design of a new 10,000 square foot (more or less) office
building that is anticipated to be two-stories.
The new building shall comply with all Federal, State and local codes including, but not limited
to building construction and stormwater management requirements.
An elevator meeting all current ADA compliance criteria is to be included.
A Building Safety System, including the fire sprinkler system and Fire Alarm System shall be
required in accordance with all applicable local, state and federal codes and regulations.
The new building shall be ADA compliant.
All necessary internal and external signage is to be included in the design.
The successful proposer will be responsible for field measurements of the proposed site and
analyze space for layout, utilization and any limitations.
The successful proposer will be required to meet with designated Board of County
Commissioners’ and Sheriff's representatives to determine the space, size and use requirements.
REQUESTED SERVICES — Following selection of a design firm, that firm shall work with Okaloosa
County to develop a new office building that will serve the needs of the Sheriff. Plans will be
developed based on the direction of the Board of County Commissioners with assistance from
Staff. Improvements contemplated with this contract will include site and building
improvements.
The selected firm shall have sole responsibility for compliance with all applicable local, state and
federal codes and design requiremenis.
Ultimately, the design firm shall supply to ihe County three sets of signed and sealed construction
documents (drawings, design documentation, specifications and bid documents} along with all
files in an electronic format. Construction drawings shall be in the current version of AUTOCAD.
OWNERSHIP & USE OF DOCUMENTS - The design services required for the completion of the work
constitute a work for hire. All rights to intellectual property in any documents, drawings,
specifications and electronic data generated in the course of providing such service are the
property of the Owner. The Owner agrees that drawings, specifications, and electronic data
shall be not used for any other project but shall be available for use by the Owner for future
additions, alterations and remodeling to any structure thai is subject to this project. The Design
Firm and other providers of professional services shall be permitted to retain copies of the
drawings, specifications and electronic data for informational purposes and reference in
connection with the Owner's use and occupancy of the project. The Design Firm shall not use
the drawings, specifications or electronic data for any other projects, except by Owner's prior
written approval. The Design Firm and other providers of professional services on this project shall
not be held liable for any changes or modifications to the drawings and specifications made by
the Owner after termination of this agreement.
Page 3
After successful completion of this agreement, the Owner shall retain possession of the drawings
and specifications as provided herein and shall be entitled to use of the drawings, specifications,
and electronic data furnished by the Design Firm without the written permission of the Design
Firm.
EVALUATION/SELECTION OF PROPOSALS - A Selection Review Committee appointed by the
Board of County Commissioners will evaluate all proposals received and:
1. Prepare an alphabetical listing of those proposers determined to be interested and
available. Evaluate the proposals meeting minimum submission criteria based upon
qualifications and conduct discussions with those firms deemed to be the most highly
qualified to provide the services required. Each of the firms will be required to execute
the Truth-In-Negotiation certificate as defined in Florida Statutes 287.055, Selection as
best qualified will be based on the following considerations:
a.
Responsiveness of the proposal clearly stating an understanding of the work to be
performed for the County.
Firm's reputation and competence, including technical education and training,
experience in similar type projects, availability of adequate personnel, equipment
and facilities and the extent of repeat business of the firm.
Current workload.
Financial responsibility.
Ability to observe and advise whether plans and specifications are being complied
with.
Past record of professional accomplishments.
Previous experience with Okaloosa County Board of County Commissioners.
Familiarity with the proposed project area.
Qualifications of personnel assigned to the program.
Experience with programs similar in size and scope to those herein proposed.
Firm’s capability to meet schedules.
Willingness to meet time and budget requirements.
Geographic location of the firm, including permanent office of staff and project
management team.
2, Review of all proposals received will proceed as follows:
a.
The Selection Committee will review all written documents submitted.
Page 4
b. The committee’s ranking of prospective firms shall be based on the firm's capabilities,
ability, and adequacy of personnel, past record, recent experience, current
workload and location of the firm or individual as provided in the submittal.
c. The Selection Committee may call for presentations by the top ranks firms.
