BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: STORMWATER
PROGRAM DESCRIPTION: The Stormwater Division of Public Works provides oversight of the Okaloosa
County stormwater system and applicable regulatory requirements. This includes stormwater system
construction, solutions to infrastructure failures, maintenance tasks, and storm recovery and restoration.
Regualtory requirements include;
• Development and implementation of Stormwater Best Management Practices (BMPs),
• Collection and management of National Pollutant Discharge Elimiation System (NPDES) data
• Evaluation and reporting of NPDES compliance activities
• Administrative maintenance of the NPDES Permit and Notice of Intent
• Development of future funding needs.
Additionally, stormwater staff provides support services for the Public Works work order system (Cartegraph).
REVENUE: Stormwater Division is funded within the County Transportation Trust Fund. Supporting
revenue of the County Transportation Trust Fund (CTTF) is fuel taxes, intergovernmental revenue, charges for
services, miscellaneous revenue and transfers. Supporting revenue of the CTTF are gas taxes and local option
gas tax (LOGT), constitutional gas taxes (CGT) and federal and state shared revenue, state and federal grants,
and an annual allocation of revenue from the general fund. Total funding for FY14 was $400,000 from all
funding sources. Unexpended funding pledged in previous years has remained in the Stormwater budget as
available cash which has provided funding to support operations and maintenance costs which now totals
$800,000 per year. These funds are depleted to critical levels by ever increasing stormwater needs and
operational costs.
EXPENDITURES:
Expenditures Budget
FY12 FY13 FY14 FY15
Category Actual $ Actual $ Original $ Approved $
Personal Services 433,495 445,230 502,106 495,296
Operating Expenses 239,146 250,684 366,146 360,662
Capital Outlay 28,845 28,258 460,645 931,681
Reserves 0 0 0 0
Total 701,486 724,172 1,328,897 1,787,639
HISTORICAL STAFFING SUMMARY:
Category FY12 FY13 FY14 FY15
Full-time 4 4 4 4
Part-Time 0 0 0 0
Relief 0 0 0 0
Total 4 4 4 4
MAJOR ACCOMPLISHMENTS LAST YEAR:
Preparation, submittal and approval of the NPDES permit renewal including the NPDES Annual Report and
Notice of Intent.
885 Stormwater Brochures for the General Public distributed Okaloosa County Fair, FWB Eco-Nomic
Living Expo, Okaloosa County School Libraries, 7th Annual Earth/Arbor Day at Fort Walton Beach
Landing
412 website vies of Stormwater Brochures
Stormwater issues discussed at four Board of County Commissioner (BCC) meetings. Publically advertised
per Florida Statutes
Identified 106 – Outfalls that flow into receiving waters and 213 – Total Outfalls currently GIS Arc mapped
44 corrected actions issued with corrections following. All corrections were made by on site contract or
electronic letter (e-mail) with a follow-up inspection to ensure all corrections were completed. Actions were
taken regarding, but not limited to, silt fencing on construction sites not being properly installed, drainage
systems around construction sites not properly protected.
8 recorded illicit discharge inspections. 1 recorded illicit discharges identified. 0 recorded illicit discharges
identified eliminated.
106 Major Outfalls that discharge to surface waters recorded.
42 Dry Weather Inspections
Citizen Request for Services - 4 Complaints received. 4 Complaints Investigated
8 Staff performed In-House Training on Importance of Stormwater Maintenance, Sediment Control on
Construction Sites and Installing Erosion and Turbidity Controls
17,297 webpage views to the information for Public, Employees, and Business of hazards associated with
Illegal Discharges and Improper Disposal of Waste
21 Private and 49 County sites - Number of construction site operations under the erosion and sedimentation
control requirements and active construction sites operating under the material management ordinance
30 Construction Plans reviewed
83 Private and 31 County inspections performed with 55 enforcement action taken
52 Parks per week actively inspected for trash and drainage maintenance
40 - Number of county construction projects that implemented correct erosion control methods. all County
construction sites will be inspected by County Inspectors who are FDEP Sedimentation and Erosion Control
Certified
11,658 cubic yards of fill was removed from channels and basins
561 swale sediment load tickets documented
185 Stormwater ponds under Okaloosa County maintenance
27 Staff performed In-House Training on Importance of Stormwater Maintenance, Sediment Control on
Construction Sites, Installing Erosion and Turbidity Controls to reduce stormwater pollution
PROGRAM GOAL: The primary goal of the Stormwater Division are to construct, maintain, inspect and
catalogue existing and planned stormwater systems within Okaloosa County. This goal is to be accomplished
utilizing the Best Management Practices defined in the County Notice of Intent within the regulatory framework
set forth within the Okaloosa County NPDES permit.
