TASK ORDER APPROVAL FORM
CONTRACT #: C13-2067-WS
TASK ORDER #: 14
TASK ORDER AMOUNT: $_70,000
OFFERED BY CONSULTANT:
Polyengineering, Inc.
FIRM’S NAME
Roy Petrey, P.E.
REPRESENTATIVE’S PRINTED NAME
SIGNATURE
VP — Florida Operations P (72//;
TITLE DATE
RECOMMENDED FOR APPROVAL APPROVED BY OKALOOSA COUNTY
(Department Director) (Per Purchasing Manual)
e $25,000 or less approved by Purchasing Director
e Between $25,001 and $50,000 approved by Purchasing
Director and County Administrator
e Inexcess of $50,000 approved by the Board.
T Ul 2 5
SIGNATURE | Py ING DIRECTOR g, feelpyr= i
OCWS Director 7/24 / (s
TITLE DATE / !
7/22) 285
DATE
COUNTY ADMWTOR (if applicable) CHAIRMAN (if applicable)
Zoz)s—
DATE DATE
TASK ORDER 14— OKALOOSA COUNTY WATER AND SEWER SYSTEM
EAST COUNTY TRANSMISSION MAIN AND COLLEGE BOULEVARD EXTENSION
C13-2067-WS
TASK ORDER 14
THis TASK ORDER IS ISSUED PURSUANT TO THE AGREEMENT FOR CONSULTING SERVICES DATED OCTOBER 1, 2013, BETWEEN THE COUNTY
OF OKALOOSA COUNTY, FLORIDA AND POLYENGINEERING, INC., WHICH IS INCORPORATED HEREIN BY THIS REFERENCE, WITH RESPECT TO
Scope of Basic Services for
East County Transmission Main and College Boulevard Extension
Article A. Purpose:
The purpose of this Task Order is to authorize and direct CONSULTANT {Polyengineering, Inc.) to proceed with
professional engineering services for assisting the Okaloosa County Water and Sewer Department (CLIENT) to provide
general water and wastewater professional services assistance. The activities that are included are described in
“Article B. Scope of Services.”
Article B. Scope of Services:
The CONSULTANT agrees to furnish general professional engineering and technical services for the Work applicabie to
Design and Construction Phase Services for the construction of proposed East County Transmission Main (Segment A)
and College Boulevard Extension (Segment B) (PROJECT). The services that the CONSULTANT agrees to furnish as part
of this AGREEMENT include, but are not limited to engineering and technical services to perform the following:
1. Design Phase services for a new wastewater force main.
2. Provide agency coordination including applying for required permit applications including FDOT, FDEP, USACOE
and County Public Works as well as providing services to assist the CLIENT with purchase order issuance for
the Horizontal Direction Drilling services required for the project.
3. Provide Construction Phase services to include services during construction and limited resident observation
services adequate to certify completion to FDEP as required.
Specific Work Tasks that may be authorized by the CLIENT’s representative are presented below.
Work Task 1 — Design Phase Services
1.1 Design Phase Services
1.1.1 CONSULTANT shall continue detailed sewer force main design/HDD Bore design (from the
current approximate 75% design through final design) from the Eglin Main Pump Station to
the Twin Oaks Facility in Niceville near Hwy 85 (Segment A).
1.1.2 CONSULTANT shall incorporate pipeline alignment modifications into plans (Segment A).
1.1.3 CONSULTANT shall prepare (60%-90%-100%) detailed sewer force main design/HDD Bore
design including tie-ins to existing mains and supplemental restraint of existing line if
required along College Blvd. in Niceville, FL between the NWFSC main entrance and the Twin
Oaks Facility near Hwy 85 (Segment B).
1.1.4 CONSULTANT shall attend onsite meeting with HDD Contractor for quote preparation
(Utilizing CLIENT’s existing “Annual Contract for Subsurface Utility Bores”)(Segments A & B).
1.1.5 CONSULTANT shall develop and utilize computerized hydraulic model to analyze pipeline for
ARV sizing and placement along with pipeline size/material optimization (Segments A & B).
1.1.6 CONSULTANT shall attend meetings as requested by representatives of the CLIENT and
provide engineering assistance, consultation, and opinions (Segments A & B).
1.1.7 CONSULTANT shall perform QA/QC review of final design (Segments A & B).
TASK ORDER 14— OKALOOSA COUNTY WATER AND SEWER SYSTEM
EAST COUNTY TRANSMISSION MAIN AND COLLEGE BOULEVARD EXTENSION
Work Task 2 — Permitting and Interagency Coordination
2.1
Permitting and interagency Coordination
2.1.1
2.1.2
2.1.3
CONSULTANT shail prepare necessary permit applications for approval by the Florida
Department of Environmental Protection (FDEP), Florida Department of Transportation
(FDOT), United States Army Corps of Engineers (USACOE) and County Department of Public
Works. Permit fees shall be paid for by CLIENT (Segments A & B).