3. Negotiations between the Selection Committee, or the Committee Designee, and the
priority proposers (the proposers ranked highest on the Board approved ranking list) that
will proceed as follows:
a. Negotiations will be held with the highest ranked proposer.
b. Ifno agreement can be reached with the highest ranked proposer, then negotiations
will commence with the 2n¢ highest ranked proposer.
c. If no agreement can be reached with the 2°¢ highest ranked proposer, then
negotiations will commence with the 3 highest ranked proposer.
d. If no agreement is reached with the 3'¢ highest ranked proposer, then the Committee
shail return to the Board to report such and recommend that a new ranking list be
established from among the other proposals submitted. If for any reason, said
procedure is not feasible, the Committee shall seek direction from the Board as to
how to proceed further.
4. Presentation of the agreements by the Selection Committee to the Board for approval.
The Executive Summary shall inform the Board as to the terms, conditions, and costs
associated with the contracts.
5. Upon approval of the agreement by the Board, execution of a formal written agreement
prior to commencement of the work associated with the contract.
6. Direct contact one-on-one with the Committee members or the Board of County
Commissioners is not allowed. Selection will be on the basis of professional qualifications
and expetience. Failure to comply with this requirement can result in disqualification.
a. The Selection Review Committee will evaluate and rank all proposals meeting the
minimum submission requirements and enter into formal negotiations with said firms.
Firms will be notified of dates and times of any interviews.
PROPOSAL OPENING — Names of firms that submit a qualifications proposal on or before the
dealing specified herein shall be available to the public once the submittal deadline has
passed, It is the proposer’s responsibility to assure that his proposal is delivered at the proper
time and place. Offers by telegram, facsimile or telephone are NOT acceptable.
Note: Crestview, Florida is “not a next day guaranteed delivery location” by delivery services.
Page §
SPECIAL CONDITIONS
Applicable Laws and Regulations - The proposers attention is directed to the fact that all
applicable state laws, county municipal ordinances, orders, rules and regulations of all
authorities having jurisdiction over project shall apply to the proposal throughout, and they
will be deemed to be included in the contract the same as though they are written out in
full herein. Special attention shall be applied to ensure that the building and alll
modifications to it are compliant with the current ADA codes.
Review of Job Site — for technical information or to see the project site, contact Don Tumer,
County Facility Maintenance Office, 850-689-5791; 8:00 a.m. - 4:00 p.m., Monday — Friday.
Proposal Information - Questions concerning proposal requirements or specifications should
be directed to Zan Fedorak at the Okaloosa County Purchasing Department, 602-C North
Pearl Street, Crestview, Florida 32536, at 850-689-5960. Any changes by the County to
specifications shall be in writing in the form of an addendum and furnished to all proposers.
Verbal information obtained otherwise will not be considered in awarding of the proposal.
Right to Waive and Reject
A. The Board, in its absolute discretion, may reject any proposal of a proposer that
has failed, in the opinion of the Board, to complete or perform an Okaloosa
County contracted project in a timely fashion or has failed in any other way, in
the opinion of the Board, to perform a prior contract in a satisfactory manner,
and has directed the Okaloosa County Purchasing Services Manager to
emphasize this condition to potential proposers,
B. There is no obligation on the part of the County to award the proposal to the
lowest proposer, and the County reserves the right to award the proposal to
proposer submitting a responsive proposal with a resulting negotiated agreement
which is most advantageous and in the best interest of Okaloosa county, and to
reject any and all proposals or to waive any irregularity or technicality in
proposals received. Okaloosa County shall be the sole judge of the propesal and
the resulting negotiated agreement that is in its best interest and its decision shall
be final.
ion The Board of County Commissioners reserves the right to waive any informalities or
reject any and all proposals, in whole or part, to utilize any applicable state
contracts in lieu of or in addition to this proposal and to accept the proposal that
in its judgment will best serve the interest of the County.
D. The Board of County Commissioners specifically reserves the right to reject any
conditional proposal and will normally reject those that made it impossible to
determine the true amount of the proposal.
Disqualification of Proposers - Any of the following reasons may be considered as
sufficient for the disqualification of a proposer and the rejection of his proposal or
proposals:
Page 6
10.
11.
A. More than one proposal for the same work from an individual, firm or corporation
under the same or different name.
