Okaloosa County BOCC — December 1, 2015 — Tanglewood/Overbrook Stormwater Improvements - Change Order 5 — agenda request

Tanglewood/Overbrook Stormwater Improvements - Change Order 5 — agenda request in the December 1, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the December 1, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1302). The date shown is the verified meeting context, not an independently established creation date for every attachment. Meeting date checked against the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
December 1, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Tanglewood/Overbrook Stormwater Improvements - Change Order 5 — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 2.3 KB · 2

Download ↓

Tanglewood/Overbrook Stormwater Improvements - Change Order 5 — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 89.1 KB · 2

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Tanglewood/Overbrook Stormwater Improvements - Change Order 5 — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: December 1, 2015 TO: Honorable Chairman and Members of the Board FROM: Jason Autrey SUBJECT: Tanglewood/Overbrook Stormwater Improvements - Change Order 5 Approval DEPARTMENT: Public Works BCC DISTRICT: 4 STATEMENT OF ISSUE: Public Works requests Board approval of a change order for the Overbrook/Tanglewood Stormwater Improvements Project. The change order allows the Contractor to modify the spillway design by adding additional concrete aprons to the backside of the spillway to prevent erosion and washouts. This change order requires Board approval due to the overall additional time that has been added to the contract. BACKGROUND: As a result of a settlement related to the Deep Water Horizon Oil Spill, FDEP allocated funds to Okaloosa County to assist with stormwater improvements in the Gap Creek Watershed Area. The two projects identified were the Tanglewood Stormwater Basin and the Overbrook retention area in Fort Walton Beach. Substantial completion for all related work under this contract was completed on October 20, 2015. During a final inspection with County staff, the Contractor and FDEP, it was discovered that the downstream side of the new spillway at Tanglewood Pond had sustained erosion from a recent heavy rain event. It was agreed by all present to utilize the remaining grant funds via change order and allow the Contractor to form and pour additional concrete slope protection along the main flume. The additional cost for this work is $4,198.00 which is within the current funding allocations of the grant agreement. The additional time needed to complete the work from the prior substantial completion date is 51 days resulting in a final contract date of Dec. 10, 2015. At the completion of this work, an additional final inspection will be made and project closeout will commence. Final payment is anticipated to be made prior to the end of the year. OPTIONS: Approve/Disapprove the Change Order for additional improvements at Tanglewood Pond in the amount of $4,198.00. RECOMMENDATIONS: Approve the Change Order for additional improvements at Tanglewood Pond in the amount of $4,198.00. RECOMMENDED BY: APPROVED BY: John Hofstad, County Administrator

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — December 1, 2015 — Tanglewood/Overbrook Stormwater Improvements - Change Order 5 — agenda request.” December 1, 2015. Action Item Printout. Crypt of Echoes evidence ID LED-2026-84724192c3bc4e0296357bab8262ccff. http://127.0.0.1:58097/evidence/LED-2026-84724192c3bc4e0296357bab8262ccff. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Tanglewood/Overbrook Stormwater Improvements - Change Order 5 — agenda request, meeting materials for December 1, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=17184&MeetingID=1302