June 2, 2015

Okaloosa County BOCC — June 2, 2015 — Foy Shaw Presentation

Foy Shaw Presentation in the June 2, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the June 2, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1262). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used ; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Foy Shaw Presentation
Date
June 2, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
5
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Foy Shaw Presentation — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 1.1 KB · 5

Download ↓

Foy Shaw Presentation — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 1.1 MB · 5

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Foy Shaw Presentation — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

FOY SHAW PARKWAY AT BOB SIKES AIRPORT (CEW) Public Hearing June 2, 2015 CORRIDOR ALTERNATIVES  5 Alternatives Studied  Evaluation Criteria o Corridor Characteristics o Physical Impacts o Environmental Impacts o Construction Costs  Public Meeting Held February 12, 2015 o Public more favorable to western alignment PREFERRED ALTERNATIVE  Alternative No. 1 o Shortest Route o Least amount of Physical Impacts o Least amount of Environmental Impacts o Lowest Construction Cost o Compatible with Airport Master Plan and Runway Protection Zone  The Board’s approval will allow for Public Works Director to sign off on the Project Environment Impact Report (PEIR) and complete the study phase. PROJECT TIMELINE  Environmental Assessment o Begin Study – October 2014 o Public Meeting – February 2015 o Public Hearing – June 2015 o End Study – June 2015 (Accelerated by 9 months)  Design – Begins July 2015 (12 Month Design) o Will accelerate Design Schedule as much as possible.

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — June 2, 2015 — Foy Shaw Presentation.” June 2, 2015. Foy Shaw Presentation. Crypt of Echoes evidence ID LED-2026-885e9aa720b94544866777e29f87f42c. http://127.0.0.1:58097/evidence/LED-2026-885e9aa720b94544866777e29f87f42c. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Foy Shaw Presentation, meeting materials for June 2, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=8448&MeetingID=1262

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