B. Evidence that the proposer has a financial interest in the firm of another proposer
for the same work.
Cc, Evidence of collusion among proposers, Participants in such collusion will receive
no recognition as proposers for any future work of the County until such
participant shall have been reinstated as a qualified proposer.
D. Uncompleted work that in the judgment of the County might hinder or prevent the
prompt completion of additional work if awarded.
E. Failure to pay or satisfactorily settle all bills due for labor and material on former
contracts in force at the time of advertisement of proposals.
F Default under previous contract.
G. The Board, in its aosolute discretion, may reject any proposal of a proposer that
has failed, in the opinion of the Board, to compiete or perform an Okaloosa
County contracted project in a timely fashion or has failed in any other way, in
the opinion of the Board, to perform a prior contract in a satisfactory manner,
and has directed the Okaloosa County Purchasing Director to emphasize this
condition to potential proposers.
Conditional and Incomplete Proposals - The Board of County Commissioners specifically
reserves the right to reject any conditional proposal and will normally reject those that make
it impossible to determine the true amount of the proposal.
Investigation of Proposer - The owner may make such investigations as he deems necessary
to determine the stability of the Proposer to perform the work and that there is no conflict of
interest as it relates to the project. The proposer shall furnish to the owner any additional
information and financial data for the purpose as the owner may request. The data shall
include a detailed and up-to-date list of plant equipment and materials which proposer
proposes to use, indicating which portions he already possesses and a detailed description
of the method and program or work to be done.
Preparation of Proposals - Proposals must be submitted upon the prescribed forms provided
herein. All blank spaces must be filled in as noted in ink or typed in both words and numbers
with the amounts extended and totaled. No changes shall be made in phraseology of the
form or in the items mentioned therein. In case of any discrepancy between the written
amount and the figures, the written amounts shall govern. Any proposal may be rejected
which contains any omissions, erasures, alterations, additions, iregularities of any kind, or
items not called for or which shall in any manner fail to conform to the conditions of
published notice inviting proposals.
Indemnification & Hold Harmless - To the fullest extent permitted by law, Contractor shall
indemnify and hold harmless COUNTY, its officers and employees from liabilities,
damages, losses, and costs including but not limited to reasonable attorney fees, to the
extent caused by the negligence, recklessness, or intentional wrongful conduct of the
Contractor and other persons employed or utilized by the Contractor in the performance
of this contract.
Page 7
12.
13.
14,
15.
Note: For proposer's convenience, this certification form is enclosed and is made a part of
the proposal package.
Conflict of Interest - The award hereunder is subject to the provisions of Chapter 112, Horida
Statutes. All respondenis must disclose with their proposal the name of any officer, director,
or agent who is also a public officer or an employee of the Okaloosa Board of County
Commissioners, or any of its’ agencies.
Furthermore, all respondents must cisclose the name of any County officer or employee
who owns, directly or indirectly, an interest of five percent (5%) or more in the firm or any of
its branches,
Furthermore, the official, prior to or at the time of submission of the proposal, must file a
statement with the Clerk of Circuit Court of Okaloosa County if he is an officer or employee
of the County, disclosing his or spouses or child's interest and the nature of the intended
business.
Note: For proposer's convenience, this certification form is enclosed and is made a part of
the proposal package.
Identical Tie Proposal - Preference shall be given to businesses with drug-free workplace
programs. Whenever two or more proposals that are equal with respect to price, quality
and service are received by the County for the procurement of commodities or contractual
services, a proposal received from a business that certifies that it has implemented a drug-
free workplace program shall be given preference in the award process (see attached
certification form).
Established procedures for processing tie proposals will be followed if none of the tied
vendors have a drug-free workplace program.
Note: For proposer's convenience, this certification form is enclosed and is made a part of
the proposal package.
Public Entity Crime Information - A person or affiliate who has been placed on the
convicted vendor list following a conviction for a public entity crime may not submit a
proposal on a contract to provide any goods or services to a public entity, may not submit
a proposal on a contract with a public entity for the construction or repair of a public
building or public work, may not submit proposals on leases of real property to a public
entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or
consultant under a contract with any public entity, and may not transact business with any
public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY
TWO for a period of 36 months from the date of being placed on the convicted vendor list.
