the APWRF as well as the horsepower requirements needed for
pumping. The benefit for Eglin is that it reduces the size of the easement needed for the force
main and also eliminates a potential conflict with future planned runway construction.
In April of 2012, OCWS entered into an interlocal agreement with the City of Niceville and City
of Valparaiso to transfer its ownership and treatment capacity at the NVOC Regional
Wastewater Treatment Facility. As part of this agreement, OCWS transferred its cost sharing
responsibility of the NVOC facility, upon relocation of all of its flows from the East
County/Bluewater Bay Service Area to the APWRF. As part of this relocation, OCWS would
need to construct a new sanitary sewer force main and repumping station to convey its flows to
the APWRF. The proposed East County Repump Station is shown as Phase 9 on the attached
East County Master Sewer Plan (labeled as "Proposed College Blvd Lift Station"). The sanitary
sewer force main is shown as Phase 10. Note that Eglin has agreed to the alternate route for
Packet Pg. 611
Phase 10, constructing the force main into the Main Base Lift Station (Phase 5). OCWS has
budgeted $4.5M in FY2012-2014 for the above-mentioned force main (Phase 10), repump
station (Phase 9), and upsize to the Eglin Main Base Sewer Pump Station (Phase 5). This $4.5M
is funded from the $15M 2012 bank loan.
Similar to the approach chosen for the design of the 7SFG force main and sewer pump station,
OCWS is proposing for Constantine Engineering to design the repump station and
Polyengineering to design the force main. For a project this large and complex, we feel it is best
for these two engineering firms to work together and review each other's work. Constantine's
Task Order 70 is for the design and other professional services for the construction of a new 4.2
MGD East County Repump Station. The attached Engineering Scope of Services from
Constantine Engineering includes the necessary work tasks to complete the scope of work for the
design, permitting, and construction management associated with the new East County Repump
Station. This Task Order 70 has been negotiated with Constantine Engineering for the necessary
Scope of Services and is a not to exceed amount of $151,500.00.
OPTIONS: Approve or deny.
RECOMMENDATIONS: OCWS requests BCC approval to authorize the Chairman to execute
Constantine Engineering Task Order 70, for a not to exceed amount of $151,500.00.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 612
Phase 1: Rocky Bayou 16" Force Main (FM) Phase 7: Replace Meigs-Seminole Lift Station
Phase 2: Rocky Bayou 16" FM Phase 8: Hwy 20 12" FM
Phase 3: Rocky Bayou 16" FM Phase 9: New College Blvd Lift Station
LLY
Phase 4: Rocky Bayou 16" FM Phase 10: NVOC 16" FM KE
Phase 5: Eglin Main 20" FM & 2 Lift Stations Phase 10a: NVOC 16" FM Alternate
Phase 6: Replace 10" FM at Canal with 16" FM
WOLVERINE
JACKSO N
E
Y
EG
LA R
LL
JC
CO
ER
ROG
S
STIC
VAL A
ANDREW
5
Y8
HW
ND
BO
Arbennie Pritcehtt WRF R TW
O BE
NR
GE Proposed Eglin Main Lift Station
LEWIS TURNER
East County Master Sewer Plan - Page 1
.
MAP PROJECTION:
Lambert Conformal Conic Projection
Stateplane : Flo ida Nor th (0903)
NAD 1983(90), NAVD 1988.
Existing Phase 3 Phase 6 Phase 9 StreetCenterlines PUBLIC RECORD:
This map was created by Okaloosa County GIS
and is in the public domain pur uant
Phase 1 Phase 4 Phase 7 Phase 10
to Chapter 119 , Florida Statutes.
DISCLAIMER:
Phase 2 Phase 5 Phase 10a 1 inch = 2,500 feet
Okaloosa County h reby expressly disclaims
Phase 8 any liability for errors or omissions in
these maps, indexes or legends.