KEY OBJECTIVES:
1. Implement a public education program to distribute educational materials to the community.
2. Conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and the
steps that the public can take to reduce pollutants in stormwater runoff.
3. Comply with State and local public notice requirements when implementing a public involvement/public
participation program.
4. Develop and maintain a storm sewer system map, showing the location of all known outfalls and the names
and location of all surface waters of the State that receive discharges from those outfalls.
5. To the extent allowable under State or local law, effectively prohibit through ordinance, or other regulatory
mechanism, of non-stormwater (i.e., "illicit") discharges into the storm sewer system and implement
appropriate enforcement procedures and actions.
6. Develop and implement a plan to detect and eliminate non-stormwater discharges, including illegal
dumping, to the MS4.
7. Develop and implement, to the extent allowable under State or local law, an ordinance or other regulatory
mechanism to require erosion and sediment controls, as well as sanctions to ensure compliance, to reduce
pollutants in any stormwater runoff to the Phase II MS4 from construction activities.
8. Develop and implement requirements for construction site operators to implement appropriate erosion and
sediment control best management practices.
9. Develop and implement requirements for construction site operators to control waste such as discarded
building materials, concrete truck washout, chemicals, litter, and sanitary waste at the construction site that
may cause adverse impacts to water quality.
10. Develop and implement procedures for site plan review that incorporate consideration of potential water
quality impacts.
11. Develop and implement procedures for receipt and consideration of information submitted by the public.
12. Develop and implement procedures for site inspection and enforcement of control measures.
13. Use an ordinance or other regulatory mechanism, to the extent allowable under State or local law, to address
from post-construction runoff from new development and redevelopment projects that are part of a larger
common plan of development or sale, that discharge into the Phase II MS4.
14. Develop and implement strategies that include a combination of structural and/or non-structural best
management practices (BMPs) appropriate for the community.
15. Require adequate long-term operation and maintenance of BMPs.
16. Develop and implement an operation and maintenance program that has the ultimate goal of preventing or
reducing pollutant runoff from MS4 operator activities, such as park and open space maintenance, fleet and
building maintenance, new construction and land disturbances, and stormwater system maintenance.
17. Using training materials that are available from regulatory agencies or other organizations, include
employee training to prevent and reduce stormwater pollution from MS4 operator activities.
PERFORMANCE MEASURES:
Actual
Actual Proposed
Performance Measures FY12/
FY13/14 FY14/15
13
Number of Full-Time Equivalents (FTEs) 4 4 4
Number of Full-Time Equivalents (FTEs) Shared 9 9 9
Salaries & Operating Expenditures $724k $960k $899k
Document and report the number of Stormwater Brochure for the
NA 885 1,000
General Public distributed.
Document and report the number of visits to Stormwater Website
NA 412 450
Section..
Document and report the number of suggestions posted to
NA 412 450
Stormwater Website Section..
Document and report the number of public notice meetings and
number of attendees NA 4 4
Document and report the number of Stormwater outfalls mapped NA 319 25
Document and report the any stormwater related enforcement actions
NA 44 35
taken.
1. Document and report the number of stormwater inspection. 1. 8 4. 8
2. Document and report the number of illicit discharges identified. NA 2. 1 5. 1
3. Document and report the number of illicit discharges eliminated 3. 0 0
Document and report the number of inspections conducted. NA 148 175
1. Document and report the number of complaints received. 1. 4
NA NA
2. Document and report the number of complaints investigated. 2. 4
Document and report the number of staff trained. NA 8