Discrimination - An entity or affiliate who has been placed on the discriminatory vendor
list may not submit a proposal on a contract to provide goods or services to a public
entity, may not submit a proposal on a contract with a public entity for the construction
or repair of a public building or public work, may not submit proposals on leases of real
property to a public entity, may not award or perform work as a contractor, supplier,
subcontractor, or consultant under contract with any public entity, and may not transact
business with any public entity.
Page 8
16.
17,
18,
19.
Proposal Opening Information - Proposal Opening shall be public, on the date and time
specified on the proposal form. It is the proposer's responsibility to assure that his proposal is
delivered at the proper time and place. Offers by telegram, facsimile, or telephone are
NOT acceptable. NOTE: Crestview, Florida is "not a next day quaranteed delivery location"
by delivery services.
No Contact Clause - The Okaloosa County Board of County Commissioners have
established a solicitation silence policy (No Contact Clause} that prohibits oral and written
communication regarding all formal solicitations for goods and services (Formal Bids,
Requests for Proposals, Requests for Qualifications) issued by the Board through the County
Purchasing Department. The Period commences when the procurement document is
received and terminates when the Board of County Commissioners approves the award.
Note: For proposer’s convenience, the certificate form is enclosed and is made part of the
bid package.
Payments — The contractor shall be paid upon submission of invoices, in duplicate, to the
Okaloosa County Facility Maintenance Department, 5489 Old Bethel Rd, Crestview FL
32536; Attn: Don Turner. The invoices must confirm to the prices stipulated herein for articles
delivered and accepted.
Protection of Resident Workers — The Okaloosa County Board of County Commissioners
actively supports the Immigration and Nationality Act {INA} which includes provisions
addressing employment eligibility, employment verifications, and nondiscrimination. Under
the INA, employers may hire only persons who may legally work in the United States ({i.e.,
citizens and nationals of the U.S.) and aliens authorized to work in the U.S. The employer
must verify the identity and employment eligibility of anyone to be hired, which includes
completing the Employment Eligibility Verifications. Tne contractor shall establish
appropriate procedures and conirols so no services or products under the Contract
Documents will be performed or manufactured by any worker who is not legally eligible to
perform such services or employment. Okaloosa County reserves the right to request
decumentation showing compliance with the requirements.
Contractors doing construction business with Okaloosa County are required to use the
Federal Government Department of Homeland Security's website and use the E-Verify
Employment Eligibility Verifications System to confirm eligibility of all employees to work in
the United States.
Page 7
INSURANCE REQUIREMENTS
Contractor's Insurance
A.
The CONTRACTOR shall not commence any work in connection with this
Agreement until he has obtained all required insurance and such insurance has
been approved by the Okaloosa County Risk Management Director.
All insurance policies shall be with insurers licensed to do business in the State of
Florida, and any insuring company is required fo have a minimum rating of A,
Class X in the Best Key Rating Guide published A. M. Best & Co., Inc.
All insurance shail include the interest of all entities names in and its respective
agents, consultants, servants and employees of each and all other interests as
may be reasonably required by Okaloosa County as Additional Insured. The
coverage afforded the Additional Insured under this policy shall be primary
insurance. If the Additional Insured have other insurance that is applicable to the
loss, such other insurance shall be on an excess or contingent basis. The amount
of the company’s liability under this policy shall not be reduced by the existence
of such other insurance.
The County of Okaloosa shall be listed as Additional Insured by policy
endorsement on all insurance contracts applicable to this Agreement except
Workers’ Compensation and Professional Liability.
The County of Okaloosa shall be furnished proof of coverage by certificates of
insurance (COl) and endorsements for every applicable insurance contract
required by this Agreement. The COl’s and policy endorsements must be
delivered to the County Representative not less than ten (10} days prior to the
commencement of any and all contractual agreements between the County of
Okaloosa and the CONTRACTOR.
The County shall retain the right to reject all insurance contracts that do not meet
the requirement of this Agreement. Further, the County reserves the right to
change these insurance requirements with 60-day notice to the CONTRACTOR.