CONSULTANT shall coordinate with said agencies and respond to requests for additional
information, in order to obtain all necessary permits (Segments A & B).
CONSULTANT shall meet with City of Niceville Staff to facilitate Turkey Creek Walk easement
acquisition (Segment A) and Twin Oaks Facility easement “Letter of No Objection” to the Air
Force (Segment B). '
Work Task 3 — Construction Phase Services
3.1
Construction Phase Services
3.1.1
3.1.2
3.1.3
3.14
CONSULTANT shall attend construction kickoff meeting and attend other meetings with
representatives of the CLIENT, the HDD Contractor, and other appropriate parties when
requested for consultation or conference about the construction activities of the projects
(Segments A & B).
CONSULTANT shall consult and advise CLIENT during construction and provide or coordinate
technical interpretations of the drawings (Segments A & B).
CONSULTANT shall make periodic visits to the site to observe the progress of the work and
to determine, in general, if the work is proceeding in accordance with the intent of the
design drawings (Segments A & B).
CONSULTANT shall make a final review of CLIENT supplied as-built RECORD DRAWINGS to
determine, in general, if the work has been completed in conformance with the design
(Segments A & B).
Work by Others — The following services will be provided by OTHERS:
Preparation of all route and site surveys including survey showing approximate mean high water level of
all water crossings.
Utility coordination to ensure all known utilities are shown on survey
Geotechnical studies and investigations (if required)
Preparation/Modification of Eglin Easements if required
Preparation of AF Form 813 (Request for Environmental Impact Analysis)
Preparation of AF Form 103 (Base Civil Engineering Work Clearance Request)
Preparation of As-built drawings
The preceding scope of services is based on the CLIENT utilizing their existing “Annual Contract for Subsurface Utility
Bores” and in-house crews for surveying and construction of the pipeline. Therefore, this scope of services does not
include the preparation of any contract documents for bidding purposes or other bid phase services. Should the
current HDD Contractor be unable to accomplish the work and bidding is required, additional time/costs will be
required for development of bidding documents and performing bid-phase services.
TAsk ORDER 14— OKALOOSA COUNTY WATER AND SEWER SYSTEM
EAST COUNTY TRANSMISSION MAIN AND COLLEGE BOULEVARD EXTENSION
Article C. Compensation Provisions:
As compensation for providing the services described within this Task Order, CLIENT shall pay CONSULTANT in
accordance with Section 5 of the October 1, 2013 Agreement based on either a percent complete for identified Lump
Sum (LS) task or rate based for Time and Material (T&M) task. T&M task will be billed based on the hourly rate
schedule per employee grade, as defined in the October 1, 2013, Agreement. The maximum fee of $70,000.00 (see
table below for estimated breakdown of fee by individual work task) is predicated on the scope detailed in Article B. In
the event of changes in scope, character, or complexity or if other services are required to be performed or furnished
by the Engineer that are not otherwise provided in this Agreement, the total compensation may be re-evaluated and
adjusted via amendment to this Task Order by an amount reached by mutual agreement between the CONSULTANT
and the CLIENT. There shall be no obligation on the part of the Engineer to perform without compensation any duties
not described within this Task Order.
L. Work Task Cost Compensation
Work Task Description Amounts Method
1. Design Phase Services $40,000 Lump Sum
2. Permitting and Interagency Coordination $20,000 Lump Sum
3. Construction Phase Services $10,000 Time & Material
Total Overall Budget $70,000
Article D. Period of Service:
The schedule for the Project within this Task Order is as follows:
Authorization to Proceed: Upon Execution of Task Order
Termination of Task Order: September 30, 2016
Article E. Authorized Representatives:
The Authorized Representatives designated below are authorized to act with respect to this Task Order.
Communications between the parties shall be through the Authorized Representatives:
For CLIENT For CONSULTANT
Name: Jeff Littrell Name: Roy Petrey, P.E.
Director Vice President — Florida Operations
M N ) 208 '/7 / 7-2245]
srgnature daté signature ( date
Address: Suite 300, Lewis Turner Boulevard, Address: P.O.Box 841
Fort Walton Beach, FL 32547 Shalimar, FL 32579
Telephone: (850) 651-7172 Telephone: (850) 609-1100
* %k %k %k k End *kk k% ok