The insurance definition of Insured or Additional Insured shall include
Subcontractor, Sub-subcontractor, and any associated or subsidiary companies
of the CONTRACTOR, which are involved, and which is a part of the contract.
The County reserves the right at any time to require the CONTRACTOR to provide
certified copies of any insurance policies to document the insurance coverage
specified in this Agreement.
The designation of CONTRACTOR shall include any associated or subsidiary
company which is involved and is a part of the contract and such, if any
associated or subsidiary company involved in the project must be named in the
Workers’ Compensation coverage.
All policies shall be written so that the County will be notified of cancellation or
restrictive amendments at least thirty (30) days prior to the effective date of such
Page 10
cancellation or amendment. Such notice shall be given directly to the County
Representative.
Workers’ Compensation Insurance
1.
The CONTRACTOR shall secure and maintain during the fife of this agreement
Workers’ Compensation insurance for all of his employees employed for the
project or any site connected with the work, including supervision, administration
or management, of this project and in case any work is sublet, with the approval
of the County of Okaloosa, the CONTRACTOR shall require the Subcontractor
similarly to provide Workers’ Compensation insurance for all employees employed
at the site of the project, and such evidence of insurance shall be furnished the
County of Okaloosa not less than ten (10) days prior to the commencement of
any and all sub-contractual agreements which have been approved by the
County of Okaloosa. ;
Such insurance shall comply with the Florida Workers’ Compensation Law.
Coverage shall include a waiver or subrogation clause in favor of Okaloosa
County. Also, this endorsement must be indicated on all Certificates of
Insurance.
Business Automobile and Commercial General Liability Insurance
A.
The CONTRACTOR shall maintain Business Automobile Liability insurance coverage
throughout the life of this Agreement. The insurance shall include Owned, Non-
Owned & Hired motor vehicle coverage.
The CONTRACTOR shall carry other Commercial General Liability insurance
against all other Bodily Injury, Property Damage and Personal and Advertising
Injury exposures.
In addition to the required coverage in B. above, Commercial General Liability
coverage shail include the following:
1) On and Off Premises Operation Liability
2.) Personal Injury Liability insurance
3.) Independent Contractor Liability
4.) Completed Operations and Products Liability
The CONTRACTOR shall agree to maintain in force Commercial General Liability
Insurance including Completed Operations and Products Liability coverage for at
least two {2) years following acceptance of the project by the COUNTY.
All liability insurance (other than Professional Liability) shall be written on an
occurrence basis and shall not be written on a claim-made basis. If the insurance
is issued with an aggregate limit of liability, the aggregate limit of liability shall
apply only to the locations included in this Agreement. If, as the result of any
claims or other reasons, the available limits of insurance reduce to less than those
stated in the LIMITS OF LIABILITY, the CONTRACTOR shall notify the County
representative in writing. The CONTRACTOR shall purchase additional liability
insurance to maintain the requirements established in this Agreement. Umbrella
Page 11
or Excess Liability insurance can be purchased to meet the Limits of Liability
specified in this Agreement.
Limits of Liability
The insurance required shall be written for not less than the following limits unless law
requires higher amounts:
COVERAGE LIMIT
A. Workers Compensation
1.) State Statutory
2.) Employers Liability $1 million each accident
B. Business Automobile $1 million each occurrence
(Combined Single Limit)
(on Commercial General Insurance $1 million each occurrence
(Combined Single Limit)
D. Professional Liability $1 million each occurrence
(Combined Single Limit)
E. Personal and Advertising Injury $250,000
Owner & Contractor's Protective Liability
In addition to the liability requirements above, the CONTRACTOR shall, at his expense,
provide an Owner and CONTRACTOR's Protective Liability insurance policy issued in the
name of the OWNER and ENGINEER. Coverage shall be provided under this policy for
not less than the following amounts:
A. Bodily Injury $1 million each occurrence
B. Property Damage $1 million each occurrence
Property Insurance
CONTRACTOR shall purchase and maintain property insurance upon the Work at the site
in the amount of the full replacement cost. Any deductible amount is the responsibility of
the CONTRACTOR. © This insurance shall (1) include as an insured the OWNER,
CONTRACTOR, ENGINEER and any others who have an insurable interest, (2) be written
on a Builder's Risk special cause of loss policy form; (3) include expenses incurred in the
repair or replacement of any insured property (including but not limited to fees and
charges of engineers and architects); (4) cover materials and equipment stored on the
site or at another location that was agreed on in writing by the OWNER prior to being
incorporated in the Work; (5) allow for partial utilization of the work by the OWNER; (6)
include testing and startup; and, (7) be maintained in effect until final payment is made
unless otherwise agreed to in writing by the OWNER, CONTRACTOR and ENGINEER with
30-day written notice to each other entity to whom a certificate of insurance has been
issued.
Page 12
Notice of Claims or Litigation
The CONTRACTOR agrees to report any incident or claim that results from performance of
this Agreement. The County representative shall receive written notice in the form of a
detailed written report describing the incident or claim within ten (10) days of the
CONTRACTOR's knowledge. In the event such incident or claim involves injury and/or
property damage to a third party, verbal notification shall be given the same day the
CONTRACTOR becomes aware of the incident or claim followed by a written detailed
report within ten (10) days of verbal notification.
Indemnification and Hold Harmless
To the fullest extent permitted by law, CONTRACTOR shall indemnify and hold harmless
COUNTY, its officers and employees from liabilities, damages, losses, and costs including
but not limited to reasonable attorney fees, to the extent caused by the negligence,
recklessness, or intentional wrongful conduct of the CONTRACTOR and other persons
employed or utilized by the CONTRACTOR in the performance of this Agreement.
Certificate of Insurance
A. Certificates of insurance, in duplicate, indicating the job site and evidencing alll
required coverage must be submitted to and approved by Okaloosa County
prior to the commencement of any of the work. The certificate holder(s) shall be
as follows:
Okaloosa County
602-C North Pearl Street
Crestview, Florida 32536
B. All policies shall expressly require 30 days written notice to Okaloosa County at
the address set out above, or the cancellations of material alterations of such
policies, and the Certificates of Insurance, shall so provide.
ion All certificates shall be subject to Okaloosa County's approval of adequacy of
protection and the satisfactory character of the Insurer.
D. The Certificates of Insurance shall disclose any and all deductibles or self-insured
retentions (SIRs). County requests that all deductibles or SIRs be no greater than
$10,000, However, CONTRACTORS having insurance with higher deductibles may
submit a proposal without penalty reflecting the pricing for their deductible
provided that CONTRACTOR also submits a brief company financial statement.
E. In no way will the entities listed as Additional Insured be responsible for, pay for,
be damaged by, or limited to coverage required by this schedule due to the
existence of a deductible or SIR. Specific written approval from Okaloosa County
will only be provided upon demonstration that the CONTRACTOR has the financial
capability and funds necessary to cover the responsibilities incurred as a result of
the deductible or SIR.
F In the event of failure of the CONTRACTOR to furnish and maintain said insurance
and to furnish satisfactory evidence thereof, Okaloosa County shall have the right
(but not the obligation) to take out and maintain insurance on the project. All
Page 13
costs for the coverage will be paid by CONTRACTOR upon presentation of a bill.
General Terms
Any type of insurance or increase of limits of liability not described above which the
CONTRACTOR required for its own protection or on account of statute shall be its own
responsibility and at its own expense.
The carrying of the insurance described shall in no way be interpreted as relieving the
CONTRACTOR of any responsibility under this contract.
Should the CONTRACTOR engage a subcontractor or sub-subcontractor, the same
conditions will apply under this Agreement to each subcontractor and sub-
subcontractor,
The CONTRACTOR hereby waives all rights of subrogation against Okaloosa County and
its consultants and other indemnities of the CONTRACTOR under all the foregoing policies
of insurance.
Umbrella Insurance
The CONTRACTOR shall have the right to meet the liability insurance requirements with
the purchase of an umbrella insurance policy. In all instances, the combination of
primary and umbrella liability coverage must equal or exceed the minimum liability
insurance limits stated in this Agreement.
Page 14